CN206292437U - A kind of cable erection apparatus system - Google Patents

A kind of cable erection apparatus system Download PDF

Info

Publication number
CN206292437U
CN206292437U CN201621096597.5U CN201621096597U CN206292437U CN 206292437 U CN206292437 U CN 206292437U CN 201621096597 U CN201621096597 U CN 201621096597U CN 206292437 U CN206292437 U CN 206292437U
Authority
CN
China
Prior art keywords
platform
hoop
mobile device
pulley
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621096597.5U
Other languages
Chinese (zh)
Inventor
赵志宏
梁斌
孙亚东
李小明
张峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Yuncheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201621096597.5U priority Critical patent/CN206292437U/en
Application granted granted Critical
Publication of CN206292437U publication Critical patent/CN206292437U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is specifically related to a kind of cable erection apparatus system, belongs to cable spanning equipment technical field;Technical problem to be solved is to provide a kind of cable erection fixed pulley;The technical scheme for using for:A kind of cable erection apparatus system, it is made up of fixed pulley and operating system, wherein fixed pulley is made up of fixation kit and pulley assembly, and the fixation kit includes long handle semicircle anchor ear and short handle semicircle anchor ear, and operating system includes lifting operating platform, mobile device and auxiliary support apparatus;The function of wherein mobile device is that the lifting operating platform that carrying is disposed thereon and auxiliary support apparatus move operation;The lifting operating platform includes setting hydraulic elevating platform on the mobile device, and fix bar, tool box, seat and operating console are provided with the top platform of hydraulic elevating platform, and the top of fix bar is provided with cable lock;The auxiliary support apparatus are protected and include stop sleeve, support hydraulic pressure bar and support pulley.

Description

一种线缆架设用装置系统A device system for erecting cables

技术领域technical field

本实用新型具体涉及一种线缆架设用装置系统,属于线缆架设设备技术领域。The utility model specifically relates to a device system for cable erection, which belongs to the technical field of cable erection equipment.

背景技术Background technique

架空光缆施工大致分为以下几步:准备→路由工程→光缆架设→光缆接续→工程验收。目前光缆架空敷设的方法大多采用定滑轮牵引法,在引上和引下两处的电杆上固定好布放光缆用的大滑轮。每杆档内的吊线上,每隔10~20m挂一个小滑轮(导引滑轮),并将牵引绳穿放入小滑轮内。然后,做好牵引头,并将牵引绳与光缆连接好,准备布放。当采用人工牵引时,人工推动光缆盘逐渐将光缆放出,然后每隔一根电杆设一个人上杆进行辅助牵引(必要时在角杆上装设导引滑轮)。在牵引端逐渐收紧牵引绳,使光缆慢慢放出。为了充分保证光纤的安全,在光缆线路的放缆端、收缆端及光缆牵引头处,应设3部联络话机,并时刻保持联络畅通。当单盘光缆较长时,一般分两次布放:即在布放完前半盘后,就地倒“8”字,再向另一个方向布放后半盘。当采用机械牵引时,机械牵引主机应置于收缆端,辅助牵引机置于架设路由的适当位置。在放缆端架起待放的光缆盘,人工推动光缆盘使光缆从盘的上方逐渐放出,以机械代替人工牵引,达到布放光缆的目的。The construction of overhead optical cables is roughly divided into the following steps: preparation → routing engineering → optical cable erection → optical cable connection → project acceptance. At present, the method of overhead laying of optical cables mostly adopts the fixed pulley traction method, and the large pulleys for laying optical cables are fixed on the poles at the upper and lower leads. Hang a small pulley (guide pulley) every 10-20m on the hanging wire in each pole, and put the traction rope into the small pulley. Then, prepare the traction head, connect the traction rope with the optical cable, and prepare for deployment. When manual traction is used, the optical cable reel is manually pushed to release the optical cable gradually, and then one person is set up on every other pole for auxiliary traction (if necessary, a guide pulley is installed on the corner pole). Gradually tighten the traction rope at the traction end to release the optical cable slowly. In order to fully ensure the safety of the optical fiber, three contact telephones should be installed at the cable release end, cable take-up end and optical cable pulling head of the optical cable line, and the communication should be kept smooth at all times. When the single-reel optical cable is long, it is generally deployed in two stages: that is, after the first half of the reel is deployed, the word "8" is placed on the spot, and then the second half of the reel is deployed in another direction. When mechanical traction is used, the mechanical traction host should be placed at the cable receiving end, and the auxiliary traction machine should be placed at an appropriate position for erecting the route. Set up the optical cable reel at the cable release end, manually push the optical cable reel to gradually release the optical cable from the top of the reel, and use machinery instead of manual traction to achieve the purpose of laying optical cables.

