CN206254292U - A kind of production line of heat preservation dismounting-free formwork - Google Patents

A kind of production line of heat preservation dismounting-free formwork Download PDF

Info

Publication number
CN206254292U
CN206254292U CN201620707065.4U CN201620707065U CN206254292U CN 206254292 U CN206254292 U CN 206254292U CN 201620707065 U CN201620707065 U CN 201620707065U CN 206254292 U CN206254292 U CN 206254292U
Authority
CN
China
Prior art keywords
cloth
lapping
strike
production line
mixer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620707065.4U
Other languages
Chinese (zh)
Inventor
谢怀宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan City Green Building Industry Co Ltd
Original Assignee
Hunan City Green Building Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan City Green Building Industry Co Ltd filed Critical Hunan City Green Building Industry Co Ltd
Priority to CN201620707065.4U priority Critical patent/CN206254292U/en
Application granted granted Critical
Publication of CN206254292U publication Critical patent/CN206254292U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, Binder Materials induction system, heat insulation mortar movement blanking system, stirring system, the production line combined according to capacity requirements design, production-line arrangement is together, the stirring system is located at the top of heat insulation mortar movement blanking system 23, and blanking system feed is moved to heat insulation mortar.The heat insulation mortar movement blanking system 23 includes frame 2301, track, mobile hopper 2302, dynamical system, and, across in the top of assembly line, mobile hopper is successively to the wall scroll production line feed of combination for frame;The Binder Materials induction system connects the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 of raw material cabin and the wall scroll production line combined.The utility model is solved and needs to build that equipment investment produced by a plurality of production line is excessive to enhance production capacities, equipment repeated construction, the problem installed.Solve the problems, such as that product strength is inadequate.Solve that product curing time is long, maintenance of equipment investment is larger, take the problems in a large amount of maintenance places.Its promotion and application has good economic benefit and social benefit.

