CN206220257U - A kind of slip attachment device for backform construction elevator - Google Patents
A kind of slip attachment device for backform construction elevator Download PDFInfo
- Publication number
- CN206220257U CN206220257U CN201621063395.0U CN201621063395U CN206220257U CN 206220257 U CN206220257 U CN 206220257U CN 201621063395 U CN201621063395 U CN 201621063395U CN 206220257 U CN206220257 U CN 206220257U
- Authority
- CN
- China
- Prior art keywords
- pulley
- conversion angle
- angle steel
- steel
- construction elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
本实用新型公开了一种用于顶模施工电梯的可滑移附着装置,包括系列辅助片式标准节,辅助片式标准节上部和下部分别滚动接触设置有一对限位滑轮组,每对限位滑轮组均通过连接机构与顶模下挂桁架固定连接,所述辅助片式标准节上端和下端分别通过连接臂与施工电梯固接,限位滑轮组包括第一滑轮、第二滑轮、第三滑轮、竖直槽钢和水平槽钢,连接机构包括第一转换角钢、第二转换角钢、第三转换角钢及水平螺杆,第一滑轮安装在竖直槽钢上,竖直槽钢与安装有第二滑轮、第三滑轮的水平槽钢焊接。本实用新型易于安装,便于拆除,可回收利用,一次安装成型,在顶模顶升过程同步滑移,全程发挥作用,有效提高施工电梯稳定性,具有巨大的商业前景和经济效益。
The utility model discloses a slidable attachment device for a top mold construction elevator, comprising a series of auxiliary piece standard joints, the upper part and the lower part of the auxiliary piece standard joints are respectively provided with a pair of limit pulleys in rolling contact, each pair of limit pulleys The pulley blocks are all fixedly connected with the truss hanging under the top mold through the connecting mechanism. The upper end and the lower end of the auxiliary piece standard section are fixedly connected with the construction elevator through the connecting arm respectively. The limit pulley block includes the first pulley, the second pulley, the third pulley, Vertical channel steel and horizontal channel steel, the connection mechanism includes the first conversion angle steel, the second conversion angle steel, the third conversion angle steel and horizontal screw rod, the first pulley is installed on the vertical channel steel, the vertical channel steel and the second conversion angle steel are installed The horizontal channel steel welding of the pulley and the third pulley. The utility model is easy to install, easy to dismantle, recyclable, one-time installation and molding, synchronous sliding during the lifting process of the top mold, and full function, effectively improving the stability of the construction elevator, and has huge commercial prospects and economic benefits.
Description
技术领域technical field
本实用新型属于建筑施工领域,尤其涉及一种用于顶模施工电梯的可滑移附着装置。The utility model belongs to the field of building construction, in particular to a slidable attachment device used for a top mold construction elevator.
背景技术Background technique
为了适应目前超高层建筑结构核心筒的施工质量和施工进度要求,顶升模架系统的应用逐渐成为潮流。在顶模系统施工过程中需要搭设施工电梯作为垂直交通工具。根据相关规范,必须通过附墙装置保证施工电梯稳定性。然而,在顶模高度范围内,标准附墙装置不再适用,传统处理方法为继续设置固定装置使施工电梯与顶模附着。然而每次进行顶模顶升操作,附着装置无法同步滑移上升,必须将其松开,利用其他设备作为临时支撑,增加工序,费时费力, 在施工速度、成本和安全性上制约着工程的进展,如存在以下缺点和不足:In order to meet the construction quality and construction schedule requirements of the core tube of the super high-rise building structure, the application of the jacking formwork system has gradually become a trend. During the construction of the top formwork system, construction elevators are required as a means of vertical transportation. According to the relevant regulations, the stability of the construction elevator must be guaranteed through the wall-attached device. However, within the height range of the top form, the standard wall attachment device is no longer applicable, and the traditional treatment method is to continue to set the fixing device to attach the construction elevator to the top form. However, every time the top mold is lifted, the attachment device cannot slide up synchronously, so it must be loosened, and other equipment is used as a temporary support, which increases the process, is time-consuming and laborious, and restricts the construction speed, cost and safety. Progress, such as the following shortcomings and deficiencies:
1.顶模高度范围内,施工电梯附着装置无法通过滑移与顶模同步上升,需要人为干预,增加顶模顶升工序。1. Within the height range of the top mold, the construction elevator attachment device cannot rise synchronously with the top mold through sliding, and human intervention is required to increase the top mold jacking process.