该方法需要布置较多滑轮,需要操作人员也较多,不方便。This method needs to arrange more pulleys, and requires more operators, which is inconvenient.

实用新型内容Utility model content

本实用新型克服现有技术的不足,所要解决的技术问题是提供一种节省人力、使用方便的线缆架设用定滑轮装置。The utility model overcomes the deficiencies of the prior art, and the technical problem to be solved is to provide a fixed pulley device for cable erection which saves manpower and is convenient to use.

为解决上述技术问题,本实用新型所采用的技术方案为:一种线缆架设用装置系统,由定滑轮装置和操作系统组成,其中:In order to solve the above technical problems, the technical solution adopted by the utility model is: a device system for cable erection, which is composed of a fixed pulley device and an operating system, wherein:

定滑轮装置由固定组件和滑轮组件构成,The fixed pulley device is composed of a fixed assembly and a pulley assembly.

所述固定组件包括长柄半圆抱箍和短柄半圆抱箍,短柄半圆抱箍的一端以铰接的形式安装在长柄半圆抱箍的长柄端,闭合状态下两个半圆抱箍的弧形部分组成一个完整的圆形抱箍结构,两个半圆抱箍的自由端通过连接件进行可拆卸连接;The fixed assembly includes a long handle semicircle hoop and a short handle semicircle hoop, one end of the short handle semicircle hoop is mounted on the long handle end of the long handle semicircle hoop in a hinged form, and the arc of the two semicircle hoops in the closed state The shaped part forms a complete circular hoop structure, and the free ends of the two semicircular hoops are detachably connected through connectors;

本实用新型此处所述的可拆卸的连接可以是常规的螺栓-螺母连接、卡接等形式,只要能够保证抱箍在线杆的安装牢固性及可拆卸就可以。The detachable connection described here in the utility model can be in the form of conventional bolt-nut connection, clamping connection, etc., as long as the installation firmness and detachability of the hoop on the wire rod can be guaranteed.

所述滑轮组件包括定滑轮、平台、液压杆和套筒,所述液压杆的缸体设置在套筒中,平台设置在液压杆的顶端,定滑轮安装在平台的台面上;平台的侧面还设置有锁扣;The pulley assembly includes a fixed pulley, a platform, a hydraulic rod and a sleeve. The cylinder body of the hydraulic rod is arranged in the sleeve, the platform is arranged on the top of the hydraulic rod, and the fixed pulley is installed on the table of the platform; equipped with a lock;

所述套筒为上端开口下端封闭的圆柱形筒,固定组件有两组,分别通过长柄半圆抱箍的长柄末端固定在套筒的上部和下部。The sleeve is a cylindrical tube with an open upper end and a closed lower end. There are two sets of fixing components, which are respectively fixed on the upper and lower parts of the sleeve by the ends of the long handles of the long handle semicircular hoops.

操作系统包括升降操作台、移动装置和辅助支撑装置;其中移动装置的功能是携带设置在其上的升降操作台和辅助支撑装置进行移动作业;The operating system includes a lifting operation table, a mobile device and an auxiliary support device; the function of the mobile device is to carry the lifting operation table and auxiliary support device set on it for mobile operations;

所述升降操作台包括设置在移动装置上的液压升降平台,液压升降平台的顶部平台上设置有固定杆、工具箱、座椅和操作控制台,固定杆的上部安装有线缆锁扣;The lifting operation platform includes a hydraulic lifting platform arranged on the mobile device, the top platform of the hydraulic lifting platform is provided with a fixed rod, a tool box, a seat and an operation console, and a cable lock is installed on the upper part of the fixed rod;

所述辅助支撑装置包括固定设置在移动装置上的支撑套筒,安装在支撑套筒中的支撑液压杆和固定在支撑液压杆顶部的支撑滑轮;所述辅助支撑装置倾斜设置,且倾斜方向与所述移动装置移动的方向相反;并且与垂直方向的夹角不大于45°。The auxiliary support device includes a support sleeve fixedly arranged on the mobile device, a support hydraulic rod installed in the support sleeve and a support pulley fixed on the top of the support hydraulic rod; The direction in which the mobile device moves is opposite; and the included angle with the vertical direction is not greater than 45°.

