CN206233567U - Profiled sheet installation temporary support - Google Patents

Profiled sheet installation temporary support Download PDF

Info

Publication number
CN206233567U
CN206233567U CN201621290589.4U CN201621290589U CN206233567U CN 206233567 U CN206233567 U CN 206233567U CN 201621290589 U CN201621290589 U CN 201621290589U CN 206233567 U CN206233567 U CN 206233567U
Authority
CN
China
Prior art keywords
supporting leg
girder steel
profiled sheet
steel
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621290589.4U
Other languages
Chinese (zh)
Inventor
李荣才
董林
戴均林
韦王睿
骆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201621290589.4U priority Critical patent/CN206233567U/en
Application granted granted Critical
Publication of CN206233567U publication Critical patent/CN206233567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to a kind of profiled sheet installation temporary support, including the support beam between the first girder steel and the second girder steel, the support beam to be set along the length direction of first girder steel and second girder steel;First supporting leg, is scalability supporting leg, and one end of first supporting leg is support on first girder steel, and the other end is articulated with the support beam;And second supporting leg, one end is support on second girder steel, and the other end is articulated with the support beam.By setting pressing plate shaped steel of the support beam come supporting erection between first, second girder steel between the first girder steel and the second girder steel, support beam is supported on first, second girder steel with the first supporting leg and the second supporting leg, wherein the first supporting leg is telescopic legs.So that the utility model plays a part of support to pressing plate shaped steel.It is time saving in practical operation, laborsaving, it is extremely convenient;Scalability leg length can be adjusted arbitrarily, and be not take up critical path.

Description

Profiled sheet installation temporary support
Technical field
The utility model is related to the realm of building construction, and in particular to a kind of profiled sheet installation temporary support.
Background technology
It is more universal as the situation of concrete floor module from metal pressing plate in steel building field. Structured design phase is general to consider girder steel spacing compared with I haven't seen you for ages according to the properties of metal pressing plate, it is common practice that provide paving If the respective nodes of profiled sheet and specify when girder steel spacing is more than certain value need in girder steel across a setting scaffold as facing When support, carry out profiled sheet laying and follow-up concreting.In practice of construction, this feelings for needing to set up temporary support Condition is also more universal, therefore designs a kind of profiled sheet installation temporary support convenient, beneficial to control duration and cost of constructing Instrument is highly desirable to.
Traditional profiled sheet installation temporary support technique need to be in girder steel across setting up double-pole scaffold, support body tip shelf If U-shaped bracket, bracket top laying flitch is adjacent to profiled sheet bottom and is supported.This kind of technique is needed in substructure face Can just be carried out after completing construction, use condition limitation is stronger.The material of double support body consumption, artificial is set up in implementation process It is more, and it is also relatively complicated, time-consuming more long to remove link.In the case where the duration is more nervous, traditional scaffold temporary support It is difficult to realize to circulate the effect had bad luck, reuse.
Utility model content
In view of the above-mentioned installation temporary support of profiled sheet in the prior art has more drawback, the utility model is provided A kind of profiled sheet installation temporary support, including:
Support beam between the first girder steel and the second girder steel, the support beam is along first girder steel and described second The length direction of girder steel is set;
First supporting leg, is scalability supporting leg, and one end of first supporting leg is support on first girder steel, other end hinge It is connected to the support beam;And
Second supporting leg, one end is support on second girder steel, and the other end is articulated with the support beam.
The beneficial effect of the utility model profiled sheet installation temporary support:
By between the first girder steel and the second girder steel set support beam come supporting erection between first, second girder steel , be supported on support beam on first, second girder steel with the first supporting leg and the second supporting leg by pressing plate shaped steel, wherein the first supporting leg is to stretch Contracting supporting leg.So that the utility model plays a part of support to pressing plate shaped steel.It is time saving in practical operation, laborsaving, it is extremely convenient; Scalability leg length can be adjusted arbitrarily, only need to be by adjusting the length of retractility supporting leg in the case of different spans Fill, and mount and dismount process simply, in actual applications extremely convenient;Use of the present utility model is to understructure face No requirement (NR) is limited, and can also complete upper support in the case where lower concrete face does not complete installs, so as to be not take up critical path Line.
The utility model profiled sheet installation temporary support further improvement is that, the support beam be section steel beam.
The utility model profiled sheet installation temporary support further improvement is that, first supporting leg and described Two supporting legs are hinged by articulated elements with the support beam;First supporting leg and second supporting leg are connected respectively by connector In first girder steel and second girder steel.
The utility model profiled sheet installation temporary support further improvement is that, the articulated elements include be connected to The articulated slab of the support beam and the jointed shaft being inserted on the articulated slab, set on first supporting leg and second supporting leg There is the jack plugged for the jointed shaft.
The utility model profiled sheet installation temporary support further improvement is that, the connector be connection end Plate, the connection end plate is connected to first girder steel and second girder steel.
The utility model profiled sheet installation temporary support further improvement is that, first girder steel and described Two girder steels are i shaped steel, and the connection end plate is fixed on the flange plate and web of the i shaped steel.
The utility model profiled sheet installation temporary support further improvement is that, first supporting leg includes:
First straddle, first straddle is provided with oval adjustment hole;
Second straddle, second straddle is provided with fixing hole;And
First fastener, is arranged in the oval adjustment hole and is fixed on the fixing hole.
The utility model profiled sheet installation temporary support further improvement is that, first straddle and described Two straddle are the angle steel of mutual overlap joint.
The utility model profiled sheet installation temporary support further improvement is that, first straddle and described Two straddle are the square tube of mutual socket.
Brief description of the drawings
Fig. 1 is the overall schematic of the utility model profiled sheet installation temporary support.
Fig. 2 is the oblique view of the utility model profiled sheet installation temporary support.
Fig. 3 is the front view of the utility model profiled sheet installation temporary support.
Fig. 4 is the oblique view of the first supporting leg of the utility model profiled sheet installation temporary support.
Fig. 5 is the decomposing schematic representation of the first supporting leg of the utility model profiled sheet installation temporary support.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Fig. 1, Fig. 2 and Fig. 3 are referred to, Fig. 1 shows the entirety of the utility model profiled sheet installation temporary support Schematic diagram, Fig. 2 shows the oblique view of the utility model profiled sheet installation temporary support, and Fig. 3 shows the utility model The front view of profiled sheet installation temporary support.
.Make interim in the bottom that the utility model is intended to the profiled sheet to being erected between the first girder steel and the second girder steel Support, conveniently carries out profiled sheet laying and follow-up concreting.For this utility model provides a kind of profiled sheet peace Dress temporary support, including:Support beam 1 between the first girder steel and the second girder steel, the support beam 1 is used for supporting die mould steel The bottom of plate;The first supporting leg 3 is connected between first girder steel and support beam 1, second is connected between the second girder steel and support beam 1 Supporting leg 2, wherein, for convenience to the regulation of the height of support beam 1, the first supporting leg 3 is telescopic legs.Specifically, the first supporting leg 3 One end be supported in the first girder steel, the other end is articulated with support beam 1;One end of second supporting leg 2 is supported in the first girder steel, the other end It is articulated with support beam 1.