2.当顶模系统进行顶升时,需要临时松开原有附着装置,增加施工电梯倾覆危险。2. When the top formwork system is jacking up, it is necessary to temporarily loosen the original attachment device, which increases the risk of the construction elevator overturning.
3.在顶模系统顶升过程中,需要利用其它设备增加临时支撑,占用资源,增加成本。3. During the jacking process of the top mold system, other equipment needs to be used to increase temporary support, occupying resources and increasing costs.
4.附着装置无法标准模块化、自动化,反复拆装,构件磨损大,增加工程不可预料性。4. The attachment device cannot be modularized or automated in a standard way. Repeated disassembly and assembly will cause large wear and tear on the components, increasing the unpredictability of the project.
实用新型内容Utility model content
针对上述技术问题,本实用新型旨在一定程度上解决上述技术问题。In view of the above technical problems, the utility model aims to solve the above technical problems to a certain extent.
本实用新型的目的是提供一种结构简单、安全性高、成本低、施工方便易拆除且可循环利用的用于顶模施工电梯的可滑移附着装置。The purpose of the utility model is to provide a slidable attachment device for a top mold construction elevator which is simple in structure, high in safety, low in cost, convenient in construction, easy to dismantle and recyclable.
为解决上述问题,本实用新型采用如下技术方案:In order to solve the above problems, the utility model adopts the following technical solutions:
一种用于顶模施工电梯的可滑移附着装置,包括系列辅助片式标准节,所述辅助片式标准节上部和下部分别滚动接触设置有一对限位滑轮组,每对限位滑轮组均通过连接机构与顶模下挂桁架固定连接,所述辅助片式标准节上端和下端分别通过连接臂与施工电梯固接,所述限位滑轮组包括第一滑轮、第二滑轮、第三滑轮、竖直槽钢和水平槽钢,所述的连接机构包括第一转换角钢、第二转换角钢、第三转换角钢及水平螺杆,所述第一滑轮安装在竖直槽钢上,所述竖直槽钢与安装有第二滑轮、第三滑轮的水平槽钢焊接,所述水平槽钢与第一转换角钢焊接,所述第一转换角钢与第二转换角钢铰接,所述第二转换角钢通过水平螺杆与第三转换角钢单自由度连接,所述第三转换角钢与顶模下挂桁架通过焊接相连。A slidable attachment device for a top mold construction elevator, including a series of auxiliary piece standard joints, the upper and lower parts of the auxiliary piece standard joints are respectively provided with a pair of limit pulleys in rolling contact, and each pair of limit pulleys passes through the The connection mechanism is fixedly connected with the truss hanging under the top formwork, the upper end and lower end of the auxiliary piece standard section are fixedly connected with the construction elevator through the connecting arm respectively, and the limit pulley block includes the first pulley, the second pulley, the third pulley, the vertical Straight channel steel and horizontal channel steel, the connecting mechanism includes the first conversion angle steel, the second conversion angle steel, the third conversion angle steel and horizontal screw rod, the first pulley is installed on the vertical channel steel, and the vertical channel The steel is welded with the horizontal channel steel equipped with the second pulley and the third pulley, the horizontal channel steel is welded with the first conversion angle steel, the first conversion angle steel is hinged with the second conversion angle steel, and the second conversion angle steel passes through the horizontal The screw rod is connected with the third conversion angle steel with a single degree of freedom, and the third conversion angle steel is connected with the lower hanging truss of the top form by welding.
进一步地,所述连接臂与施工电梯通过高强螺栓连接。易于拆装,即装即用。Further, the connecting arm is connected to the construction elevator through high-strength bolts. Easy to disassemble and install, ready to use.
进一步地,位于辅助片式标准节上部的第二转换角钢与位于辅助片式标准节下部的第三转换角钢之间通过铰链连接设置有可调钢支撑,有效适应安装偏差,保证附着装置整体性。Furthermore, adjustable steel supports are set between the second conversion angle steel located at the upper part of the auxiliary piece standard section and the third conversion angle steel located at the lower part of the auxiliary piece standard section through a hinge connection, which can effectively adapt to the installation deviation and ensure the integrity of the attachment device .