所述长柄半圆抱箍和短柄半圆抱箍的半圆抱箍上设置有多个安装孔或者一个长孔,半圆抱箍内设置有弧形胶片,所述弧形胶片的凸侧设置有与半圆抱箍上的安装孔相适应的多个柱状凸起或者一个与长孔对应的长条状凸起,并通过凸起设置在半圆抱箍内侧。The semicircle hoop of the long handle semicircle hoop and the semicircle hoop of the short handle are provided with a plurality of mounting holes or a long hole, and an arc film is arranged inside the semicircle hoop, and the convex side of the arc film is provided with a A plurality of columnar protrusions corresponding to the mounting holes on the semicircular hoop or a strip-shaped protrusion corresponding to the long hole are arranged inside the semicircular hoop through the protrusions.

本实用新型进一步在抱箍内设置弧形胶片,弧形胶片可以设置多种厚度,这是由于线杆的直径是不一样的,但是为了保证装置的使用寿命和强度,一般都会采用金属特别是钢材,直径不便调节,可以通过内置胶片的形式使之适应不同直径的线杆安装操作,且内置胶片还能够起到防滑效果,进一步提高安装牢固性。The utility model is further provided with an arc-shaped film in the hoop, and the arc-shaped film can be provided with various thicknesses. This is because the diameters of the wire rods are different, but in order to ensure the service life and strength of the device, metals, especially metals, are generally used. Steel, the diameter is inconvenient to adjust, and it can be adapted to the installation operation of poles with different diameters in the form of built-in film, and the built-in film can also play a non-slip effect, further improving the firmness of the installation.

本实用新型所述移动装置为卡车或其他具有合适的运输功能移动设备。The mobile device described in the utility model is a truck or other mobile equipment with suitable transportation functions.

优选的,所述支撑套筒通过倾斜角度调节装置安装在移动装置上,所述角度调节装置能够调节支撑套筒与垂直方向的夹角,这样辅助支撑装置在未使用状态下保持直立,操作员在操作平台上就能顺利的完成线缆穿过其上支撑滑轮的工作,然后通过操作控制台控制角度调节装置使辅助支撑装置倾斜到合适的角度以及控制支撑液压杆将支撑滑轮送至合适的高度。Preferably, the support sleeve is installed on the mobile device through an inclination angle adjustment device, and the angle adjustment device can adjust the angle between the support sleeve and the vertical direction, so that the auxiliary support device remains upright in the unused state, and the operator The work of passing the cables through the supporting pulleys can be successfully completed on the operating platform, and then the auxiliary supporting device can be tilted to a suitable angle by controlling the angle adjustment device through the operating console and controlling the supporting hydraulic rod to send the supporting pulleys to a suitable position. high.

与现有技术相比本实用新型具有以下有益效果。Compared with the prior art, the utility model has the following beneficial effects.

本实用新型的定滑轮可以实现不用爬杆完成定滑轮的安装,安装牢固程度和安全性易掌控,降低了作业强度和风险。固定组件和套筒、液压杆等可以拆卸组装,方便携带、运输和存放。The fixed pulley of the utility model can realize the installation of the fixed pulley without climbing poles, the firmness and safety of the installation are easy to control, and the work intensity and risks are reduced. The fixed components, sleeves, hydraulic rods, etc. can be disassembled and assembled, which is convenient for carrying, transportation and storage.

