CN206193189U - Portable transformer buchholz relay calibration equipment - Google Patents
Portable transformer buchholz relay calibration equipment Download PDFInfo
- Publication number
- CN206193189U CN206193189U CN201621291360.2U CN201621291360U CN206193189U CN 206193189 U CN206193189 U CN 206193189U CN 201621291360 U CN201621291360 U CN 201621291360U CN 206193189 U CN206193189 U CN 206193189U
- Authority
- CN
- China
- Prior art keywords
- calibration device
- gas relay
- controller
- air pump
- frequency converter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
本实用新型公开了一种便携式变压器瓦斯继电器校验装置,包括瓦斯继电器校验装置本体和触控显示屏,所述瓦斯继电器校验装置本体通过输气管连接有变电器瓦斯继电器,所述气泵右侧连接有进气管,且左侧设置有压力传感器,所述校验装置外壳下方安装有万向轮,所述校验装置外壳内部上方设置有变频器,所述触控显示屏前方通过电性连接有控制器,且控制器前方安装有变频器,所述校验装置外壳后方上部表面安装有触控显示屏。该便携式变压器瓦斯继电器校验装置,结构设置合理,通过压力传感器和流速传感器设置,对瓦斯继电器动作定值,接点同期的现场校准测试,检测周期短,方便快捷且准确可靠,工作效率高,促进电力行业的发展。
The utility model discloses a portable transformer gas relay verification device, which comprises a gas relay verification device body and a touch display screen. The gas relay verification device body is connected with a transformer gas relay through an air pipe. The side is connected with an air intake pipe, and a pressure sensor is installed on the left side, a universal wheel is installed under the casing of the calibration device, a frequency converter is installed above the casing of the calibration device, and the front of the touch screen is passed through an electric A controller is connected, and a frequency converter is installed in front of the controller, and a touch screen is installed on the rear upper surface of the calibration device shell. The portable transformer gas relay calibration device has a reasonable structure and setting. Through the setting of the pressure sensor and the flow rate sensor, the action value of the gas relay is set, and the on-site calibration test of the contact is synchronized. The detection cycle is short, convenient, fast, accurate and reliable, and the work efficiency is high. Promote Development of the power industry.
Description
技术领域technical field
本实用新型涉及电力系统的变压器安全检测设备技术领域,具体为一种便携式变压器瓦斯继电器校验装置。The utility model relates to the technical field of transformer safety detection equipment for power systems, in particular to a portable transformer gas relay calibration device.
背景技术Background technique
在电力系统和供用电系统中,变压器是一种及其重要的电力设备,保护变压器的安全稳定运行也就成为供电部门的重要工作,目前我国电力系统中普遍采用油浸式变压器,瓦斯继电器是保护油浸式变压器安全运行的重要技术措施,具有灵敏度高、安装接线简单等优点,瓦斯继电器校验时间较长,由于缺乏在线查故处缺、快速复役的技术手段,故难以确保在主变短时停役期间完成校验,造成运行中的潜在隐患,可能造成瓦斯继电器对变压器内部故障的动作响应不及时,扩大事故范围等后果,瓦斯继电器校准检测方法主要是将待检测的瓦斯继电器放置于实验室中的瓦斯继电器校验台。此种方法虽然可行,但其因为使用电泵及介质油,其体积较大且易污染环境,另外,该方法需要在实验室环境下进行,对于通常的电力设备检修的现场来说,这种检测校准方法无法进行现场校准,其校准周期较长,工作效率较低,不利于变电检修和现场故障判断。In the power system and power supply system, the transformer is an extremely important power equipment, and protecting the safe and stable operation of the transformer has become an important task for the power supply department. At present, oil-immersed transformers and gas relays are commonly used in my country's power systems It is an important technical measure to protect the safe operation of the oil-immersed transformer. It has the advantages of high sensitivity and simple installation and wiring. The completion of the calibration during the short-term outage of the main transformer will cause potential hidden dangers in operation, which may cause the gas relay to respond untimely to the internal fault of the transformer, and expand the scope of the accident. The relay is placed on the test bench of the gas relay in the laboratory. Although this method is feasible, it has a large volume and is easy to pollute the environment because of the use of electric pumps and medium oil. In addition, this method needs to be carried out in a laboratory environment. The detection and calibration method cannot carry out on-site calibration, and its calibration period is long, and the work efficiency is low, which is not conducive to substation maintenance and on-site fault judgment.
实用新型内容Utility model content
本实用新型的目的在于提供一种便携式变压器瓦斯继电器校验装置,以解决上述背景技术中提出的无法进行现场校准,其校准周期较长,工作效率较低,不利于变电检修和现场故障判断等问题。The purpose of this utility model is to provide a portable transformer gas relay calibration device to solve the problem of inability to perform on-site calibration proposed in the above-mentioned background technology. And other issues.
