CN206290224U - Drilling well steel pipe clamping device - Google Patents

Drilling well steel pipe clamping device Download PDF

Info

Publication number
CN206290224U
CN206290224U CN201621355629.9U CN201621355629U CN206290224U CN 206290224 U CN206290224 U CN 206290224U CN 201621355629 U CN201621355629 U CN 201621355629U CN 206290224 U CN206290224 U CN 206290224U
Authority
CN
China
Prior art keywords
clamping part
fixed
bottom plate
outriggers
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621355629.9U
Other languages
Chinese (zh)
Inventor
陈海亮
刘强
谢晶
邱志强
李安强
汪文勇
陆彤
彭高友
高明忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201621355629.9U priority Critical patent/CN206290224U/en
Application granted granted Critical
Publication of CN206290224U publication Critical patent/CN206290224U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

钻井钢管夹持装置,属于钻井机械设备领域,包括安装在底板上的夹持部,底板包括固定底板和活动底板,夹持部包括第一夹持部与第二夹持部,第一夹持部固定在固定底板上,第二夹持部上设置有连接杆,第二夹持部固定在活动底板上,活动底板上还设置有固定支座,固定支座上设置有用于固定连接杆的通孔,连接杆穿过通孔与手柄相连,摇动手柄,连接杆带动第二夹持部及活动底板移动,夹持部紧闭时,第一夹持部与第二夹持部相接触,底板下方连接有支撑体,支撑体包括基座,基座侧壁间隔设置有可伸缩的支腿,支腿中部设置有与调节旋钮相连的中部滑动杆,通过旋转调节旋钮可伸缩调节支腿的长度,支腿下端设置有支腿脚,适用于夹持钢管。

The drilling steel pipe clamping device belongs to the field of drilling machinery and equipment, and includes a clamping part installed on a bottom plate. The bottom plate includes a fixed bottom plate and a movable bottom plate. The clamping part includes a first clamping part and a second clamping part. The first clamping part part is fixed on the fixed base, the second clamping part is provided with a connecting rod, the second clamping part is fixed on the movable base, the movable base is also provided with a fixed support, and the fixed support is provided with a bracket for fixing the connecting rod. Through the hole, the connecting rod is connected to the handle through the through hole, the handle is shaken, the connecting rod drives the second clamping part and the movable bottom plate to move, when the clamping part is tightly closed, the first clamping part contacts the second clamping part, A support body is connected under the bottom plate, the support body includes a base, and telescopic outriggers are arranged at intervals on the side wall of the base, and a middle sliding rod connected with an adjustment knob is arranged in the middle of the outriggers, and the outriggers can be telescopically adjusted by rotating the adjustment knob. length, the lower end of the outrigger is provided with outrigger feet, which are suitable for clamping steel pipes.

Description

钻井钢管夹持装置Drilling steel pipe clamping device

技术领域technical field

本实用新型属于钻井机械设备领域,尤其是涉及一种用于夹持钻井钢管的夹持装置。The utility model belongs to the field of drilling machinery and equipment, in particular to a clamping device for clamping a drilling steel pipe.

背景技术Background technique

在钻井试验现场通常都需要将钢管接入到钻孔中的操作。现有技术中钻孔接入钢管时需要将钢管固定在铅锤上,再将钢管接入钻孔,在将钢管固定在铅锤上的过程中,需要几个操作员工一起协作,先人工固定住钢管,再将钢管与铅锤相连接。然而,人工固定钢管牢固性较差,钢管经常在与钻井铅锤连接固定时滚动,效果不好;且人工固定钢管费时费力。因此,亟需一种钻井钢管夹持装置,以便降低操作员工接入钢管时的劳动强度,提高工作效率,增强固定牢固性。The operation of inserting steel pipes into the borehole is usually required at the drilling test site. In the prior art, when the drill hole is connected to the steel pipe, it is necessary to fix the steel pipe on the plumb bob, and then connect the steel pipe to the drill hole. In the process of fixing the steel pipe on the plumb bob, several operators need to work together to fix it manually first. Hold the steel pipe, and then connect the steel pipe with the plumb weight. However, the firmness of manually fixing the steel pipe is relatively poor, and the steel pipe often rolls when it is connected and fixed with the drilling plumb, and the effect is not good; and the manual fixing of the steel pipe is time-consuming and laborious. Therefore, there is an urgent need for a clamping device for drilling steel pipes, so as to reduce the labor intensity of operators when connecting steel pipes, improve work efficiency, and enhance the firmness of fixing.