本实用新型的锁扣或者线缆锁扣为活动锁扣,用于临时固定线缆头(电缆或光缆等),固定好只有,启动液压杆将定滑轮升到需要的高度位置,进行缆线牵引时,再将线缆从锁扣中取下,穿过定滑轮,以做好牵引准备。整个过程人工只负责将装置通过固定组件安装在线杆下部、操作液压杆按钮和线缆牵引定位的工作,作业强度低,准确可控。The lock or cable lock of the utility model is a movable lock, which is used to temporarily fix the cable head (cable or optical cable, etc.). When pulling, the cable is removed from the lock and passed through the fixed pulley to prepare for pulling. In the whole process, the labor is only responsible for installing the device at the lower part of the wire rod through the fixed components, operating the hydraulic rod button and cable traction and positioning. The work is low in intensity and accurate and controllable.

安装完定滑轮后,操作员即到液压升降平台就位,进行挂线作业,过程中不再需要悬挂多个小型定滑轮,减少了架线的工序。After the fixed pulley is installed, the operator will go to the hydraulic lifting platform to take the position and carry out the wire hanging operation. During the process, it is no longer necessary to hang multiple small fixed pulleys, which reduces the process of stringing the wire.

附图说明Description of drawings

下面结合附图对本实用新型作进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1中定滑轮装置的结构示意图。Fig. 2 is a schematic structural view of the fixed pulley device in Fig. 1 .

图3为图2的俯视结构示意图。FIG. 3 is a schematic top view of the structure in FIG. 2 .

图中:1为长柄半圆抱箍,2为短柄半圆抱箍,3为套筒,4为弧形胶片,5为定滑轮,6为平台,7为液压杆,8为锁扣,9为液压升降平台,10为固定杆,11为工具箱,12为座椅,13为操作控制台,14为支撑套筒,15为支撑液压杆,16为支撑滑轮,17为线缆锁扣。In the figure: 1 is a long handle semicircle hoop, 2 is a short handle semicircle hoop, 3 is a sleeve, 4 is an arc film, 5 is a fixed pulley, 6 is a platform, 7 is a hydraulic rod, 8 is a lock, 9 10 is a fixed rod, 11 is a tool box, 12 is a seat, 13 is an operation console, 14 is a support sleeve, 15 is a support hydraulic rod, 16 is a support pulley, and 17 is a cable lock.

具体实施方式detailed description

以下结合具体实施例对本实用新型作进一步说明。Below in conjunction with specific embodiment the utility model is further described.

实施例1Example 1

如图1、3所示,一种线缆架设用装置系统,由定滑轮装置和操作系统组成,其中:As shown in Figures 1 and 3, a device system for cable erection is composed of a fixed pulley device and an operating system, wherein:

定滑轮装置由固定组件和滑轮组件构成,The fixed pulley device is composed of a fixed assembly and a pulley assembly.

所述固定组件包括长柄半圆抱箍1和短柄半圆抱箍2,短柄半圆抱箍2的一端以铰接的形式安装在长柄半圆抱箍1的长柄端,闭合状态下两个半圆抱箍的弧形部分组成一个完整的圆形抱箍结构,两个半圆抱箍的自由端通过连接件进行可拆卸连接;The fixed assembly includes a long handle semicircle hoop 1 and a short handle semicircle hoop 2, one end of the short handle semicircle hoop 2 is mounted on the long handle end of the long handle semicircle hoop 1 in the form of a hinge, and the two semicircle hoops in the closed state The arc-shaped part of the hoop forms a complete circular hoop structure, and the free ends of the two semicircular hoops are detachably connected through connectors;

所述滑轮组件包括定滑轮5、平台6、液压杆7和套筒3,所述液压杆7的缸体设置在套筒3中,平台6设置在液压杆7的顶端,定滑轮5安装在平台6的台面上;平台6的侧面还设置有锁扣8;Described pulley assembly comprises fixed pulley 5, platform 6, hydraulic rod 7 and sleeve 3, and the cylinder block of described hydraulic rod 7 is arranged in sleeve 3, and platform 6 is arranged on the top of hydraulic rod 7, and fixed pulley 5 is installed on On the table of the platform 6; the side of the platform 6 is also provided with a lock 8;

所述套筒3为上端开口下端封闭的圆柱形筒,固定组件有两组,分别通过长柄半圆抱箍1的长柄末端固定在套筒3的上部和下部;The sleeve 3 is a cylindrical tube with an open upper end and a closed lower end. There are two sets of fixing components, which are respectively fixed on the upper and lower parts of the sleeve 3 through the long handle end of the long handle semicircular hoop 1;