为实现上述目的,本实用新型提供如下技术方案:一种便携式变压器瓦斯继电器校验装置,包括瓦斯继电器校验装置本体和触控显示屏,所述瓦斯继电器校验装置本体通过输气管连接有变电器瓦斯继电器,且瓦斯继电器校验装置本体左侧前端安装有连接头,所述瓦斯继电器校验装置本体包括有校验装置外壳、控制器、气泵和储气装置,所述校验装置外壳内部下端设置安装有储气装置,且储气装置上方安装有气泵,所述气泵右侧连接有进气管,且左侧设置有压力传感器,所述校验装置外壳下方安装有万向轮,所述校验装置外壳外部左侧安装有流速传感器,且流速传感器与气泵相连接,所述流速传感器左侧固定连接有电动控制阀,所述校验装置外壳内部上方设置有变频器,所述触控显示屏前方通过电性连接有控制器,且控制器前方安装有变频器,所述校验装置外壳后方上部表面安装有触控显示屏。In order to achieve the above purpose, the utility model provides the following technical solutions: a portable transformer gas relay calibration device, including a gas relay calibration device body and a touch display screen, the gas relay calibration device body is connected to a transformer through a gas pipeline Electric gas relay, and the left front end of the gas relay verification device body is equipped with a connector. The gas relay verification device body includes a verification device shell, a controller, an air pump and a gas storage device. A gas storage device is installed at the lower end, and an air pump is installed above the gas storage device. The right side of the air pump is connected to an intake pipe, and a pressure sensor is installed on the left side. Universal wheels are installed under the casing of the calibration device. A flow rate sensor is installed on the left side of the outer shell of the calibration device, and the flow rate sensor is connected to the air pump. An electric control valve is fixedly connected to the left side of the flow rate sensor. A controller is electrically connected in front of the display screen, and a frequency converter is installed in front of the controller, and a touch display screen is installed on the rear upper surface of the casing of the calibration device.
优选的,所述压力传感器、电动控制阀和流速传感器的电信号输出端与控制器信号输入端相连接,且控制器信号输出端通过排线连接有触控显示屏的信号输入端。Preferably, the electrical signal output terminals of the pressure sensor, the electric control valve and the flow rate sensor are connected to the signal input terminal of the controller, and the signal output terminal of the controller is connected to the signal input terminal of the touch screen through a cable.
优选的,所述连接头为带有密封圈的连接头,且连接头与输气管密封连接。Preferably, the connecting head is a connecting head with a sealing ring, and the connecting head is sealed and connected with the gas delivery pipe.
优选的,所述变频器与气泵通过电性相连接,且变频器与控制器通过电性相连接。Preferably, the frequency converter is electrically connected to the air pump, and the frequency converter is electrically connected to the controller.
优选的,所述控制器为单片机设置,且气泵为气动执行机构。Preferably, the controller is a single-chip microcomputer, and the air pump is a pneumatic actuator.
与现有技术相比,本实用新型的有益效果是:该便携式变压器瓦斯继电器校验装置,结构设置合理,体积小巧,通过压力传感器和流速传感器设置,对瓦斯继电器动作定值、接点同期的现场校准测试,检测周期短,方便快捷且准确可靠,工作效率高,使电网具备便捷可靠的校准能力,校验从技术能力上得到了提高,对电网的安全运行提供了技术支撑,同时设备采用触控显示屏,使操作更加方便,促进电力行业的发展。Compared with the prior art, the utility model has the beneficial effects that: the portable transformer gas relay verification device has a reasonable structure and small size, and is set by the pressure sensor and the flow rate sensor to set the action value of the gas relay and synchronize the contacts on the spot Calibration test, the detection cycle is short, convenient, fast, accurate and reliable, and the work efficiency is high, so that the power grid has convenient and reliable calibration capabilities, the calibration has been improved in terms of technical capabilities, and provides technical support for the safe operation of the power grid. The control display screen makes the operation more convenient and promotes the development of the electric power industry.
附图说明Description of drawings
图1为本实用新型结构瓦斯继电器校验装置本体组装示意图;Fig. 1 is a schematic diagram of the assembly of the main body of the gas relay calibration device of the utility model;
图2为本实用新型结构瓦斯继电器校验装置本体展开示意图。Fig. 2 is a schematic diagram of the main body of the gas relay verification device of the utility model.