Components above is described in detail below in conjunction with accompanying drawing and preferred embodiment:
Support beam 1 needs to meet certain intensity in structure as the support member of pressing plate shaped steel in the utility model, compared with Good use section steel beam, section steel beam uses an elongated angle steel, and the first girder steel is arranged on along the length direction of first, second girder steel With the second girder steel across with reduce the first girder steel and second girder steel across spacing.
Support beam 1 is located between the first girder steel and the second girder steel, and first is support on by the first supporting leg 3 and the second supporting leg 2 On girder steel and the second girder steel.For convenience of description, the first supporting leg 3 and the second supporting leg 2 have relative first end and the second end;First The first end of the supporting leg 2 of supporting leg 3 and second is hinged by articulated elements with support beam 1;Second end of the first supporting leg 3 and the second supporting leg 2 Connected respectively by connector and be support on the first girder steel and the second girder steel.
The first supporting leg 3, the second supporting leg 2 are connected with support beam 1 by articulated elements, reach the effect for rotating regulation, it is convenient Coordinate the flexible height to adjust support beam 1 of the first supporting leg 3.Articulated elements includes being connected to the articulated slab 17 of support beam 1 and inserts Jointed shaft on articulated slab 17;The first end of the first supporting leg 3 and the second supporting leg 2 is provided with the jack plugged for jointed shaft.It is excellent Choosing, articulated slab 17 is steel plate, is welded on elongated angle steel;Jointed shaft is the screw rod with nut, jack and is hinged shaft position Fastened with nut after alignment.
The first supporting leg 3, the second supporting leg 2 are connected with support beam 1 by connector.Reach the first supporting leg 3 and second Leg 2 is individually fixed in the effect on the first girder steel and the second girder steel.Connector is the company on the first girder steel and the second girder steel End plate 14 is connect, the first supporting leg 3 is connected to the second end of the second supporting leg 2 and is connected on end plate 14.
Multiple first supporting legs 3 are arranged side by side between the girder steel of support beam 1 and first, between the girder steel of support beam 1 and second Multiple second supporting legs 2 are arranged side by side.
Fig. 4 and Fig. 5 is referred to, the height of support beam 1, the first supporting leg 3 is adjusted when support beam 1 is installed for convenience Using retractility supporting leg.Therefore, the first supporting leg 3 includes the first straddle 11 and the second straddle 12, the first straddle 11 is provided with oval Adjustment hole 20, the second straddle 12 is provided with fixing hole 21, and oval adjustment hole 20 is worn with fixing hole 21 by the first fastener 16 It is fixed.Specifically, oval adjustment hole 20 is slotted hole, fixing hole 21 is circular hole;First fastener 16 is arranged in circular hole and oval Kong Zhong, and position slip of first fastener 16 in slotted hole is adjustable.Preferably, the first fastener 16 is fixing bolt.
First straddle 11 and the second straddle 12 use angle steel or square tube, install and adjust to facilitate.Specifically, first point When the straddle 12 of leg 11 and second is angle steel, the first straddle 11 and the second straddle 12 mutually overlap, in the first straddle 11 1 Side opens up slotted hole at two, and opposite side opens up circular hole at two.Second straddle 12 opens up circular hole at two in the side of relative position, separately Side opens up slotted hole at two.Fixing bolt is set at circular hole everywhere after angle steel and angle steel overlap joint, is after unclamping fixing bolt Can the first supporting leg 3 be i.e. by the length that changes the lap of splice of angle steel and angle steel to adjust the first supporting leg 3, after tightening fixing bolt Fixed support can be formed.
When first straddle 11 and the second straddle 12 are square tube, the first straddle 11 and the second straddle 12 mutually connect together, Slotted hole at two is opened up in the side of the first straddle 11, opposite side opens up circular hole at two.Second straddle 12 is in the side of relative position Circular hole at two is opened up, opposite side opens up slotted hole at two.Fixing bolt, pine are set at circular hole everywhere after angle steel and angle steel overlap joint The length of the first supporting leg 3 is adjusted by changing angle steel with the lap of splice of angle steel by opening after fixing bolt, fixed spiral shell is tightened The first supporting leg 3 can form fixed support after bolt (this structure is specifically illustrating, but can be to be drawn according to description).
So that the first girder steel and the second girder steel are steel I-beam as an example, specific installation method of the present utility model is:
In practical operation, the utility model profiled sheet installation all parts of temporary support complete to process in factory, Part is transported to after needing the position for adding temporary support, proceeds by the overall package of support.By the first supporting leg 3 and second The corresponding connection end plate 14 of leg 2 is positioned over original structure steel beam flange and web intersection.Now the absolute altitude of elongated angle steel is not necessarily Meet and require, can be by changing the length of telescopic legs and changing the angle of the first supporting leg 3 and the second supporting leg 2 and elongated angle steel To adjust absolute altitude.Fixing bolt is unclamped, the lap of splice of angle steel 11 and angle steel 12 is adjusted so as to change the length of scalability supporting leg Degree, tightens fixing bolt after the completion of adjustment, continue to adjust the angle of the first supporting leg 3 and elongated angle steel 1 to supporting surface level.Adjustment After the completion of the elongated absolute altitude of angle steel 1 of repetition measurement, after repeating above step until elongated angle steel 1 reaches required absolute altitude, confirm all fixations After bolt non-loosening, start to lay profiled sheet.
Take above technical scheme so that with following beneficial effect:
The utility model major part is angle steel, with small volume, lightweight advantage, time saving in practical operation, province Power is extremely convenient;Scalability leg length can be adjusted arbitrarily, only need to be by adjusting retractility branch in the case of different spans The length of leg can be filled, and installation and removal process is simple, in actual applications extremely convenient;It is of the present utility model to use The no requirement (NR) of understructure face is limited, can also complete upper support in the case where lower concrete face does not complete installs, so that It is not take up critical path.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some of embodiment details should not be constituted to this practicality New restriction, the scope that the utility model will be defined using appended claims is used as protection domain of the present utility model.

