CN206318603U - A kind of special hanger of large-sized water turbine field ring integral hoisting - Google Patents

A kind of special hanger of large-sized water turbine field ring integral hoisting Download PDF

Info

Publication number
CN206318603U
CN206318603U CN201621395153.1U CN201621395153U CN206318603U CN 206318603 U CN206318603 U CN 206318603U CN 201621395153 U CN201621395153 U CN 201621395153U CN 206318603 U CN206318603 U CN 206318603U
Authority
CN
China
Prior art keywords
main
special hanger
plate
water turbine
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621395153.1U
Other languages
Chinese (zh)
Inventor
彭贵军
廖劲凯
吴瑞清
黄建强
张自敏
赵七美
杨轩
陈国明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201621395153.1U priority Critical patent/CN206318603U/en
Application granted granted Critical
Publication of CN206318603U publication Critical patent/CN206318603U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model is a kind of special hanger for large-sized water turbine field ring integral hoisting, special hanger includes main hanging bolt, connecting plate, main shackle plate, reinforcement gusset, connecting plate is connected by the Kong Yuzhu hanging bolts in the middle of it, main shackle plate is fixed on connecting plate, it is connected simultaneously with main hanging bolt, there is a lifting circular hole on main shackle plate, set between main shackle plate and connecting plate and strengthen gusset.Before lifting, after special hanger is arranged in the lifting hole(eyelet) of seat ring bottom circumferential lamella, 2 load-bearing nuts are screwed in the screw thread of main hanging bolt lower end, so far special hanger installation.Using the connection speed for after this special hanger, improving seat ring, suspender and bridge machine, the adjustment of seat ring level is realized, manpower is saved, the duration is shortened, cost has been saved, generate preferable Social benefit and economic benefit.