图中:1、变电器瓦斯继电器,2、输气管,3、瓦斯继电器校验装置本体,4、校验装置外壳,5、压力传感器,6、连接头,7、电动控制阀,8、流速传感器,9、变频器,10、触控显示屏,11、控制器,12、气泵,13、进气管,14、储气装置,15、万向轮。In the figure: 1. Transformer gas relay, 2. Air pipe, 3. Gas relay calibration device body, 4. Calibration device shell, 5. Pressure sensor, 6. Connector, 7. Electric control valve, 8. Flow rate Sensor, 9, frequency converter, 10, touch display screen, 11, controller, 12, air pump, 13, intake pipe, 14, gas storage device, 15, universal wheel.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-2,本实用新型提供一种技术方案:一种便携式变压器瓦斯继电器校验装置,包括变电器瓦斯继电器1、输气管2、瓦斯继电器校验装置本体3、校验装置外壳4、压力传感器5、连接头6、电动控制阀7、流速传感器8、变频器9、触控显示屏10、控制器11、气泵12、进气管13、储气装置14、万向轮15,瓦斯继电器校验装置本体3通过输气管2连接有变电器瓦斯继电器1,且瓦斯继电器校验装置本体3左侧前端安装有连接头6,连接头6为带有密封圈的连接头,且连接头6与输气管2密封连接,瓦斯继电器校验装置本体3包括有校验装置外壳4、控制器11、气泵12和储气装置14,校验装置外壳4内部下端设置安装有储气装置14,且储气装置14上方安装有气泵12,气泵12右侧连接有进气管13,且左侧设置有压力传感器5,校验装置外壳4下方安装有万向轮15,校验装置外壳4外部左侧安装有流速传感器8,且流速传感器8与气泵12相连接,流速传感器8左侧固定连接有电动控制阀7,校验装置外壳4内部上方设置有变频器9,触控显示屏10前方通过电性连接有控制器11,且控制器11前方安装有变频器9,变频器9与气泵12通过电性相连接,且变频器9与控制器11通过电性相连接,控制器11为单片机设置,且气泵12为气动执行机构,校验装置外壳4后方上部表面安装有触控显示屏10,压力传感器5、电动控制阀7和流速传感器8的电信号输出端与控制器11信号输入端相连接,且控制器11信号输出端通过排线连接有触控显示屏10的信号输入端,对瓦斯继电器动作定值、接点同期的现场校准测试,检测周期短,方便快捷且准确可靠,工作效率高,使电网具备便捷可靠的校准能力,校验从技术能力上得到了提高。Please refer to Figure 1-2, the utility model provides a technical solution: a portable transformer gas relay calibration device, including transformer gas relay 1, air pipe 2, gas relay calibration device body 3, calibration device shell 4 , pressure sensor 5, connector 6, electric control valve 7, flow rate sensor 8, frequency converter 9, touch screen 10, controller 11, air pump 12, intake pipe 13, gas storage device 14, universal wheel 15, gas The relay verification device body 3 is connected to the transformer gas relay 1 through the air pipe 2, and the left front end of the gas relay verification device body 3 is equipped with a connector 6, the connector 6 is a connector with a sealing ring, and the connector 6 is sealed and connected with the gas pipeline 2. The gas relay calibration device body 3 includes a calibration device housing 4, a controller 11, an air pump 12 and a gas storage device 14. The lower end of the calibration device housing 4 is equipped with a gas storage device 14. And the air pump 12 is installed above the gas storage device 14, the air intake pipe 13 is connected to the right side of the air pump 12, and the pressure sensor 5 is arranged on the left side, the universal wheel 15 is installed under the calibration device shell 4, and the external left side of the calibration device shell 4 A flow rate sensor 8 is installed on the side, and the flow rate sensor 8 is connected to the air pump 12. An electric control valve 7 is fixedly connected to the left side of the flow rate sensor 8. A frequency converter 9 is installed above the inside of the calibration device shell 4. The front of the touch screen 10 passes through the A controller 11 is electrically connected, and a frequency converter 9 is installed in front of the controller 11. The frequency converter 9 is electrically connected to the air pump 12, and the frequency converter 9 is electrically connected to the controller 11. The controller 11 is a single-chip microcomputer set, and the air pump 12 is a pneumatic actuator, a touch screen 10 is installed on the rear upper surface of the calibration device housing 4, the electrical signal output end of the pressure sensor 5, the electric control valve 7 and the flow rate sensor 8 and the signal input end of the controller 11 connected, and the signal output end of the controller 11 is connected to the signal input end of the touch display screen 10 through a cable, and the on-site calibration test of the fixed value of the gas relay action and the synchronization of the contacts has a short detection period, is convenient, fast, accurate and reliable, and works The high efficiency enables the power grid to have convenient and reliable calibration capabilities, and the technical capabilities of calibration have been improved.
