CN206329137U - A kind of concrete wire pole temporary fasteners - Google Patents
A kind of concrete wire pole temporary fasteners Download PDFInfo
- Publication number
- CN206329137U CN206329137U CN201621284169.5U CN201621284169U CN206329137U CN 206329137 U CN206329137 U CN 206329137U CN 201621284169 U CN201621284169 U CN 201621284169U CN 206329137 U CN206329137 U CN 206329137U
- Authority
- CN
- China
- Prior art keywords
- rod
- screw
- supporting
- hoop
- hoops
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本实用新型公开了一种水泥电线杆临时固定器,包括安装于线杆上的两个抱箍和支撑于两个抱箍上的三个支撑机构,两个抱箍在线杆上呈上下布置,三个支撑机构围绕线杆布置,支撑机构包括支撑杆、丝杠装置和连接杆,支撑杆与线杆平行设置,支撑杆的上段与连接杆的一端连接,连接杆的另一端铰接于位于上侧的抱箍上,所述丝杠装置一端连接于支撑杆的中部,另一端连接于下侧的抱箍上。
The utility model discloses a temporary fixer for a cement utility pole, which comprises two hoops installed on the utility pole and three supporting mechanisms supported on the two hoops, the two hoops are arranged up and down on the utility pole, Three supporting mechanisms are arranged around the wire rod. The supporting mechanism includes a supporting rod, a screw device and a connecting rod. The supporting rod is arranged in parallel with the wire rod. On the hoop on the side, one end of the screw device is connected to the middle of the support rod, and the other end is connected to the hoop on the lower side.
Description
技术领域technical field
本实用新型属于电力线杆架设技术领域,尤其涉及一种水泥电线杆临时固定器。The utility model belongs to the technical field of electric pole erection, in particular to a temporary fixer for cement electric poles.
背景技术Background technique
架空电力线路运行时间过长或因为外力破坏等原因,可能造成电感裂纹、露筋等杆体损坏,若不及时处理或更换会造成倒断杆事故,可能危及人身和设备安全。但往往处理此类事故需要等待停电机会,从而造成了危杆还需要临时运行一段时间,而更换新线杆时,新立线杆往往回填土较松,因此,在此类线杆上工作存在一定的危险系数。Overhead power lines run for too long or are damaged by external forces, which may cause damage to the rod body such as inductor cracks and exposed ribs. If it is not handled or replaced in time, it will cause a broken rod accident, which may endanger personal and equipment safety. However, it is often necessary to wait for the opportunity of power failure to deal with such accidents, resulting in temporary operation for a period of time for dangerous poles. When replacing new poles, the new poles are often backfilled with loose soil. A certain risk factor.
发明内容Contents of the invention
为了解决现有技术中存在的问题,本实用新型的目的是提供一种水泥电线杆临时固定器,通过该临时固定器对线杆进行临时支撑,保证了工作人员在线杆上工作时的安全。In order to solve the problems in the prior art, the purpose of this utility model is to provide a temporary fixer for cement utility poles, through which the utility poles are temporarily supported, ensuring the safety of workers when working on the utility poles.
为了实现上述发明目的,本实用新型采用如下所述的技术方案:In order to achieve the above-mentioned purpose of the invention, the utility model adopts the following technical solutions:
一种水泥电线杆临时固定器,包括安装于线杆上的两个抱箍和支撑于两个抱箍上的三个支撑机构,两个抱箍在线杆上呈上下布置,三个支撑机构围绕线杆布置,支撑机构包括支撑杆、丝杠装置和连接杆,支撑杆与线杆平行设置,支撑杆的上段与连接杆的一端连接,连接杆的另一端铰接于位于上侧的抱箍上,所述丝杠装置一端连接于支撑杆的中部,另一端连接于下侧的抱箍上。A temporary fixer for cement utility poles, comprising two hoops installed on the utility pole and three supporting mechanisms supported on the two hoops, the two hoops are arranged up and down on the utility pole, and the three supporting mechanisms surround the Wire rod arrangement, the supporting mechanism includes a supporting rod, a screw device and a connecting rod, the supporting rod is arranged in parallel with the wire rod, the upper section of the supporting rod is connected with one end of the connecting rod, and the other end of the connecting rod is hinged on the upper hoop , one end of the screw device is connected to the middle of the support rod, and the other end is connected to the lower hoop.
