CN206335166U - Roof perforate specific purpose tool - Google Patents

Roof perforate specific purpose tool Download PDF

Info

Publication number
CN206335166U
CN206335166U CN201621467843.3U CN201621467843U CN206335166U CN 206335166 U CN206335166 U CN 206335166U CN 201621467843 U CN201621467843 U CN 201621467843U CN 206335166 U CN206335166 U CN 206335166U
Authority
CN
China
Prior art keywords
working beam
support bar
bar
pull bar
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621467843.3U
Other languages
Chinese (zh)
Inventor
王星军
王荣香
何杰
陈菲菲
乔青荣
侯利君
赵金凤
樊厂兴
朱晓丽
石艺
校婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Second Construction Group Co Ltd
Original Assignee
Shanxi Second Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Second Construction Group Co Ltd filed Critical Shanxi Second Construction Group Co Ltd
Priority to CN201621467843.3U priority Critical patent/CN206335166U/en
Application granted granted Critical
Publication of CN206335166U publication Critical patent/CN206335166U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Roof perforate specific purpose tool, it is mainly used in floor roof perforate, it includes handle, it is characterized in that one support bar of handle interconnection, a working beam and a pull bar, support bar is parallel with working beam, pull bar is vertical with support bar and working beam and pull bar is connected between support bar and working beam, spacing is 0.4~0.5m between support bar and working beam, working beam top bundlees an electric drill with three road iron wires, the switch of electric drill connects a bracing wire, support bar is used for the adjustment hole for adjusting working beam height provided with a row, and the pitch-row of adjustment hole is 0.3m.The utility model improves operating efficiency, alleviates the manual labors such as carrying stool, reduces security risk, while mitigating injury of the dust produced in boring procedure directly to human eye and respiratory system, is conducive to occupational health.

Description

Roof perforate specific purpose tool
Technical field:
The utility model belongs to construction and decoration specific purpose tool, is mainly used in roof construction punching, mainly solves in floor Tap operation difficult problem vertically upward.
Background technology
In architecture storey civil engineering and installing engineering work progress, we are frequently encountered must the rear perforate in top board.Mesh Preceding roof punching is stood directly on stool or direct electric hand drill perforate operation, Jun Xugong on door-type scaffold by builder entirely People is faced upward operation, and due to operating difficulties, often position of opening is forbidden, and the dust that drilling operation of facing upward in addition is produced is directly to operation The health care belt of workman endangers, and three be that aloft operation hazards are more.In this regard, job site is in the urgent need to a kind of novel auxiliary Assistant engineer's tool shortcoming in perforate and polishing operation to more than is improved.
Utility model content
The utility model be mainly solution at present bar planting work, install embedded bracket operation field work progress in The problem of floor roof perforate operation is also easy to produce displacement, operates not safe enough.
Roof perforate specific purpose tool, including handle, it is characterized in that one support bar of handle interconnection, a working beam and One pull bar, support bar is parallel with working beam, and pull bar is vertical with support bar and working beam and pull bar is connected to support bar and work Between bar, spacing is 0.4~0.5m between support bar and working beam, and working beam top bundlees an electric drill, electricity with three road iron wires The switch of brill connects a bracing wire, and support bar is used for the adjustment hole for adjusting working beam height, the pitch-row of adjustment hole provided with a row It is 0.3m.The position of working beam binding iron wire is 2mm groove provided with depth.
Handle, support bar, working beam and pull bar are made from the conventional lumps of wood keel in scene or square steel, and specification is 40* 60mm, by taking China Democratic National Construction Association architecture Standards floor height 3.0m as an example, a height of 2.2m of support bar.Pull bar is all used with support bar and working beam Screw mandrel is connected with double nut.Handle 0.8~1.2m longer than support bar, handle and ground level angle are 15 degree, and people is direct during perforate Stand in floor ground operation.
The utility model improves the work efficiency and security of the pore-forming of falling hole in architectural engineering, reduces potential safety hazard.
The utility model can be widely applied to floor height in architectural engineering is higher, floor height change is complicated all types of industries with it is civilian Civil engineering and the pore-forming of falling hole of installing engineering engineering in building, application are wider, and utilization rate is higher.
Brief description of the drawings
Fig. 1 is the utility model front view.
Fig. 2 is left view of the present utility model.
In figure, 1, handle, 2, support bar, 3, pull bar, 4, bolt, 5, working beam, 6, electric drill, 7, iron wire, 8, adjustment hole, 9, Bracing wire.
Embodiment
The utility model is illustrated with reference to accompanying drawing 1, Fig. 2.
Roof perforate specific purpose tool, including handle 1, it is characterized in that handle 1 is hinged a support bar 2, an and of working beam 5 One pull bar 3, support bar is parallel with working beam, and pull bar is vertical with support bar and working beam and pull bar is connected to support bar and work Between bar, spacing is 0.4~0.5m between support bar and working beam, and working beam top bundlees an electric drill 6 with three road iron wires 7, The switch of electric drill connects a bracing wire 9, and support bar is used for the adjustment hole 8 for adjusting working beam height provided with a row, adjustment hole 8 Pitch-row is 0.3m.The position of working beam binding iron wire is 2mm groove provided with depth.
When carrying out live bore operation, operator's alignment operation pulls down the bracing wire being connected with electric drill knob behind hole Firmly, drill bit is connected and electrically activated, and then operator presses downwards handle, and working beam slowly carries out bore operation upwards.