与现有技术相比,本实用新型的有益效果是:结构标准模块化,一次成型,自动同步滑移上升,避免反复装拆,省去销项工序,加快顶升速度,不需临时借用其他动力设备,有效保证施工电梯全过程安全性,各标准构件可循环利用,节省材料,降低成本。总体上可加快施工进度,具有巨大的商业前景和经济效益,可广泛应用于顶升模架系统施工过程中。Compared with the prior art, the beneficial effects of the utility model are: standard modular structure, one-time molding, automatic synchronous sliding up, avoiding repeated assembly and disassembly, eliminating the pin-out process, accelerating the jacking speed, and not needing to temporarily borrow other Power equipment can effectively ensure the safety of the whole process of construction elevators, and all standard components can be recycled, saving materials and reducing costs. Generally, the construction progress can be accelerated, and the method has huge commercial prospects and economic benefits, and can be widely used in the construction process of the jacking formwork system.
附图说明Description of drawings
图1为本实用新型实施例的主视示意图。Fig. 1 is a schematic front view of an embodiment of the utility model.
图2为本实用新型实施例的附视示意图。Fig. 2 is a schematic diagram of an attached view of an embodiment of the utility model.
图3为本实用新型实施例的细部三维放大示意图。Fig. 3 is a three-dimensional enlarged schematic view of the details of the embodiment of the utility model.
图4为本实用新型实施例的整体三维示意图。Fig. 4 is an overall three-dimensional schematic diagram of the embodiment of the utility model.
图中:1-辅助片式标准节; 2-第一滑轮;3-第二滑轮;4-第三滑轮; 5-竖直槽钢;6-水平槽钢;7-第一转换角钢;8-第二转换角钢;9-第三转换角钢;10-可调钢支撑;11-连接臂;12-施工电梯;13-顶模下挂桁架;14-限位滑轮组;15-水平螺杆。In the figure: 1-auxiliary piece standard section; 2-first pulley; 3-second pulley; 4-third pulley; 5-vertical channel steel; 6-horizontal channel steel; 7-first conversion angle steel; 8 - second conversion angle steel; 9 - third conversion angle steel; 10 - adjustable steel support; 11 - connecting arm; 12 - construction elevator; 13 - truss hanging under the top form;
具体实施方式detailed description
下面结合附图和具体实施例对本实用新型的实用新型目的作进一步详细地描述,实施例不能在此一一赘述,但本实用新型的实施方式并不因此限定于以下实施例。除非特别说明,本实用新型采用的材料和加工方法为本技术领域常规材料和加工方法。The purpose of the utility model will be further described in detail below in conjunction with the accompanying drawings and specific examples. The examples cannot be repeated here one by one, but the implementation of the utility model is not therefore limited to the following examples. Unless otherwise specified, the materials and processing methods used in the present invention are conventional materials and processing methods in the technical field.
如图1、2、图3及图4所示,一种用于顶模施工电梯的可滑移附着装置,包括系列辅助片式标准节1,所述辅助片式标准节1上部和下部分别滚动接触设置有一对限位滑轮组14,每对限位滑轮组14均通过连接机构与顶模下挂桁架13固定连接,所述辅助片式标准节1上端和下端分别通过连接臂11与施工电梯12固接,所述限位滑轮组14包括第一滑轮2、第二滑轮3、第三滑轮4、竖直槽钢5和水平槽钢6,所述的连接机构包括第一转换角钢7、第二转换角钢8、第三转换角钢9及水平螺杆15,所述第一滑轮2安装在竖直槽钢5上,所述竖直槽钢5与安装有第二滑轮3、第三滑轮4的水平槽钢6焊接,所述水平槽钢6与第一转换角钢7焊接,所述第一转换角钢7与第二转换角钢8铰接,所述第二转换角钢8通过水平螺杆15与第三转换角钢9单自由度连接,所述第三转换角钢9与顶模下挂桁架13通过焊接相连。As shown in Fig. 1, 2, Fig. 3 and Fig. 4, a slidable attachment device used for top form construction elevators includes a series of auxiliary piece standard sections 1, and the upper and lower parts of the auxiliary piece standard sections 1 are respectively The rolling contact is provided with a pair of limit pulleys 14, and each pair of limit pulleys 14 is fixedly connected with the truss 13 under the top mold through a connecting mechanism. Fixed connection, the limit pulley block 14 includes the first pulley 2, the second pulley 3, the third pulley 4, the vertical channel steel 5 and the horizontal channel steel 6, and the connecting mechanism includes the first conversion angle steel 7, the second Conversion angle steel 8, the 3rd conversion angle steel 9 and horizontal screw rod 15, described first pulley 2 is installed on the vertical channel steel 5, described vertical channel steel 5 and the level that second pulley 3, the 3rd pulley 4 are installed The channel steel 6 is welded, the horizontal channel steel 6 is welded to the first conversion angle steel 7, the first conversion angle steel 7 is hinged to the second conversion angle steel 8, and the second conversion angle steel 8 is connected to the third conversion angle steel through a horizontal screw 15 9 single-degree-of-freedom connection, the third conversion angle steel 9 is connected with the truss 13 under the top form by welding.