进一步的,连接杆的另一端倾斜向上,并与位于上侧的抱箍铰接。Further, the other end of the connecting rod is inclined upwards, and is hinged with the hoop located on the upper side.
进一步的,所述丝杠装置包括丝杆A、丝杆B和连接套,丝杆A的一端与固设在支撑杆上的丝母A丝接,丝杆A的另一端与连接套的一端丝接,丝杆B的一端与固设在位于下侧的抱箍上的丝母B丝接,丝杆B的另一端与连接套的另一端丝接。Further, the screw device includes a screw rod A, a screw rod B and a connecting sleeve, one end of the screw rod A is connected with the screw nut A fixed on the support rod, and the other end of the screw rod A is connected with one end of the connecting sleeve For wire connection, one end of the screw rod B is connected with the screw nut B fixed on the hoop located on the lower side, and the other end of the screw rod B is connected with the other end of the connecting sleeve.
进一步的,所述支撑杆的下端部为倒锥形,且在支撑杆的下端部的锥形面上设置有螺旋叶片。Further, the lower end of the support rod is in an inverted cone shape, and a helical blade is provided on the tapered surface of the lower end of the support rod.
由于采用上述技术方案,本实用新型具有以下优越性:Due to the above-mentioned technical scheme, the utility model has the following advantages:
本实用新型结构简单、设计合理,通过设置两个抱箍和三个支撑机构能够对线杆起到稳固的支撑,保证了人员在线杆上工作的安全。The utility model has a simple structure and a reasonable design. By setting two hoops and three supporting mechanisms, the utility model can provide stable support to the wire rod, thereby ensuring the safety of personnel working on the wire rod.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;
图3为丝杠装置的结构示意图;Fig. 3 is the structural representation of lead screw device;
图中:1、线杆;2、抱箍;3、支撑杆;4、丝杠装置;40、连接套;41、丝杆A;42、丝杆B;5、连接杆。In the figure: 1, wire rod; 2, hoop; 3, support rod; 4, screw device; 40, connecting sleeve; 41, screw A; 42, screw B; 5, connecting rod.
具体实施方式detailed description
下面结合附图及实施例对本实用新型的技术方案做进一步详细的说明。The technical solutions of the present utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.
如图1、2所示,一种水泥电线杆临时固定器,包括安装于线杆1上的两个抱箍2和支撑于两个抱箍2上的三个支撑机构,两个抱箍在线杆上呈上下布置,三个支撑机构围绕线杆布置,支撑机构包括支撑杆3、丝杠装置4和连接杆5,支撑杆3与线杆1平行设置,支撑杆3的上段与连接杆5的一端连接,连接杆5的另一端铰接于位于上侧的抱箍2上,所述丝杠装置一端连接于支撑杆3的中部,另一端连接于下侧的抱箍2上。As shown in Figures 1 and 2, a temporary fixer for cement utility poles includes two hoops 2 installed on the utility pole 1 and three supporting mechanisms supported on the two hoops 2, and the two hoops are on the line The rod is arranged up and down, and three supporting mechanisms are arranged around the wire rod. The supporting mechanism includes a supporting rod 3, a screw device 4 and a connecting rod 5. The supporting rod 3 is arranged in parallel with the wire rod 1. The other end of the connecting rod 5 is hinged on the hoop 2 on the upper side, one end of the screw device is connected to the middle part of the support rod 3, and the other end is connected to the hoop 2 on the lower side.
连接杆5的另一端倾斜向上,并与位于上侧的抱箍2铰接。The other end of the connecting rod 5 is inclined upwards, and is hinged with the hoop 2 on the upper side.
