CN206289668U - A kind of plains region monitoring well - Google Patents
A kind of plains region monitoring well Download PDFInfo
- Publication number
- CN206289668U CN206289668U CN201621385334.6U CN201621385334U CN206289668U CN 206289668 U CN206289668 U CN 206289668U CN 201621385334 U CN201621385334 U CN 201621385334U CN 206289668 U CN206289668 U CN 206289668U
- Authority
- CN
- China
- Prior art keywords
- well
- pipe
- monitoring
- plains region
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a kind of plains region monitoring well, including:Well body, vertically sleeve pipe is provided with well body perpendicular to ground, and some filter bores are distributed with below the tube wall of sleeve pipe, and the part that the filter bores are distributed with constitutes filter pipe, and screen pack is enclosed with the periphery of filter pipe;Described sleeve pipe is made of pvc material.Sleeve bottom uses pvc material back cover.The plains region monitoring well that the application is provided, from structure, it meets the requirement of plains region landform and soil texture situation;From the material selected, material both beneficial to the use of monitoring well and selected does not interfere with the water quality of underground water yet, so as to ensure the monitoring of water quality, improves the accuracy of scientific research;Made full use of from resource, the life-span of monitoring well when it loses scientific research monitoring and acts on, can be also used for the irrigation well or living-use water well in field at 8 10 years or so (in the case of maintenance is proper), accomplish making full use of for resource.
Description
Technical field
The utility model is related to drilling technology field, more particularly to a kind of and supporting flat land of Ground water Quality Survey instrument
Area's monitoring well.
Background technology
Monitoring well is terrain and level of ground water situation according to Plain to be designed, and is mainly used in monitoring plains region ground
Lower water Nutrient change or other scientific research activities related to groundwater monitoring;And current plains region monitoring well monitoring
The accuracy of water quality is not high, and service life is short, unitary function.
Utility model content
The purpose of this utility model is to solve the defect that above-mentioned prior art is present, there is provided a kind of water quality monitoring accuracy
Plains region monitoring well high.
A kind of plains region monitoring well, including:Well body, vertically set is provided with well body perpendicular to ground
Pipe, is distributed with some filter bores below the tube wall of sleeve pipe, and the part that the filter bores are distributed with constitutes filter pipe, in filter pipe
Periphery be enclosed with screen pack;Described sleeve pipe is made of pvc material.Sleeve bottom uses pvc material back cover.
Further, plains region monitoring well as described above, the screen pack is made up of polyvinyl chloride material, between hole pattern
Away from 3mm × 3mm, porosity 17.9%.
Further, plains region monitoring well as described above, between the inwall of well body and the outer wall of filter pipe
Space be filled with gravel.
Further, plains region monitoring well as described above, a diameter of 5-15 ㎜ of the gravel.
Further, plains region monitoring well as described above, is inlaid with the shield of steel material above well body
Wall pipe, described sleeve pipe stretches into shaft bottom through rear its end in the wall protection pipe.
Beneficial effect:
The plains region monitoring well that the application is provided, from structure, it meets plains region landform and soil texture situation
Requirement;From the material selected, material both beneficial to the use of monitoring well and selected does not interfere with the water of underground water yet
Matter, so as to ensure the monitoring of water quality, improves the accuracy of scientific research;Made full use of from resource, the life-span of monitoring well is in 8-
10 years or so (in the case of maintenance is proper), when it loses scientific research monitoring and acts on, can be also used for irrigation well or the life in field
Well is applied flexibly, has accomplished making full use of for resource.
Brief description of the drawings
Fig. 1 is the utility model plains region monitoring well structural representation.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, below technical side in the utility model
Case is clearly and completely described, it is clear that described embodiment is a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of the utility model protection.
Fig. 1 is the utility model plains region monitoring well structural representation, as shown in figure 1, the utility model offer is flat
Original area's monitoring well, including:Well body, is vertically provided with sleeve pipe 2, in the pipe of sleeve pipe 2 in well body perpendicular to ground
Wall lower section is distributed with some filter bores 4, and the part that the filter bores 4 are distributed with constitutes filter pipe, in the periphery parcel of filter pipe
There is screen pack 5.Described sleeve pipe 2 is made of polyvinyl chloride.The bottom of sleeve pipe 2 uses pvc material back cover.
Specifically, Nutrient change is detected to obtain underground underground water, the application is by the lower section band in well body
The sleeve pipe for having filter pipe realizes the collection of underground water, at the same in the particle sleeve pipe such as soil in order to avoid jacket exterior and shadow
The accuracy of water quality monitoring is rung, the utility model has wrapped up two-layer screen pack for filtering jacket exterior in the periphery of filter pipe
Silt.Simultaneously in order to avoid the water quality of influence underground water, described sleeve pipe 2 is made of pvc material.Sleeve bottom is used
Pvc material back cover (purpose of back cover is to prevent the water quality in the influence to sediment well of bottom).
Preferably, in order to further avoid influenceing the water quality of underground water, the screen pack is made up of polyvinyl chloride material, from
And improve the accuracy of water quality monitoring;Meanwhile, in order to the silt for preferably preventing cartridge exterior enters filter pipe, the filtering
The net spacing 3mm × 3mm of mesh, porosity 17.9%.
Preferably, can not offset vertically in well body to ensure the sleeve pipe being made of pvc material,
So as to avoid the fracture of sleeve pipe, and then the service life of the application monitoring well is improved, inwall and filter of the application in well body
Space between the outer wall of water pipe is filled with gravel, and on the one hand the gravel plays a part of supporting sleeve, on the other hand, also has
There is bulk impurity (for example large-scale particle of clod, mud) in filtering underground, it is to avoid the screen pack quilt of filter pipe periphery
The situation of blocking occurs.
Preferably, a diameter of 5-15 ㎜ of the gravel.Only when the diameter of gravel is in the range of 5-15 ㎜, gravel
Between gap can be only achieved it is optimal, so as to bulk impurity can be effectively filtered out and make the gravel filled between hole
It is more sufficient, there can be more preferable support force to go supporting sleeve not offset;And gravel low cost, so as to reduce the application flat land
The overall cost of area's monitoring well.
Preferably, the wall protection pipe 1 of steel material is inlaid with above well body, described sleeve pipe 2 passes through the retaining wall
Shaft bottom is stretched into its end after in pipe 1.
In order to avoid sleeve pipe produces skew during lower section, the application is first inserted in one in the top of well body first
The wall protection pipe 1 of section steel, then passes through the back lower place of wall protection pipe 1 to shaft bottom by sleeve pipe again, and by the limitation of wall protection pipe, sleeve pipe exists
Skew would not be produced during lower section, the possibility of casing failure is also avoided, the application Plain is further increased
The service life of regional monitoring well.In addition, pillar wall protects well head also in drilling process, aided drilling and periphery is prevented
Soil block is collapsed.
First, monitoring well design requirement
Monitoring well drilling equipment uses CZ-22 type percussive drills, and using the drilling well of yellow mud mud off, (effect of yellow mud has two
It is individual:One be in drilling process because be impingement drilling mode, thus had when drill bit falls it is offset, in drilling well
Yellow mud is added to be conducive to the borehole wall for protecting periphery to prevent from deflecting in well in journey;Two is that yellow mud viscosity is strong, increases after addition yellow mud and beats
The viscosity of mud during well, fast and easy removes mud), (drill bit is " one " font to the drilling well of " one " font drill bit, is passed through
Machine by drill bit from top to bottom repeated stock ground reaching the purpose of drilling), disposal pore-forming (is drilling through the process of monitoring well
It is middle whole only with the drill bit of this model, the well depth of needs is disposably got to, using bore>600mm, is a footpath Cheng Jing
(diameter would not become since drilling) one tubing string (can only just put down one space of well casing in monitoring well, prevent space
The excessive well casing for causing offsets), the sleeve pipe of monitoring well uses polyvinyl chloride U-PVC, caliber external diameter Φ 200 ㎜, (internal diameter) DN192
㎜, (every PVC well casing 4m, because well depth is 15m, the 1m having more above can do appropriate interception to every pipeline 4000 ㎜ long, stay
Part conduct is installed monitoring instrument and is used, or as the effect of auxiliary protection wellhead installation), filter pipe material uses U-
PVC, caliber external diameter Φ 200 ㎜, (internal diameter) DN192 ㎜, 8.0 meters of shaft bottom bottom is that (length of filter pipe can base area for filter pipe
The water level of lower water is appropriately adjusted), filter pipe is using artificial drilling open pore size Φ 10.0mm, the ㎜ of pitch of holes 50, every drainage
The round of pipe perforate symmetry number 6, per round spacing 104mm, filter pipe often arranges 75 holes, the every hole of filter pipe 450, and filter pipe periphery is adopted
Wound with material polyvinyl chloride hole pattern, hole pattern spacing 3mm × 3mm, porosity 17.9%, well casing configuration, well casing bottom (drainage
Pipe) 8.0 meters, using pvc material back cover, (purpose of back cover is to prevent the water in the influence to sediment well of bottom in shaft bottom
Matter), well casing top (wall casing) 8.0 meters of outer gussets of (including 1.0 meters of nature ground) well casing fill out Φ 5-15 ㎜ specification gravels.
Two monitoring well operational procedures
The well location measuring well point of offer → → rig install in place → → mud (addition yellow mud) hole encircle and hunt down → → drilling well extremely
Projected depth → → well casing (because well casing is four sections, therefore this procedure needs a section well casing connection is gone into the well) is installed and hung down
Directly → → correction well casing (keeps well casing to be located at the center of well, the mode of correction each drilling company should difference, this Shen
Please with to be fixation with steel wire correct, it is convenient succinct) → → throw in filtrate (filtrate Φ 5-15 ㎜ gravels) → → cleaning well
Mud → → examination draws water → → positive examination draw water (either for monitoring or domestic water, be required for drawing water, on the one hand can be by
The yellow mud on unnecessary silt and the borehole wall in well is developed, well water is evacuated in formal drawing water on the other hand it is limpid, so as to
Monitor and use).
Well location is determined by your unit according to integrated planning drilling well position in region.
3. after rig is installed in place, well location is checked, after confirmation is errorless, by hand excavation's Φ 700mm circular hole cutting depths
500mm, buried Φ 700mm wall protection pipes (pillar wall be exactly in order to drilling process protect well head, aided drilling and prevent periphery soil
Block is collapsed), wall protection pipe is buried after finishing, and rig hangs in Φ 700mm wall protection pipes Φ 600mm " one " font drill bit, and will be viscous
Property native (yellow mud) while being put into the hole in and then clear water being filled in hole and start percussion drilling, drilling process is always using high density mud
In case collapse hole, drilling depth reaches whole hole after design well depth to slurry retaining wall drilling.Bit size is checked at any time simultaneously in boring procedure
Hard wear-resistant material is welded in drill bit bottom to ensure bit size not less than ≮ Φ 550mm by the abrasion condition according to drill bit, and
It is required that wellhole perpendicularity is not less than ≮ 95%.
4. after drilling depth reaches design well depth, drilling technique director reply hole depth, perpendicularity is detected, detected
Start outside mud extraction hole in hole with draw tube after obtaining above-mentioned standard.Well casing lifting uses muslin band by Φ 200mm polychlorostyrene
Ethene U-PVC well casings are fixed well casing is simultaneously slowly put into hole sleeve lift using hoist for driller, should distinguish during down tube first
8.0 meters of lower filter pipe, then 8.0 meters of lower going-into-well wall pipe and accomplishes to be connected firmly between well casing successively, installs vertical.
5. sleeve pipe perpendicularity is corrected and is fixed after the completion of Casing elevator dress, the ㎜ gravels of specification 5~10 are inserted in sleeve pipe periphery
Filtrate is filled out untill 1 meter of the natural ground, and it is this (such mesh that 1 meter of well top is filled to natural ground with clay after the completion of well-flushing
To be to maintain around the well casing away from natural ground be that permeability is weak, the strong material of steadiness).