操作系统包括升降操作台、移动装置和辅助支撑装置;其中移动装置的功能是携带设置在其上的升降操作台和辅助支撑装置进行移动作业;The operating system includes a lifting operation table, a mobile device and an auxiliary support device; the function of the mobile device is to carry the lifting operation table and auxiliary support device set on it for mobile operations;

所述升降操作台包括设置在移动装置上的液压升降平台9,液压升降平台9的顶部平台上设置有固定杆10、工具箱11、座椅12和操作控制台13,固定杆10的上部安装有线缆锁扣17;Described lifting operation platform comprises the hydraulic lifting platform 9 that is arranged on mobile device, and the top platform of hydraulic lifting platform 9 is provided with fixed bar 10, tool box 11, seat 12 and operation console 13, and the top of fixed bar 10 is installed There is a cable lock 17;

所述辅助支撑装置包括固定设置在移动装置上的支撑套筒14,安装在支撑套筒14中的支撑液压杆15和固定在支撑液压杆15顶部的支撑滑轮16;所述辅助支撑装置倾斜设置,且倾斜方向与所述移动装置移动的方向相反;并且与垂直方向的夹角不大于45°。The auxiliary supporting device includes a supporting sleeve 14 fixedly arranged on the mobile device, a supporting hydraulic rod 15 installed in the supporting sleeve 14 and a supporting pulley 16 fixed on the top of the supporting hydraulic rod 15; the auxiliary supporting device is arranged obliquely , and the direction of inclination is opposite to the moving direction of the mobile device; and the included angle with the vertical direction is not greater than 45°.

实施例2Example 2

如图1-3所示,一种线缆架设用装置系统,由定滑轮装置和操作系统组成,其中:As shown in Figure 1-3, a device system for cable erection is composed of a fixed pulley device and an operating system, wherein:

定滑轮装置由固定组件和滑轮组件构成,The fixed pulley device is composed of a fixed assembly and a pulley assembly.

所述固定组件包括长柄半圆抱箍1和短柄半圆抱箍2,短柄半圆抱箍2的一端以铰接的形式安装在长柄半圆抱箍1的长柄端,闭合状态下两个半圆抱箍的弧形部分组成一个完整的圆形抱箍结构,两个半圆抱箍的自由端通过连接件进行可拆卸连接;The fixed assembly includes a long handle semicircle hoop 1 and a short handle semicircle hoop 2, one end of the short handle semicircle hoop 2 is mounted on the long handle end of the long handle semicircle hoop 1 in the form of a hinge, and the two semicircle hoops in the closed state The arc-shaped part of the hoop forms a complete circular hoop structure, and the free ends of the two semicircular hoops are detachably connected through connectors;

所述滑轮组件包括定滑轮5、平台6、液压杆7和套筒3,所述液压杆7的缸体设置在套筒3中,平台6设置在液压杆7的顶端,定滑轮5安装在平台6的台面上;平台6的侧面还设置有锁扣8;Described pulley assembly comprises fixed pulley 5, platform 6, hydraulic rod 7 and sleeve 3, and the cylinder block of described hydraulic rod 7 is arranged in sleeve 3, and platform 6 is arranged on the top of hydraulic rod 7, and fixed pulley 5 is installed on On the table of the platform 6; the side of the platform 6 is also provided with a lock 8;

所述套筒3为上端开口下端封闭的圆柱形筒,固定组件有两组,分别通过长柄半圆抱箍1的长柄末端固定在套筒3的上部和下部;The sleeve 3 is a cylindrical tube with an open upper end and a closed lower end. There are two sets of fixing components, which are respectively fixed on the upper and lower parts of the sleeve 3 through the long handle end of the long handle semicircular hoop 1;

操作系统包括升降操作台、移动装置和辅助支撑装置;其中移动装置的功能是携带设置在其上的升降操作台和辅助支撑装置进行移动作业;The operating system includes a lifting operation table, a mobile device and an auxiliary support device; the function of the mobile device is to carry the lifting operation table and auxiliary support device set on it for mobile operations;