工作原理:在使用该便携式变压器瓦斯继电器校验装置时,首先将设备运输到现场,通过连接头6连接到输气管2上,通过瓦斯继电器校验装置本体3对变电器瓦斯继电器1进行校验,对瓦斯继电器动作点测试,通过流速传感器8检测设备的气体流量,通过电信号将数据反馈给控制器11,通过触控显示屏10进行数据显示,通过控制电动控制阀7的开度,调节流量的喷射气体,同时通过压力传感器5检测气体压力,如不足量则通过气泵12进行充气,将数值反馈给控制器11,控制器11通过变频器9控制气泵12,进行压力调节,通过压力传感器5及流速传感器8记录触发继电器接点动作时喷射气体的流量、压力及变化时间,通过单片机建立数学模型得出喷流的气体流量值对应的油流量值,从而对继电器的动作特性进行现场检测,这就是该便携式变压器瓦斯继电器校验装置工作的整个过程。Working principle: When using the portable transformer gas relay calibration device, first transport the equipment to the site, connect it to the gas pipeline 2 through the connector 6, and calibrate the transformer gas relay 1 through the gas relay calibration device body 3 , to test the operating point of the gas relay, the gas flow rate of the equipment is detected by the flow sensor 8, the data is fed back to the controller 11 through the electric signal, the data is displayed through the touch screen 10, and the opening degree of the electric control valve 7 is controlled to adjust At the same time, the gas pressure is detected by the pressure sensor 5. If the amount is insufficient, the air pump 12 is used to inflate the gas, and the value is fed back to the controller 11. The controller 11 controls the air pump 12 through the frequency converter 9 to adjust the pressure. 5 and the flow rate sensor 8 record the flow rate, pressure and change time of the jet gas when the contact of the relay is triggered, and establish a mathematical model through the single-chip microcomputer to obtain the oil flow value corresponding to the gas flow value of the jet flow, so as to conduct on-site detection of the action characteristics of the relay. This is the whole working process of the portable transformer gas relay calibration device.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621291360.2U CN206193189U (en) | 2016-11-29 | 2016-11-29 | Portable transformer buchholz relay calibration equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621291360.2U CN206193189U (en) | 2016-11-29 | 2016-11-29 | Portable transformer buchholz relay calibration equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206193189U true CN206193189U (en) | 2017-05-24 |
Family
ID=58724938
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621291360.2U Active CN206193189U (en) | 2016-11-29 | 2016-11-29 | Portable transformer buchholz relay calibration equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206193189U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109298141A (en) * | 2018-11-16 | 2019-02-01 | 徐州江煤科技有限公司 | A kind of methane transducer calibration equipment |
| CN111426948A (en) * | 2020-05-06 | 2020-07-17 | 西安亚能电气有限责任公司 | Portable Buchholz Relay Calibrator |
-
2016
- 2016-11-29 CN CN201621291360.2U patent/CN206193189U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109298141A (en) * | 2018-11-16 | 2019-02-01 | 徐州江煤科技有限公司 | A kind of methane transducer calibration equipment |
| CN111426948A (en) * | 2020-05-06 | 2020-07-17 | 西安亚能电气有限责任公司 | Portable Buchholz Relay Calibrator |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110174137B (en) | A monitoring method of transformer monitoring device based on non-electricity comprehensive feature information | |
| CN211013484U (en) | A pneumatic control valve testing device | |
| CN106015924A (en) | Multifunctional full-automatic gas charging device of SF6 equipment | |
| CN204903096U (en) | Batteries of electric vehicle casing gas tightness detection device | |
| CN204330246U (en) | A kind of movable type general-purpose device automatically detected for impermeability | |
| CN206740578U (en) | Breaker SF6 gas density is on-Line Monitor Device | |
| CN203394728U (en) | Air pump performance test system | |
| CN202255463U (en) | Pressure and flow test system | |
| CN206178436U (en) | Pressure test device | |
| CN203895552U (en) | Field detecting and maintaining system for fuel cell power supply | |
| CN205879454U (en) | Special detection instrument of insulating gloves | |
| CN105333312B (en) | Gas safety management system is used using Internet of Things control technology | |
| CN203632664U (en) | Portable fault detector for remote power-collecting system equipment | |
| CN203965110U (en) | A kind of gas inspection machine | |
| CN106763811A (en) | A kind of gas valve device with flow monitoring | |
| CN206818842U (en) | A kind of gas density relay monitor station | |
| CN211853527U (en) | Portable sulfur hexafluoride gas pressure-stabilizing distribution device | |
| CN204854814U (en) | A leakage current and temperature -detecting device for electric energy meter batch meter | |
| CN202735052U (en) | High speed train electrical connector junction box body airtightness detection apparatus | |
| CN102890241A (en) | Gas circuit system for online checking device of mutation pressure relay | |
| CN209707658U (en) | Pressure switch calibration device | |
| CN203241205U (en) | Plugging pipe end final internal pressure cycle and heat cycle testing system | |
| CN205484258U (en) | Be applied to SF6 concentration monitoring devices in distribution switch | |
| CN203231886U (en) | Oil Storage Tank Breathing Valve Tester | |
| CN205228735U (en) | Electronic product gas tightness detection device |