6. mud, sand grains in well are cleaned up side by side using 6/7 cube of air compressor machine (can simply be interpreted as suction pump)
Go out outside well, duration of well flushing should be not less than 4 machine-teams, if being found in washing well process, gravel sinks, and should in time supplement filtrate and see at any time
Water outlet sand content is examined, falling-rising change in flow and well, to ensure that well Water sand content is not more than 1/10000.
6. (last this step, be the application need plus a step;Because some indexs, monitor used herein is simultaneously
Being unable to real-time monitoring needs us to draw water up personal monitoring, therefore we can place immersible pump in well;In addition, this kind of monitoring
Well can simultaneously place immersible pump and monitoring instrument in plains region, and both does not conflict) put in well after the completion of well-flushing work
Enter model:175QJ-30/2 immersible pumps, (immersible pump bore 175mm, 30 cubic meters/hour of flow, power of motor 5.5KW), DN65
Lifting pipe, 3 × 4mm2 cables carry out examination and draw water after installing, and the definition of observation well water is should be noted that when drawing water, when observation is sent out
The well water now extracted out it is as clear as crystal when should termination of pumping immediately wait underground water to recover and the part in water-bearing layer remained in during by drilling well
Mud bring into well and by immersible pump out well outside, immersible pump is reopened into (the reason for termination of pumping after about 10 minutes termination of pumping time:
Because it is so fast that the migration of underground water is not as surface water, after we draw water out from monitoring well, water level can decline, it is necessary to
Underground water around regular hour can just ooze, so needing termination of pumping and continuously taking out several days), it is straight that termination of pumping is so taken out repeatedly
To well water without muddy, without sand it is turbid it is as clear as crystal untill.Time of pumping should be no less than 72 hours.Should be by motor for submerged pump when formally drawing water
Clear water is inside filled, the motor for submerged pump insulaion resistance is tested with megger, insulaion resistance should be not less than 0.5 megaohm, be pumped up water during lower pump
Pipe connection sealing is firm, accomplishes slow in one's movements to prevent scratch well inner cable during installation.
Finally it should be noted that:Above example is only used to illustrate the technical solution of the utility model, rather than its limitations;
Although being described in detail to the utility model with reference to the foregoing embodiments, it will be understood by those within the art that:
It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc.
With replacement;And these modifications or replacement, the essence of appropriate technical solution is departed from each embodiment technology of the utility model
The spirit and scope of scheme.
Claims (5)
1. a kind of plains region monitoring well, it is characterised in that including:Well body, it is vertical perpendicular to ground in well body
Sleeve pipe (2) is provided with, some filter bores (4) are distributed with the tube wall lower section of sleeve pipe (2), the portion of the filter bores (4) is distributed with
Divide and constitute filter pipe, screen pack (5) is enclosed with the periphery of filter pipe;Described sleeve pipe (2) is made of pvc material;Set
Pipe (2) bottom uses pvc material back cover.
2. plains region monitoring well according to claim 1, it is characterised in that the screen pack (5) is by polyvinyl chloride material
Matter is made, hole pattern spacing 3mm × 3mm, porosity 17.9%.
3. plains region monitoring well according to claim 1, it is characterised in that in inwall and the filter pipe of well body
Space between outer wall is filled with gravel.
4. plains region monitoring well according to claim 3, it is characterised in that a diameter of 5-15 ㎜ of the gravel.