所述升降操作台包括设置在移动装置上的液压升降平台9,液压升降平台9的顶部平台上设置有固定杆10、工具箱11、座椅12和操作控制台13,固定杆10的上部安装有线缆锁扣17;Described lifting operation platform comprises the hydraulic lifting platform 9 that is arranged on mobile device, and the top platform of hydraulic lifting platform 9 is provided with fixed bar 10, tool box 11, seat 12 and operation console 13, and the top of fixed bar 10 is installed There is a cable lock 17;

所述辅助支撑装置包括固定设置在移动装置上的支撑套筒14,安装在支撑套筒14中的支撑液压杆15和固定在支撑液压杆15顶部的支撑滑轮16;所述辅助支撑装置倾斜设置,且倾斜方向与所述移动装置移动的方向相反;并且与垂直方向的夹角不大于45°。The auxiliary supporting device includes a supporting sleeve 14 fixedly arranged on the mobile device, a supporting hydraulic rod 15 installed in the supporting sleeve 14 and a supporting pulley 16 fixed on the top of the supporting hydraulic rod 15; the auxiliary supporting device is arranged obliquely , and the direction of inclination is opposite to the moving direction of the mobile device; and the included angle with the vertical direction is not greater than 45°.

所述长柄半圆抱箍1和短柄半圆抱箍2的半圆抱箍上设置有多个安装孔或者一个长孔,半圆抱箍内设置有弧形胶片4,所述弧形胶片4的凸侧设置有与半圆抱箍上的安装孔相适应的多个柱状凸起或者一个与长孔对应的长条状凸起,并通过凸起设置在半圆抱箍内侧。The semicircle hoops of the long handle semicircle hoop 1 and the short handle semicircle hoop 2 are provided with a plurality of mounting holes or a long hole, an arc-shaped film 4 is arranged in the semi-circle hoop, and the protrusion of the arc-shaped film 4 A plurality of columnar protrusions adapted to the mounting holes on the semicircular hoop or a strip-shaped protrusion corresponding to the long hole are arranged on the side, and are arranged inside the semicircular hoop through the protrusions.

使用基本过程如下:首先将定滑轮装置通过固定组件固定在目标线杆下部,然后将线缆通过锁扣8固定在平台6上,启动液压杆7将定滑轮5提升到需要的高度。此时将卡车(移动装置)携带的一体操作系统运输就位(靠近定滑轮装置),操作员在工作台座椅12处就位,启动操作控制台13,控制支撑液压杆15和液压升降平台9升高,然后操作员将线缆从锁扣8取下,牵引固定到线缆锁扣17上,同时线缆应当通过辅助支撑装置的支撑滑轮16,并继续利用支撑液压杆15将支撑滑轮16提升到高于定滑轮5的位置(这种过高支撑有利于避免缺少辅助滑轮的情况下,线缆因自重与挂钩接触产生不必要的摩擦),同时操作控制台13控制角度调节装置使辅助支撑装置倾斜到合适的角度。操作员从工具箱中取出工具完成线缆的架设,并在完成某段安装后,点击操作控制台13的按钮通知车内人员开车前进,或通过喊话通知,直到完成两根线杆之间的架设工作。The basic process is as follows: First, fix the fixed pulley device to the lower part of the target pole through the fixing assembly, then fix the cable on the platform 6 through the lock 8, and start the hydraulic lever 7 to lift the fixed pulley 5 to the required height. At this time, the integrated operating system carried by the truck (mobile device) is transported in place (close to the fixed pulley device), the operator takes the position at the workbench seat 12, starts the operation console 13, and controls the supporting hydraulic rod 15 and the hydraulic lifting platform 9 rises, and then the operator removes the cable from the lock 8, pulls and fixes it on the cable lock 17, and at the same time the cable should pass through the support pulley 16 of the auxiliary support device, and continue to use the support hydraulic rod 15 to push the support pulley 16 is lifted to a position higher than the fixed pulley 5 (this over-high support is beneficial to avoid unnecessary friction caused by the contact between the cable and the hook due to its own weight in the absence of auxiliary pulleys), and at the same time, the console 13 is operated to control the angle adjustment device so that The auxiliary support device is tilted to the appropriate angle. The operator takes out the tool from the tool box to complete the erection of the cable, and after completing a certain section of installation, clicks the button on the operation console 13 to inform the personnel in the vehicle to drive forward, or notify by shouting until the installation between the two wire poles is completed. erection work.