Description

A kind of production line of heat preservation dismounting-free formwork
Technical field
The utility model is related to building machinery technical field, more particularly to a kind of production line of heat preservation dismounting-free formwork.
Background technology
The heat preservation dismounting-free formwork for building has the significant advantages such as high-strength light, heat-insulation and heat-preservation, water proof anti-seepage, be both beam, The construction formwork of the monolithic reinforced concrete structure of the heat bridge such as post, shear wall, floor, roofing part, is again the guarantor of structure heat bridge Warm layer.Insulation is united two into one with construction formwork, structure heat bridge part is not required to do heat-insulation layer again.It is the once great of building energy conservation Change.
There is the document of some compound heat preservation die plates in Chinese patent literature, for example, in patent《A kind of composite insulation boards life The technique of producing line and its processing warming plate》In (application number CN201310146969.5), its technical scheme is:A kind of complex heat-preservation Board assembly line, it is characterised in that including one-to-two stock preparation system, formation system, movement system, diced system and dress plate system:
One point of three stock preparation system includes that raw material cabin, unidirectional double outlet screw elevating conveyors, bidirectional screw level are defeated Send machine, measuring chute one, measuring chute two, lower slurry feed preparing device, insulation material feed preparing device and upper slurry feed preparing device:
Unidirectional double outlet screw elevating conveyors have discharging port A and discharging opening B, the bidirectional screw horizontal feed Described unidirectional pair of the discharging opening connection that machine has discharging opening C and discharging opening D, the raw material cabin exports entering for screw elevating conveyor Material mouth.
The lower slurry feed preparing device includes lower slurry mixer, and the discharging opening C connects the lower slurry and stirs Mix machine;
The upper slurry feed preparing device includes upper slurry mixer, and the discharging opening D connects the upper slurry and stirs Mix machine;
The insulation material feed preparing device includes heat preservation slurry mixer, insulation compound mixer, super-light aggregate storage bin With super-light aggregate metering device, the heat preservation slurry mixer connection is described to be incubated compound mixer, and the heat preservation slurry is stirred The machine of mixing is located at the top of the insulation compound mixer, and the super-light aggregate storage bin is connected by super-light aggregate metering device The insulation compound mixer;
The charging aperture of the measuring chute one connects the discharging port A, and the discharging opening connection of the measuring chute one is described two-way The feeding gate of spiral horizontal conveyer, the measuring chute two is located between the discharging opening B and the heat preservation slurry mixer;
The formation system is arranged on the top of the movement system, the formation system bag by a frame type working platform Include lower floor network cloth installation aiding device, lower slurry feeding device, insulation compound feeding device, the upper strata grid cloth for setting gradually Installation aiding device, hydraulic means and upper slurry feeding device;
The lower slurry feeding device is located at the lower section of the lower slurry mixer;
The upper slurry feeding device is located at the lower section of the upper slurry mixer;
The insulation compound feeding device is located at the lower section of the insulation compound mixer;
The movement system includes base, supporting plate and conveyer, and the conveyer is located on base, and the supporting plate is placed on On the conveyer;
The diced system is located between the upper slurry cutoff device and dress plate system.
The dress plate system is located at the rear end of the conveyer.
The defect of the technical scheme is, 1, the technical scheme be single production line, limits throughput, if to expand product Amount, according to the technical scheme, just needs to build production line more, must install raw material cabin more, install mixer more, installs hopper more, Equipment manufacturing cost is larger, waste of resource, and 2, in the technical scheme, the first cloth pulp grinder is connected using conveying worm one end, one end connects Another cloth pulp grinder is connect, need to such as be enhanced production capacities, produced using a plurality of production line, need to just use multiple auger conveyors, and need multiple Raw material cabin, could be supporting with multiple auger conveyors.3rd, in the patent document, it is impossible to realize uniform distribution, in the technical scheme Between insulation compound feeding device and upper strata grid cloth installation aiding device, insulation material lying device, the insulation material stand are provided with Mat formation and put including vibrating motor, spring and guide plate, the guide plate bottom towards the insulation compound feeding device be in circular arc, The guide plate connects the vibrating motor by spring.The defect of the device is:In practical operation, heat insulation mortar source in heaps Source is constantly placed on mould, is run forward with conveyer belt, before heat insulation mortar can more and more get lodged in circularoscillations guide plate, work Make over time, just to have before substantial amounts of heat insulation mortar is deposited in circularoscillations guide plate, as heat insulation mortar is piled up increasingly It is many, more to a certain extent, circularoscillations guide plate can be flowed or blow over and cover completely, conveyer belt can also be blocked so that conveyer belt can not continue forward Operation, production is forced to interrupt.In vibration paves operation, because vibrating forming machine is fitted without locating piece, it is difficult to keep template Consistency of thickness.In the patent document technical scheme, conveyer belt is located on base, and supporting plate, complex heat-preservation are provided with conveyer belt Plate is molded on supporting plate, is then transported on nursing frame and is conserved.Substantial amounts of supporting plate, nursing frame and correlation is so accomplished by set It is standby, increased the cost and cost of equipment.In the technical scheme, after complex heat-preservation sheet metal forming, finally also need to carry out racker Sequence, transhipment conserve operation, unload operation, dress plate operation that frame operation, composite insulation boards with supporting plate separate, and technological process is more multiple It is miscellaneous.Cut-out segmentation is carried out in the seam crossing of adjacent bottom plates, the seam crossing of adjacent pans is just switched in production line, in operation There is also certain difficulty.The product has larger difference with the art of this patent product, and the production method of the product, production line are constituted Also differed with the art of this patent.
In patent《A kind of Composite insulation board production line》In (application number CN201210024073.5), its technical characteristic is: A kind of Composite insulation board production line, including production line support body (1), it is characterized in that:Described production line support body (1) is provided with conveying Device (2), described production line support body (1) according to be sequentially provided with same direction blanking device I (3), blanking device II (4), Blanking device III (5) blanking device IV (6), the production line support body (1) one end adjacent with blanking device IV (6) is provided with shifting Dynamic hanger device (7), the both sides of the blanking device I (3) are provided with lapping lattice cloth apparatus, blanking device II (4) and blanking device Lapping lattice cloth apparatus are provided between III (5), the both sides of blanking device IV (6) are provided with lapping lattice cloth apparatus, described production coil holder Multiple scraping devices (25) are uniformly distributed on body (1).
The defect of the technical scheme is that the technical scheme is the technical scheme of wall scroll production line, if to expand yield, is pressed According to the technical scheme, need to just repeat to build a plurality of same production line, multiple raw material cabins, multiple feeding systems must be built.Again, The technical scheme need to place on the conveyor belt substantial amounts of mould could produce, it is necessary to set of molds shelve, point plate system, dress plate system The large number quipments such as system, travelling bridge.The four fundamental rules technical schemes is directed to be done surface and adds using ordinary cement on the two sides of styrofoam Strong layer, thus solidification, shaping, curing time is all more long could be produced, it is necessary to big, it is necessary to place substantial amounts of mould on the conveyor belt The maintenance of equipment of amount and maintenance place.
In patent《Double stiff dough sheet material polyurethane composite heat-conservation board production lines》(CN201510511250.6) in, its technology is special It is defeated the invention discloses a kind of pair of stiff dough sheet material polyurethane composite heat-conservation board production line, including sheet material feed mechanism, sheet material to levy Send mechanism and coating mechanism.The feed mechanism includes top plate feed mechanism and lower plywood feed mechanism, the sheet material conveying Mechanism includes top plate conveying mechanism and lower plywood conveying mechanism, divides on the top plate conveying mechanism and lower plywood conveying mechanism Heating arrangements are not provided with, and top plate conveying mechanism and lower plywood conveying mechanism are set in the angle less than 450.Effectively Solve during double stiff dough polyurethane composite heat-conservation boards produced, the difficult problem of levels composite plate feeding, and realize sheet material Continuous transmission operation, drastically increase production problem and come into force efficiency, meanwhile, by coating polyurethane foam material it Before, slab bridge is preheated.The reliability of sheet material compound sticking is effectively ensured, double stiff dough lance urethanes has been drastically increased and is answered The quality of production of warming plate is closed, and its quality is more stablized.
The defect of the product of the technical scheme has:The polyurethane foaming body intensity being clipped in the middle of double stiff dough is small, easily aging, no The cast-in-place exterior sheathing of building is can serve as, production method and the production line of the product are also differed with the art of this patent.It is thus raw The product that output is come there is also many differences at the aspect such as function, purposes of product.
In patent《Composite heat-insulating wall plate, external wall outer insulation board assembly line》In (notification number CN100586686C), its skill Art is characterized in disclose a kind of composite heat-insulating wall plate, external wall outer insulation board assembly line, and the production line includes passing through Belt Conveying On the streamline automatic pop-up template mechanism being sequentially connected, roller press mechanism of arranging net, grid cloth automatic cutting mechanism and automatic plate discharging Frame goes out frame mechanism, between automatic pop-up template mechanism and first group of roller press mechanism of arranging net and the last period Belt Conveying streamline Top position be provided with stirring blanking mechanism, stirring blanking mechanism and arrange net roller press mechanism at least provided with supporting two groups.
The defect of the product of the technical scheme has:1st, the patent is merely able to produce and process the warming plate of individual layer coverage rate, no Can adapt to the processing request of upper and lower coverage rate and intermediate insulating layer now.2nd, styrofoam is very soft, is produced according to the technical scheme Composite insulation boards, do not reach the intensity requirement of the cast-in-place exterior sheathing of building.3rd, the technical scheme is the technology of wall scroll production line Scheme, if to expand yield, according to the technical scheme, need to just repeat to build a plurality of same production line, must build multiple originals Feed bin, multiple feeding systems.4th, the technical scheme needs to place on the conveyor belt substantial amounts of mould and could produce, it is necessary on automatic Flask board mechanism, automatic plate discharging restocking go out the large number quipments such as frame mechanism, travelling bridge.5th, the technical scheme is directed to using common Cement does the individual layer coverage rate of styrofoam, thus solidification, shaping, curing time are all more long, it is necessary to place on the conveyor belt a large amount of Mould could produce, it is necessary to it is substantial amounts of maintenance of equipment and maintenance place.
Technical problem to be solved in the utility model is:
1st, the equipment investment for solving to need to build to enhance production capacities produced by a plurality of production line is excessive, equipment repeated construction, The problem of installation.
2nd, solve the problems, such as that product strength is inadequate.
3rd, solution product curing time is long, investment of maintaining equipment is larger, takes a large amount of problems for conserving places.
The content of the invention
Regarding to the issue above, the utility model is adopted the technical scheme that:
Scheme one
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, glue Gel material induction system, heat insulation mortar movement blanking system, stirring system, the life combined according to capacity requirements design Producing line, together, wall scroll production line includes that the first lapping system 1, the first cloth system 2, first strike off system to production-line arrangement 3rd, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system the 7, the 3rd and strike off system the 8, the 4th Lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 15,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system the 7, the 3rd are struck off strike off system 8, the 4th lapping system 9, the 3rd cloth system the 10, the 4th Strike off that system 11, the 5th lapping system 12, diced system 15 are adjacent successively according to same direction, production line support body is provided with conveying Band, production line support body and conveyer belt strike off system 3, the second lapping system positioned at the first lapping system 1, the first cloth system 2, first The 4, second cloth system 5 of system, second strike off system 6, the 3rd lapping system 7, the 3rd strike off system 8, the 4th lapping system 9, the Three cloth systems the 10, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The stirring system is located at the top of heat insulation mortar movement blanking system 23, is supplied to heat insulation mortar movement blanking system Material.
The heat insulation mortar movement blanking system 23 includes frame 2301, track, mobile hopper 2302, dynamical system, Frame is provided with rotating wheel across in the top of assembly line, there is track in frame on mobile hopper, rotating wheel is located at rail On road, dynamical system connection rotating wheel, successively to the wall scroll production line feed of combination, discharging opening is located at movement and expects mobile hopper Bucket bottom;
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5, the 3rd cloth system 10.
