CN206267390U - Modular architectural structural - Google Patents

Modular architectural structural Download PDF

Info

Publication number
CN206267390U
CN206267390U CN201621303577.0U CN201621303577U CN206267390U CN 206267390 U CN206267390 U CN 206267390U CN 201621303577 U CN201621303577 U CN 201621303577U CN 206267390 U CN206267390 U CN 206267390U
Authority
CN
China
Prior art keywords
connecting rod
lower plywood
blind hole
top plate
modular architectural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621303577.0U
Other languages
Chinese (zh)
Inventor
王红梅
王丽英
闫晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Energy College
Original Assignee
Chongqing Energy College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Energy College filed Critical Chongqing Energy College
Priority to CN201621303577.0U priority Critical patent/CN206267390U/en
Application granted granted Critical
Publication of CN206267390U publication Critical patent/CN206267390U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a kind of modular architectural structural, including modularization floor, the modularization floor includes top plate, lower plywood, the top plate is provided with bulge-structure near the one side of lower plywood, the lower plywood is provided with the groove structure coordinated with bulge-structure near the one side of top plate, also include steel support structure, the steel support structure includes first connecting rod and second connecting rod, the middle part of the first connecting rod is articulated and connected with second connecting rod middle part, and the modularization floor is fixed on steel support structure.Using this scheme, the globality and intensity between upper plate and lower plate are improve, so as to the bulk strength of modular architectural is greatly improved.