Description

A kind of special hanger of large-sized water turbine field ring integral hoisting
Technical field
The utility model belongs to large hydropower station turbine technology field, and in particular to a kind of large-sized water turbine field ring is overall The special hanger of lifting.
Background technology
In recent years, domestic in continuous newly-built large hydropower station, the turbine stay ring appearance and size of large hydropower station is huge, Weight is up to hundreds of tons, and seat ring typically divides 4~6 valves to dispatch from the factory, in power station live main building clipping room carry out point valve seat ring group circle and After the completion of welding job, assembling and welding, seat ring need to integrally be hung in machine hole and carry out mounting and adjusting.Hung for convenience of the entirety of seat ring Dress, need to design one kind can meet main building Large bridge machine be connected, can reuse with seat ring, bearing requirements can be met, can be to seat The special hanger that ring level is adjusted, to ensure being smoothed out for lifting.
The content of the invention
The purpose of this utility model is to provide a kind of special hanger of large-sized water turbine field ring integral hoisting, can realize main factory The connection of room Large bridge machine and seat ring, and the bearing requirements of the overall seat ring of lifting can be met.
The technical solution of the utility model is:The special hanger of large-sized water turbine field ring integral hoisting, including main lifting spiral shell Bolt, connecting plate, main shackle plate, reinforcement gusset, connecting plate are connected by Kong Yuzhu hanging bolts in the middle of it, and main shackle plate is fixed On connecting plate, while being connected with main hanging bolt, there is a lifting circular hole on main shackle plate, in main shackle plate with being connected Set between plate and strengthen gusset.
There is a breach plane at the position being connected on described main hanging bolt with main shackle plate, and main hanging bolt length is 520mm, it is M100 × 6mm that main hanging bolt, which has screw thread in the bottom of connecting plate,.
Described connecting plate is circle, and thickness is 40mm, and external diameter is 300mm, and middle main hanging bolt hole passes through aperture For 105mm.
Described main hanger plate thickness is 40mm, is highly 350mm, width is 240mm, apart from upper end arc-shaped edges 120mm Centre position lifting Circularhole diameter 80mm, to facilitate shackle to be passed through from hole.
Described reinforcement gusset has 2 pieces, is symmetricly set on the both sides of main hanging bolt, and thickness is 30mm.
Described main hanging bolt lower end is installed by 2 load-bearing nuts.
Good effect of the present utility model:
1st, during seat ring integral hoisting, seat ring level can be adjusted using main hanging bolt, facilitates seat ring flatly to fall It is placed on the paired wedge adjusted and installs in place, it is ensured that installation quality.
2nd, this special hanger is bolt connection form, and overall seat ring is lifted using this suspender, reusable, is not required to every Hanger is welded on platform set seat ring ring flat-plate.The application of this special hanger new technology, improves efficiency of construction, accelerates construction speed, The duration is shortened, manpower is saved, cost has been saved, the principle for welding temporary component less as far as possible on seat ring ring flat-plate is also met.
3rd, the special hanger of seat ring integral hoisting has low cost, preparation method easy;Before lifting suspender connection speed it is fast, The features such as seat ring level can be adjusted.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, for ordinary skill people For member, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is main hanging bolt structural representation of the present utility model;
Fig. 2 is Fig. 1 top view.
Fig. 3 is the structural representation of special hanger of the present utility model.
Fig. 4 is Fig. 3 left view.
Fig. 5 is Fig. 3 P direction views.
Fig. 6 is the use state figure that special hanger of the present utility model is connected with seat ring.
In figure, the main hanging bolts of 1-;2- connecting plates;The main shackle plates of 3-;4- strengthens gusset, 5- load-bearing nuts.
Embodiment
The turbine stay ring of large hydropower station is generally a point valve and dispatched from the factory, in clipping room carry out group circle and welding, special with this Seat ring is integrally hung in machine hole and is installed and adjusted by suspender.
As illustrated, the special hanger of the present invention, including main hanging bolt 1, connecting plate 2, main shackle plate 3, reinforcement gusset 4, connecting plate 2 is connected by Kong Yuzhu hanging bolts in the middle of it, and main shackle plate 3 is fixed on connecting plate 2, at the same with main lifting Bolt 1 is connected, and has a lifting circular hole on main shackle plate, is set between main shackle plate and connecting plate and strengthen gusset 1.
The position being connected on described main hanging bolt with main shackle plate have a breach plane, i.e. processing length for 180mm, Deep 14mm plane, is assembled with facilitating with main hanger, and can conveniently carry out the welding of weld seam.Main hanging bolt length is 520mm(Determined according to seat ring base ring plate thickness), it is M100 × 6mm that main hanging bolt, which has screw thread in the bottom of connecting plate,.
Described connecting plate is circle, and thickness is 40mm, and external diameter is 300mm, and middle main hanging bolt hole passes through aperture For 105mm, to facilitate main hanging bolt to be passed through from hole.
Described main hanger plate thickness is 40mm, is highly 350mm, width is 240mm, apart from upper end arc-shaped edges 120mm Centre position lifting Circularhole diameter 80mm, to facilitate shackle to be passed through from hole.
Described reinforcement gusset has 2 pieces, is symmetricly set on the both sides of main hanging bolt, thickness is 30mm, to shackle plate Play booster action.
According to turbine stay ring design feature, the hoisting point position that can be evenly arranged is determined on seat ring bottom circumferential lamella, confirms to hang The connected mode of tool and seat ring, needs to be adjusted the level of seat ring, seat ring horizontal adjustment is met after requirement before seat ring lifting Lifted.
Application method:According to design structure, the uniform 24 φ 150mm of the full circle hole on seat ring bottom circumferential lamella, at this 24 8 uniform holes are selected in hole as hoisting point position during seat ring integral hoisting.After the completion of the assembling of seat ring point valve and welding, profit With 8 points uniform on seat ring bottom circumferential lamella as hoisting point position, with the bolt M100 on boom hoisting × long 520mm of 6- from upper past Under penetrated from hole, after penetrating bottom circumferential lamella bottom screw in 2 M100 × 6mm load-bearing nut, tighten nut with special spanner, Boom hoisting installation.55t shackles, connection special hanger and steel wire rope are installed in the lifting hole(eyelet) of special hanger, by steel wire rope Hang on bridge machine suspension hook, can then carry out the examination slinging work of overall seat ring.
This utility model meets large-scale seat ring integral hoisting, can reuse, can carry out seat ring horizontal adjustment and satisfaction is held The requirement of load.
General principle of the present utility model, principal character and advantages of the present invention has been shown and described above.The industry Technical staff it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification only It is to illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model also has Various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model requirement Protection domain is by appending claims and its equivalent thereof.

Claims (7)

1. a kind of special hanger of large-sized water turbine field ring integral hoisting, it is characterised in that:Including main hanging bolt, connecting plate, Main shackle plate, reinforcement gusset, connecting plate are connected by Kong Yuzhu hanging bolts in the middle of it, and main shackle plate is fixed on connecting plate On, while being connected with main hanging bolt, there is a lifting circular hole on main shackle plate, set between main shackle plate and connecting plate Strengthen gusset.
2. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Described master There is a breach plane at the position being connected on hanging bolt with main shackle plate.
3. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Main lifting spiral shell Bolt length is 520mm, and it is M100 × 6mm that main hanging bolt, which has screw thread in the bottom of connecting plate,.
4. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Described company Fishplate bar is circle, and thickness is 40mm, and external diameter is 300mm, and it is 105mm that middle main hanging bolt hole, which passes through aperture,.
5. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Described master Hanger plate thickness is 40mm, is highly 350mm, width is 240mm, the lifting apart from upper end arc-shaped edges 120mm centre position Circularhole diameter 80mm.
6. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Described adds Strengthening tendons plate has 2 pieces, is symmetricly set on the both sides of main hanging bolt, and thickness is 30mm.
7. the special hanger of large-sized water turbine field ring integral hoisting according to claim 1, it is characterised in that:Described master Hanging bolt lower end is installed by 2 load-bearing nuts.
CN201621395153.1U 2016-12-19 2016-12-19 A kind of special hanger of large-sized water turbine field ring integral hoisting Expired - Fee Related CN206318603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621395153.1U CN206318603U (en) 2016-12-19 2016-12-19 A kind of special hanger of large-sized water turbine field ring integral hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621395153.1U CN206318603U (en) 2016-12-19 2016-12-19 A kind of special hanger of large-sized water turbine field ring integral hoisting

Publications (1)

Publication Number Publication Date
CN206318603U true CN206318603U (en) 2017-07-11

Family

ID=59266803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621395153.1U Expired - Fee Related CN206318603U (en) 2016-12-19 2016-12-19 A kind of special hanger of large-sized water turbine field ring integral hoisting

Country Status (1)

Country Link
CN (1) CN206318603U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111943037A (en) * 2020-07-26 2020-11-17 国家电网有限公司 A movable guide vane operating device for a pumped storage power station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111943037A (en) * 2020-07-26 2020-11-17 国家电网有限公司 A movable guide vane operating device for a pumped storage power station

Similar Documents

Publication Publication Date Title
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN204454235U (en) A kind of novel many suspension centres equalizing bar device
CN206942160U (en) Steel bar truss floor support plate lifting device
CN204778275U (en) But balancing jack -up hoist
CN206233122U (en) For bridge cantilever construction with Hanging Basket movable tower crane
CN206318603U (en) A kind of special hanger of large-sized water turbine field ring integral hoisting
CN203159027U (en) A prefabricated iron tower foundation spreader
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN203624808U (en) Detachable steel structure hanger
CN206580440U (en) Steel beam string hoisting device
CN109081235A (en) A hoisting method of steel truss girder unit applied in single hoisting point hoisting mode
CN207090779U (en) One kind auxiliary runner plate turns over instrument
CN206654649U (en) A kind of simply adjustable shaped steel lifting card construction equipment
CN206174481U (en) Jack -up instrument is used in fan hoist and mount of tuber pipe and suspension type installation
CN213117785U (en) Turnbuckle suitable for large-load hanging bracket and adjusting device thereof
CN204727507U (en) For the overlength attachment rod member of tower crane
CN209907222U (en) Novel reinforcing bar installation appurtenance
CN108516454A (en) A kind of hanging apparatus of prefabricated components
CN202324586U (en) Integral attached device attached with lifting scaffold
CN202577927U (en) Suspended basket for assembling honeycomb grid column structural steel framework
CN208603571U (en) A kind of template hook gear
CN207932896U (en) Ring beam and ring rail integral hoisting tool
CN206665957U (en) A kind of detachable auxiliary hanger
CN207312923U (en) A kind of heavy-duty steel component hanging apparatus
CN205590148U (en) Steel pipe hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711