如图3所示,所述丝杠装置包括丝杆A41、丝杆B42和连接套40,丝杆A41的一端与固设在支撑杆3上的丝母A丝接,丝杆A41的另一端与连接套40的一端丝接,丝杆B42的一端与固设在位于下侧的抱箍2上的丝母B丝接,丝杆B42的另一端与连接套410另一端丝接。As shown in Figure 3, the screw device includes a screw A41, a screw B42 and a connecting sleeve 40, one end of the screw A41 is connected with the nut A fixed on the support rod 3, and the other end of the screw A41 One end of the screw rod B42 is screwed with the screw nut B fixed on the lower hoop 2 , and the other end of the screw rod B42 is screwed with the other end of the connecting sleeve 410 .
在使用时,支撑杆3是需要打入地面下的,因此为了提高支撑杆与地面的连接强度,支撑杆的下端部为倒锥形,且在支撑杆的下端部的锥形面上设置有螺旋叶片。When in use, the support rod 3 needs to be driven into the ground, so in order to improve the connection strength between the support rod and the ground, the lower end of the support rod is an inverted cone, and the tapered surface of the lower end of the support rod is provided with Spiral blade.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621284169.5U CN206329137U (en) | 2016-11-28 | 2016-11-28 | A kind of concrete wire pole temporary fasteners |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621284169.5U CN206329137U (en) | 2016-11-28 | 2016-11-28 | A kind of concrete wire pole temporary fasteners |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206329137U true CN206329137U (en) | 2017-07-14 |
Family
ID=59288162
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621284169.5U Expired - Fee Related CN206329137U (en) | 2016-11-28 | 2016-11-28 | A kind of concrete wire pole temporary fasteners |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206329137U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108173225A (en) * | 2018-01-26 | 2018-06-15 | 农克俭 | A kind of municipal works line tower |
-
2016
- 2016-11-28 CN CN201621284169.5U patent/CN206329137U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108173225A (en) * | 2018-01-26 | 2018-06-15 | 农克俭 | A kind of municipal works line tower |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204370830U (en) | A kind of electric pole centralizer | |
| CN204663121U (en) | Packaged type insulating supporting line bar | |
| CN103236656B (en) | Column suspension type crossing structure and operating method thereof | |
| CN204590753U (en) | The anti-tilter of a kind of cement pole | |
| CN203339564U (en) | High-altitude extended wiring pliers | |
| CN206329137U (en) | A kind of concrete wire pole temporary fasteners | |
| CN205489270U (en) | Fine tuning ground wire hoisting device | |
| CN202645027U (en) | Pipe type screw corrector | |
| CN205314654U (en) | Reinforcement iron tower of power transmission sequence | |
| CN202840363U (en) | 1000kV UHV AC Line Tension Insulator String Insulation Lifting Bracket | |
| CN105113839A (en) | Multifunctional environmental protection low-voltage line support device | |
| CN206667891U (en) | A kind of safe concurrent | |
| CN205123091U (en) | Insulating retaining device with adjustable | |
| CN205069916U (en) | Electric wire netting construction device with personally ensuring safety leading of line | |
| CN204045895U (en) | A connection structure of concrete pole ground wire | |
| CN204983858U (en) | Portable hand pull rod of steel pipe tower cross arm | |
| CN202068150U (en) | Special anchor ear for temporarily supporting crossarm | |
| CN203967265U (en) | Portable steel tower Special grounding wire | |
| CN202534989U (en) | Rocking arm type cable clamper dismounting device | |
| CN102738601B (en) | Movable multifunctional external grounding device | |
| CN204060485U (en) | anti-tilt ladder | |
| CN203871758U (en) | Angle iron pile equipped with spiral pulling device | |
| CN205422119U (en) | Interim fixer of danger pole | |
| CN204663106U (en) | Removable multi-functional line bar | |
| CN204089035U (en) | A kind of transmission line pole tower ascent aid |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170714 Termination date: 20171128 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |