CN206346206U - Construction of soil-nailed wall structure - Google Patents

Construction of soil-nailed wall structure Download PDF

Info

Publication number
CN206346206U
CN206346206U CN201621436524.6U CN201621436524U CN206346206U CN 206346206 U CN206346206 U CN 206346206U CN 201621436524 U CN201621436524 U CN 201621436524U CN 206346206 U CN206346206 U CN 206346206U
Authority
CN
China
Prior art keywords
steel
soil
soil layer
steel pipe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621436524.6U
Other languages
Chinese (zh)
Inventor
戴彦杰
房志敏
李康康
李宬
王大伟
李晓兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mingda Marine Engineering Co Ltd
Original Assignee
Mingda Marine Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mingda Marine Engineering Co Ltd filed Critical Mingda Marine Engineering Co Ltd
Priority to CN201621436524.6U priority Critical patent/CN206346206U/en
Application granted granted Critical
Publication of CN206346206U publication Critical patent/CN206346206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of construction of soil-nailed wall structure, its drip irrigation device is the steel pipe for including base soil layer, the steel wire positioned at base soil layer outer surface and being inserted in base soil layer and fixed steel wire, slurry outlet is provided with the steel pipe, one end that the steel pipe gos deep into base soil layer is fixed with tapered steel tip, and the other end exposes outside base soil layer and is connected with steel wire.The utility model solves the problem of existing construction of soil-nailed wall can not be applied to the place of the boulder bed containing denser well.