上面结合附图对本实用新型的实施例作了详细说明,但是本实用新型并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The embodiments of the present utility model have been described in detail above in conjunction with the accompanying drawings, but the present utility model is not limited to the above-mentioned embodiments. Make various changes below.

Claims (4)

1.一种线缆架设用装置系统,其特征在于,由定滑轮装置和操作系统组成,其中:1. A device system for cable erection, characterized in that it consists of a fixed pulley device and an operating system, wherein: 定滑轮装置由固定组件和滑轮组件构成,The fixed pulley device is composed of a fixed assembly and a pulley assembly. 所述固定组件包括长柄半圆抱箍(1)和短柄半圆抱箍(2),短柄半圆抱箍(2)的一端以铰接的形式安装在长柄半圆抱箍(1)的长柄端,闭合状态下两个半圆抱箍的弧形部分组成一个完整的圆形抱箍结构,两个半圆抱箍的自由端通过连接件进行可拆卸连接;The fixing assembly includes a long handle semicircle hoop (1) and a short handle semicircle hoop (2), and one end of the short handle semicircle hoop (2) is hingedly installed on the long handle of the long handle semicircle hoop (1) In the closed state, the arc-shaped parts of the two semicircular hoops form a complete circular hoop structure, and the free ends of the two semicircular hoops are detachably connected through connectors; 所述滑轮组件包括定滑轮(5)、平台(6)、液压杆(7)和套筒(3),所述液压杆(7)的缸体设置在套筒(3)中,平台(6)设置在液压杆(7)的顶端,定滑轮(5)安装在平台(6)的台面上;平台(6)的侧面还设置有锁扣(8);The pulley assembly includes a fixed pulley (5), a platform (6), a hydraulic rod (7) and a sleeve (3), the cylinder of the hydraulic rod (7) is set in the sleeve (3), and the platform (6 ) is set on the top of the hydraulic rod (7), and the fixed pulley (5) is installed on the platform (6); the side of the platform (6) is also provided with a lock (8); 所述套筒(3)为上端开口下端封闭的圆柱形筒,固定组件有两组,分别通过长柄半圆抱箍(1)的长柄末端固定在套筒(3)的上部和下部;The sleeve (3) is a cylindrical tube with an open upper end and a closed lower end. There are two sets of fixing components, which are respectively fixed on the upper and lower parts of the sleeve (3) through the long handle end of the long handle semicircular hoop (1); 操作系统包括升降操作台、移动装置和辅助支撑装置;其中移动装置的功能是携带设置在其上的升降操作台和辅助支撑装置进行移动作业;The operating system includes a lifting operation table, a mobile device and an auxiliary support device; the function of the mobile device is to carry the lifting operation table and auxiliary support device set on it for mobile operations; 所述升降操作台包括设置在移动装置上的液压升降平台(9),液压升降平台(9)的顶部平台上设置有固定杆(10)、工具箱(11)、座椅(12)和操作控制台(13),固定杆(10)的上部安装有线缆锁扣(17);The lifting operation platform includes a hydraulic lifting platform (9) arranged on the mobile device, and the top platform of the hydraulic lifting platform (9) is provided with a fixed rod (10), a tool box (11), a seat (12) and an operation The console (13), the upper part of the fixed rod (10) is equipped with a cable lock (17); 所述辅助支撑装置包括固定设置在移动装置上的支撑套筒(14),安装在支撑套筒(14)中的支撑液压杆(15)和固定在支撑液压杆(15)顶部的支撑滑轮(16);所述辅助支撑装置倾斜设置,且倾斜方向与所述移动装置移动的方向相反;并且与垂直方向的夹角不大于The auxiliary support device includes a support sleeve (14) fixedly arranged on the mobile device, a support hydraulic rod (15) installed in the support sleeve (14) and a support pulley fixed on the top of the support hydraulic rod (15) ( 16); the auxiliary supporting device is arranged obliquely, and the direction of the inclination is opposite to the direction in which the mobile device moves; and the included angle with the vertical direction is not greater than 45°。45°. 2.根据权利要求1所述的一种线缆架设用装置系统,其特征在于:所述长柄半圆抱箍(1)和短柄半圆抱箍(2)的半圆抱箍上设置有多个安装孔或者一个长孔,半圆抱箍内设置有弧形胶片(4),所述弧形胶片(4)的凸侧设置有与半圆抱箍上的安装孔相适应的多个柱状凸起或者一个与长孔对应的长条状凸起,并通过凸起设置在半圆抱箍内侧。2. A device system for cable erection according to claim 1, characterized in that: the semicircular hoops of the long-handled semicircular hoop (1) and the short-handled semicircular hoop (2) are provided with multiple A mounting hole or a long hole, an arc-shaped film (4) is arranged in the semi-circular hoop, and a plurality of columnar protrusions or protrusions adapted to the mounting holes on the semi-circular hoop are provided on the convex side of the arc-shaped film (4). A long strip-shaped protrusion corresponding to the long hole is arranged inside the semicircular hoop through the protrusion. 3.根据权利要求1所述的一种线缆架设用装置系统,其特征在于:所述移动装置为卡车。3. A device system for cable erection according to claim 1, characterized in that: the mobile device is a truck. 4.根据权利要求1所述的一种线缆架设用装置系统,其特征在于:所述支撑套筒(14)通过倾斜角度调节装置安装在移动装置上,所述角度调节装置能够调节支撑套筒(14)与垂直方向的夹角。4. A device system for cable erection according to claim 1, characterized in that: the support sleeve (14) is installed on the mobile device through an inclination angle adjustment device, and the angle adjustment device can adjust the support sleeve The angle between cylinder (14) and vertical direction.
CN201621096597.5U 2016-09-30 2016-09-30 A kind of cable erection apparatus system Expired - Fee Related CN206292437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621096597.5U CN206292437U (en) 2016-09-30 2016-09-30 A kind of cable erection apparatus system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621096597.5U CN206292437U (en) 2016-09-30 2016-09-30 A kind of cable erection apparatus system