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer is done:Feed proportioning system conveys lightweight aggregate to mixer, and Binder Materials, additive and water are stirred into Insulation compound, mobile hopper is run to mixer discharging opening lower section, triggers mixer, to mobile hopper conveying, mixer After conveying terminates, mobile hopper by setup program, by the driving of dynamical system, runs to adjacent first conveyer belt top, Heat insulation mortar is laid on the second bonding enhancement layer, at the same time, mixer feed paddle by setup program, until completing to stir Mix, mobile hopper returns to mixer discharging opening lower section, and triggering mixer is to mobile hopper conveying;After mixer conveying terminates, move Dynamic hopper runs to adjacent Article 2 conveyer belt top by setup program, and heat insulation mortar is laid on the second bonding enhancement layer, Move in circles according to this, complete the blanking of combined production line;After mobile hopper blanking terminates, the wall scroll production line of combination is by setting Determine program and start conveyer belt, then the 3rd strike off system 8 and strike off heat insulation mortar, the 4th lapping system 9 is in the insulation material for striking off On slurry, one layer of enhancing net is re-layed, constitute the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is air-transport system.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or The induction system includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, stirring Machine connects delivery pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is spray Head.
The art of this patent scheme uses Combined production line, improves utilization rate of equipment and installations, reduces equipment investment, solves The equipment investment for needing to build to enhance production capacities produced by a plurality of production line is excessive, equipment repeated construction, the problem installed.This is specially Mobile hopper is moved back and forth on the track across the frame of a plurality of production line in sharp technical scheme, successively to each bar production line Insulation compound is unloaded, a plurality of production line can share a set of feed proportioning system, induction system, share a stirring system.This patent Technical scheme can using the first cloth system 2 of air-transport system connection raw material cabin and the wall scroll production line combined, Second cloth system 5, the 3rd cloth system 10, only need flow transfer pump to be connected with Pneumatic conveying pipeline, so that it may by feedstock transportation To in each article of the first cloth system 2 of production line, the second cloth system 5, the 3rd cloth system 10.Or will be stirred using delivery pump The machine slurry pipeline transport that finishes of stirring to the first cloth system 2 of each wall scroll production line combined, the second cloth system 5, The schemes such as the 3rd cloth system 10.And in published patent document《A kind of Composite insulation board production line》(application number CN201210024073.5)、《Composite heat-insulating wall plate, external wall outer insulation board assembly line》(notification number CN100586686C),《One The technique for planting Composite insulation board production line and its processing warming plate》In (application number CN201310146969.5), multiple has all been needed Feed proportioning system, the supporting feed of multiple induction systems.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance is solved product Product curing time is long, maintenance of equipment investment is larger, takes the problem in a large amount of maintenance places.Also shorten production simultaneously Time, improve production efficiency.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme two
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated System, the production line combined designed according to capacity requirements are sent, together, wall scroll production line includes the to production-line arrangement One lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off System 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, the 4th lapping system 9, the 4th cloth system 19th, the 4th system 11, the 5th lapping system 12, diced system 15 are struck off,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd are struck off strike off system 8, the 4th lapping system the 9, the 4th Cloth system the 19, the 4th strikes off system 11, the 5th lapping system 12, diced system 15, production adjacent successively according to same direction Coil holder body is provided with conveyer belt, and production line support body and conveyer belt strike off positioned at the first lapping system 1, the first cloth system 2, first System 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system 18, 3rd strikes off system 8, the 4th lapping system 9, the 4th cloth system the 19, the 4th strikes off under system 11, the 5th lapping system 12 Side,
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5, the 3rd cloth system 18, the 4th cloth system 19;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
(5) the 4th bonding enhancement layer is done:4th cloth system 19, one layer of supergrip of laying on the 3rd bonding enhancement layer coagulates Material, then the 4th strikes off system 11 and strikes off supergrip gel material, and the 5th lapping system 12 is in the supergrip gel material for striking off On, one layer of enhancing net is re-layed, constitute the 4th and be bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting, example are installed between the second lapping system 4 and the second cloth system 5 Such as one group of carrying roller, or one group of rolling device;
The conveyer belt both sides are provided with rib.
The induction system is air-transport system.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or The induction system includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, stirring Machine connects delivery pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is spray Head.
The art of this patent scheme uses Combined production line, improves utilization rate of equipment and installations, reduces equipment investment, solves The equipment investment for needing to build to enhance production capacities produced by a plurality of production line is excessive, equipment repeated construction, the problem installed.This is specially Sharp technical scheme using air-transport system connection raw material cabin and the wall scroll production line combined the first cloth system 2, Second cloth system 5, the 3rd cloth system 10, or mixer is stirred to combination one using delivery pump for the slurry pipeline transport for finishing The schemes such as the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 of each wall scroll production line for rising.And disclosed Patent document《A kind of Composite insulation board production line》(application number CN201210024073.5),《Composite heat-insulating wall plate, exterior wall Heat-insulation plate for external production line》(notification number CN100586686C),《A kind of work of Composite insulation board production line and its processing warming plate Skill》In (application number CN201310146969.5), multiple feed proportioning systems, the supporting feed of multiple induction systems have all been needed.This patent In technical scheme, a plurality of product line group is combined, and only needs flow transfer pump to be connected with Pneumatic conveying pipeline, so that it may which raw material is defeated It is sent to each equipment in production line.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance solves product maintenance to product Overlong time, maintenance of equipment investment are larger, take the problem in a large amount of maintenance places.The production time is also shortened simultaneously, is carried Production efficiency high.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme three
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated System, the production line combined designed according to capacity requirements are sent, together, wall scroll production line includes the to production-line arrangement One lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off System 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, the 4th lapping system 9,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd are struck off strike off system 8, the 4th lapping system 9, Ni Zhifu drill System 14, diced system 15, palletizing system 16 are adjacent successively according to same direction, and production line support body is provided with conveyer belt, production Coil holder body and conveyer belt are located at the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the Two cloth systems 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8, the 4th lapping System 9, lower section,
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5, the 3rd cloth system 18;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or The induction system includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, stirring Machine connects delivery pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is spray Head.
The art of this patent scheme uses Combined production line, improves utilization rate of equipment and installations, reduces equipment investment, solves The equipment investment for needing to build to enhance production capacities produced by a plurality of production line is excessive, equipment repeated construction, the problem installed.This is specially Sharp technical scheme using air-transport system connection raw material cabin and the wall scroll production line combined the first cloth system 2, Second cloth system 5, the 3rd cloth system 10, or mixer is stirred to combination one using delivery pump for the slurry pipeline transport for finishing The schemes such as the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 of each wall scroll production line for rising.And disclosed Patent document《A kind of Composite insulation board production line》(application number CN201210024073.5),《Composite heat-insulating wall plate, exterior wall Heat-insulation plate for external production line》(notification number CN100586686C),《A kind of work of Composite insulation board production line and its processing warming plate Skill》In (application number CN201310146969.5), multiple feed proportioning systems, the supporting feed of multiple induction systems have all been needed.This patent In technical scheme, a plurality of product line group is combined, and only needs flow transfer pump to be connected with Pneumatic conveying pipeline, so that it may which raw material is defeated It is sent to each equipment in production line.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance solves product maintenance to product Overlong time, maintenance of equipment investment are larger, take the problem in a large amount of maintenance places.The production time is also shortened simultaneously, is carried Production efficiency high.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme four
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated System, the production line combined designed according to capacity requirements are sent, together, wall scroll production line includes the to production-line arrangement One lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off System 6, the 3rd lapping system 7,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second strike off system 6, the 3rd lapping system 7, Ni Zhifu drill system 14, diced system 15, palletizing system 16 according to same direction according to Secondary adjacent, production line support body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system 1, the first cloth system System 2, first strikes off system 3, the second lapping system 4, second cloth system 5, second strikes off system 6, the 3rd lapping system 7 Lower section,
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, second are bonded enhancement layer, are fixed together, and constitute heat preservation dismounting-free formwork. One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as one group of carrying roller Or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
Scheme five
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated System, heat insulation mortar blanking system, the first lapping system 1, the first cloth system 2, first is sent to strike off system 3, the second lapping system The 4, second cloth system 5 of system, second strike off system 6, the 3rd lapping system 7, the 3rd strike off system 8, the 4th lapping system 9, the Three cloth systems the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 15, the first lapping system 1, the first cloth System 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, Heat insulation mortar blanking system, the 3rd strike off system 8, the 4th lapping system 9, the 3rd cloth system 10, the 4th strike off system 11, Five lapping systems 12, diced system 15 are adjacent successively according to same direction, and production line support body is provided with conveyer belt, production line support body With conveyer belt system 3, the second lapping system 4, the second cloth are struck off positioned at the first lapping system 1, the first cloth system 2, first System 5, second strike off system 6, the 3rd lapping system 7, heat insulation mortar blanking system, the 3rd strike off system 8, the 4th lapping system 9th, the 3rd cloth system the 10, the 4th strikes off system 11, the lower section of the 5th lapping system 12,
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5, the 3rd cloth system 10.
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer) is done:Heat insulation mortar moves blanking system 13 and lays insulation material on the second bonding enhancement layer Slurry, then the 3rd strikes off system 8 and strikes off heat insulation mortar, and the 4th lapping system 9 re-lays one layer on the heat insulation mortar for striking off Enhancing net, constitutes the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or The induction system includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, stirring Machine connects delivery pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is spray Head.
The art of this patent scheme improves utilization rate of equipment and installations, reduces equipment investment.The art of this patent scheme uses strength Induction system connects the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 of raw material cabin and wall scroll production line, or Mixer is stirred by first cloth system 2, second cloth system of the slurry pipeline transport for finishing to each wall scroll production line using delivery pump The schemes such as the 5, the 3rd cloth system 10 of system.And in published patent document《A kind of Composite insulation board production line》(application number CN201210024073.5)、《Composite heat-insulating wall plate, external wall outer insulation board assembly line》(notification number CN100586686C),《One The technique for planting Composite insulation board production line and its processing warming plate》In (application number CN201310146969.5), multiple has all been needed Feed proportioning system, the supporting feed of multiple induction systems.In the art of this patent scheme, flow transfer pump is only needed to connect with Pneumatic conveying pipeline It is logical, so that it may by feedstock transportation to each equipment in production line.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance solves product maintenance to product Overlong time, maintenance of equipment investment are larger, take the problem in a large amount of maintenance places.The production time is also shortened simultaneously, is carried Production efficiency high.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme six