Description

Construction of soil-nailed wall structure
Technical field
The utility model is related to a kind of construction structure, in particular, and it is related to a kind of construction of soil-nailed wall structure.
Background technology
The soil nail wall of the first soil nail wall engineering recorded in the world from 1972 till now is widely used, and soil nail wall is Through becoming an independent foundation stabilization subject branch.Soil nail wall is mainly used in wing support engineering, soft because its structure is light-duty Property it is big, have good shock resistance and ductility, good airproof performance, construction work amount is few, the advantages of low engineering cost, soil nail wall should now Use Tunnel Engineering, road engineering, the multiple fields such as house construction engineering, are a kind of superior soil body reinforcement technologies in situ.However, pin To some soil properties exception, the especially place of the boulder bed containing denser, soil nailing then can not normal construction.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of suitable for containing denser Boulder bed local construction of soil-nailed wall structure.
To achieve the above object, the utility model provides following technical scheme:A kind of construction of soil-nailed wall structure, including base Set on soil layer, the steel wire positioned at base soil layer outer surface and the steel pipe for being inserted in base soil layer and fixed steel wire, the steel pipe There is slurry outlet, one end that the steel pipe gos deep into base soil layer is fixed with tapered steel tip, and the other end exposes outside base soil layer and and steel Silk screen is connected.
By using above-mentioned technical proposal, in the base soil layer construction with cobble, the termination of steel pipe carries steel tip energy In the base soil layer for enough hammering into more than 5m.Therefore, soil nailing wall foundation pit support depth uses band more than 5.0m and the boulder bed of the above The steel pipe slip casting of steel tip, its length and resistance to plucking stress can meet requirement.
Preferably, the slurry outlet is in quincuncial arrangement on the circumference of steel pipe.
By using above-mentioned technical proposal so that pulp is more uniform, then steel pipe is fixed also more in base soil layer It is stable.
Preferably, anti-back leg is also fixedly connected with the outer wall of the steel pipe, the anti-back leg and the steel pipe shape Into towards the angle on the outside of steel pipe be acute angle.
It by using above-mentioned technical proposal, steel pipe is firmly fixed in base soil layer, reduce its abjection Probability.
Preferably, the anti-back leg is the Ribbed Bar for being welded in the steel pipe.
By using above-mentioned technical proposal, it is simple to manufacture, and structural strength is high.
Preferably, being provided with retainer ring on the node of the steel wire, the outer end of the steel pipe is provided with for catching on admittedly Determine the hangnail of ring.
By using above-mentioned technical proposal, steel wire can firmly be fixed on base soil layer by hangnail by catching on retainer ring Lateral surface on;In addition, after steel wire is arranged on the lateral surface of base soil layer, retainer ring plays positioning action so that When hammering into steel pipe, it is not necessary to remeasure positioning, make its convenient quickly of constructing.
In summary, the utility model has the advantages that compared to prior art:1. the utility model is applied to In base soil layer with cobble;2. bonding strength of the present utility model is high;3. the utility model is easy for installation, quick.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is the front view of the steel wire of embodiment;
Fig. 3 is the partial sectional view of embodiment.
In figure:1st, φ 50mm steel pipes;2nd, slurry outlet;3rd, tapered steel tip;4th, the first φ 12mm Ribbed Bars;5th, the 2nd φ 12mm Ribbed Bars;6th, steel wire;7th, retainer ring;8th, hangnail;9th, base soil layer.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment:As shown in figure 1, a kind of construction of soil-nailed wall structure, including base soil layer 9, it is arranged on the outer surface of base soil layer 9 Steel wire 6 and the steel pipe that is inserted in base soil layer 9.One end that steel pipe is inserted in base soil layer is fixedly connected with tapered steel point First 3, and pipe shaft welding anti-back leg, anti-back leg is Ribbed Bar, and the other end then exposes to be connected outside base soil layer 9 with steel wire 6, Steel wire 6 is laid on the outer surface of base soil layer 9.
As shown in Figure 2 and Figure 3, from φ 50mm steel pipes 1, the wall thickness 3.00mm of φ 50mm steel pipes 1, in φ 50mm steel pipes one end Tapered steel tip 3 is welded, and opens up diameter 5mm pulp by quincuncial arrangement, every 300mm on the circumference of φ 50mm steel pipes 1 Hole 2.Because traditional soil nailing can not be in the normal pore-forming of closely knit boulder bed, so using φ 50mm steel pipes 1, being welded on φ 50mm steel pipes 1 The firm tip 3 of taper connect is and the plum blossom on φ 50mm steel pipes 1 in order to preferably make φ 50mm steel pipes 1 insert in closely knit boulder bed The grout outlet 2 of shape arrangement is, because quincuncial arrangement serves drawknot effect, to increase globality, and can uniform pulp.According to going out The quantity in slurry hole 2 such as weld at the Ribbed Bar of quantity at pipe outer wall, and Ribbed Bar includes the first φ 12mm Ribbed Bars 4, the The 2nd φ 12mm Ribbed Bars 5 that one φ 12mm Ribbed Bars 4 are welded away from the one end of tapered steel tip 3(One can be also used herein Ribbed Bar is integrally formed), and four hangnails 8 are welded in the outer end of φ 50mm steel pipes 1.The outer wall of φ 50mm steel pipes 1 is close to pulp Welded in the first φ 12mm Ribbed Bars 4 and the first φ 12mm Ribbed Bars 4 that hole 2 is welded with it into the of 160 degree of angles Two φ 12mm Ribbed Bars 5 are in order to be able to making φ 50mm steel pipes 1 be anchored in boulder bed.In toward φ 50mm steel pipes 1 during slip casting, slurry Liquid can be flowed in the first φ 12mm Ribbed Bars 4 and the 2nd φ 12mm Ribbed Bars 5 from grout outlet 2, some slurry stream Enter into boulder bed, after after slurries condensation, form anchoring.By the first φ 12mm Ribbed Bars 4 and the 2nd φ 12mm band rib steels Muscle 5 realizes the effect instead of traditional soil nailing tension with the frictional force that slurries and closely knit boulder bed are produced.Lay steel in soil layer surface Silk screen 6, steel wire 6 is provided with retainer ring 7, and φ 50mm steel pipes 1 are squeezed into soil through retainer ring 7.In the prior art, soil nail wall is applied Work, it is necessary to spread grid, the soil nailing stayed in outside soil layer is fixed, then fill-before-fire concrete surface after soil nailing insertion soil layer Plate, and prior art typically first measures spacing and the position of soil nailing, then squeezes into soil nailing, re-lays bar-mat reinforcement.Due to surveying Spacing and the position for measuring soil nailing are both time-consuming by looking for position to set soil nailing again, and produce mistake when easily squeezing into soil nailing again Difference, so we are provided with steel wire 6, is provided with solid on steel wire 6 by the soil nailing position measured in advance by the position of soil nailing Determine ring 7.When needing to carry out construction of soil-nailed wall, position and the spacing of φ 50mm steel pipes 1 are first measured, then will be needed on steel wire 6 The position for squeezing into φ 50mm steel pipes 1 is welded and fixed ring 7, then steel wire 6 is layered on soil layer, and surrounding has with riveting fixes, φ 50mm steel pipes 1 squeeze into soil layer according to the position of retainer ring 7.In view of the stability of steel wire 6, φ 50mm steel pipes 1 are exposed at soil Four hangnails 8 are welded in one end outside layer, so effectively limit dropping for steel wire 6, and it is φ that hangnail 8, which is inserted in soil, 50mm steel pipes 1 provide tensile capacity.This structure is simple in construction, easy to operate, and cost is low, and stability is high, safe, construction speed Degree is fast.
During installation, first tapered steel tip 3 will be welded on φ 50mm steel pipes 1, then apart from the about 300mm of tapered steel tip 3 First diameter 3.00mm slurry outlet 2 is got at place, is punched according still further to spacing 300mm.Then by the first φ 12mm Ribbed Bars 4 It is close to the welding, then the 2nd φ 12mm Ribbed Bars 5 are welded in the first φ 12mm Ribbed Bars 4 nearby of each slurry outlet 2, Weld four hangnails 8 in the end of φ 50mm steel pipes 1.The spacing of φ 50mm steel pipes 1, and record position are measured, steel wire is layered on soil On layer, ring 7 is welded and fixed according to the position of the φ 50mm steel pipes 1 of record.In use, steel wire 6 is completed according to predeterminated position, Surrounding riveting tool is fixed, and the tapered steel tip 3 on φ 50mm steel pipes 1 is aligned into retainer ring 7, using jump bit by φ 50mm steel Pipe 1 hammers boulder bed, then slip casting, gunite concrete panel.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (5)

