The content of the invention
The utility model provides a kind of temporary blocking type big orifice bridging plug, overcomes the deficiency of above-mentioned prior art, and it can have
Effect is solved in staged fracturing, and production tube is difficult to down the problem for entering.
The technical solution of the utility model is realized by following measures:A kind of temporary blocking type big orifice bridging plug, including
Big orifice bridging plug component and temporarily stifled plug;Big orifice bridging plug component includes central tube, packer accessory, lower cone, slips part and nose cone;
Packer accessory, lower cone, slips part and nose cone are from top to bottom sequentially installed with central tube;It is close in nose cone on the downside of central tube
Envelope is installed with temporarily stifled plug, and the temporarily stifled shear pin that temporarily blocked up by bridging plug between plug and nose cone is fixedly installed togather.
Here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
Above-mentioned packer accessory may include to press overcoat and packing element;The top of upper pressure overcoat is cylindrical in shape and by the first shear pin
Outside the top of central tube;At least two elastic claws for being in strip are distributed with upper pressure overcoat lower circumference, packing element is solid
Surely it is connected to outside the elastic claw of pressure overcoat bottom;Lower cone includes that the packing element of middle and upper part sets section and the slips of bottom sets
Section, packing element sets the outside of section in up-narrow and down-wide cone barrel, and the elastic claw bottom of upper pressure overcoat is sleeved on packing element and sets section
Upper end outside;Nose cone is fixedly mounted on the lower end of central tube by the second shear pin;The pressure rating of the first shear pin is small
In the pressure rating of the second shear pin;The pressure rating of the second shear pin temporarily blocks up the pressure rating of shear pin less than bridging plug.
Above-mentioned slips part may include retaining ring and slips;Cone mobile guide set is fixed with the upper end of nose cone, slips
Bottom is cylindrical in shape, and is sleeved on the bottom of cone mobile guide set;Moved installed in cone by retaining ring in the downside of lower cone
Outside the top of action-oriented set;The top circle distribution of slips has slips calvus, and slips sets section in inversed conical drum wide at the top and narrow at the bottom
Shape, slips sets the inner top side that pars infrasegmentalis is seated at slips calvus;Central tube in lower cone upper end is externally provided with chuck, lower cone
Upper end withstand in chuck and with central tube axial limiting.
Above-mentioned retaining ring can use pawl ring, cone mobile guide set it is outer be arranged in order up and down be distributed with obliquely
Retaining teeth groove, is provided with the pawl being engaged in retaining teeth groove on the inner ring surface of pawl ring;Pawl ring is engaged by pawl and installed
Outside the top of cone mobile guide set.
Above-mentioned temporarily stifled plug can be used and can melt plug.
It is above-mentioned to melt the melted plug that plug be almag material.
The utility model reasonable and compact in structure, it is easy to use;The temporary blocking type big orifice bridging plug for setting can be by underground pressure
Power is blocked, it is to avoid down-hole pressure influences, and makes to enter process more Labor-saving safety under production tube;Under enter production tube operation complete
Afterwards, the shear pin that temporarily block up bridging plug by that can be built the pressure is cut, and opens the passage of the bridging plug, releases closure;Removed without brill during de-plugging, greatly
The big brill that reduces is practical except risk and operating cost.
Brief description of the drawings
Accompanying drawing 1 is the half-sectional structural representation of main view of the utility model most preferred embodiment.
Accompanying drawing 2 be accompanying drawing 1 in A-A to enlarged section structural representation.
Coding in accompanying drawing is respectively:Managed centered on 1,2 set section for packing element, and 3 is nose cone, and 4 is that bridging plug temporarily blocks up shear pin, 5
It is temporary stifled plug, 6 is upper pressure overcoat, and 7 is the second shear pin, and 8 is elastic claw, and 9 set section for slips, and 10 is the first shearing
Pin, 11 is pawl ring, and 12 is slips, and 13 is cone mobile guide set, and 14 is slips calvus, and 15 is chuck, and 16 is packing element.
Specific embodiment
The utility model is not limited by following embodiments, can according to the technical solution of the utility model and actual conditions come
Determine specific embodiment.
In the utility model, for the ease of description, the description of the relative position relation of each part is according to specification
The Butut mode of accompanying drawing 1 is described, such as:The position relationship of upper and lower, left and right etc. is according to the Butut of Figure of description 1
Direction determines.
As shown in Figure 1, the temporary blocking type big orifice bridging plug includes big orifice bridging plug component and temporarily stifled plug 5;Big orifice bridge
Plug assembly includes central tube 1, packer accessory, lower cone, slips part and nose cone 3;Envelope is from top to bottom sequentially installed with central tube 1
Spacing body, lower cone, slips part and nose cone 3;The interior sealing of nose cone 3 in the downside of central tube 1 is installed with temporarily stifled plug 5, temporarily stifled
Shear pin 4 is temporarily blocked up between plug 5 and nose cone 3 by bridging plug to be fixedly installed togather.When using, after coiled tubing pressure break terminates,
Specified location will first be entered under this bridging plug to set, then carry out entering work under production tube;This bridging plug for setting can be by underground pressure
Power is blocked, it is to avoid down-hole pressure influences, and makes to enter process more Labor-saving safety under production tube;Under enter production tube operation complete
Afterwards, the shear pin 4 that temporarily block up bridging plug by that can be built the pressure is cut, and opens the passage of the bridging plug, releases closure;The big orifice bridging plug for using
Component is entirely capable of meeting production needs, is removed without boring, and greatly reduces brill except risk and operating cost, practical.