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated Send system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, Second strikes off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strikes off system 8, the 4th lapping system 9, the 4th cloth Material system the 19, the 4th strikes off system 11, the 5th lapping system 12, diced system 15,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd are struck off strike off system 8, the 4th lapping system the 9, the 4th Cloth system the 19, the 4th strikes off system 11, the 5th lapping system 12, diced system 15, production adjacent successively according to same direction Coil holder body is provided with conveyer belt, and production line support body and conveyer belt strike off positioned at the first lapping system 1, the first cloth system 2, first System 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system 18, 3rd strikes off system 8, the 4th lapping system 9, the 4th cloth system the 19, the 4th strikes off under system 11, the 5th lapping system 12 Side,
Induction system connection raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 18, the Four cloth systems 19;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
(5) the 4th bonding enhancement layer is done:4th cloth system 19, one layer of supergrip of laying on the 3rd bonding enhancement layer coagulates Material, then the 4th strikes off system 11 and strikes off supergrip gel material, and the 5th lapping system 12 is in the supergrip gel material for striking off On, one layer of enhancing net is re-layed, constitute the 4th and be bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or The induction system includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, stirring Machine connects delivery pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is spray Head.
The art of this patent scheme improves utilization rate of equipment and installations, reduces equipment investment.The art of this patent scheme uses strength First cloth system 2 of the induction system connection raw material cabin with the wall scroll production line combined, the second cloth system the 5, the 3rd Cloth system 10, and in published patent document《A kind of Composite insulation board production line》(application number CN201210024073.5)、《Composite heat-insulating wall plate, external wall outer insulation board assembly line》(notification number CN100586686C),《One The technique for planting Composite insulation board production line and its processing warming plate》In (application number CN201310146969.5), multiple has all been needed Feed proportioning system, the supporting feed of multiple induction systems.In the art of this patent scheme, flow transfer pump is only needed to connect with Pneumatic conveying pipeline It is logical, so that it may by feedstock transportation to each equipment in production line.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance solves product maintenance to product Overlong time, maintenance of equipment investment are larger, take the problem in a large amount of maintenance places.The production time is also shortened simultaneously, is carried Production efficiency high.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme seven
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, glue Gel material induction system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth Material system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8, the 4th lapping system 9, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second Strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8, the 4th lapping system 9, diced system 15 Adjacent successively according to same direction, production line support body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system The 1, first cloth system 2 of system, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the Three lapping systems 7, the 3rd cloth system the 18, the 3rd strike off system 8, the lower section of the 4th lapping system 9,
The induction system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 18;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The art of this patent scheme improves utilization rate of equipment and installations, reduces equipment investment.The art of this patent scheme uses strength First cloth system 2 of the induction system connection raw material cabin with the wall scroll production line combined, the second cloth system the 5, the 3rd Cloth system 10, and in published patent document《A kind of Composite insulation board production line》(application number CN201210024073.5)、《Composite heat-insulating wall plate, external wall outer insulation board assembly line》(notification number CN100586686C),《One The technique for planting Composite insulation board production line and its processing warming plate》In (application number CN201310146969.5), multiple has all been needed Feed proportioning system, the supporting feed of multiple induction systems.In the art of this patent scheme, flow transfer pump is only needed to connect with Pneumatic conveying pipeline It is logical, so that it may by feedstock transportation to each equipment in production line.
The art of this patent solves the problems, such as that product strength is inadequate.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, because its setting time is short, on the conveyor belt, side operation, side maintenance solves product maintenance to product Overlong time, maintenance of equipment investment are larger, take the problem in a large amount of maintenance places.The production time is also shortened simultaneously, is carried Production efficiency high.There is no special nursing frame and maintenance place in the art of this patent scheme thus.
When use rapid hardening Binder Materials is used as the first bonding enhancement layer, the second bonding enhancement layer, the 3rd in the art of this patent When being bonded the material of enhancement layer, or rapid hardening Binder Materials is added to strengthen as the first bonding enhancement layer, the second bonding in dispensing When layer, the material of the 3rd bonding enhancement layer, because its setting time is short, it is not necessary to place substantial amounts of mould or supporting plate on the conveyor belt Could produce, it is not necessary to the large number quipments such as set of molds is shelved, point plate system, dress plate system, travelling bridge.Only need to be in conveyer belt two Side sets rib.Thus a large amount of supporting plates are not placed on the conveyor belt in the art of this patent scheme, it is not required that set of molds shelves, Divide the equipment such as plate system, dress plate system, travelling bridge.
Scheme eight
A kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, defeated Send system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, Second strikes off system 6, the 3rd lapping system 7,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second strike off that system 6, the 3rd lapping system 7, diced system 15 are adjacent successively according to same direction, production line support body is provided with Conveyer belt, production line support body and conveyer belt strike off the paving of system 3, second positioned at the first lapping system 1, the first cloth system 2, first Net system 4, the second cloth system 5, second strike off system 6, the lower section of the 3rd lapping system 7,
The induction system connects raw material cabin and the first cloth system 2, the second cloth system 5;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer are fixed together, and constitute heat preservation dismounting-free formwork.
One group of Thickness sensitivity and means for correcting are installed between the second lapping system 4 and the second cloth system 5, such as One group of carrying roller or one group of roller;
The conveyer belt both sides are provided with rib.
The induction system is Pneumatic conveyer.
First cloth system is distribution device, including distribution device frame 201, weighing hopper 202, hopper 203, spiral Conveyer 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, the first inductive proximity switch 208 and second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, the one end of conveying worm 204 connection hopper 203, one End connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed in lightweight charging basket axle of stirrer frame 205, motor There are the first inductive proximity switch 208 and the second inductive proximity switch 209, the biography of motor 207 in the both sides of 207 power transmission shaft respectively Moving axis connection lightweight charging basket axle of stirrer frame 205;Second cloth system or the 3rd cloth system or the 4th cloth system with First cloth system is identical.
First cloth system is distribution device, including mixer, dynamical system and mobile tremie pipe, mixer connection Mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or distribution device includes mixer, dynamical system and mobile hopper, stirs Mix the mobile hopper of machine connection, the mobile hopper of dynamical system connection;Second cloth system or the 3rd cloth system or the 4th cloth Material system is identical with the first cloth system.
The heat insulation mortar blanking system is heat insulation mortar blanking device, including mixer, dynamical system and mobile blanking Pipe, the mobile tremie pipe of mixer connection, the mobile tremie pipe of dynamical system connection;Or heat insulation mortar blanking device include mixer, Dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
The solution have the advantages that:
1st, the equipment investment for needing to build to enhance production capacities produced by a plurality of production line is solved excessive, equipment repeats to build If, install problem.
2nd, solve the problems, such as that product strength is inadequate.
3rd, on the conveyor belt, side operation, side maintenance solves product curing time long, foster to the product of the art of this patent Shield equipment investment is larger, takes the problem in a large amount of maintenance places.The production time is also shortened simultaneously, production effect is improve Rate.
Brief description of the drawings
Fig. 1 is a kind of structural representation for being incubated the production line for exempting to roll over template of the utility model in implementation method one
Fig. 2 is a kind of top view for being incubated the production line for exempting to roll over template of the utility model in implementation method one
Fig. 3 is a kind of structural representation for being incubated the production line for exempting to roll over template of the utility model in implementation method two
Fig. 4 is a kind of top view for being incubated the production line for exempting to roll over template of the utility model in implementation method two
Fig. 5 is a kind of structural representation for being incubated the production line for exempting to roll over template of the utility model in implementation method three
Fig. 6 is a kind of structural representation for being incubated the production line for exempting to roll over template of the utility model in implementation method four
Fig. 7 is the first cloth system structural representation
Fig. 8 is the structural representation of the first cloth system another kind technical scheme
Fig. 9 is flow transfer pump structural representation
Figure 10 is the side view of the first lapping system
Figure 11 is the structural representation of the first lapping system
Figure 12 is a kind of process chart for being incubated the production method for exempting to roll over template of the present invention in implementation method nine
Figure 13 is a kind of process chart for being incubated the production method for exempting to roll over template of the present invention in implementation method ten
In figure:1st, the first lapping system, the 2, first cloth system, 3, first strikes off system, the 4, second lapping system, 5, Two cloth systems, 6, second strikes off system, the 7, the 3rd lapping system, and the 8, the 3rd strikes off system, the 9, the 4th lapping system, 10, Three cloth systems, the 11, the 4th strikes off system, the 12, the 5th lapping system, and 28, diced system,
Specific embodiment
Implementation method one
As shown in Figure 1 and Figure 2, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production of the heat preservation dismounting-free formwork Line includes that raw material cabin, induction system, heat insulation mortar move blanking system, stirring system, exist according to the combination of capacity requirements design Production line together, together, wall scroll production line includes the first lapping system 1, the first cloth system 2, first to production-line arrangement System 3, the second lapping system 4 are struck off, the second cloth system 5, second system 6, the 3rd lapping system the 7, the 3rd is struck off and is struck off and be The 8, the 4th lapping system 9 of system, the 3rd cloth system the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 28,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system the 7, the 3rd are struck off strike off system 8, the 4th lapping system 9, the 3rd cloth system the 10, the 4th Strike off that system 11, the 5th lapping system 12, diced system 15 are adjacent successively according to same direction, production line support body is provided with conveying Band, production line support body and conveyer belt strike off system 3, the second lapping system positioned at the first lapping system 1, the first cloth system 2, first The 4, second cloth system 5 of system, second strike off system 6, the 3rd lapping system 7, the 3rd strike off system 8, the 4th lapping system 9, the Three cloth systems the 10, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The stirring system is located at the top of heat insulation mortar movement blanking system 23, is supplied to heat insulation mortar movement blanking system Material.
The heat insulation mortar movement blanking system 23 includes frame 2301, track, mobile hopper 2302, dynamical system, Frame is provided with rotating wheel across in the top of assembly line, there is track in frame on mobile hopper, rotating wheel is located at rail On road, dynamical system connection rotating wheel, successively to the wall scroll production line feed of combination, discharging opening is located at movement and expects mobile hopper Bucket bottom;
First cloth system 2 of Pneumatic conveyer connection raw material cabin and the wall scroll production line combined, the Two cloth systems 5, the 3rd cloth system 10.
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Styrofoam is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer is done:Feed proportioning system conveys lightweight aggregate to mixer, and Binder Materials, additive and water are stirred into Insulation compound, mobile hopper is run to mixer discharging opening lower section, triggers mixer, to mobile hopper conveying, mixer After conveying terminates, mobile hopper by setup program, by the driving of dynamical system, runs to adjacent first conveyer belt top, Heat insulation mortar is laid on the second bonding enhancement layer, at the same time, mixer feed paddle by setup program, until completing to stir Mix, mobile hopper returns to mixer discharging opening lower section, and triggering mixer is to mobile hopper conveying;After mixer conveying terminates, move Dynamic hopper runs to adjacent Article 2 conveyer belt top by setup program, and heat insulation mortar is laid on the second bonding enhancement layer, Move in circles according to this, complete the blanking of combined production line;After mobile hopper blanking terminates, the wall scroll production line of combination is by setting Determine program and start conveyer belt, then the 3rd strike off system 8 and strike off heat insulation mortar, the 4th lapping system 9 is in the insulation material for striking off On slurry, one layer of enhancing net is re-layed, constitute the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment, as shown in Figure 1 and Figure 2, feed proportioning system includes glass bead bucket elevator 16, glass bead feed bin Glass bead is transported to glass bead material by the 17th, conveying worm 20, conveyer 22, weighing hopper 23, glass bead bucket elevator 16 Accelerated cement is transported to weighing hopper 23 by storehouse 17, conveying worm 20, and glass bead is transported to weighing hopper 23 by conveyer 22.
As shown in Fig. 2, Fig. 9, Pneumatic conveyer includes flow transfer pump 26, Pneumatic conveying pipeline 15, flow transfer pump 26 include material bin 2601, feed pipe 2602, blast pipe 2603, compressed air inlet pipe 2604, switch 2605, and compressed air will Goods fluid, make it is material suspended in material bin 2601, then Pneumatic conveying pipeline 15 switch open, in pushing away for compressed air Under dynamic, material is transported to the first cloth system 2, second cloth system the 5, the 3rd of each wall scroll production line along Pneumatic conveying pipeline Cloth system 10.
As shown in Figure 10, Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, horizontal stroke Axle 102, positioning roller 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, positioning roller 103 Positioned at the lower section of transverse axis 102, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, Located roller 103, repaves on conveyer belt 31.
As shown in figure 12, the first cloth system 2 is the first distribution device, including the first distribution device frame 201, weighing hopper 202nd, hopper 203, conveying worm 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, First inductive proximity switch 208 and the second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, conveying worm 204 1 End connection hopper 203, one end connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed on lightweight charging basket mixer In frame 205,
There are the first inductive proximity switch 208 and the second inductive proximity switch in the both sides of the power transmission shaft of motor 207 respectively 209, the power transmission shaft connection lightweight charging basket axle of stirrer frame 205 of motor 207, during work, material is through the electronic scale of weighing hopper 202 After metering, hopper 203 is fallen into, conveying worm 204 is transported to stirring in lightweight charging basket mixer 206, after stirring is finished, Motor 207 starts, and the sensing object 210 before the first inductive proximity switch 208 rotates to the second inductive proximity switch When before 209, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is downwardly turned over, lightweight charging basket mixer 206 On the conveyor belt, then motor 207 starts interior material, when sensing object 210 returns to the first inductive proximity switch When before 208, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is flipped up, and so moves in circles.
Or as shown in figure 8, the first distribution device includes mixer 3301, dynamical system and mobile tremie pipe 3302, stir Mix the mobile tremie pipe 3302 of the connection of machine 3301, the mobile tremie pipe 3302 of dynamical system connection;Feed proportioning system will be prepared during work To mixer 3301, after stirring is finished, dynamical system drives mobile tremie pipe 3302 to do laterally past on the conveyor belt to feedstock transportation Motion (conveying tape motion direction is longitudinal direction) is returned, as conveyer belt moves with uniform velocity, mobile tremie pipe 3302 is equably by slurry Distribution is on the conveyor belt.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.
Second cloth system 5, the 3rd cloth system 10 are identical with the structure and method of work of the first cloth system 2.
Implementation method two
As shown in Figure 3, Figure 4, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production of the heat preservation dismounting-free formwork The production line combined that line includes raw material cabin, Binder Materials induction system, designed according to capacity requirements, production-line arrangement Together, wall scroll production line include the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, Second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8, the 4th paving Net system 9, the 4th cloth system the 19, the 4th strike off system 11, the 5th lapping system 12, diced system 28;
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd are struck off strike off system 8, the 4th lapping system the 9, the 4th Cloth system the 19, the 4th strikes off system 11, the 5th lapping system 12, diced system 15, production adjacent successively according to same direction Coil holder body is provided with conveyer belt, and production line support body and conveyer belt strike off positioned at the first lapping system 1, the first cloth system 2, first System 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system 18, 3rd strikes off system 8, the 4th lapping system 9, the 4th cloth system the 19, the 4th strikes off under system 11, the 5th lapping system 12 Side;
First cloth system 2 of air-transport system connection raw material cabin and the wall scroll production line combined, the Two cloth systems 5, the 3rd cloth system 18, the 4th cloth system 19;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Styrofoam is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
(5) the 4th bonding enhancement layer is done:4th cloth system 19, one layer of supergrip of laying on the 3rd bonding enhancement layer coagulates Material, then the 4th strikes off system 11 and strikes off supergrip gel material, and the 5th lapping system 12 is in the supergrip gel material for striking off On, one layer of enhancing net is re-layed, constitute the 4th and be bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment,
As shown in Fig. 3, Fig. 4, Fig. 9, rapid hardening Binder Materials is transported to fluidisation conveying by conveying worm 32 from raw material cabin 14 Pump 26, Pneumatic conveyer include flow transfer pump 26, Pneumatic conveying pipeline 15, flow transfer pump 26 include material bin 2601, Goods fluid hangs material by feed pipe 2602, blast pipe 2603, compressed air inlet pipe 2604, switch 2605, compressed air Float in material bin 2601, then the switch of Pneumatic conveying pipeline 15 is opened, under the promotion of compressed air, by material along strength Conveyance conduit is transported to the first cloth system 2, the second cloth system 5, the 3rd cloth system 18, the 4th cloth of each wall scroll production line Material system 19.
As shown in Figure 10, Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, horizontal stroke Axle 102, positioning roller 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, positioning roller 103 Positioned at the lower section of transverse axis 102, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, Located roller 103, repaves on conveyer belt 31.
As shown in figure 12, the first cloth system 2 is the first distribution device, including the first distribution device frame 201, weighing hopper 202nd, hopper 203, conveying worm 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, First inductive proximity switch 208 and the second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, conveying worm 204 1 End connection hopper 203, one end connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed on lightweight charging basket mixer In frame 205,
There are the first inductive proximity switch 208 and the second inductive proximity switch in the both sides of the power transmission shaft of motor 207 respectively 209, the power transmission shaft connection lightweight charging basket axle of stirrer frame 205 of motor 207, during work, material is through the electronic scale of weighing hopper 202 After metering, hopper 203 is fallen into, conveying worm 204 is transported to stirring in lightweight charging basket mixer 206, after stirring is finished, Motor 207 starts, and the sensing object 210 before the first inductive proximity switch 208 rotates to the second inductive proximity switch When before 209, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is downwardly turned over, lightweight charging basket mixer 206 On the conveyor belt, then motor 207 starts interior material, when sensing object 210 returns to the first inductive proximity switch When before 208, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is flipped up, and so moves in circles.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.
The structure and work of the second cloth system 5, the 3rd cloth system 18, the 4th cloth system 19 and the first cloth system 2 Make method identical.
Implementation method three
As shown in figure 5, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, induction system, according to capacity requirements design the production line combined, production-line arrangement together, wall scroll Production line includes that the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system System 5, second strikes off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strikes off system 8, the 4th lapping system 9, the One lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off System 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, the 4th lapping system 9, Ni Zhifu drill system 14, cut Cut system 15, palletizing system 16 adjacent successively according to same direction, production line support body is provided with conveyer belt, production line support body and defeated Band is sent to strike off system 3, the second lapping system 4, the second cloth system positioned at the first lapping system 1, the first cloth system 2, first 5th, second system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd are struck off strike off under system 8, the 4th lapping system 9 Side,
The induction system connects the first cloth system 2, second cloth of raw material cabin and the wall scroll production line combined Material system 5, the 3rd cloth system 18;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Styrofoam is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
Implementation method four
As shown in fig. 6, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork The production line combined for include raw material cabin, Binder Materials induction system, designing according to capacity requirements, production-line arrangement is one Rise, wall scroll production line includes that the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, second Cloth system 5, second strike off system 6, the 3rd lapping system 7,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second strike off system 6, the 3rd lapping system 7, Ni Zhifu drill system 14, diced system 15, palletizing system 16 according to same direction according to Secondary adjacent, production line support body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system 1, the first cloth system System 2, first strikes off system 3, the second lapping system 4, the second cloth system 5, second strikes off under system 6, the 3rd lapping system 7 Side,
The Binder Materials induction system connects the first cloth system of raw material cabin and the wall scroll production line combined 2nd, the second cloth system 5;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, second are bonded enhancement layer, are fixed together, and constitute heat preservation dismounting-free formwork.
Implementation method five
As shown in figure 1, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, heat insulation mortar blanking system, the first lapping system 1, the first cloth system 2, first scrape Flat system 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system the 7, the 3rd and strike off system 8th, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 15, and first Lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off and be The 6, the 3rd lapping system 7 of system, heat insulation mortar blanking system, the 3rd strike off system 8, the 4th lapping system 9, the 3rd cloth system 10th, the 4th to strike off system 11, the 5th lapping system 12, diced system 15 adjacent successively according to same direction, on production line support body It is provided with conveyer belt, production line support body and conveyer belt are located at the first lapping system 1, the first cloth system 2, first strike off system 3, the Two lapping systems 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, heat insulation mortar blanking system, the 3rd scrape Flat system 8, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The air-transport system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 10。
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer) is done:Heat insulation mortar moves blanking system 13 and lays insulation material on the second bonding enhancement layer Slurry, then the 3rd strikes off system 8 and strikes off heat insulation mortar, and the 4th lapping system 9 re-lays one layer on the heat insulation mortar for striking off Enhancing net, constitutes the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment, feed proportioning system is identical with the feed proportioning system in implementation method one.
As shown in figure 9, Pneumatic conveyer includes flow transfer pump 26, Pneumatic conveying pipeline 15, flow transfer pump 26 is wrapped Material bin 2601, feed pipe 2602, blast pipe 2603, compressed air inlet pipe 2604, switch 2605 are included, compressed air is by material Fluidisation, make it is material suspended in material bin 2601, then Pneumatic conveying pipeline 15 switch open, in the promotion of compressed air Under, material is transported to the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 along Pneumatic conveying pipeline.As schemed 10th, shown in Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, transverse axis 102, positioning rolling Wheel 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, and positioning roller 103 is located at transverse axis 102 Lower section, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, located roller 103, repave on conveyer belt 31.
As shown in figure 12, the first cloth system 2 is the first distribution device, including the first distribution device frame 201, weighing hopper 202nd, hopper 203, conveying worm 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, First inductive proximity switch 208 and the second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, conveying worm 204 1 End connection hopper 203, one end connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed on lightweight charging basket mixer In frame 205,
There are the first inductive proximity switch 208 and the second inductive proximity switch in the both sides of the power transmission shaft of motor 207 respectively 209, the power transmission shaft connection lightweight charging basket axle of stirrer frame 205 of motor 207, during work, material is through the electronic scale of weighing hopper 202 After metering, hopper 203 is fallen into, conveying worm 204 is transported to stirring in lightweight charging basket mixer 206, after stirring is finished, Motor 207 starts, and the sensing object 210 before the first inductive proximity switch 208 rotates to the second inductive proximity switch When before 209, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is downwardly turned over, lightweight charging basket mixer 206 On the conveyor belt, then motor 207 starts interior material, when sensing object 210 returns to the first inductive proximity switch When before 208, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is flipped up, and so moves in circles.
Or as shown in figure 8, the first distribution device includes mixer 3301, dynamical system and mobile tremie pipe 3302, stir Mix the mobile tremie pipe 3302 of the connection of machine 3301, the mobile tremie pipe 3302 of dynamical system connection;Feed proportioning system will be prepared during work To mixer 3301, after stirring is finished, dynamical system drives mobile tremie pipe 3302 to do laterally past on the conveyor belt to feedstock transportation Motion (conveying tape motion direction is longitudinal direction) is returned, as conveyer belt moves with uniform velocity, mobile tremie pipe 3302 is equably by slurry Distribution is on the conveyor belt.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.
Second cloth system 5, the 3rd cloth system 10 are identical with the structure and method of work of the first cloth system 2.
Implementation method six
As shown in figure 3, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping System 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, 4th lapping system 9, the 4th cloth system the 19, the 4th strike off system 11, the 5th lapping system 12, diced system 15, the first paving Net system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off system 6th, the 3rd lapping system 7, the 3rd cloth system 18, the 3rd strike off system 8, the 4th lapping system 9, the 4th cloth system 19, Four strike off system 11, the 5th lapping system 12, diced system 15, adjacent successively according to same direction, and production line support body is provided with Conveyer belt, production line support body and conveyer belt strike off the paving of system 3, second positioned at the first lapping system 1, the first cloth system 2, first Net system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8th, the 4th lapping system 9, the 4th cloth system the 19, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The air-transport system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 18th, the 4th cloth system 19;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
(5) the 4th bonding enhancement layer is done:4th cloth system 19, one layer of supergrip of laying on the 3rd bonding enhancement layer coagulates Material, then the 4th strikes off system 11 and strikes off supergrip gel material, and the 5th lapping system 12 is in the supergrip gel material for striking off On, one layer of enhancing net is re-layed, constitute the 4th and be bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment,
As shown in Fig. 3, Fig. 9, rapid hardening Binder Materials is transported to flow transfer pump 26, gas by conveying worm from raw material cabin 14 Power conveying device includes flow transfer pump 26, Pneumatic conveying pipeline 15, and flow transfer pump 26 includes material bin 2601, feed pipe 2602nd, blast pipe 2603, compressed air inlet pipe 2604, switch 2605, compressed air makes material suspended in thing goods fluid In feed bin 2601, then the switch of Pneumatic conveying pipeline 15 is opened, under the promotion of compressed air, by material along pneumatic carrier Road is transported to the first cloth system 2, the second cloth system 5, the 3rd cloth system 18, the 4th cloth system of each wall scroll production line 19。
As shown in Figure 10, Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, horizontal stroke Axle 102, positioning roller 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, positioning roller 103 Positioned at the lower section of transverse axis 102, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, Located roller 103, repaves on conveyer belt 31.
As shown in figure 12, the first cloth system 2 is the first distribution device, including the first distribution device frame 201, weighing hopper 202nd, hopper 203, conveying worm 204, lightweight charging basket axle of stirrer frame 205, lightweight charging basket mixer 206, motor 207, First inductive proximity switch 208 and the second inductive proximity switch 209, the connection hopper 203 of weighing hopper 202, conveying worm 204 1 End connection hopper 203, one end connects lightweight charging basket mixer 206, and lightweight charging basket mixer 206 is fixed on lightweight charging basket mixer In frame 205,
There are the first inductive proximity switch 208 and the second inductive proximity switch in the both sides of the power transmission shaft of motor 207 respectively 209, the power transmission shaft connection lightweight charging basket axle of stirrer frame 205 of motor 207, during work, material is through the electronic scale of weighing hopper 202 After metering, hopper 203 is fallen into, conveying worm 204 is transported to stirring in lightweight charging basket mixer 206, after stirring is finished, Motor 207 starts, and the sensing object 210 before the first inductive proximity switch 208 rotates to the second inductive proximity switch When before 209, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is downwardly turned over, lightweight charging basket mixer 206 On the conveyor belt, then motor 207 starts interior material, when sensing object 210 returns to the first inductive proximity switch When before 208, motor 207 is stopped, and lightweight charging basket axle of stirrer frame 205 is flipped up, and so moves in circles.
Or as shown in figure 8, the first distribution device includes mixer 3301, dynamical system and mobile tremie pipe 3302, stir Mix the mobile tremie pipe 3302 of the connection of machine 3301, the mobile tremie pipe 3302 of dynamical system connection;Feed proportioning system will be prepared during work To mixer 3301, after stirring is finished, dynamical system drives mobile tremie pipe 3302 to do laterally past on the conveyor belt to feedstock transportation Motion (conveying tape motion direction is longitudinal direction) is returned, as conveyer belt moves with uniform velocity, mobile tremie pipe 3302 is equably by slurry Distribution is on the conveyor belt.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.
The structure and work of the second cloth system 5, the 3rd cloth system 18, the 4th cloth system 19 and the first cloth system 2 Make method identical.
Implementation method seven
As shown in figure 5, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping System 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, 4th lapping system 9, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth Material system 5, second strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd and strike off system 8, the 4th lapping system 9th, diced system 15 is adjacent successively according to same direction, and production line support body is provided with conveyer belt, production line support body and conveyer belt position System 3, the second lapping system 4, the second cloth system 5, second are struck off in the first lapping system 1, the first cloth system 2, first Strike off system 6, the 3rd lapping system 7, the 3rd cloth system the 18, the 3rd strike off system 8, the 4th lapping system 9, lower section,
The Binder Materials induction system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth System 18;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the 3rd bonding enhancement layer is done:3rd cloth system 18, one layer of supergrip of laying on the second bonding enhancement layer coagulates Material, then the 3rd strikes off system 8 and strikes off supergrip gel material, the 4th lapping system 9 on the supergrip gel material for striking off, One layer of enhancing net is re-layed, the 3rd is constituted and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, the second bonding enhancement layer, the 3rd bonding enhancement layer, the 4th bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
Implementation method eight
As shown in fig. 6, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, the first lapping system 1, the first cloth system 2, first strike off system 3, the second lapping System 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7,
First lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5th, second to strike off system 6, the 3rd lapping system 7, diced system 15 adjacent successively according to same direction, is set on production line support body 17 There is a conveyer belt, production line support body 17 and conveyer belt are located at the first lapping system 1, the first cloth system 2, first strike off system 3, the Two lapping systems 4, the second cloth system 5, second strike off system 6, the lower section of the 3rd lapping system 7,
The Binder Materials induction system connects raw material cabin and the first cloth system 2, the second cloth system 5;
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, heat-insulation layer, second are bonded enhancement layer, are fixed together, and constitute heat preservation dismounting-free formwork.
Implementation method nine
As shown in figure 12, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, heat insulation mortar blanking system, the first lapping system 1, the first cloth system 2, first scrape Flat system 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system the 7, the 3rd and strike off system 8th, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 15, and first Lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off and be The 6, the 3rd lapping system 7 of system, heat insulation mortar blanking system the 28, the 3rd strike off system 8, the 4th lapping system 9, the 3rd cloth system 10th, the 4th to strike off system 11, the 5th lapping system 12, diced system 15 adjacent successively according to same direction, on production line support body It is provided with conveyer belt, production line support body and conveyer belt are located at the first lapping system 1, the first cloth system 2, first strike off system 3, the Two lapping systems 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, heat insulation mortar blanking system, the 3rd scrape Flat system 8, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The induction system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 10.
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer) is done:Heat insulation mortar blanking system 28 lays heat insulation mortar on the second bonding enhancement layer, so The 3rd strike off system 8 and strike off heat insulation mortar afterwards, the 4th lapping system 9 re-lays one layer of enhancing on the heat insulation mortar for striking off Net, constitutes the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment, feed proportioning system is identical with the feed proportioning system in implementation method one.
In present embodiment, the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 are shower nozzle.
As shown in figure 12, induction system includes mixer 16, delivery pump, pipeline 19, the connection delivery pump of mixer 16, conveying Pump connecting pipe 19;The accelerated cement in accelerated cement raw material cabin 14 is transported to mixer 16 by conveying worm during work, is treated After stirring, convey pump startup, by the accelerated cement slurry for stirring by pipeline 19 be transported to the first cloth system 2, Second cloth system 5, the 3rd cloth system 10.After conveying is finished, pipeline and shower nozzle are cleaned, Sewage treatment is utilized.Such as Shown in Figure 10, Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, transverse axis 102, positioning Roller 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, and positioning roller 103 is located at transverse axis 102 lower section, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, located rolling Wheel 103, repaves on conveyer belt 31.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.
Implementation method ten
As shown in figure 13, a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line bag of the heat preservation dismounting-free formwork Include raw material cabin, Binder Materials induction system, heat insulation mortar blanking system, the first lapping system 1, the first cloth system 2, first scrape Flat system 3, the second lapping system 4, the second cloth system 5, second strike off system 6, the 3rd lapping system the 7, the 3rd and strike off system 8th, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the 5th lapping system 12, diced system 15, and first Lapping system 1, the first cloth system 2, first strike off system 3, the second lapping system 4, the second cloth system 5, second strike off and be The 6, the 3rd lapping system 7 of system, heat insulation mortar blanking system the 28, the 3rd strike off system 8, the 4th lapping system 9, the 3rd cloth system 10th, the 4th to strike off system 11, the 5th lapping system 12, diced system 15 adjacent successively according to same direction, on production line support body It is provided with conveyer belt, production line support body and conveyer belt are located at the first lapping system 1, the first cloth system 2, first strike off system 3, the Two lapping systems 4, the second cloth system 5, second strike off system 6, the 3rd lapping system 7, heat insulation mortar blanking system, the 3rd scrape Flat system 8, the 4th lapping system 9, the 3rd cloth system the 10, the 4th strike off system 11, the lower section of the 5th lapping system 12,
The induction system connects raw material cabin and the first cloth system 2, the second cloth system 5, the 3rd cloth system 10.
The production method of the production line of the heat preservation dismounting-free formwork is comprised the following steps:
(1) the first bonding enhancement layer is done:First lapping system 1 lays one layer of enhancing net, the first cloth system on the conveyor belt Then system 2 first strikes off system 3 and strikes off supergrip gel material in enhancing one layer of supergrip gel material of laying on the net, the second paving Net system 4 re-lays one layer of enhancing net on the supergrip gel material for striking off, and constitutes first and is bonded enhancement layer;
(2) the first heat-insulation layer is done:Warming plate is laid on the first bonding enhancement layer;
(3) the second bonding enhancement layer is done:Second cloth system 5 lays one layer of supergrip gel material on warming plate, then Second strikes off system 6 strikes off supergrip gel material, and the 3rd lapping system 7 re-lays one on the supergrip gel material for striking off Layer enhancing net, constitutes second and is bonded enhancement layer;
(4) the second heat-insulation layer) is done:Heat insulation mortar blanking system 28 lays heat insulation mortar on the second bonding enhancement layer, so The 3rd strike off system 8 and strike off heat insulation mortar afterwards, the 4th lapping system 9 re-lays one layer of enhancing on the heat insulation mortar for striking off Net, constitutes the second heat-insulation layer;
(5) the 3rd bonding enhancement layer is done:3rd cloth system 10 lays one layer of supergrip gel material on the second heat-insulation layer, Then the 4th strike off system 11 and strike off supergrip gel material, the 5th lapping system 12 on the supergrip gel material for striking off, then One layer of enhancing net of laying, constitutes the 3rd and is bonded enhancement layer;
Above-mentioned first bonding enhancement layer, the first heat-insulation layer, the second bonding enhancement layer, the second heat-insulation layer, the 3rd bonding are strengthened Layer is fixed together, and constitutes heat preservation dismounting-free formwork.
In present embodiment, feed proportioning system is identical with the feed proportioning system in implementation method one.
In present embodiment, the first cloth system 2, the second cloth system 5, the 3rd cloth system 10 are shower nozzle.
As shown in figure 13, induction system includes proportioner 20, mixer 16, delivery pump, pipeline 19, conveying device one end Connection proportioner 20, one end connection mixer 16, the connection delivery pump of mixer 16, delivery pump connecting pipe 19;Spiral shell during work Accelerated cement in accelerated cement raw material cabin 14 is transported to proportioner 20 by rotation conveyer, and conveyer is from river sand raw material cabin 21 River sand is transported to proportioner 20, after dispensing is finished in proportion, the material that conveying device will be prepared is transported to and stirs proportioner 20 Mix machine 16, it is to be mixed it is uniform after, convey pump startup, the fast hardening concrete slurry for stirring is transported to first by pipeline 19 Cloth system 2, the second cloth system 5, the 3rd cloth system 10, the first cloth system 2, the second cloth system 5, the 3rd cloth system System 10 is shower nozzle, after conveying is finished, pipeline and shower nozzle is cleaned, and waste water is recycled.
As shown in Figure 10, Figure 11, the first lapping system 1 is that the first device for layering includes the first device for layering frame 101, horizontal stroke Axle 102, positioning roller 103, transverse axis 102 and positioning roller 103 are fixed in bottom device for layering frame 101, positioning roller 103 Positioned at the lower section of transverse axis 102, on transverse axis 102, glass fiber reticular cloth is down pulled glass fiber reticular cloth drum sheath from reel during work, Located roller 103, repaves on conveyer belt 31.
Second lapping system 4, the 3rd lapping system 7, the 4th lapping system 9, the 5th lapping system 12 and the first lapping system The structure of system 1 is identical with method of work.

Claims (15)

1. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, heat insulation mortar movement blanking system, stirring system, the production line combined, production-line arrangement together, give birth to by wall scroll Producing line includes that the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), second Cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd strike off system (8), the 4th lapping system (9), 3rd cloth system (10), the 4th strike off system (11), the 5th lapping system (12), diced system (15), the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off System (6), the 3rd lapping system (7), the 3rd strike off system (8), the 4th lapping system (9), the 3rd cloth system (10), the 4th Strike off system (11), the 5th lapping system (12), diced system (15) adjacent successively according to same direction, set on production line support body There is conveyer belt, production line support body and conveyer belt strike off system positioned at the first lapping system (1), the first cloth system (2), first (3), the second lapping system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd strike off System (8), the 4th lapping system (9), the 3rd cloth system (10), the 4th strike off system (11), the 5th lapping system (12) Lower section;
The stirring system is located at heat insulation mortar and moves blanking system (23) top, and blanking system feed is moved to heat insulation mortar;
The heat insulation mortar moves blanking system (23) includes frame (2301), track, mobile hopper (2302), dynamical system System, frame is provided with rotating wheel, rotating wheel position across in the top of assembly line, there is track in frame on mobile hopper In on track, dynamical system connects rotating wheel, and successively to the wall scroll production line feed of combination, discharging opening is located at and moves mobile hopper Dynamic feed hopper bottom;
The induction system connects the first cloth system (2), second cloth of raw material cabin and the wall scroll production line combined System (5), the 3rd cloth system (10).
2. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the production line combined, together, wall scroll production line includes the first lapping system (1), the first cloth to production-line arrangement Material system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), Three lapping systems (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), the 4th cloth system (19), the 4th system (11), the 5th lapping system (12), diced system (15), the first lapping system (1), the first cloth are struck off System (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), the 3rd Lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), the 4th cloth system (19), the 4th system (11), the 5th lapping system (12), diced system (15), production adjacent successively according to same direction are struck off Coil holder body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system (1), the first cloth system (2), first Strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), the 4th cloth system (19), the 4th strike off and be System (11), the lower section of the 5th lapping system (12);
The induction system connects the first cloth system (2), second cloth of raw material cabin and the wall scroll production line combined System (5), the 3rd cloth system (18), the 4th cloth system (19).
3. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the production line combined, together, wall scroll production line includes the first lapping system (1), the first cloth to production-line arrangement Material system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), Three lapping systems (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off System (6), the 3rd lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), Ni Zhifu drill System (14), diced system (15), palletizing system (16) are adjacent successively according to same direction, and production line support body is provided with conveying Band, production line support body and conveyer belt strike off system (3), second positioned at the first lapping system (1), the first cloth system (2), first Lapping system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd cloth system (18), 3rd strikes off system (8), the lower section of the 4th lapping system (9);
The induction system connects the first cloth system (2), second cloth of raw material cabin and the wall scroll production line combined System (5), the 3rd cloth system (18).
4. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the production line combined, together, wall scroll production line includes the first lapping system (1), the first cloth to production-line arrangement Material system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), Three lapping systems (7), the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), Ni Zhifu drill system (14), diced system (15), palletizing system (16) is adjacent successively according to same direction, and production line support body is provided with conveyer belt, production line support body and conveying Band strikes off system (3), the second lapping system (4), the second cloth positioned at the first lapping system (1), the first cloth system (2), first Material system (5), second strike off system (6), the lower section of the 3rd lapping system (7);
The induction system connects the first cloth system (2), second cloth of raw material cabin and the wall scroll production line combined System (5).
5. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, heat insulation mortar blanking system, the first lapping system (1), the first cloth system (2), first strike off system (3), the second paving Net system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd strike off system (8), Four lapping systems (9), the 3rd cloth system (10), the 4th strike off system (11), the 5th lapping system (12), diced system (15), the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth System (5), second strike off system (6), the 3rd lapping system (7), heat insulation mortar blanking system, the 3rd strike off system (8), the 4th Lapping system (9), the 3rd cloth system (10), the 4th strike off system (11), the 5th lapping system (12), diced system (15) and press Adjacent successively according to same direction, production line support body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off System (6), the 3rd lapping system (7), heat insulation mortar blanking system, the 3rd strike off system (8), the 4th lapping system (9), the 3rd Cloth system (10), the 4th strike off system (11), the lower section of the 5th lapping system (12);
The induction system connects the first cloth system (2), second cloth of raw material cabin and the wall scroll production line combined System (5), the 3rd cloth system (10).
6. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth System (5), second strike off system (6), the 3rd lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th Lapping system (9), the 4th cloth system (19), the 4th strike off system (11), the 5th lapping system (12), diced system (15), First lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second system (6), the 3rd lapping system (7) is struck off, the 3rd cloth system (18), the 3rd system (8), the 4th lapping is struck off System (9), the 4th cloth system (19), the 4th strike off system (11), the 5th lapping system (12), diced system (15), according to Same direction is adjacent successively, and production line support body is provided with conveyer belt, and production line support body and conveyer belt are located at the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth system (5), second strike off System (6), the 3rd lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), the 4th Cloth system (19), the 4th strike off system (11), the lower section of the 5th lapping system (12);
Induction system connection raw material cabin and the first cloth system (2), the second cloth system (5), the 3rd cloth system (18), 4th cloth system (19).
7. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth System (5), second strike off system (6), the 3rd lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th Lapping system (9), the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), Second cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd cloth system (18), the 3rd strike off system (8), the 4th lapping system (9), diced system (15) are adjacent successively according to same direction, and production line support body is provided with conveyer belt, Production line support body and conveyer belt strike off system (3), the second paving positioned at the first lapping system (1), the first cloth system (2), first Net system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), the 3rd cloth system (18), Three strike off system (8), the lower section of the 4th lapping system (9),
The induction system connects raw material cabin and the first cloth system (2), the second cloth system (5), the 3rd cloth system (18).
8. a kind of production line of heat preservation dismounting-free formwork, it is characterized in that, the production line of the heat preservation dismounting-free formwork includes raw material cabin, conveying System, the first lapping system (1), the first cloth system (2), first strike off system (3), the second lapping system (4), the second cloth System (5), second strike off system (6), the 3rd lapping system (7), the first lapping system (1), the first cloth system (2), first Strike off system (3), the second lapping system (4), the second cloth system (5), second strike off system (6), the 3rd lapping system (7), Diced system (15) is adjacent successively according to same direction, and production line support body is provided with conveyer belt, production line support body and conveyer belt position System (3), the second lapping system (4), the second cloth system are struck off in the first lapping system (1), the first cloth system (2), first System (5), second strike off system (6), the lower section of the 3rd lapping system (7);
The induction system connects raw material cabin and the first cloth system (2), the second cloth system (5).
9. the production line of a kind of heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, One group of Thickness sensitivity and means for correcting are installed between the second lapping system (4) and the second cloth system (5).
10. the production line of a kind of heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute State conveyer belt both sides and rib is installed.
A kind of production line of 11. heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute Induction system is stated for air-transport system.
A kind of production line of 12. heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute The first cloth system is stated for distribution device, including distribution device frame (201), weighing hopper (202), hopper (203), helical feed Machine (204), lightweight charging basket axle of stirrer frame (205), lightweight charging basket mixer (206), motor (207), the first sensing are close Switch (208) and the second inductive proximity switch (209), weighing hopper (202) connect hopper (203), conveying worm (204) one end Connection hopper (203), one end connects lightweight charging basket mixer (206), and lightweight charging basket mixer (206) is fixed on lightweight charging basket and stirs Mix in machine frame (205), there are the first inductive proximity switch (208) and the second sense in the both sides of the power transmission shaft of motor (207) respectively The power transmission shaft of proximity switch (209), motor (207) is answered to connect lightweight charging basket axle of stirrer frame (205);The second cloth system System or the 3rd cloth system or the 4th cloth system it is identical with the first cloth system.
A kind of production line of 13. heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute The first cloth system is stated for distribution device, including mixer, dynamical system and mobile tremie pipe, the mobile blanking of mixer connection Pipe, the mobile tremie pipe of dynamical system connection;Or first cloth system be distribution device, including mixer, dynamical system and Mobile hopper, the mobile hopper of mixer connection, dynamical system or dynamical system are connected mobile hopper with transmission mechanism;Described second Cloth system or the 3rd cloth system or the 4th cloth system are identical with the first cloth system.
A kind of production line of 14. heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute Heat insulation mortar blanking system is stated for heat insulation mortar blanking device, including mixer, dynamical system and mobile tremie pipe, mixer company Logical mobile tremie pipe, the mobile tremie pipe of dynamical system connection;Or the heat insulation mortar blanking system is heat insulation mortar blanking device, Including mixer, dynamical system and mobile hopper, the mobile hopper of mixer connection, the mobile hopper of dynamical system connection.
A kind of production line of 15. heat preservation dismounting-free formwork according to claim 1,2,3,4,5,6,7 or 8, it is characterized in that, institute Stating induction system includes mixer, delivery pump, pipeline, mixer connection delivery pump, delivery pump connecting pipe;Or the delivery system System includes proportioner, mixer, delivery pump, pipeline, conveying device connection proportioner and mixer, mixer connection conveying Pump, delivery pump connecting pipe;Or first cloth system is shower nozzle;Or second cloth system is shower nozzle.
CN201620707065.4U 2016-06-27 2016-06-27 A kind of production line of heat preservation dismounting-free formwork Expired - Fee Related CN206254292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620707065.4U CN206254292U (en) 2016-06-27 2016-06-27 A kind of production line of heat preservation dismounting-free formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620707065.4U CN206254292U (en) 2016-06-27 2016-06-27 A kind of production line of heat preservation dismounting-free formwork

Publications (1)

Publication Number Publication Date
CN206254292U true CN206254292U (en) 2017-06-16

Family

ID=59022851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620707065.4U Expired - Fee Related CN206254292U (en) 2016-06-27 2016-06-27 A kind of production line of heat preservation dismounting-free formwork

Country Status (1)

Country Link
CN (1) CN206254292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847068A (en) * 2019-11-18 2020-02-28 南京东垚环保材料有限公司 Production system of FLC sound barrier
CN111805725A (en) * 2019-04-12 2020-10-23 浙江双友物流器械股份有限公司 Production method of building composite board

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111805725A (en) * 2019-04-12 2020-10-23 浙江双友物流器械股份有限公司 Production method of building composite board
CN110847068A (en) * 2019-11-18 2020-02-28 南京东垚环保材料有限公司 Production system of FLC sound barrier

Similar Documents

Publication Publication Date Title
CN206578964U (en) A kind of Combined production line of heat preservation dismounting-free formwork for building
CN103192451B (en) Composite insulation board production line and machining process of insulation board
CN101328758A (en) Method and apparatus for producing exterior wall self-heat preservation composite ecological light wall board
CN206254292U (en) A kind of production line of heat preservation dismounting-free formwork
CN106166794A (en) A kind of preform production line
CN102672815A (en) Production method of foam slurry core-filling building blocks free of steaming
CN105922438A (en) Concrete integral production system
CN105089273B (en) One kind is Fully-mechanized to build wall construction system
CN107538608A (en) A kind of Combined production line and production method of heat preservation dismounting-free formwork for building
CN105064519B (en) Insulation, structural integrity board assembly line and production method
CN102632546A (en) Stage-by-stage maintenance method in automatic production process of foam slurry core filling building blocks
CN205255245U (en) Building wallboard automatic production line
CN206926070U (en) A kind of preform production line
US20100136156A1 (en) Plant for production of concrete
CN108748644A (en) A kind of embedded concrete small size prefabricated components automatic manufacturing device of grid-type
CN101352892A (en) Rolling type technique and production line for molding assembly large plate
CN206030207U (en) Prefab production line
CN102672813A (en) Staging maintaining method of rapid hardening foam slurry core filling block in automatic production process
CN205012483U (en) Heat preservation, structure intergral template production line
CN107538606A (en) The production line and production method of a kind of heat preservation dismounting-free formwork
CN105500517A (en) Automatic construction partition panel production line
CN103938789B (en) A kind of combined wall board production equipment
CN207027844U (en) A kind of production line of heat preservation dismounting-free formwork for building
CN203726632U (en) Wet mortar and concrete dual-purpose agitator system
CN206186077U (en) Prefab production line

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170616

Termination date: 20190627

CF01 Termination of patent right due to non-payment of annual fee