Claims (9)

1. a kind of profiled sheet installation temporary support, it is characterised in that including
Support beam between the first girder steel and the second girder steel, the support beam is along first girder steel and second girder steel Length direction set;
First supporting leg, is scalability supporting leg, and one end of first supporting leg is support on first girder steel, and the other end is articulated with The support beam;And
Second supporting leg, one end is support on second girder steel, and the other end is articulated with the support beam.
2. profiled sheet installation temporary support according to claim 1, it is characterised in that:The support beam is shaped steel Beam.
3. profiled sheet installation temporary support according to claim 1, it is characterised in that:First supporting leg and described Second supporting leg is hinged by articulated elements with the support beam;First supporting leg and second supporting leg are connected respectively by connector It is connected to first girder steel and second girder steel.
4. profiled sheet installation temporary support according to claim 3, it is characterised in that:The articulated elements includes connection In the articulated slab and the jointed shaft that is inserted on the articulated slab of the support beam, on first supporting leg and second supporting leg It is provided with the jack plugged for the jointed shaft.
5. profiled sheet installation temporary support according to claim 3, it is characterised in that:The connector is connection end Plate, the connection end plate is connected to first girder steel and second girder steel.
6. profiled sheet installation temporary support according to claim 5, it is characterised in that:First girder steel with it is described Second girder steel is i shaped steel, and the connection end plate is fixed on the bottom flange plate and web of the i shaped steel.
7. profiled sheet installation temporary support according to claim 1, it is characterised in that:First supporting leg includes:
First straddle, first straddle is provided with oval adjustment hole;
Second straddle, second straddle is provided with fixing hole;And
First fastener, is arranged in the oval adjustment hole and is fixed on the fixing hole.
8. profiled sheet installation temporary support according to claim 7, it is characterised in that:First straddle and described Second straddle is the angle steel of mutual overlap joint.
9. profiled sheet installation temporary support according to claim 7, it is characterised in that:First straddle and described Second straddle is the square tube of mutual socket.
CN201621290589.4U 2016-11-29 2016-11-29 Profiled sheet installation temporary support Expired - Fee Related CN206233567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621290589.4U CN206233567U (en) 2016-11-29 2016-11-29 Profiled sheet installation temporary support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621290589.4U CN206233567U (en) 2016-11-29 2016-11-29 Profiled sheet installation temporary support

Publications (1)

Publication Number Publication Date
CN206233567U true CN206233567U (en) 2017-06-09

Family

ID=58981125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621290589.4U Expired - Fee Related CN206233567U (en) 2016-11-29 2016-11-29 Profiled sheet installation temporary support

Country Status (1)

Country Link
CN (1) CN206233567U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812005A (en) * 2019-01-31 2019-05-28 中国建筑第八工程局有限公司 The support device and its construction method of cantilevered plate on fashioned iron
CN110984566A (en) * 2019-12-05 2020-04-10 中国三冶集团有限公司 Reinforced concrete rammed floor support and construction method
CN112160422A (en) * 2020-09-30 2021-01-01 中建八局科技建设有限公司 Connecting structure of profiled steel sheet and steel beam and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812005A (en) * 2019-01-31 2019-05-28 中国建筑第八工程局有限公司 The support device and its construction method of cantilevered plate on fashioned iron
CN110984566A (en) * 2019-12-05 2020-04-10 中国三冶集团有限公司 Reinforced concrete rammed floor support and construction method
CN112160422A (en) * 2020-09-30 2021-01-01 中建八局科技建设有限公司 Connecting structure of profiled steel sheet and steel beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN206233567U (en) Profiled sheet installation temporary support
CN207066856U (en) A kind of experiment of anchor pole or anchor cable anti-pulling and tensioning and locking counterforce device
CN105781100A (en) Template component for sidewall of subway station
CN107975251B (en) Assembled building wallboard joint support device
CN204059799U (en) A kind of installation constitution of railing angular adjustment
CN206472082U (en) photovoltaic panel roof mounting assembly
CN105781131A (en) Assembled building wall plate mounting support system and construction method thereof
CN204899108U (en) Node structure is hung futilely to marble
CN208668988U (en) Rack jack-up construction Compact Mounts
CN207862747U (en) A kind of large-span steel arch
CN105804417A (en) Sway brace for installation of assembly type building wallboard and using method thereof
CN105804291A (en) Bare concrete sloping core interlayer through connection system and construction method thereof
CN206737428U (en) A kind of wall form verticality adjusting device
CN217175760U (en) Scalable anti-bank reinforcing apparatus of concrete
CN211691437U (en) Building aluminum formwork capable of being adjusted at different angles
CN209323832U (en) Steel row spacing control device
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN209353711U (en) Angle adjustable top bracket
CN209704012U (en) The formwork erection device of steel column cornerite
CN206638251U (en) A kind of novel column measuring instrument leg means
CN203174618U (en) Steel support for reverse construction of firstly erecting steel column and then pouring concrete foundation
CN209354130U (en) Total station hanging basket
CN207048351U (en) A kind of steel structural upright column correction auxiliary tools
CN206971809U (en) A kind of civil engineering support
CN104863360A (en) Curved surface template supporting system and method for installing curved surface template by adopting same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

CF01 Termination of patent right due to non-payment of annual fee