Description

Modular architectural structural
Technical field
The utility model belongs to E04B1/00:The technology of any structure in partitions, or floor or ceiling or roof Field.
Background technology
It is generally brick mix structure, tower structure etc. using more architecture structure form at present in industrial civil building. Wherein, brick mix structure refers to that wall, post of vertical load-carrying members in building etc. uses brick or concrete block masonry, horizontal load-bearing Beam, floor, roof boarding etc. use reinforced concrete structure, and this structural seismic capacity is poor, is restricted from great, floor height, building Form underaction.Tower structure is most commonly used that concrete frame, steel frame, and concrete frame and steel frame are adapted to big rule Mould industrialized construction, efficiency is higher, construction quality preferably, but its still suffer from from great, cracking resistance it is poor, take a lot of work, site operation Cycle is long, and construction is by deficiencies such as seasonal effects.
Patent announcement number discloses a kind of modular architectural structural for the Chinese utility model patent of CN203247699U.It Including modularization floor, modularization floor includes top plate, lower plywood, is connected by main structural between top plate and lower plywood Connect, modularization floor is fixed on steel structure support;Steel structure support includes head tree or including head tree, diagonal brace.This practicality New structure is simple, and easy to assembly flexibly the site operation speed fast period is short, small by seasonal effect, and dead load is light, using steel Structural support, mechanical property is good, and overall structure is stable and firm, and anti-seismic performance is good.In such scheme, between adjacent modular floor Only connected by diagonal brace, be easily moved, and intensity is relatively low, is easily damaged.
Utility model content
The utility model is intended to provide a kind of modular architectural structural, low to solve existing module Building Structure Strength Problem.
Modular architectural structural in this programme, including modularization floor, the modularization floor include top plate, lower floor Plate, the top plate is provided with bulge-structure near the one side of lower plywood, the lower plywood near the one side of top plate be provided with it is convex The groove structure of respective outer side edges is played, also including steel support structure, the steel support structure includes first connecting rod and second connecting rod, institute The middle part and second connecting rod middle part for stating first connecting rod are articulated and connected, and the modularization floor is fixed on steel support structure.
The operation principle of above-mentioned technical proposal and have the beneficial effect that:The bulge-structure of top plate and the groove structure of lower plywood Connect and fix, facilitate the dismounting and installation of upper plate and lower plate, and it is easy to assembly, while steel support structure is two connecting rod middle parts Be hinged and form, one piece of modularization floor and steel support structure have two tie points, including first connecting rod one end and second connecting rod One end, the other end of first connecting rod and the other end of second connecting rod are all connected with another piece of modularization floor, so bracing members knot Structure is cruciform shape, improves the steadiness between modularization floor.Using this scheme, improve whole between upper plate and lower plate Body and intensity, so as to the bulk strength of modular architectural is greatly improved.
Prioritization scheme one, used as the further optimization to base case, the cross section of the bulge-structure is honeycombed, institute It is the groove structure of honeycombed for cross section to state groove structure.Honeycombed is multiple regular hexagon compositions, honeycombed densification Structure makes the stress of each side impartial, and easily by force dispersion, the impact that honeycomb-shaped structure can bear is also bigger than other structures. Further improve the intensity of this building structure.
Prioritization scheme two, as the further optimization to base case, the bulge-structure be uniform intervals set every Plate, the groove structure is two relative broken line plates, and the angle of adjacent two broken lines of the broken line plate is 120 °, described the The cavity corresponding with dividing plate is additionally provided with two plate bodys.The dividing plate of top plate is inserted the cavity of lower plywood, makes top plate with Laminate perfect cooperation forms assembled plate, and the coupling part of this assembled plate has several broken lines and cavity, and several cavitys can Stop that any one plate body thinks that any direction is moved, further improve the stability of this assembled plate, and this connected mode is convenient Installation and removal.
Prioritization scheme three, used as the further optimization to prioritization scheme two, the both ends of the top plate are provided with the first cunning Groove section and the second chute section, the both ends of the top plate are also provided with opening upward first blind hole in blind hole and second, The both ends of the lower plywood are provided with the 3rd chute section and the 4th chute section, the both ends of the lower plywood be additionally provided with opening to Under first time blind hole and second time blind hole, the two ends of the first connecting rod, the two ends of second connecting rod are respectively and fixedly provided with connecting portion, institute Stating connecting portion includes top shoe and sliding block, and also including spring, the top shoe is connected with sliding block by spring, the upper cunning Block is and blind hole coordinates fixation.Connecting portion is slidably connected in chute, the connecting portion above steel support structure is slided, makes cunning Block is connected to fixed, the connecting portion below slip steel support structure in a blind hole for the top plate of modularization floor, makes downslide Block is connected in the blind hole of the lower plywood of another modularization floor fixed, and this connected mode steel support structure is by two pieces of modules Change floor to be connected, be prevented from that slip and movement occur between modularization floor, greatly improve the strong of modularization floor Degree.
Prioritization scheme four, used as the further optimization to prioritization scheme three, one end of the modularization floor is provided with raised line, The other end of the modularization floor is provided with the groove corresponding with raised line.Two pieces of laterally adjacent modularization floors pass through raised line It is fixedly connected with groove, is not only easy for installation and removal, and prevents connected two pieces of modularization floors to be moved.
Prioritization scheme five, as the further optimization to prioritization scheme four, blind hole on the 3rd is also provided with the top plate With the 4th on blind hole, be also provided with three times blind holes and the four times blind holes on the lower plywood.Top shoe and sliding block are pressed, due to Spring is provided between top shoe and sliding block, therefore top shoe is close to modularization floor middle part with sliding block, then slides Sliding block and sliding block, make two top shoes respectively slide on the 3rd of top plate both ends blind hole in blind hole and the 4th, make two Individual sliding block respectively slides to lower plywood;Three times blind holes at both ends and the four times blind holes, increase two small end portions Distance so that.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model modular architectural structural embodiment 1;
Fig. 2 is the structural representation of connecting portion in Fig. 1;
Fig. 3 is the structural representation of Fig. 1 plates at the middle and upper levels;
Fig. 4 is the structural representation of lower plywood in Fig. 1;
Fig. 5 is the structural representation of the plate at the middle and upper levels of the utility model modular architectural structural embodiment 2;
Fig. 6 is the structural representation of lower plywood in the utility model modular architectural structural embodiment 2.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference in Figure of description includes:Modularization floor 1, top plate 10, bulge-structure 101, lower plywood 11, Dividing plate 12, broken line plate 13, cavity 14, groove structure 111, steel support structure 2, first connecting rod 20, second connecting rod 21, the first chute It is blind under blind hole 32, the 3rd chute the 4, the 4th chute of section section 40, first in blind hole 31, second in the 3, second chute of section section 30, first Hole 41, second time blind hole 42, top shoe 5, sliding block 50, spring 51.
Embodiment 1:
Embodiment 1 is substantially as shown in Figure 1:Modular architectural structural, including modularization floor 1, the right side of modularization floor 1 End is provided with raised line, and the left end of modularization floor 1 is provided with the groove for raised line insertion, and modularization floor 1 includes the He of top plate 10 Lower plywood 11, as shown in figure 3, the lower surface of top plate 10 is provided with bulge-structure 101, the cross section of bulge-structure 101 is honeycomb Shape, the two ends of top plate 10 are provided with the first chute section 3 and the second chute section 30, and the top of the first chute section 3 is provided with blind on first Blind hole on hole 31 and the 3rd, the top of the second chute section 30 is provided with second blind hole in blind hole 32 and the 4th, as shown in figure 4, under The upper surface of laminate 11 is provided with the groove structure 111 coordinated with bulge-structure 101, and the cross section of groove structure 111 is honeycombed, Also include steel support structure 2, steel support structure 2 includes first connecting rod 20 and second connecting rod 21, the middle part of first connecting rod 20 and the The middle part of two connecting rod 21 is articulated and connected, and the two ends of first connecting rod 20 are fixed with connecting portion, and the two ends of second connecting rod 21 are fixed with connection Portion, connecting portion all same, as shown in Fig. 2 connecting portion includes top shoe 5 and sliding block 50, is led between top shoe 5 and sliding block 50 Cross spring 51 to connect, top shoe 5 is and blind hole coordinates fixation, and top shoe 5 and sliding block 50 are slidably connected with chute section, first The one end of connecting rod 20 and the one end of second connecting rod 21 connect one piece of modularization floor 1, the other end and second connecting rod 21 of first connecting rod 20 The other end connect another piece of modularization floor 1.
It is fixed in the groove of the honeycombed that the raised line of the honeycombed of top plate 10 is inserted lower plywood 11 to form one when using Block modularization floor 1, then by the first chute section 3 in one end of first connecting rod 20 insertion lower plywood 11, first connecting rod 20 The other end insert the 3rd chute section 4, in the second chute section 30 in one end of second connecting rod 21 insertion lower plywood 11, second The other end of connecting rod 21 is inserted in the 4th chute section 40, and sliding slider makes top shoe 5 be respectively clamped into blind hole 31 and second on first In upper blind hole 32, be connected on another piece of modularization floor 1 for first connecting rod 20 and second connecting rod 21 by similarly clamping.
When needing to change the distance between two pieces of modularization floors 1, top shoe 5 and sliding block 50 are pressed, due to upper cunning Spring 51 is provided between block 5 and sliding block 50, therefore top shoe 5 is close to the middle part of modularization floor 1 with sliding block 50, then slides Dynamic top shoe 5 and sliding block 50, make two top shoes 5 respectively slide on the 3rd of the both ends of top plate 10 in blind hole and the 4th Blind hole, makes two sliding blocks 50 respectively slide to lower plywood 11;Three times blind holes at both ends and the four times blind holes, increase two The distance in root small end portion, so as to reduce two pieces of distances of modularization floor 1, the raised line of one piece of modularization floor 1 is inserted In entering the groove of adjacent modular floor 1, so that the adjacent two pieces of modularization floors 1 of fixation.
Embodiment 2:
Embodiment 2 is differed only in embodiment 1:As shown in figure 5, bulge-structure 101 be uniform intervals set every Plate 12, as shown in fig. 6, groove structure 111 is two relative broken line plates 13, the angle of adjacent two broken lines of broken line plate 13 is 120 °, the cavity 14 corresponding with dividing plate 12 is additionally provided with the second plate body.
When using, the dividing plate 12 of top plate 10 is inserted the cavity 14 of lower plywood 11, make top plate 10 complete with lower plywood 11 U.S.A cooperatively forms assembled plate, and the coupling part of this assembled plate has several broken lines and cavity 14, and several cavitys 14 can hinder Keep off any one plate body and think that any direction is moved, further improve the stability of this assembled plate, and the convenient peace of this connected mode Assembly and disassembly.
Above-described is only embodiment of the present utility model, the general knowledge such as known concrete structure and/or characteristic in scheme Excessive description is not made herein.It should be pointed out that for a person skilled in the art, before the utility model structure is not departed from Put, some deformations and improvement can also be made, these should also be considered as protection domain of the present utility model, and these are all without shadow Ring effect and practical applicability that the utility model is implemented.This application claims protection domain should be with its claim Appearance is defined, and specific embodiment in specification etc. records the content that can be used for explaining claim.

Claims (6)

1. a kind of modular architectural structural, including modularization floor(1), it is characterised in that the modularization floor(1)Including upper Laminate(10), lower plywood(11), the top plate(10)Near lower plywood(11)One side be provided with bulge-structure, the lower plywood (11)Near top plate(10)One side be provided with bulge-structure coordinate groove structure, also including steel support structure(2), it is described Steel support structure(2)Including first connecting rod(20)With second connecting rod(21), the first connecting rod(20)Middle part and second connecting rod (21)Middle part is articulated and connected, the modularization floor(1)It is fixed on steel support structure(2)On.
2. modular architectural structural according to claim 1, it is characterised in that the bulge-structure(101)Cross section It is honeycombed, the groove structure(111)For cross section is the groove structure of honeycombed.
3. modular architectural structural according to claim 1, it is characterised in that the bulge-structure is what uniform intervals were set Dividing plate(12), the groove structure is two relative broken line plates(13), the broken line plate(13)Adjacent two broken lines angle It is 120 ° to spend, the lower plywood(11)It is additionally provided with the cavity corresponding with dividing plate(14).
4. modular architectural structural according to claim 3, it is characterised in that the top plate(10)Both ends be provided with First chute section(3)With the second chute section(30), the top plate(10)Both ends be also provided with opening upward first Blind hole(31)With second on blind hole(32), the lower plywood(11)Both ends be provided with the 3rd chute section(4)With the 4th chute section (40), the lower plywood(11)Both ends be additionally provided with the downward first time blind hole in opening(41)With second time blind hole(42), The first connecting rod(20)Two ends, second connecting rod(21)Two ends be respectively and fixedly provided with connecting portion, the connecting portion includes top shoe (5)And sliding block(50), also including spring(51), the top shoe(5)With sliding block(50)By spring(51)Connection, it is described Top shoe(5)Fixed with blind hole cooperation.
5. modular architectural structural according to claim 4, it is characterised in that the modularization floor(1)One end set There are raised line, the modularization floor(1)The other end be provided with the groove corresponding with raised line.
6. modular architectural structural according to claim 5, it is characterised in that the top plate(10)On be also provided with the 3rd Blind hole in upper blind hole and the 4th, the lower plywood(11)On be also provided with three times blind holes and the four times blind holes.
CN201621303577.0U 2016-11-30 2016-11-30 Modular architectural structural Expired - Fee Related CN206267390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621303577.0U CN206267390U (en) 2016-11-30 2016-11-30 Modular architectural structural

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621303577.0U CN206267390U (en) 2016-11-30 2016-11-30 Modular architectural structural

Publications (1)

Publication Number Publication Date
CN206267390U true CN206267390U (en) 2017-06-20

Family

ID=59043224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621303577.0U Expired - Fee Related CN206267390U (en) 2016-11-30 2016-11-30 Modular architectural structural

Country Status (1)

Country Link
CN (1) CN206267390U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155669A (en) * 2018-11-08 2020-05-15 江苏泰来包装工程集团有限公司 Novel plastic honeycomb plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155669A (en) * 2018-11-08 2020-05-15 江苏泰来包装工程集团有限公司 Novel plastic honeycomb plate

Similar Documents

Publication Publication Date Title
CN203891201U (en) Large-span steel structure two-stage shock mount
CN108708481B (en) Construction method for constructional column without formwork support
CN201635421U (en) Large-sized detachable plank house
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN211286250U (en) Prefabricated ceiling conversion layer
CN105804294A (en) Rammed earth-based composite wall, formwork device used in its construction and construction method
CN109944430A (en) A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation
CN202492946U (en) Light steel ribbed bar internal mesh hollow cement partition wall
CN213477202U (en) Green energy-conserving fire prevention steel construction for building
CN203834694U (en) Steel and wood connection structure
CN220889064U (en) Light steel wall convenient to installation
CN209277286U (en) Outdoor bamboo matter assembled double-spliced beam column structure
CN109457805B (en) An outdoor bamboo assembled double beam-column structure and its assembly method and application
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN111456322A (en) A carbon fiber bamboo and wood hybrid space tension string beam structure and its construction method
CN207110415U (en) A kind of building construction scaffold being easily installed
CN213573164U (en) Ancient building clear water wall body migration bottom reinforcing apparatus
CN210684360U (en) Overhead brick
CN203821882U (en) Super high-rise prefabricated assembled type residential building
CN208456627U (en) A kind of tunnel steel form that bearing capacity is big
CN203256614U (en) Large-span bent cap lower-bearing type Bailey frame formwork device
CN202164731U (en) Beam string of plane heavy roof
CN204691048U (en) Building block brick
CN205955014U (en) Wood structural grouping post
CN214169634U (en) Arc-shaped component assembly type building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20191130

CF01 Termination of patent right due to non-payment of annual fee