进一步地,所述连接臂11与施工电梯12通过高强螺栓连接。易于拆装,即装即用。Further, the connecting arm 11 is connected to the construction elevator 12 through high-strength bolts. Easy to disassemble and install, ready to use.
进一步地,位于辅助片式标准节1上部的第二转换角钢8与位于辅助片式标准节1下部的第三转换角钢9之间通过铰链连接设置有可调钢支撑10,有效适应安装偏差,保证附着装置整体性。Furthermore, an adjustable steel support 10 is provided through a hinge connection between the second conversion angle steel 8 located on the upper part of the auxiliary piece standard section 1 and the third conversion angle steel 9 located on the lower part of the auxiliary piece standard section 1, which can effectively adapt to the installation deviation, Ensure attachment integrity.
所有构件可在车间制作完成,之后在现场分段放样安装,施工时,首先将All components can be manufactured in the workshop, and then installed in sections on site. During construction, the
限位滑轮组14与第一转换角钢7进行焊接,然后将第一转换角钢7与第二转换角钢8通过销钉连接,接着将第三转换角钢9上的水平螺杆15安装在第二转换角钢8上,接着将带有连接臂11的辅助片式标准节1通过螺栓与施工电梯标准节12固接,接着在辅助片式标准节1上安装限位滑轮组14,接着通过水平螺杆15调节第三转换角钢9与顶模下挂桁架13的距离,最后将第三转换角钢9通过焊接与顶模下挂桁架13固定。The limit pulley block 14 is welded to the first conversion angle steel 7, and then the first conversion angle steel 7 is connected to the second conversion angle steel 8 by pins, and then the horizontal screw 15 on the third conversion angle steel 9 is installed on the second conversion angle steel 8 , then connect the auxiliary piece standard section 1 with the connecting arm 11 to the construction elevator standard section 12 through bolts, then install the limit pulley block 14 on the auxiliary piece standard section 1, and then adjust the third conversion through the horizontal screw 15 The distance between the angle steel 9 and the hanging truss 13 under the top form, and finally the third conversion angle steel 9 is fixed with the hanging truss 13 under the top form by welding.
此时所述限位滑轮组14与顶模下挂桁架固定13,辅助片式标准节1与施工电梯12固定,限位滑轮组14与辅助片式标准节1可相对滑移。Now described limit pulley block 14 is fixed 13 with the truss hanging under the top mold, auxiliary piece standard section 1 is fixed with construction elevator 12, and limit pulley block 14 and auxiliary piece type standard section 1 can slide relatively.
在顶模顶升过程中,顶模下挂桁架13带动限位滑轮组14沿着辅助片式标准节1同步上升。限位滑轮组14通过辅助片式标准节1限制施工电梯12水平位移。During the jacking process of the top mold, the hanging truss 13 under the top mold drives the limit pulley block 14 to rise synchronously along the auxiliary piece standard section 1 . The limit pulley block 14 limits the horizontal displacement of the construction elevator 12 through the auxiliary piece standard section 1.
通过比较,相对传统附着装置,本实施例具有如下优点:By comparison, compared with the traditional attachment device, this embodiment has the following advantages:
1. 结构标准模块化,一次成型,自动同步滑移上升,避免反复安装,省去销项工序,加快顶升速度。1. Standard modular structure, one-time molding, automatic synchronous sliding up, avoiding repeated installation, eliminating the pin-out process, and speeding up the jacking speed.
2. 顶模顶升过程中不需借用其他设备进行作为临时支撑,有效保证施工电梯全过程安全性,节约资源。2. There is no need to borrow other equipment as temporary support during the lifting process of the top formwork, effectively ensuring the safety of the elevator during construction and saving resources.
3. 所有部件都由基本钢材制作,可以直接在车间中制造,生产成本低。3. All components are made of basic steel, which can be directly manufactured in the workshop, and the production cost is low.
4. 现场组装与普通节点的组装区别很少,甚至更加简便。4. On-site assembly is slightly different from that of ordinary nodes, and is even simpler.
5. 标准化生产,可进行回收循环利用,节省材料,降低成本,符合绿色工程理念。5. Standardized production can be recycled and reused, saving materials and reducing costs, which is in line with the concept of green engineering.