实用新型内容Utility model content

本实用新型所要解决的技术问题是为了克服现有钻井试验操作中需要人工固定钢管,牢固性差且效率底下的缺点,提供一种钻井钢管夹持装置。The technical problem to be solved by the utility model is to provide a clamping device for drilling steel pipes in order to overcome the shortcomings of manual fixing of steel pipes in the existing drilling test operation, poor firmness and low efficiency.

本实用新型解决其技术问题所采用的技术方案是:钻井钢管夹持装置,包括安装在底板上的夹持部,底板包括固定底板和活动底板,夹持部包括第一夹持部与第二夹持部,第一夹持部固定在固定底板上,第二夹持部上设置有连接杆,第二夹持部固定在活动底板上,活动底板上还设置有固定支座,固定支座上设置有用于固定连接杆的通孔,连接杆穿过通孔与手柄相连,摇动手柄,连接杆带动第二夹持部及活动底板移动,夹持部紧闭时,第一夹持部与第二夹持部相接触,其内部形成放置钢管的腔体,底板下方连接有有支撑体,支撑体包括基座,基座侧壁间隔设置有可伸缩的支腿,支腿中部设置有与调节旋钮相连的中部滑动杆,通过旋转调节旋钮可伸缩调节支腿的长度,支腿下端设置有支腿脚。The technical solution adopted by the utility model to solve the technical problem is: the drilling steel pipe clamping device includes a clamping part installed on the bottom plate, the bottom plate includes a fixed bottom plate and a movable bottom plate, and the clamping part includes a first clamping part and a second clamping part. The clamping part, the first clamping part is fixed on the fixed base, the second clamping part is provided with a connecting rod, the second clamping part is fixed on the movable base, and the movable base is also provided with a fixed support, the fixed support There is a through hole for fixing the connecting rod, the connecting rod passes through the through hole and is connected with the handle, the handle is shaken, the connecting rod drives the second clamping part and the movable bottom plate to move, when the clamping part is closed, the first clamping part and the The second clamping part is in contact, and a cavity for placing steel pipes is formed inside it. A support body is connected under the bottom plate. The support body includes a base. The side walls of the base are provided with telescopic outriggers at intervals. The middle sliding rod connected with the adjustment knob can be used to telescopically adjust the length of the outrigger by rotating the adjustment knob, and the lower end of the outrigger is provided with a outrigger foot.

进一步的,基座侧壁上设有连接片,支腿与连接片相连,支腿可绕连接片转动。Further, a connecting piece is provided on the side wall of the base, the outrigger is connected with the connecting piece, and the outrigger can rotate around the connecting piece.

具体的,第一夹持部与第二夹持部为弧形,夹持部与钢管接触的接触面设置有柔性材料层,柔性材料层上设置有防滑纹。Specifically, the first clamping part and the second clamping part are arc-shaped, the contact surface of the clamping part and the steel pipe is provided with a flexible material layer, and the flexible material layer is provided with anti-slip lines.

进一步的,底板上设置有倾角测量仪及自动报警装置,倾角测量仪与自动报警装置相连,倾角测量仪用于测量底板的倾斜角度,当底板的倾斜角度超过预设值时,自动报警装置接收到信号发出警报。Further, the base plate is provided with an inclination measuring instrument and an automatic alarm device, the inclination measuring instrument is connected with the automatic alarm device, the inclination measuring instrument is used to measure the inclination angle of the base plate, and when the inclination angle of the base plate exceeds a preset value, the automatic alarm device receives To the signal to sound the alarm.

进一步的,支腿下部设置有位移传感器,位移传感器与自动报警装置相连,位移传感器用于测量支腿的位移,当支腿的位移超过一定阈值时,自动报警装置接收到信号发出警报。Further, a displacement sensor is provided at the lower part of the outrigger, and the displacement sensor is connected with an automatic alarm device. The displacement sensor is used to measure the displacement of the outrigger. When the displacement of the outrigger exceeds a certain threshold, the automatic alarm device receives a signal and sends out an alarm.

优选的,底板轴心处设置有中心螺纹孔,支撑体顶部设置有与中心螺纹孔相适配的螺纹杆。Preferably, a central threaded hole is provided at the axis of the bottom plate, and a threaded rod matching the central threaded hole is provided on the top of the support body.

进一步的,支腿脚为三角支腿脚或平板支腿脚,平板支腿脚包括平脚支撑底板、平脚支撑垫片及平脚支撑固定栓,通过平脚支撑垫片及平脚支撑固定栓将支腿固定在平脚支撑底板上。Further, the outrigger foot is a triangular outrigger foot or a flat outrigger foot, and the flat outrigger foot includes a flat foot supporting base plate, a flat foot supporting gasket and a flat foot supporting fixing bolt, and the supporting leg is fixed by the flat foot supporting gasket and the flat foot supporting fixing bolt. Fastened to flat foot support base.

本实用新型的有益效果是:使用时将多个钻井钢管夹持装置安置在适当位置,并利用合适的支腿脚进行固定,将所需钢管安置在钢管夹持装置上,并通过钢管夹持装置将钢管两端或其他部位固定,将钢管固定好之后即可与钻井铅锤装置相连接;该装置结构简单,固定效果好,且使用柔性材料层的接触面,防止损坏钢管,利用防滑纹防止钢管脱落,节约人力资源,提高工作效率,增强固定牢固性。本实用新型用于夹持钢管。The beneficial effects of the utility model are: when in use, a plurality of drilling steel pipe clamping devices are placed in appropriate positions, and fixed by using suitable outriggers, the required steel pipes are placed on the steel pipe clamping devices, and the steel pipe clamping devices pass through Fix both ends or other parts of the steel pipe, and then connect the steel pipe with the drilling plumb device; the device has a simple structure, good fixing effect, and uses a flexible material layer contact surface to prevent damage to the steel pipe, and uses anti-slip lines to prevent The steel pipe falls off, saving human resources, improving work efficiency, and enhancing the firmness of fixing. The utility model is used for clamping steel pipes.

附图说明Description of drawings

图1是本实用新型实施例1中夹持部分开时的结构示意图;Fig. 1 is the structural representation when clamping part is separated in the utility model embodiment 1;

图2是本实用新型实施例1中夹持部紧闭时的结构示意图;Fig. 2 is a schematic diagram of the structure when the clamping part is tightly closed in Embodiment 1 of the utility model;

图3是本实用新型实施例1的俯视图;Fig. 3 is the top view of the utility model embodiment 1;

图4是本实用新型实施例1中三角支腿脚的结构示意图;Fig. 4 is a schematic structural view of a triangular outrigger foot in Example 1 of the utility model;

图5是本实用新型实施例2中的结构示意图;Fig. 5 is the structural representation among the utility model embodiment 2;

图6是本实用新型实施例2中平脚支腿脚的结构示意图;Fig. 6 is a schematic view of the structure of the flat-leg support leg in Example 2 of the utility model;

图7为支撑体上部主视图;Figure 7 is a front view of the upper part of the support body;

图8为支撑体上部侧视图;Figure 8 is a side view of the upper part of the support body;

其中,1为夹持部,11为第一夹持部,12为第二夹持部,2为连接杆,3为底板,4为固定支座,5为手柄,61为第一支腿,71为第一支腿调节旋钮,81为第一支腿中部滑动杆,91为第一三角支腿脚,10为活动底板,62为第二支腿,72为第二支腿调节旋钮,82为第二支腿中部滑动杆,92为第二三角支腿脚,63为第三支腿,73为第三支腿调节旋钮,83为第三支腿中部滑动杆,93为第三三角支腿脚,111为第一连接片,112为第二连接片,113为第三连接片,13为基座,14为平脚支撑底板,15为平脚支撑固定栓,16为平脚支撑垫片,17为平脚支腿,18为三角支撑脚,19为三角支腿,211为第一平脚支腿脚,212为第二平脚支腿脚,213为第三平脚支腿脚,20为倾角测量仪,241为第一位移传感器,242为第二位移传感器,243为第三位移传感器,23为自动报警装置。Among them, 1 is a clamping part, 11 is a first clamping part, 12 is a second clamping part, 2 is a connecting rod, 3 is a bottom plate, 4 is a fixed support, 5 is a handle, 61 is a first leg, 71 is the first leg adjustment knob, 81 is the middle sliding rod of the first leg, 91 is the first triangular leg foot, 10 is the movable bottom plate, 62 is the second leg, 72 is the second leg adjustment knob, 82 is the The sliding rod in the middle of the second leg, 92 is the foot of the second triangular leg, 63 is the third leg, 73 is the adjustment knob of the third leg, 83 is the sliding rod in the middle of the third leg, and 93 is the pin of the third triangular leg, 111 is the first connecting piece, 112 is the second connecting piece, 113 is the third connecting piece, 13 is the base, 14 is the flat foot support base plate, 15 is the flat foot support fixing bolt, 16 is the flat foot support gasket, 17 18 is a triangular support leg, 19 is a triangular leg, 211 is the first flat leg leg, 212 is the second flat leg leg, 213 is the third flat leg leg, 20 is an inclination measuring instrument , 241 is the first displacement sensor, 242 is the second displacement sensor, 243 is the third displacement sensor, and 23 is an automatic alarm device.

具体实施方式detailed description

下面结合附图及实施例,详细描述本实用新型的技术方案。The technical scheme of the utility model is described in detail below in conjunction with the accompanying drawings and embodiments.

实施例1Example 1

本实用新型的钻井钢管夹持装置,包括安装在底板3上的夹持部1,底板3包括固定底板和活动底板10,夹持部1包括第一夹持部11与第二夹持部12,第一夹持部11固定在固定底板上,第二夹持部12上设置有连接杆2,第二夹持部12固定在活动底板10上,活动底板10上还设置有固定支座4,固定支座4上设置有用于固定连接杆2的通孔,连接杆2穿过通孔与手柄5相连,摇动手柄5,连接杆2带动第二夹持部12及活动底板10移动,摇动手柄使得夹持部1紧闭时,第一夹持部11与第二夹持部12相接触,其底部的固定底板和活动底板相接触,第一夹持部11与第二夹持部12内部形成用于夹紧钢管的腔体,即转动手柄5,通过活动底板、第二夹持部12、连接杆2及固定支座4的整体移动来调节第一夹持部与第二夹持部之间的间距,从而将钢管夹紧。底板3下方连接有有支撑体,支撑体包括基座13,为了保证平衡,底板与基座13同轴设置,基座13侧壁均匀间隔设置有可伸缩的支腿,支腿中部设置有与调节旋钮相连的中部滑动杆,通过旋转调节旋钮可伸缩调节支腿的长度,支腿下端设置有支腿脚。可采用焊接、粘接等方式固定支腿与支腿脚。为了增强支腿与支腿脚的固定力,支腿下端设有螺纹孔,支腿脚上端设置有与螺纹孔相适配螺杆。The drilling steel pipe clamping device of the present utility model includes a clamping part 1 installed on a base plate 3, the base plate 3 includes a fixed base plate and a movable base plate 10, and the clamping part 1 includes a first clamping part 11 and a second clamping part 12 , the first clamping part 11 is fixed on the fixed base plate, the second clamping part 12 is provided with a connecting rod 2, the second clamping part 12 is fixed on the movable base plate 10, and the movable base plate 10 is also provided with a fixed support 4 , the fixed support 4 is provided with a through hole for fixing the connecting rod 2, the connecting rod 2 passes through the through hole and is connected with the handle 5, the handle 5 is shaken, the connecting rod 2 drives the second clamping part 12 and the movable bottom plate 10 to move, shake When the handle makes the clamping part 1 tightly closed, the first clamping part 11 is in contact with the second clamping part 12, and the fixed bottom plate at the bottom thereof is in contact with the movable bottom plate, and the first clamping part 11 and the second clamping part 12 are in contact. A cavity for clamping the steel pipe is formed inside, that is, the handle 5 is turned, and the first clamping part and the second clamping part are adjusted through the overall movement of the movable bottom plate, the second clamping part 12, the connecting rod 2 and the fixed support 4. The distance between the parts, so that the steel pipe is clamped. The bottom of the base plate 3 is connected with a support body, and the support body includes a base 13. In order to ensure balance, the base plate and the base 13 are coaxially arranged, and the side walls of the base 13 are evenly spaced with telescopic legs. The middle sliding rod connected with the adjustment knob can be used to telescopically adjust the length of the outrigger by rotating the adjustment knob, and the lower end of the outrigger is provided with a outrigger foot. The outriggers and outrigger feet can be fixed by means of welding, bonding, etc. In order to enhance the fixing force between the outrigger and the outrigger foot, the lower end of the outrigger is provided with a threaded hole, and the upper end of the outrigger foot is provided with a screw rod matching the threaded hole.

支腿可以采用多种方式调节其长度,如具有三个杆,分别为上部杆、下部杆及中部滑动杆,中部滑动杆套接在下部杆内部,当需要伸长支腿时,通过旋转调节旋钮将中部滑动杆从下部杆内拉出,或是其他结构也可以。The length of the outrigger can be adjusted in various ways. For example, there are three rods, which are the upper rod, the lower rod and the middle sliding rod. The middle sliding rod is sleeved inside the lower rod. When the leg needs to be extended, it can be adjusted by rotation A knob pulls the middle sliding rod out of the lower rod, or other configurations would work as well.

第一夹持部11与第二夹持部12可以相接触形成密闭圆环,也可以形成钢管周长四分之三或其他长度的弧,亦或是其他形状,只要能夹持钢管即可。第一夹持部11与第二夹持部12为优选弧形,夹持部与钢管接触的接触面设置有柔性材料层,以免夹持钢管时损伤钢管;柔性材料层上设置有防滑纹,防止夹持钢管时打滑。柔性材料可以为橡胶、硅胶等。The first clamping part 11 and the second clamping part 12 can be in contact to form a closed ring, and can also form an arc of three-quarters of the circumference of the steel pipe or other lengths, or other shapes, as long as the steel pipe can be clamped . The first clamping part 11 and the second clamping part 12 are preferably arc-shaped, and the contact surface between the clamping part and the steel pipe is provided with a flexible material layer, so as not to damage the steel pipe when clamping the steel pipe; the flexible material layer is provided with anti-slip lines, Prevents slippage when clamping steel pipes. The flexible material can be rubber, silica gel, etc.

实施例2Example 2

支腿可为任意个,但考虑到兼具稳定性及成本低廉的效果,优选三个,因此,本例以三个三角支腿脚为例进行说明。There can be any number of outriggers, but considering the effects of both stability and low cost, three are preferred. Therefore, this example uses three triangular outriggers as an example for illustration.

如图1-4所示,第一支腿61、第二支腿62、第三支腿63分别连接到基座13上。第一支腿61、第二支腿62、第三支腿63分别可绕第一连接片111、第二连接片112、第三连接片112转动。第一连接片111、第二连接片112、第三连接片113均布于基座13周围,支撑体上部的结构如图7-8所示。支撑体可以直接焊接、粘接基座13上,考虑到部件损坏时易于维修和更换,以及具有良好的固定力,在底板3轴心处设置有中心螺纹孔,支撑体顶部设置有与中心螺纹孔相适配的螺纹杆。As shown in FIGS. 1-4 , the first leg 61 , the second leg 62 and the third leg 63 are respectively connected to the base 13 . The first leg 61 , the second leg 62 and the third leg 63 can rotate around the first connecting piece 111 , the second connecting piece 112 and the third connecting piece 112 respectively. The first connecting piece 111 , the second connecting piece 112 and the third connecting piece 113 are evenly distributed around the base 13 , and the structure of the upper part of the supporting body is shown in FIGS. 7-8 . The support body can be directly welded and bonded to the base 13. Considering that the parts are damaged, it is easy to repair and replace, and has good fixing force. A central threaded hole is provided at the axis of the bottom plate 3, and a central threaded hole is provided on the top of the support body. threaded rod to match the hole.