Publications (1)

Publication Number Publication Date
CN206292437U true CN206292437U (en) 2017-06-30

Family

ID=59095824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621096597.5U Expired - Fee Related CN206292437U (en) 2016-09-30 2016-09-30 A kind of cable erection apparatus system

Country Status (1)

Country Link
CN (1) CN206292437U (en)

Similar Documents

Publication Publication Date Title
JP5026936B2 (en) Derrick for steel tower assembly / disassembly and removal method
CN110027981B (en) Be used for wire pole production to use hoisting device
JP2016152698A (en) Cable lifting device and cable laying method
CN108821161B (en) A device for moving cable trench covers
CN206057660U (en) A kind of cable erection fixed pulley
CN206292437U (en) A kind of cable erection apparatus system
CN212425226U (en) Clamp type pipeline vertical hoisting equipment
JP2001220088A (en) Winch attaching/detaching apparatus of mobile crane
CN208772850U (en) A kind of rapid and handy device for aligning pipeline
CN111137736B (en) An automatic take-up device for power grid detection
CN211393326U (en) A pay-off for in wire and cable work progress
CN117856107A (en) A wire tightening device for power cable installation and use method thereof
CN204030464U (en) A kind of electric cable accessories is made platform
CN209740566U (en) Hoisting device for construction of building machine room
JPH10219689A (en) Pole extraction tool
CN116495617A (en) An auxiliary installation device for drainage pipes on the outer wall of a super high-rise building
CN114221260A (en) Insulator maintenance frame of electric power pylon
CN210710044U (en) Portable pay-off rack
CN201825703U (en) Gas cylinder hydraulic pressure test perpendicular lifting device
CN221662491U (en) A fire protection pipeline auxiliary construction device
CN107394651A (en) It is grounded operating assist device
CN209383165U (en) A new type of cable pay-off vehicle
CN223591333U (en) Cable transport device that is easy to fix
CN223879202U (en) A cable processing and pay-off device
CN215402535U (en) Metal support hoisting mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

CF01 Termination of patent right due to non-payment of annual fee