本实用新型的上述实施例仅仅是为清楚地说明本实用新型所作的举例,而并非是对本实用新型的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型权利要求的保护范围之内。The above-mentioned embodiments of the present utility model are only examples for clearly illustrating the present utility model, and are not intended to limit the implementation of the present utility model. For those of ordinary skill in the art, other changes or changes in different forms can be made on the basis of the above description. It is not necessary and impossible to exhaustively list all the implementation manners here. All modifications, equivalent replacements and improvements made within the spirit and principles of the utility model shall be included in the protection scope of the claims of the utility model.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621063395.0U CN206220257U (en) | 2016-09-19 | 2016-09-19 | A kind of slip attachment device for backform construction elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621063395.0U CN206220257U (en) | 2016-09-19 | 2016-09-19 | A kind of slip attachment device for backform construction elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206220257U true CN206220257U (en) | 2017-06-06 |
Family
ID=58782441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621063395.0U Expired - Fee Related CN206220257U (en) | 2016-09-19 | 2016-09-19 | A kind of slip attachment device for backform construction elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206220257U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107235401A (en) * | 2017-07-28 | 2017-10-10 | 中建四局第建筑工程有限公司 | The slip wall-attaching equipment and its application method of connection construction elevator and creeping formwork support body |
CN109095319A (en) * | 2018-07-25 | 2018-12-28 | 中国建筑第四工程局有限公司 | A kind of construction elevator operating system integrated with climbing frame |
CN112723094A (en) * | 2021-01-29 | 2021-04-30 | 中建三局集团华南有限公司 | Integrated wall-attached device based on synchronous climbing of light steel platform |
CN115807537A (en) * | 2022-11-14 | 2023-03-17 | 中国建筑第八工程局有限公司 | Climbing formwork attached truss system for construction elevator with super high-rise side tube structure and construction method |
-
2016
- 2016-09-19 CN CN201621063395.0U patent/CN206220257U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107235401A (en) * | 2017-07-28 | 2017-10-10 | 中建四局第建筑工程有限公司 | The slip wall-attaching equipment and its application method of connection construction elevator and creeping formwork support body |
CN109095319A (en) * | 2018-07-25 | 2018-12-28 | 中国建筑第四工程局有限公司 | A kind of construction elevator operating system integrated with climbing frame |
CN112723094A (en) * | 2021-01-29 | 2021-04-30 | 中建三局集团华南有限公司 | Integrated wall-attached device based on synchronous climbing of light steel platform |
CN115807537A (en) * | 2022-11-14 | 2023-03-17 | 中国建筑第八工程局有限公司 | Climbing formwork attached truss system for construction elevator with super high-rise side tube structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206220257U (en) | A kind of slip attachment device for backform construction elevator | |
CN106801510A (en) | Plastic formwork early removing system | |
CN105544397A (en) | High concrete pier construction formwork device | |
CN104131700B (en) | A kind of door and window Cast-in-situ Beam casting method and mould | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN107447668A (en) | A kind of automatic lifting positions tapered pier template | |
CN205777580U (en) | Automatic lifting type discharging platform | |
CN110714611A (en) | Light climbing formwork steel frame system | |
CN204376279U (en) | Hydroelectric station GIS bus auxiliary repair adjustable supporting device | |
CN202946193U (en) | Tunnel center gutterway formwork | |
CN205990571U (en) | A kind of quick removing device based on CRTS III template | |
CN201367730Y (en) | A die plate supporting device convenient for dismounting die plates | |
CN211173071U (en) | Light climbing formwork steel frame system | |
CN205205683U (en) | High mound construction formwork device of concrete | |
CN210025768U (en) | A operation platform system for caisson template installation | |
CN105537470B (en) | A kind of fluid pressure type pier shaft steel bar meter mould bases and pier shaft reinforcement construction technique | |
CN204689552U (en) | A kind of equipment jacking apparatus of zigzag | |
CN111519661A (en) | A laterally slidable vertical wall construction mobile formwork and construction method thereof | |
CN217580664U (en) | Construction device with post-pouring section for prefabricated shear wall | |
CN205894292U (en) | Prefabricated assembly structure tip beam column node fixed knot constructs | |
CN206373585U (en) | Fastener blade provision for disengagement | |
CN204727536U (en) | A lifting movable support for the transmission shaft of the crane | |
CN204689525U (en) | A kind of equipment jacking apparatus being convenient to measure | |
CN108843043A (en) | A kind of people's air defense doorframe support replacement bracing means and its construction method | |
CN204549879U (en) | A kind of device removing air guide wall for vetical furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170606 Termination date: 20170919 |