Claims (1)

1. roof perforate specific purpose tool, including handle, it is characterized in that one support bar of handle interconnection, a working beam and one Individual pull bar, support bar is parallel with working beam, and pull bar is vertical with support bar and working beam and pull bar is connected to support bar and working beam Between, spacing is 0.4~0.5m between support bar and working beam, and working beam top bundlees an electric drill, electric drill with three road iron wires Switch connect a bracing wire, support bar is used to adjust the adjustment hole of working beam height provided with a row, and the pitch-row of adjustment hole is 0.3m。
CN201621467843.3U 2016-12-29 2016-12-29 Roof perforate specific purpose tool Active CN206335166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621467843.3U CN206335166U (en) 2016-12-29 2016-12-29 Roof perforate specific purpose tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621467843.3U CN206335166U (en) 2016-12-29 2016-12-29 Roof perforate specific purpose tool

Publications (1)

Publication Number Publication Date
CN206335166U true CN206335166U (en) 2017-07-18

Family

ID=59303239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621467843.3U Active CN206335166U (en) 2016-12-29 2016-12-29 Roof perforate specific purpose tool

Country Status (1)

Country Link
CN (1) CN206335166U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107717011A (en) * 2017-10-16 2018-02-23 中国十七冶集团有限公司 A kind of new suspension rod drilling equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107717011A (en) * 2017-10-16 2018-02-23 中国十七冶集团有限公司 A kind of new suspension rod drilling equipment

Similar Documents

Publication Publication Date Title
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN201427197Y (en) Upward drilling punching device
CN202517082U (en) Ceiling drilling machine and tool with adjustable height
CN203495283U (en) Drilling tool for drilling of indoor decorative suspended ceilings
CN206335166U (en) Roof perforate specific purpose tool
CN102071791A (en) Quick perforation method and device for suspended ceiling
CN107790787A (en) The lengthening support that a kind of packaged type electric drill drills vertically upward
CN207971457U (en) Top plate drilling combines yoke at a kind of superelevation
CN204621156U (en) A kind of arm extending type percussion drill
CN204525381U (en) A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole
CN210548286U (en) Electric drill support capable of adjusting drilling depth
CN203412518U (en) Indoor ceiling drilling device capable of freely adjusting drilling height
CN104972444A (en) Mechanism for tool lifting and rotating
CN107876836A (en) Drilling equipment without operating platform
CN210758496U (en) Height drilling auxiliary equipment capable of adjusting drilling depth
CN205967520U (en) Top drilling support appurtenance
CN205414490U (en) Drilling auxiliary device
CN203281932U (en) Simple high-altitude electric drill hole drilling device
CN202391338U (en) Device for quickly punching ceiling
CN201848837U (en) Percussion drill capable of collecting dust
CN203401104U (en) Beam slab bottom drilling tool
CN204800006U (en) Ceiling drilling appurtenance
CN204711271U (en) A kind of portable high-rise working crosshead
CN204449406U (en) A kind of suspended ceiling drilling device
CN204773060U (en) A drilling equipment for concrete structure is drilling upwards

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant