CN206289668U - A kind of plains region monitoring well - Google Patents

A kind of plains region monitoring well Download PDF

Info

Publication number
CN206289668U
CN206289668U CN201621385334.6U CN201621385334U CN206289668U CN 206289668 U CN206289668 U CN 206289668U CN 201621385334 U CN201621385334 U CN 201621385334U CN 206289668 U CN206289668 U CN 206289668U
Authority
CN
China
Prior art keywords
well
pipe
monitoring
plains region
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621385334.6U
Other languages
Chinese (zh)
Inventor
凌静
张腾
邓良基
万柯均
唐祺超
马丁
邓欧平
谌首蓓
熊雷
徐博寒
康洋
冯香荣
张春龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Agricultural University
Original Assignee
Sichuan Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Agricultural University filed Critical Sichuan Agricultural University
Priority to CN201621385334.6U priority Critical patent/CN206289668U/en
Application granted granted Critical
Publication of CN206289668U publication Critical patent/CN206289668U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a kind of plains region monitoring well, including:Well body, vertically sleeve pipe is provided with well body perpendicular to ground, and some filter bores are distributed with below the tube wall of sleeve pipe, and the part that the filter bores are distributed with constitutes filter pipe, and screen pack is enclosed with the periphery of filter pipe;Described sleeve pipe is made of pvc material.Sleeve bottom uses pvc material back cover.The plains region monitoring well that the application is provided, from structure, it meets the requirement of plains region landform and soil texture situation;From the material selected, material both beneficial to the use of monitoring well and selected does not interfere with the water quality of underground water yet, so as to ensure the monitoring of water quality, improves the accuracy of scientific research;Made full use of from resource, the life-span of monitoring well when it loses scientific research monitoring and acts on, can be also used for the irrigation well or living-use water well in field at 8 10 years or so (in the case of maintenance is proper), accomplish making full use of for resource.

Description

A kind of plains region monitoring well
Technical field
The utility model is related to drilling technology field, more particularly to a kind of and supporting flat land of Ground water Quality Survey instrument Area's monitoring well.
Background technology
Monitoring well is terrain and level of ground water situation according to Plain to be designed, and is mainly used in monitoring plains region ground Lower water Nutrient change or other scientific research activities related to groundwater monitoring;And current plains region monitoring well monitoring The accuracy of water quality is not high, and service life is short, unitary function.
Utility model content
The purpose of this utility model is to solve the defect that above-mentioned prior art is present, there is provided a kind of water quality monitoring accuracy Plains region monitoring well high.
A kind of plains region monitoring well, including:Well body, vertically set is provided with well body perpendicular to ground Pipe, is distributed with some filter bores below the tube wall of sleeve pipe, and the part that the filter bores are distributed with constitutes filter pipe, in filter pipe Periphery be enclosed with screen pack;Described sleeve pipe is made of pvc material.Sleeve bottom uses pvc material back cover.
Further, plains region monitoring well as described above, the screen pack is made up of polyvinyl chloride material, between hole pattern Away from 3mm × 3mm, porosity 17.9%.
Further, plains region monitoring well as described above, between the inwall of well body and the outer wall of filter pipe Space be filled with gravel.
Further, plains region monitoring well as described above, a diameter of 5-15 ㎜ of the gravel.
Further, plains region monitoring well as described above, is inlaid with the shield of steel material above well body Wall pipe, described sleeve pipe stretches into shaft bottom through rear its end in the wall protection pipe.
Beneficial effect:
The plains region monitoring well that the application is provided, from structure, it meets plains region landform and soil texture situation Requirement;From the material selected, material both beneficial to the use of monitoring well and selected does not interfere with the water of underground water yet Matter, so as to ensure the monitoring of water quality, improves the accuracy of scientific research;Made full use of from resource, the life-span of monitoring well is in 8- 10 years or so (in the case of maintenance is proper), when it loses scientific research monitoring and acts on, can be also used for irrigation well or the life in field Well is applied flexibly, has accomplished making full use of for resource.
Brief description of the drawings
Fig. 1 is the utility model plains region monitoring well structural representation.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, below technical side in the utility model Case is clearly and completely described, it is clear that described embodiment is a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of the utility model protection.
Fig. 1 is the utility model plains region monitoring well structural representation, as shown in figure 1, the utility model offer is flat Original area's monitoring well, including:Well body, is vertically provided with sleeve pipe 2, in the pipe of sleeve pipe 2 in well body perpendicular to ground Wall lower section is distributed with some filter bores 4, and the part that the filter bores 4 are distributed with constitutes filter pipe, in the periphery parcel of filter pipe There is screen pack 5.Described sleeve pipe 2 is made of polyvinyl chloride.The bottom of sleeve pipe 2 uses pvc material back cover.
Specifically, Nutrient change is detected to obtain underground underground water, the application is by the lower section band in well body The sleeve pipe for having filter pipe realizes the collection of underground water, at the same in the particle sleeve pipe such as soil in order to avoid jacket exterior and shadow The accuracy of water quality monitoring is rung, the utility model has wrapped up two-layer screen pack for filtering jacket exterior in the periphery of filter pipe Silt.Simultaneously in order to avoid the water quality of influence underground water, described sleeve pipe 2 is made of pvc material.Sleeve bottom is used Pvc material back cover (purpose of back cover is to prevent the water quality in the influence to sediment well of bottom).
Preferably, in order to further avoid influenceing the water quality of underground water, the screen pack is made up of polyvinyl chloride material, from And improve the accuracy of water quality monitoring;Meanwhile, in order to the silt for preferably preventing cartridge exterior enters filter pipe, the filtering The net spacing 3mm × 3mm of mesh, porosity 17.9%.
Preferably, can not offset vertically in well body to ensure the sleeve pipe being made of pvc material, So as to avoid the fracture of sleeve pipe, and then the service life of the application monitoring well is improved, inwall and filter of the application in well body Space between the outer wall of water pipe is filled with gravel, and on the one hand the gravel plays a part of supporting sleeve, on the other hand, also has There is bulk impurity (for example large-scale particle of clod, mud) in filtering underground, it is to avoid the screen pack quilt of filter pipe periphery The situation of blocking occurs.
Preferably, a diameter of 5-15 ㎜ of the gravel.Only when the diameter of gravel is in the range of 5-15 ㎜, gravel Between gap can be only achieved it is optimal, so as to bulk impurity can be effectively filtered out and make the gravel filled between hole It is more sufficient, there can be more preferable support force to go supporting sleeve not offset;And gravel low cost, so as to reduce the application flat land The overall cost of area's monitoring well.
Preferably, the wall protection pipe 1 of steel material is inlaid with above well body, described sleeve pipe 2 passes through the retaining wall Shaft bottom is stretched into its end after in pipe 1.
In order to avoid sleeve pipe produces skew during lower section, the application is first inserted in one in the top of well body first The wall protection pipe 1 of section steel, then passes through the back lower place of wall protection pipe 1 to shaft bottom by sleeve pipe again, and by the limitation of wall protection pipe, sleeve pipe exists Skew would not be produced during lower section, the possibility of casing failure is also avoided, the application Plain is further increased The service life of regional monitoring well.In addition, pillar wall protects well head also in drilling process, aided drilling and periphery is prevented Soil block is collapsed.
First, monitoring well design requirement
Monitoring well drilling equipment uses CZ-22 type percussive drills, and using the drilling well of yellow mud mud off, (effect of yellow mud has two It is individual:One be in drilling process because be impingement drilling mode, thus had when drill bit falls it is offset, in drilling well Yellow mud is added to be conducive to the borehole wall for protecting periphery to prevent from deflecting in well in journey;Two is that yellow mud viscosity is strong, increases after addition yellow mud and beats The viscosity of mud during well, fast and easy removes mud), (drill bit is " one " font to the drilling well of " one " font drill bit, is passed through Machine by drill bit from top to bottom repeated stock ground reaching the purpose of drilling), disposal pore-forming (is drilling through the process of monitoring well It is middle whole only with the drill bit of this model, the well depth of needs is disposably got to, using bore>600mm, is a footpath Cheng Jing (diameter would not become since drilling) one tubing string (can only just put down one space of well casing in monitoring well, prevent space The excessive well casing for causing offsets), the sleeve pipe of monitoring well uses polyvinyl chloride U-PVC, caliber external diameter Φ 200 ㎜, (internal diameter) DN192 ㎜, (every PVC well casing 4m, because well depth is 15m, the 1m having more above can do appropriate interception to every pipeline 4000 ㎜ long, stay Part conduct is installed monitoring instrument and is used, or as the effect of auxiliary protection wellhead installation), filter pipe material uses U- PVC, caliber external diameter Φ 200 ㎜, (internal diameter) DN192 ㎜, 8.0 meters of shaft bottom bottom is that (length of filter pipe can base area for filter pipe The water level of lower water is appropriately adjusted), filter pipe is using artificial drilling open pore size Φ 10.0mm, the ㎜ of pitch of holes 50, every drainage The round of pipe perforate symmetry number 6, per round spacing 104mm, filter pipe often arranges 75 holes, the every hole of filter pipe 450, and filter pipe periphery is adopted Wound with material polyvinyl chloride hole pattern, hole pattern spacing 3mm × 3mm, porosity 17.9%, well casing configuration, well casing bottom (drainage Pipe) 8.0 meters, using pvc material back cover, (purpose of back cover is to prevent the water in the influence to sediment well of bottom in shaft bottom Matter), well casing top (wall casing) 8.0 meters of outer gussets of (including 1.0 meters of nature ground) well casing fill out Φ 5-15 ㎜ specification gravels.
Two monitoring well operational procedures
The well location measuring well point of offer → → rig install in place → → mud (addition yellow mud) hole encircle and hunt down → → drilling well extremely Projected depth → → well casing (because well casing is four sections, therefore this procedure needs a section well casing connection is gone into the well) is installed and hung down Directly → → correction well casing (keeps well casing to be located at the center of well, the mode of correction each drilling company should difference, this Shen Please with to be fixation with steel wire correct, it is convenient succinct) → → throw in filtrate (filtrate Φ 5-15 ㎜ gravels) → → cleaning well Mud → → examination draws water → → positive examination draw water (either for monitoring or domestic water, be required for drawing water, on the one hand can be by The yellow mud on unnecessary silt and the borehole wall in well is developed, well water is evacuated in formal drawing water on the other hand it is limpid, so as to Monitor and use).
Well location is determined by your unit according to integrated planning drilling well position in region.
3. after rig is installed in place, well location is checked, after confirmation is errorless, by hand excavation's Φ 700mm circular hole cutting depths 500mm, buried Φ 700mm wall protection pipes (pillar wall be exactly in order to drilling process protect well head, aided drilling and prevent periphery soil Block is collapsed), wall protection pipe is buried after finishing, and rig hangs in Φ 700mm wall protection pipes Φ 600mm " one " font drill bit, and will be viscous Property native (yellow mud) while being put into the hole in and then clear water being filled in hole and start percussion drilling, drilling process is always using high density mud In case collapse hole, drilling depth reaches whole hole after design well depth to slurry retaining wall drilling.Bit size is checked at any time simultaneously in boring procedure Hard wear-resistant material is welded in drill bit bottom to ensure bit size not less than ≮ Φ 550mm by the abrasion condition according to drill bit, and It is required that wellhole perpendicularity is not less than ≮ 95%.
4. after drilling depth reaches design well depth, drilling technique director reply hole depth, perpendicularity is detected, detected Start outside mud extraction hole in hole with draw tube after obtaining above-mentioned standard.Well casing lifting uses muslin band by Φ 200mm polychlorostyrene Ethene U-PVC well casings are fixed well casing is simultaneously slowly put into hole sleeve lift using hoist for driller, should distinguish during down tube first 8.0 meters of lower filter pipe, then 8.0 meters of lower going-into-well wall pipe and accomplishes to be connected firmly between well casing successively, installs vertical.
5. sleeve pipe perpendicularity is corrected and is fixed after the completion of Casing elevator dress, the ㎜ gravels of specification 5~10 are inserted in sleeve pipe periphery Filtrate is filled out untill 1 meter of the natural ground, and it is this (such mesh that 1 meter of well top is filled to natural ground with clay after the completion of well-flushing To be to maintain around the well casing away from natural ground be that permeability is weak, the strong material of steadiness).
6. mud, sand grains in well are cleaned up side by side using 6/7 cube of air compressor machine (can simply be interpreted as suction pump) Go out outside well, duration of well flushing should be not less than 4 machine-teams, if being found in washing well process, gravel sinks, and should in time supplement filtrate and see at any time Water outlet sand content is examined, falling-rising change in flow and well, to ensure that well Water sand content is not more than 1/10000.
6. (last this step, be the application need plus a step;Because some indexs, monitor used herein is simultaneously Being unable to real-time monitoring needs us to draw water up personal monitoring, therefore we can place immersible pump in well;In addition, this kind of monitoring Well can simultaneously place immersible pump and monitoring instrument in plains region, and both does not conflict) put in well after the completion of well-flushing work Enter model:175QJ-30/2 immersible pumps, (immersible pump bore 175mm, 30 cubic meters/hour of flow, power of motor 5.5KW), DN65 Lifting pipe, 3 × 4mm2 cables carry out examination and draw water after installing, and the definition of observation well water is should be noted that when drawing water, when observation is sent out The well water now extracted out it is as clear as crystal when should termination of pumping immediately wait underground water to recover and the part in water-bearing layer remained in during by drilling well Mud bring into well and by immersible pump out well outside, immersible pump is reopened into (the reason for termination of pumping after about 10 minutes termination of pumping time: Because it is so fast that the migration of underground water is not as surface water, after we draw water out from monitoring well, water level can decline, it is necessary to Underground water around regular hour can just ooze, so needing termination of pumping and continuously taking out several days), it is straight that termination of pumping is so taken out repeatedly To well water without muddy, without sand it is turbid it is as clear as crystal untill.Time of pumping should be no less than 72 hours.Should be by motor for submerged pump when formally drawing water Clear water is inside filled, the motor for submerged pump insulaion resistance is tested with megger, insulaion resistance should be not less than 0.5 megaohm, be pumped up water during lower pump Pipe connection sealing is firm, accomplishes slow in one's movements to prevent scratch well inner cable during installation.
Finally it should be noted that:Above example is only used to illustrate the technical solution of the utility model, rather than its limitations; Although being described in detail to the utility model with reference to the foregoing embodiments, it will be understood by those within the art that: It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc. With replacement;And these modifications or replacement, the essence of appropriate technical solution is departed from each embodiment technology of the utility model The spirit and scope of scheme.

Claims (5)

1. a kind of plains region monitoring well, it is characterised in that including:Well body, it is vertical perpendicular to ground in well body Sleeve pipe (2) is provided with, some filter bores (4) are distributed with the tube wall lower section of sleeve pipe (2), the portion of the filter bores (4) is distributed with Divide and constitute filter pipe, screen pack (5) is enclosed with the periphery of filter pipe;Described sleeve pipe (2) is made of pvc material;Set Pipe (2) bottom uses pvc material back cover.
2. plains region monitoring well according to claim 1, it is characterised in that the screen pack (5) is by polyvinyl chloride material Matter is made, hole pattern spacing 3mm × 3mm, porosity 17.9%.
3. plains region monitoring well according to claim 1, it is characterised in that in inwall and the filter pipe of well body Space between outer wall is filled with gravel.
4. plains region monitoring well according to claim 3, it is characterised in that a diameter of 5-15 ㎜ of the gravel.
5. plains region monitoring well according to claim 1, it is characterised in that be inlaid with steel above well body The wall protection pipe (1) of material, described sleeve pipe (2) stretches into shaft bottom through rear its end in the wall protection pipe (1).
CN201621385334.6U 2016-12-16 2016-12-16 A kind of plains region monitoring well Expired - Fee Related CN206289668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621385334.6U CN206289668U (en) 2016-12-16 2016-12-16 A kind of plains region monitoring well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621385334.6U CN206289668U (en) 2016-12-16 2016-12-16 A kind of plains region monitoring well