Above-mentioned temporary blocking type big orifice bridging plug can be made further optimization and/or improvements according to actual needs:
As shown in Figure 2, packer accessory includes upper pressure overcoat 6 and packing element 16;The top of upper pressure overcoat 6 is cylindrical in shape and by the
One shear pin 10 is arranged on outside the top of central tube 1;At least two bullets for being in strip are distributed with the upper pressure lower circumference of overcoat 6
Property calvus 8, packing element 16 is fixedly connected on outside the elastic claw 8 of pressure overcoat 6 bottom;Lower cone includes that the packing element of middle and upper part sets
The slips of section 2 and bottom sets section 9, and packing element sets the outside of section 2 in up-narrow and down-wide cone barrel, the elastic claw of upper pressure overcoat 6
The bottom of piece 8 is sleeved on packing element and sets outside the upper end of section 2;Nose cone 3 is fixedly mounted under central tube 1 by the second shear pin 7
End;Pressure rating of the pressure rating of the first shear pin 10 less than the second shear pin 7;Pressure of second shear pin 7 etc.
Level temporarily blocks up the pressure rating of shear pin 4 less than bridging plug.When using, this bridging plug is lowered into setting position first, using setting tool
Pressure overcoat 6 and packing element 16 apply to set pressure upwards, and when pressure applying is set to a certain extent, the first shear pin 10 is cut
Disconnected, upper pressure overcoat 6 and packing element 16 are descending, while elastic claw 8 is flared out along the male cone (strobilus masculinus) that packing element sets section 2, can also give
One downward thrust of lower cone, makes lower cone that slips part is acted on after moving down, and slips part is opened and central tube 1 is fixed
On sleeve pipe;Be further continued for pressurization, packing element 16 is set in place, until the second shear pin 7 is cut, then by central tube 1 and
Setting tool proposes well head, completes to set;Wherein, 8 need of elastic claw overcome with packing element set frictional resistance between section 2 and
The reaction force that cone cylinder face is given is capable of achieving to set, compared to the existing big orifice bridge realized by packing element radial deformation and set
Plug, needed for it to set pressure smaller, reduce and set difficulty, improve security.
As shown in Figure 1, slips part includes retaining ring and slips 12;Cone mobile guide is fixed with the upper end of nose cone 3
Set 13, the bottom of slips 12 is cylindrical in shape, and is sleeved on the bottom of cone mobile guide set 13;Pass through retaining in the downside of lower cone
Ring is arranged on outside the top of cone mobile guide set 13;The top circle distribution of slips 12 has slips calvus 14, and slips sets section 9
In back taper tubular wide at the top and narrow at the bottom, slips sets the inner top side that the bottom of section 9 is seated at slips calvus 14;In lower cone upper end
Central tube 1 is externally provided with chuck 15, the upper end of lower cone withstand in chuck 15 and with the axial limiting of central tube 1.During setting,
As lower cone is moved down, the inverted cone surface that slips sets section 9 acts on slips calvus 14, with the increase of depression depths, slips pawl
Piece 14 is flared out and fixes on internal surface of sleeve pipe the bridging plug.
As shown in Figure 1, retaining ring uses pawl ring 11, is distributed with outer being arranged in order up and down of cone mobile guide set 13
Inside retaining teeth groove obliquely, is provided with the pawl being engaged in retaining teeth groove on the inner ring surface of pawl ring 11;Pawl ring 11 leads to
Pawl engagement is crossed to be arranged on outside the top of cone mobile guide set 13.So not only easy disassembly, and ensure that lower cone with
Bonding strength between pawl ring 11.
As needed, temporarily the stifled use of plug 5 can melt plug.Plug can be melted can be melted after liquid is run into, and reduced underground and fallen
Thing.
As needed, the melted plug that plug is almag material can be melted.
Above technical characteristic constitutes most preferred embodiment of the present utility model, and it has stronger adaptability and optimal implementation
Effect, can according to actual needs increase and decrease non-essential technical characteristic to meet the demand of different situations.
The use process of the utility model most preferred embodiment:
After coiled tubing pressure break terminates, the utility model is first lowered into setting position, is pressed upwards using setting tool
Overcoat 6 and packing element 16 apply to set pressure, and when pressure applying is set to a certain extent, the first shear pin 10 is cut;Upper pressure
Overcoat 6 and packing element 16 are descending, while elastic claw 8 is flared out along the male cone (strobilus masculinus) that packing element sets section 2, can also give lower cone one
Individual downward thrust, makes lower cone that slips calvus 14 is acted on after moving down, and with the increase of depression depths, slips calvus 14 is outside
Open and fix on internal surface of sleeve pipe the bridging plug;Pressurization is further continued for, packing element 16 is set in place, until the second shearing
Pin 7 is cut, then central tube 1 and setting tool are proposed into well head, completes to set;After the temporary blocking type big orifice bridging plug sets, rise
Go out cable and setting tool, then under enter production tube to bridging plug top;Oil pipe to be produced in place after, built the pressure by well head, cut
Bridging plug temporarily blocks up shear pin, temporarily plug 5 is fallen into shaft bottom, oil pipe is entered under proceeding and ensures the normal of follow-up work to setting position
Carry out.