1. a kind of construction of soil-nailed wall structure, it is characterised in that:Including base soil layer (9), the steel wire positioned at base soil layer (9) outer surface (6) and it is inserted on the steel pipe of base soil layer (9) and fixed steel wire (6), the steel pipe and is provided with slurry outlet (2), the steel pipe The one end goed deep into base soil layer (9) is fixed with tapered steel tip (3), and the other end exposes base soil layer (9) outside and with steel wire (6) even Connect.
2. construction of soil-nailed wall structure according to claim 1, it is characterised in that:Circumference of the slurry outlet (2) in steel pipe Upper is in quincuncial arrangement.
3. construction of soil-nailed wall structure according to claim 1, it is characterised in that:Also it is fixedly connected on the outer wall of the steel pipe Have an anti-back leg, the anti-back leg and steel pipe formation towards the angle on the outside of steel pipe be acute angle.
4. construction of soil-nailed wall structure according to claim 3, it is characterised in that:The anti-back leg is to be welded in the steel The Ribbed Bar of pipe.
5. construction of soil-nailed wall structure according to claim 1, it is characterised in that:Set on the node of the steel wire (6) There is retainer ring (7), the outer end of the steel pipe is provided with the hangnail (8) for catching on retainer ring (7).
CN201621436524.6U 2016-12-23 2016-12-23 Construction of soil-nailed wall structure Expired - Fee Related CN206346206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621436524.6U CN206346206U (en) 2016-12-23 2016-12-23 Construction of soil-nailed wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621436524.6U CN206346206U (en) 2016-12-23 2016-12-23 Construction of soil-nailed wall structure

Publications (1)

Publication Number Publication Date
CN206346206U true CN206346206U (en) 2017-07-21

Family

ID=59317330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621436524.6U Expired - Fee Related CN206346206U (en) 2016-12-23 2016-12-23 Construction of soil-nailed wall structure

Country Status (1)

Country Link
CN (1) CN206346206U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714383A (en) * 2019-09-26 2020-01-21 温州大学 Novel reinforced structure for composite inclined reinforced slope and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714383A (en) * 2019-09-26 2020-01-21 温州大学 Novel reinforced structure for composite inclined reinforced slope and construction method thereof

Similar Documents

Publication Publication Date Title
CN100575615C (en) Multistage bag-type compression anchor bar
CN104234050B (en) One draws hole implanted band branch anti-floating rock bolt and construction method
CN203583498U (en) Micropile combination wall supporting structure
CN105464110A (en) Construction technology of basalt fiber reinforced material anchor rods
CN206346206U (en) Construction of soil-nailed wall structure
CN204098032U (en) One draws hole implanted band branch anti-floating rock bolt
CN209923952U (en) Miniature anti-slide pile of soil slope makes up reinforced structure
CN210127472U (en) Anti-pulling prestressed pipe pile
CN101492917A (en) Hollow anchor stock circulating pressure slip casting construction method and special slip casting system thereof
CN105297732B (en) Slagging promoting device for ultra-thick clay layer positive-cycle cast-in-place pile and construction method of slagging promoting device
CN111501854A (en) Anti-floating anchor rod structure penetrating through water-rich gravel bottom layer and construction method thereof
CN207295732U (en) It is a kind of can reaming novel slurry filling floral tube
CN207452933U (en) A kind of building aseismicity pile foundation
CN202688990U (en) Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark
CN206941576U (en) One kind building stake
CN108317146A (en) A kind of glue injection type structure anchor bolt
CN204267057U (en) A kind of nested type pipe seam anchor bar
CN204252132U (en) A kind of anchor pole orienting locator
CN208138275U (en) A kind of glue injection type structure anchor bolt
CN207944463U (en) A kind of steel pipe-shaped steel combination formula diagonal brace foundation pit supporting construction
CN206887953U (en) Soil nailing port closing device and soil nailing wall structure
CN207362840U (en) A kind of taper anchor cable suitable for rock side slope
CN207739247U (en) A kind of bored concrete pile grouting behind shaft or drift lining structure
CN201671097U (en) Prestressed pull-out resistance type concrete tubular pile
CN206607586U (en) A kind of self-balancing grouting under pressure steel tube for soil-nail structure

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721

Termination date: 20191223