Publications (1)

Publication Number Publication Date
CN206289668U true CN206289668U (en) 2017-06-30

Family

ID=59104753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621385334.6U Expired - Fee Related CN206289668U (en) 2016-12-16 2016-12-16 A kind of plains region monitoring well

Country Status (1)

Country Link
CN (1) CN206289668U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759652A (en) * 2016-12-16 2017-05-31 四川农业大学 The monitoring well that the supporting water quality monitor in plains region is used
CN110441208A (en) * 2019-08-09 2019-11-12 陈芬娜 A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging
CN110541436A (en) * 2019-08-20 2019-12-06 浙江大学 Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method
CN115126409A (en) * 2022-08-30 2022-09-30 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Monitoring well construction process and direct-pushing well forming tool thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759652A (en) * 2016-12-16 2017-05-31 四川农业大学 The monitoring well that the supporting water quality monitor in plains region is used
CN110441208A (en) * 2019-08-09 2019-11-12 陈芬娜 A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging
CN110441208B (en) * 2019-08-09 2020-06-26 乐清市钜派企业管理咨询有限公司 Tracking monitoring well of landfill seepage-proofing system and arrangement method thereof
CN110541436A (en) * 2019-08-20 2019-12-06 浙江大学 Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method
CN110541436B (en) * 2019-08-20 2021-04-06 浙江大学 Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method
CN115126409A (en) * 2022-08-30 2022-09-30 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Monitoring well construction process and direct-pushing well forming tool thereof

Similar Documents

Publication Publication Date Title
CN206289668U (en) A kind of plains region monitoring well
CN101736732B (en) Pressure and water reduction construction method of ultra-deep foundation pit confined water
CN108468528A (en) Fourth-series deep well layered water pumping and stopping device and water pumping and stopping method thereof
RU2100531C1 (en) Method of laying of underground liquid and gas manifolds and device for its realization
CN105863023B (en) A kind of sponge urban construction ground water recharging well and quick well formation method
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN109339080A (en) A kind of open-cut foundation ditch deep slob region vacuum precipitation system and construction method
CN104695879B (en) A kind of stake holes is rinsed and takes out sand hole method
ES2251874B1 (en) HORIZONTAL DRAIN INSTALLATION PROCEDURE FOR MARINE WATER CAPTURE.
CN218880917U (en) Dewatering well structure for foundation pit drainage
CN105544573A (en) Water pressure jetting type well completion construction method of dewatering tube well
CN110424430A (en) Deep basal pit powder land floor Deep Pumped Wells construction method and its application
CN206581279U (en) A kind of foundation ditch pressure release type dewatering well and its plugging structure
CN106759652A (en) The monitoring well that the supporting water quality monitor in plains region is used
CN110055988A (en) For foundation pit drainage-decompression inner curtain type combined shaft and working method and application
CN112523241A (en) Horizontal well-forming foundation pit dewatering process
CN209798792U (en) open cut foundation pit deep silt layer vacuum dewatering system
JP3268159B2 (en) Saline recharge wells, drilling methods, and deep seawater intake methods
CN211037023U (en) Pipe well dewatering well arranged at bottom of underground diaphragm wall
KR100284857B1 (en) Gathering Method of Underground Water
CN114250801A (en) Pipe well and light well point combined dewatering construction method
CN208328962U (en) A kind of drainage of foundation pit device under the head positioned at low pressure water
JP2955170B2 (en) On-site permeability test equipment
CN220899795U (en) Can reduce monitoring well structure that silt got into
JP3488887B2 (en) Well drilling method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20181216

CF01 Termination of patent right due to non-payment of annual fee