第一支腿的中部滑动杆81处、第二支腿的中部滑动杆82处、第三支腿的中部滑动杆83处分别设置有第一支腿调节旋钮71、第二支腿调节旋钮72、第三支腿调节旋钮73。旋转支腿调节按钮可以伸缩支腿。第一支腿61下部、第二支腿62下部、第三支腿63下部分别布设有第一位移传感器241、第二位移传感器242、第三位移传感器243。第一支腿61下部、第二支腿62下部、第三支腿63下部分别与第一三角支腿脚91、第二三角支腿脚92、第三三角支腿脚93相连。The middle sliding rod 81 of the first leg, the middle sliding rod 82 of the second supporting leg, and the middle sliding rod 83 of the third supporting leg are provided with the first leg adjusting knob 71 and the second supporting leg adjusting knob 72 respectively. , The third leg adjustment knob 73. Rotate the outrigger adjustment buttons to extend and retract the outriggers. A first displacement sensor 241 , a second displacement sensor 242 , and a third displacement sensor 243 are disposed on the lower part of the first leg 61 , the second leg 62 , and the third leg 63 , respectively. The bottom of the first leg 61 , the bottom of the second leg 62 and the bottom of the third leg 63 are connected to the first triangular leg 91 , the second triangular leg 92 and the third triangular leg 93 respectively.

底板3上布设有倾角测量仪20及自动报警装置23,倾角测量仪20与自动报警装置23相连,倾角测量仪20用于测量底板的倾斜角度,当底板的倾斜角度超过预设值时,自动报警装置23接收到信号发出警报,提醒工作人员对装置进行调节。The base plate 3 is equipped with an inclination measuring instrument 20 and an automatic alarm device 23, the inclination measuring instrument 20 is connected with the automatic alarm device 23, and the inclination measuring instrument 20 is used for measuring the inclination angle of the base plate. The alarm device 23 receives the signal and sends an alarm to remind the staff to adjust the device.

第一支腿61下部、第二支腿62下部、第三支腿63下部分别布设有第一位移传感器241、第二位移传感器242、第三位移传感器243,第一位移传感器241、第二位移传感器242、第三位移传感器243分别与自动报警装置23相连,位移传感器用于测量支腿的位移,并当支腿位移超过临界值时,自动报警装置被激活发出警报,提醒工作人员对支腿进行调节。The bottom of the first leg 61, the bottom of the second leg 62, and the bottom of the third leg 63 are respectively equipped with a first displacement sensor 241, a second displacement sensor 242, a third displacement sensor 243, the first displacement sensor 241, the second displacement sensor Sensor 242, the 3rd displacement sensor 243 are connected with automatic alarm device 23 respectively, and displacement sensor is used for measuring the displacement of support leg, and when the displacement of support leg exceeds critical value, automatic alarm device is activated and sends out the alarm, reminds the staff to monitor the support leg. Make adjustments.

实施例3Example 3

如图5-6所示,是使用平脚支腿脚的钻井钢管夹持装置及平脚支腿脚的结构示意图。平板支腿脚包括平脚支撑底板14、平脚支撑垫片16及平脚支撑固定栓15,通过平脚支撑垫片16及平脚支撑固定栓15将支腿固定在平脚支撑底板14上。第一支腿61下部、第二支腿62下部、第三支腿63下部分别与第一平脚支腿脚211、第二平脚支腿脚212、第三平脚支腿脚213相连。As shown in Figure 5-6, it is a schematic diagram of the structure of the drilling steel pipe clamping device and the flat leg leg using the flat leg leg. Flat-panel supporting leg pin comprises flat-foot support base plate 14, flat-foot support gasket 16 and flat-foot support fixing bolt 15, by flat-foot support gasket 16 and flat-foot support fixing bolt 15, supporting leg is fixed on the flat-foot support bottom plate 14. The bottom of the first leg 61 , the bottom of the second leg 62 and the bottom of the third leg 63 are connected to the first flat leg 211 , the second flat leg 212 and the third flat leg 213 respectively.

支腿脚需要根据钻井实验现场的条件进行选择,若钻井实验现场为泥地则可选用三角支腿脚91、92、93或平脚支腿脚211、212、213,若钻井实验现场为水泥地则选用平脚支腿脚211、212、213。The outriggers need to be selected according to the conditions of the drilling test site. If the drilling test site is mud, you can choose triangular outriggers 91, 92, 93 or flat outriggers 211, 212, 213. If the drilling test site is cement ground, you can choose Flat feet outrigger feet 211,212,213.

Claims (7)

1.钻井钢管夹持装置,其特征在于,包括安装在底板(3)上的夹持部(1),底板(3)包括固定底板和活动底板(10),夹持部(1)包括第一夹持部(11)与第二夹持部(12),第一夹持部(11)固定在固定底板上,第二夹持部(12)上设置有连接杆(2),第二夹持部(12)固定在活动底板(10)上,活动底板(10)上还设置有固定支座(4),固定支座(4)上设置有用于固定连接杆(2)的通孔,连接杆(2)穿过通孔与手柄(5)相连,摇动手柄(5),连接杆(2)带动第二夹持部(12)及活动底板(10)移动,夹持部(1)紧闭时,第一夹持部(11)与第二夹持部(12)相接触,其内部形成放置钢管的腔体,底板(3)下方连接有支撑体,支撑体包括基座(13),基座(13)侧壁均匀间隔设置有可伸缩的支腿,支腿中部设置有与调节旋钮相连的中部滑动杆,通过旋转调节旋钮可伸缩调节支腿的长度,支腿下端设置有支腿脚。1. Drilling steel pipe clamping device, it is characterized in that, comprises the clamping part (1) that is installed on the base plate (3), and base plate (3) comprises fixed base plate and movable base plate (10), and clamping part (1) comprises the first A clamping part (11) and a second clamping part (12), the first clamping part (11) is fixed on the fixed base plate, the second clamping part (12) is provided with a connecting rod (2), the second The clamping part (12) is fixed on the movable bottom plate (10), and the movable bottom plate (10) is also provided with a fixed support (4), and the fixed support (4) is provided with a through hole for fixing the connecting rod (2) , the connecting rod (2) is connected to the handle (5) through the through hole, and the handle (5) is shaken, and the connecting rod (2) drives the second clamping part (12) and the movable bottom plate (10) to move, and the clamping part (1 ) is tightly closed, the first clamping part (11) is in contact with the second clamping part (12), and a cavity for placing steel pipes is formed inside it, and a support body is connected under the bottom plate (3), and the support body includes a base ( 13), the side wall of the base (13) is evenly spaced with telescopic outriggers, the middle part of the outriggers is provided with a middle sliding rod connected with the adjustment knob, the length of the outriggers can be telescopically adjusted by rotating the adjustment knob, and the lower end of the outriggers is provided with There are outrigger feet. 2.如权利要求1所述的钻井钢管夹持装置,其特征在于,基座(13)侧壁上设有连接片,支腿与连接片相连,支腿可绕连接片转动。2. The clamping device for drilling steel pipes according to claim 1, characterized in that a connecting piece is provided on the side wall of the base (13), and the legs are connected to the connecting piece, and the legs can rotate around the connecting piece. 3.如权利要求1所述的钻井钢管夹持装置,其特征在于,第一夹持部(11)与第二夹持部(12)为弧形,夹持部与钢管接触的接触面设置有柔性材料层,柔性材料层上设置有防滑纹。3. The drilling steel pipe clamping device according to claim 1, characterized in that the first clamping part (11) and the second clamping part (12) are arc-shaped, and the contact surface between the clamping part and the steel pipe is set There is a flexible material layer, and anti-slip lines are arranged on the flexible material layer. 4.如权利要求1所述的钻井钢管夹持装置,其特征在于,底板(3)上设置有倾角测量仪(20)及自动报警装置(23),倾角测量仪(20)与自动报警装置(23)相连,倾角测量仪(20)用于测量底板的倾斜角度,当底板的倾斜角度超过预设值时,自动报警装置(23)接收到信号发出警报。4. The clamping device for drilling steel pipes as claimed in claim 1, characterized in that, the bottom plate (3) is provided with an inclination measuring instrument (20) and an automatic alarm device (23), and the inclination measuring instrument (20) and the automatic alarm device (23) is connected, and inclinometer (20) is used for measuring the inclination angle of base plate, and when the inclination angle of base plate exceeds preset value, automatic alarm device (23) receives signal and sends out the alarm. 5.如权利要求4所述的钻井钢管夹持装置,其特征在于,支腿下部设置有位移传感器,位移传感器与自动报警装置(23)相连,位移传感器用于测量支腿的位移,当支腿的位移超过一定阈值时,自动报警装置(23)接收到信号发出警报。5. The clamping device for drilling steel pipes as claimed in claim 4, characterized in that, the lower part of the support leg is provided with a displacement sensor, the displacement sensor is connected to the automatic alarm device (23), and the displacement sensor is used to measure the displacement of the support leg. When the displacement of the leg exceeds a certain threshold, the automatic alarm device (23) receives a signal and sends an alarm. 6.如权利要求1所述的钻井钢管夹持装置,其特征在于,底板(3)轴心处设置有中心螺纹孔,支撑体顶部设置有与中心螺纹孔相适配的螺纹杆。6. The drilling steel pipe clamping device according to claim 1, characterized in that a central threaded hole is provided at the axis of the bottom plate (3), and a threaded rod matching the central threaded hole is provided on the top of the support body. 7.如权利要求1所述的钻井钢管夹持装置,其特征在于,支腿脚为三角支腿脚或平板支腿脚,平板支腿脚包括平脚支撑底板(14)、平脚支撑垫片(16)及平脚支撑固定栓(15),通过平脚支撑垫片(16)及平脚支撑固定栓(15)将支腿固定在平脚支撑底板(14)上。7. The clamping device for drilling steel pipes as claimed in claim 1, characterized in that the outriggers are triangular outriggers or flat outriggers, and the flat outriggers include a flat foot support base plate (14) and a flat foot support pad (16) And flat foot support fixed bolt (15), support leg is fixed on the flat foot support base plate (14) by flat foot support gasket (16) and flat foot support fixed bolt (15).
CN201621355629.9U 2016-12-12 2016-12-12 Drilling well steel pipe clamping device Expired - Fee Related CN206290224U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621355629.9U CN206290224U (en) 2016-12-12 2016-12-12 Drilling well steel pipe clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621355629.9U CN206290224U (en) 2016-12-12 2016-12-12 Drilling well steel pipe clamping device