5. plains region monitoring well according to claim 1, it is characterised in that be inlaid with steel above well body
The wall protection pipe (1) of material, described sleeve pipe (2) stretches into shaft bottom through rear its end in the wall protection pipe (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621385334.6U CN206289668U (en) | 2016-12-16 | 2016-12-16 | A kind of plains region monitoring well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621385334.6U CN206289668U (en) | 2016-12-16 | 2016-12-16 | A kind of plains region monitoring well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206289668U true CN206289668U (en) | 2017-06-30 |
Family
ID=59104753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621385334.6U Expired - Fee Related CN206289668U (en) | 2016-12-16 | 2016-12-16 | A kind of plains region monitoring well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206289668U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759652A (en) * | 2016-12-16 | 2017-05-31 | 四川农业大学 | The monitoring well that the supporting water quality monitor in plains region is used |
CN110441208A (en) * | 2019-08-09 | 2019-11-12 | 陈芬娜 | A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging |
CN110541436A (en) * | 2019-08-20 | 2019-12-06 | 浙江大学 | Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method |
CN115126409A (en) * | 2022-08-30 | 2022-09-30 | 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) | Monitoring well construction process and direct-pushing well forming tool thereof |
-
2016
- 2016-12-16 CN CN201621385334.6U patent/CN206289668U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759652A (en) * | 2016-12-16 | 2017-05-31 | 四川农业大学 | The monitoring well that the supporting water quality monitor in plains region is used |
CN110441208A (en) * | 2019-08-09 | 2019-11-12 | 陈芬娜 | A kind of landfill site seepage prevention system tracking and monitoring well and its method for arranging |
CN110441208B (en) * | 2019-08-09 | 2020-06-26 | 乐清市钜派企业管理咨询有限公司 | Tracking monitoring well of landfill seepage-proofing system and arrangement method thereof |
CN110541436A (en) * | 2019-08-20 | 2019-12-06 | 浙江大学 | Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method |
CN110541436B (en) * | 2019-08-20 | 2021-04-06 | 浙江大学 | Double-layer HDPE (high-density polyethylene) film vertical antifouling barrier structure containing leakage detection layer and method |
CN115126409A (en) * | 2022-08-30 | 2022-09-30 | 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) | Monitoring well construction process and direct-pushing well forming tool thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206289668U (en) | A kind of plains region monitoring well | |
CN101736732B (en) | Pressure and water reduction construction method of ultra-deep foundation pit confined water | |
CN108468528A (en) | Fourth-series deep well layered water pumping and stopping device and water pumping and stopping method thereof | |
RU2100531C1 (en) | Method of laying of underground liquid and gas manifolds and device for its realization | |
CN105863023B (en) | A kind of sponge urban construction ground water recharging well and quick well formation method | |
CN109736338A (en) | A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method | |
CN109339080A (en) | A kind of open-cut foundation ditch deep slob region vacuum precipitation system and construction method | |
CN104695879B (en) | A kind of stake holes is rinsed and takes out sand hole method | |
ES2251874B1 (en) | HORIZONTAL DRAIN INSTALLATION PROCEDURE FOR MARINE WATER CAPTURE. | |
CN218880917U (en) | Dewatering well structure for foundation pit drainage | |
CN105544573A (en) | Water pressure jetting type well completion construction method of dewatering tube well | |
CN110424430A (en) | Deep basal pit powder land floor Deep Pumped Wells construction method and its application | |
CN206581279U (en) | A kind of foundation ditch pressure release type dewatering well and its plugging structure | |
CN106759652A (en) | The monitoring well that the supporting water quality monitor in plains region is used | |
CN110055988A (en) | For foundation pit drainage-decompression inner curtain type combined shaft and working method and application | |
CN112523241A (en) | Horizontal well-forming foundation pit dewatering process | |
CN209798792U (en) | open cut foundation pit deep silt layer vacuum dewatering system | |
JP3268159B2 (en) | Saline recharge wells, drilling methods, and deep seawater intake methods | |
CN211037023U (en) | Pipe well dewatering well arranged at bottom of underground diaphragm wall | |
KR100284857B1 (en) | Gathering Method of Underground Water | |
CN114250801A (en) | Pipe well and light well point combined dewatering construction method | |
CN208328962U (en) | A kind of drainage of foundation pit device under the head positioned at low pressure water | |
JP2955170B2 (en) | On-site permeability test equipment | |
CN220899795U (en) | Can reduce monitoring well structure that silt got into | |
JP3488887B2 (en) | Well drilling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170630 Termination date: 20181216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |