CN206245338U CN201621179259.8U CN201621179259U CN206245338U CN 206245338 U CN206245338 U CN 206245338U CN 201621179259 U CN201621179259 U CN 201621179259U CN 206245338 U CN206245338 U CN 206245338U
Authority
CN
China
Prior art keywords
raft plate
double
support column
construction elevator
raft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621179259.8U
Other languages
Chinese (zh)
Inventor
古至罡
王立强
王婧媛
佟志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201621179259.8U priority Critical patent/CN206245338U/en
Application granted granted Critical
Publication of CN206245338U publication Critical patent/CN206245338U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a construction elevator foundation structure technical field discloses a construction elevator foundation structure of double-deck raft board. The utility model discloses set up in the foundation ditch, including reinforced concrete raft and support column, reinforced concrete raft includes bottom raft and top layer raft, and bottom raft sets up on the bottom bed course, and the bottom bed course is located basic holding power layer, and the central point of bottom raft puts and is provided with the support column, and the support column is reinforced concrete frame post, and backfill has backfilled basis around the support column, sets up the roof bed course on the backfilling basis on the support column top, is provided with the top layer raft on the roof bed course. The utility model discloses stability can be good, bears the dynamic height, and the construction is simple and convenient, and the security performance is high.

Description

The basic structure of construction elevator of double-deck raft plate
Technical field
The utility model is related to basic structure of construction elevator technical field, the construction electricity of more particularly to a kind of double-deck raft plate Ladder foundation structure.
Background technology
At present in the work progress of skyscraper, due to the reasons such as basement, podium and pattern foundation pit supporting structure backfill, construction Elevator basis typically can not be all placed directly onto on ground, and most construction elevator basis is terminated in foundation construction, and the earthwork is returned Constructed again after filling out, elevator basis generally individual layer raft is board-like, because backfill material is generally miscellaneous fill, rubble, stone nitre, brick slag Hierarchical is compacted, and elevator basis is seated when in backfill, is easily influenceed by sleety weather, produces differential settlement, cracking, exists Larger potential safety hazard.When the building number of plies is higher, side slope, bank protection also by construction elevator basis instrument in skyscraper On, its soil property is soft, easily causes the inclination and sinking on elevator basis, there is potential safety hazard.
Utility model content
A kind of stability of the utility model offer is good, high capacity, easy construction, security performance double-deck raft plate high Basic structure of construction elevator.
The technical problem to be solved is:Traditional construction elevator basis cannot be arranged on ground, there is certain bearing capacity Deficiency, stability problem not high, with certain potential safety hazard.
In order to solve the above technical problems, the utility model is adopted the following technical scheme that:
The basic structure of construction elevator of the utility model bilayer raft plate, is arranged in foundation ditch, including Reinforced Concrete Raft plate And support column, the Reinforced Concrete Raft plate includes bottom raft plate and top layer raft plate, and bottom raft plate is arranged on bottom cushion, bottom Plate bed course is located on essential bearing stratum, and the center of bottom raft plate is provided with support column, and support column is steel reinforced concrete frame post, Support column surrounding is backfilled with back filled foundation, and top board bed course is set on the back filled foundation on support column top, is provided with top board bed course Top layer raft plate.
The basic structure of construction elevator of the utility model bilayer raft plate, further, the bottom cushion and top board bed course Formed using C15 concretings.
The basic structure of construction elevator of the utility model bilayer raft plate, further, the bottom cushion and top board bed course Thickness be 50-150mm, the absolute altitude of bottom cushion is identical with the absolute altitude of building substrate.
The basic structure of construction elevator of the utility model bilayer raft plate, further, configuration is double-deck in the bottom raft plate Two-way concrete slab, is formed using C30 concretings.
The basic structure of construction elevator of the utility model bilayer raft plate, further, the thickness of the bottom raft plate is 400-500mm。
The basic structure of construction elevator of the utility model bilayer raft plate, further, the top surface absolute altitude of the support column is low In the absolute altitude 50-100mm of back filled foundation.
The basic structure of construction elevator of the utility model bilayer raft plate, further, configuration is double-deck in the top layer raft plate Two-way concrete slab, is formed using C30 concretings.
The basic structure of construction elevator of the utility model bilayer raft plate, further, the thickness of the top layer raft plate is 350-450mm, the absolute altitude 100-200mm of the top mark higher than construction elevator road surface of top layer raft plate.
The basic structure of construction elevator of the utility model bilayer raft plate has the advantages that compared with prior art:
The basis that the basic structure of construction elevator of the utility model bilayer raft plate is combined using double-deck raft plate with support column Support, is set directly in the foundation ditch of ground, and construction elevator essential bearing stratum is reduced into balcony essential bearing stratum by backfill, The directly fixed stability in bottom is ensured;The construction of bottom raft plate and carriage post was first carried out before backfill, is returned The construction of top layer Base isolation system, the back filled foundation of support column surrounding backfill, by being compacted layer by layer, to support are carried out after the completion of filling out again Post also plays firm effect;Support column shores top layer raft plate, eliminates the elevator basis of backfill differential settlement generation The adverse effects such as deformation, sedimentation, effectively increase the security on construction elevator basis.
The basic structure of construction elevator to double-deck raft plate of the present utility model is described further below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structural representation of the basic structure of construction elevator of the utility model bilayer raft plate.
Reference:
1- bottom raft plates;2- top layer raft plates;3- bottom cushions;4- support columns;5- back filled foundations;6- top board bed courses.
Specific embodiment
As shown in figure 1, the basic structure of construction elevator of the utility model bilayer raft plate is arranged in foundation ditch, including reinforcing bar is mixed Solidifying soil raft plate and support column 4, Reinforced Concrete Raft plate include bottom raft plate 1 and top layer raft plate 2, and bottom raft plate 1 is arranged at base plate On bed course 3, bottom cushion 3 is located on essential bearing stratum, and bottom cushion 3 is formed using C15 concretings, bottom cushion 3 Thickness is 50-150mm, and the absolute altitude of bottom cushion 3 is identical with the absolute altitude of building substrate, configuration double-layer double-direction steel in bottom raft plate 1 Muscle, is formed using C30 concretings, and the thickness of bottom raft plate 1 is 400-500mm, and the center of bottom raft plate 1 is provided with Support column 4, support column 4 is steel reinforced concrete frame post, and back filled foundation 5, the top surface absolute altitude of support column 4 are backfilled with around support column 4 Less than the absolute altitude 50-100mm of back filled foundation 5, top board bed course 6 is set, top board bed course 6 is adopted on the back filled foundation 5 on the top of support column 4 Formed with C15 concretings are poured, the thickness of top board bed course 6 is 50-150mm, and top layer raft plate 2 is provided with top board bed course 6, Configuration double-layer double-direction reinforcing bar, is formed using C30 concretings in top layer raft plate 2, and the thickness of top layer raft plate 2 is 350-450mm, Absolute altitude 100-200mm of the top mark of top layer raft plate 2 higher than construction elevator road surface.
The construction method of the basic structure of construction elevator of the utility model bilayer raft plate is specific as follows:
Step one, bottom cushion construction:Before the basis backfill of construction balcony, C15 coagulations are poured on blinding layer Native bottom cushion 3, the thickness of bottom cushion 3 is 50-150mm, and the area of bottom cushion 3 is extended out with the size according to elevator basis 100mm is standard, and the absolute altitude of bottom cushion 3 is identical with the absolute altitude of building substrate;
Step 2, the construction of bottom raft plate:Accurately measured and unwrapping wire according to arrangement and method for construction, it is enterprising in bottom cushion 3 The colligation of row reinforcing bar and template-setup, it is ensured that the cross centre line of bottom cushion 3 is accurately weighed with the cross centre line of bottom raft plate 1 It is folded, then formed with C30 concretings, after concrete reaches some strength, carry out form removable;
Step 3, support column construction:Steel reinforcement cage is set in the center of bottom raft plate 1, template is built, is then mixed Solidifying soil is poured, and after concrete reaches some strength, carries out form removable;
Step 4, back filled foundation:Then to basic backfill is carried out in foundation ditch, in the surrounding compaction in layers of support column 4, support column Absolute altitude 50-100mm of the 4 top surface absolute altitude less than back filled foundation 5;
Step 5, top board cushion construction:After the basis backfill of construction balcony, on the back filled foundation 5 on the top of support column 4 C15 concrete rooves bed course 6 is poured, the thickness of top board bed course 6 is 50-150mm, and the area of top board bed course 6 is with according to elevator base The size of plinth extends out 100mm for standard;
Step 6, the construction of top layer raft plate:Reinforcing bar colligation is carried out on top board bed course 6 and template is built, it is ensured that the He of support column 4 The cross centre line of top board bed course 6 is accurately overlap with the cross centre line of top layer raft plate 2, is then formed with C30 concretings, After concrete reaches some strength, form removable is carried out, the thickness of top layer raft plate 2 is 350-450mm, the top of top layer raft plate 2 Absolute altitude 100-200mm of the absolute altitude higher than construction elevator road surface.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this Various modifications and improvement that the technical scheme of utility model is made, all should fall into the protection of the utility model claims determination In the range of.

Claims (8)

1. the basic structure of construction elevator of double-deck raft plate, is arranged in foundation ditch, it is characterised in that:Including Reinforced Concrete Raft plate and Support column(4), the Reinforced Concrete Raft plate include bottom raft plate(1)With top layer raft plate(2), bottom raft plate(1)It is arranged at bottom Plate bed course(3)On, bottom cushion(3)On essential bearing stratum, bottom raft plate(1)Center be provided with support column(4), Support column(4)It is steel reinforced concrete frame post, support column(4)Surrounding is backfilled with back filled foundation(5), support column(4)The backfill on top Basis(5)Upper setting top board bed course(6), top board bed course(6)On be provided with top layer raft plate(2).
2. the basic structure of construction elevator of double-deck raft plate according to claim 1, it is characterised in that:The bottom cushion (3)With top board bed course(6)Formed using C15 concretings.
3. the basic structure of construction elevator of double-deck raft plate according to claim 2, it is characterised in that:The bottom cushion (3)With top board bed course(6)Thickness be 50-150mm, the bottom cushion(3)Absolute altitude with building substrate absolute altitude it is identical.
4. the basic structure of construction elevator of double-deck raft plate according to claim 1, it is characterised in that:The bottom raft plate (1)Interior configuration double-layer double-direction reinforcing bar, is formed using C30 concretings.
5. the basic structure of construction elevator of double-deck raft plate according to claim 4, it is characterised in that:The bottom raft plate (1)Thickness be 400-500mm.
6. the basic structure of construction elevator of double-deck raft plate according to claim 1, it is characterised in that:The support column(4) Top surface absolute altitude be less than back filled foundation(5)Absolute altitude 50-100mm.
7. the basic structure of construction elevator of double-deck raft plate according to claim 1, it is characterised in that:The top layer raft plate (2)Interior configuration double-layer double-direction reinforcing bar, is formed using C30 concretings.
8. the basic structure of construction elevator of double-deck raft plate according to claim 7, it is characterised in that:The top layer raft plate (2)Thickness be 350-450mm, top layer raft plate(2)Absolute altitude 100-200mm of the top mark higher than construction elevator road surface.
CN201621179259.8U 2016-10-27 2016-10-27 Construction elevator foundation structure of double-layer raft plate Expired - Fee Related CN206245338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621179259.8U CN206245338U (en) 2016-10-27 2016-10-27 Construction elevator foundation structure of double-layer raft plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621179259.8U CN206245338U (en) 2016-10-27 2016-10-27 Construction elevator foundation structure of double-layer raft plate

Publications (1)

Publication Number Publication Date
CN206245338U true CN206245338U (en) 2017-06-13

Family

ID=58997219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621179259.8U Expired - Fee Related CN206245338U (en) 2016-10-27 2016-10-27 Construction elevator foundation structure of double-layer raft plate

Country Status (1)

Country Link
CN (1) CN206245338U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112074640A (en) * 2019-04-02 2020-12-11 株式会社璞莱克斯 Concrete foundation structure and its construction method
CN113417310A (en) * 2021-06-02 2021-09-21 中建二局第四建筑工程有限公司 Construction method for foundation of column cap type elevator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112074640A (en) * 2019-04-02 2020-12-11 株式会社璞莱克斯 Concrete foundation structure and its construction method
US11047103B2 (en) 2019-04-02 2021-06-29 Prex Co., Ltd Concrete foundation structure and method for constructing same
AU2019439273B2 (en) * 2019-04-02 2021-10-28 Prex Co., Ltd Concrete foundation structure and construction method for same
CN113417310A (en) * 2021-06-02 2021-09-21 中建二局第四建筑工程有限公司 Construction method for foundation of column cap type elevator

Similar Documents

Publication Publication Date Title
CN101718086B (en) A concrete-rockfill hybrid dam and its construction method
CN108560542B (en) A kind of bidirectional reinforcement of waste tire covering building slag and construction method thereof
CN203174619U (en) Reverse raft concrete terrace
CN205152982U (en) Barricade and structure of filling suitable for height is filled
CN111441331A (en) A kind of high water content clay dynamic compaction replacement filling foundation and its construction method
CN206245338U (en) Construction elevator foundation structure of double-layer raft plate
CN203765790U (en) Pedestal for prestress small box girder of highway in soft-foundation geological condition
CN101967819A (en) Forced ramming displacement synthetic method for construction of soft soil foundations of transformer substations
CN111636404B (en) Construction method of compacted sand pile foundation bed for offshore wind power
CN204418197U (en) A kind of foundation structure of transformer station
CN209555967U (en) An H-shaped concrete slab assembled ecological retaining wall
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN201512803U (en) Structural layer used for preventing building from sinking and bottom layer structure in transformer substation
CN105113350A (en) Pier abutment roadbed structure and construction method
CN203238542U (en) Suspension bridge anchorage foundation with split-type open caissons adopted
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN205000338U (en) A lattice form reinforced structure for soft soil area foundation ditch hole end
CN205975653U (en) Independent bearing platform structure of soil child mould construction
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN208151788U (en) Complex foundation Modified airport runway device
CN204940031U (en) A kind ofly be close to the road structure that bridge pier platform is convenient to rapid construction
CN207685850U (en) An anti-icing structure suitable for low pile cap foundation of offshore wind power
CN212772442U (en) A stepped beam-slab foundation structure suitable for sloping foundations
CN207419517U (en) Composite foundation reinforcement rockfill barrier wall structure
CN222716000U (en) Novel structure of T-shaped self-balancing slide-resistant pile in filling area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170613

Termination date: 20171027

CF01 Termination of patent right due to non-payment of annual fee