Publications (1)

Publication Number Publication Date
CN206290224U true CN206290224U (en) 2017-06-30

Family

ID=59096798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621355629.9U Expired - Fee Related CN206290224U (en) 2016-12-12 2016-12-12 Drilling well steel pipe clamping device

Country Status (1)

Country Link
CN (1) CN206290224U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437563A (en) * 2016-12-12 2017-02-22 四川大学 Drilling steel pipe clamping device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437563A (en) * 2016-12-12 2017-02-22 四川大学 Drilling steel pipe clamping device

Similar Documents

Publication Publication Date Title
CN205640136U (en) Surveying instrument tripod
CN204188188U (en) A kind of horizontal adjustment instrument measuring ground elevation
CN105805510A (en) Surveying and mapping instrument tripod
CN210771277U (en) A level tripod for construction project management
CN104295862B (en) A kind of power measuring instrument tripod
CN211525987U (en) Municipal works topography survey and drawing auxiliary assembly
CN206290224U (en) Drilling well steel pipe clamping device
CN219300375U (en) Detection support for detecting straightness of drill rod
CN106437563A (en) Drilling steel pipe clamping device
CN112146636A (en) An easy-to-move verticality detection device for construction projects
CN209131571U (en) A pile foundation verticality detection device
CN203025195U (en) Portable downhole anemograph bracket
CN205895176U (en) Improved generation mounting structure of rig holder
CN209026466U (en) A new type of centering rod bracket for measurement
CN211977890U (en) A positioning and ranging device for environmental art design
CN211855289U (en) Bridge renovation is measured and is prevented falling surveyor's level with high accuracy
CN204177316U (en) A kind of multi-functional tunnel monitoring utility appliance
CN108645510A (en) A kind of HVAC power transmission line noise-monitoring equipment
CN208204383U (en) For installing the horizontal adjustment bracket of test apparatus
CN214037436U (en) Instrument support frame for architectural survey
CN207378437U (en) A kind of Novel portable instrument of surveying and mapping stent
CN205426359U (en) Device is buried underground at scene of inside temperature in test road surface
CN207351439U (en) A kind of portable gradiometer of land surveying
CN216523631U (en) A wall detection device for construction engineering
CN210014787U (en) Manual hole digging pile verticality measuring instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20211212