CN206189739U - Perforated web formula combination beam - Google Patents
Perforated web formula combination beam Download PDFInfo
- Publication number
- CN206189739U CN206189739U CN201621081656.1U CN201621081656U CN206189739U CN 206189739 U CN206189739 U CN 206189739U CN 201621081656 U CN201621081656 U CN 201621081656U CN 206189739 U CN206189739 U CN 206189739U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- concrete prefabricated
- web
- prefabricated board
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型公开了一种开孔腹板式组合梁,包括钢结构梁,钢结构梁的顶部固定有开孔腹板连接件,开孔腹板连接件由翼缘和腹板组成,翼缘固定在腹板的一端,腹板的另一端固定在钢结构梁上,腹板上设有均匀分布的孔位;下层连接钢筋穿过孔位一端位于第一钢筋混凝土预制板内,另一端位于第二钢筋混凝土预制板内;翼缘的上方均匀铺设有若干上层连接钢筋,上层连接钢筋一端位于第一钢筋混凝土预制板上方,另一端位于第二钢筋混凝土预制板上方;第一钢筋混凝土预制板、第二钢筋混凝土预制板和钢结构梁的上方填充有粘合材料。采用本实用新型提供的组合梁,通过对比计算,型钢用量可减少12%‑17%,显著降低建造成本。
The utility model discloses a perforated web type composite beam, which comprises a steel structure beam, and a perforated web connector is fixed on the top of the steel structure beam, and the perforated web connector is composed of a flange and a web, and the flange is fixed At one end of the web, the other end of the web is fixed on the steel structure beam, and holes are evenly distributed on the web; one end of the connecting steel bars passing through the holes is located in the first reinforced concrete prefabricated slab, and the other end is located in the second In the second reinforced concrete prefabricated slab; above the flange, a number of upper connecting steel bars are evenly laid, one end of the upper layer connecting steel bars is located above the first reinforced concrete prefabricated slab, and the other end is located above the second reinforced concrete prefabricated slab; the first reinforced concrete prefabricated slab, The upper part of the second reinforced concrete prefabricated slab and the steel structure beam is filled with adhesive material. By adopting the composite beam provided by the utility model, through comparative calculation, the consumption of section steel can be reduced by 12%-17%, and the construction cost can be significantly reduced.
Description
技术领域technical field
本实用新型涉及建筑工程技术领域,特别是涉及一种开孔腹板式组合梁。The utility model relates to the technical field of construction engineering, in particular to an open-hole web type composite beam.
背景技术Background technique
钢-混凝土组合梁同钢筋混凝土梁相比,可以减轻结构自重,加强抗震性能,减小截面尺寸,增加有效使用空间,节省支模工序和模板,缩短施工周期,增加梁的延伸性等。同钢梁相比,可以减小用钢量,增大刚度,增加稳定性和整体性,增强结构防火性和耐久性等。Compared with reinforced concrete beams, steel-concrete composite beams can reduce the weight of the structure, enhance the seismic performance, reduce the size of the section, increase the effective use of space, save formwork and formwork, shorten the construction period, and increase the extensibility of the beam. Compared with steel beams, it can reduce the amount of steel used, increase rigidity, increase stability and integrity, and enhance structural fire resistance and durability.
近年来,钢-混凝土组合梁在我国城市立交桥梁及建筑结构中已得到了越来越广泛的应用,并且正朝着大跨方向发展。钢-混凝土组合梁在我国的应用实践表明,它兼有钢结构和混凝土结构的优点,具有显著的技术经济效益和社会效益,适合我国基本建设的国情,是未来结构体系的主要发展方向之一。In recent years, steel-concrete composite beams have been more and more widely used in urban overpass bridges and building structures in my country, and are developing in the direction of large spans. The application practice of steel-concrete composite beam in our country shows that it has both the advantages of steel structure and concrete structure, has significant technical, economic and social benefits, is suitable for the national conditions of my country's basic construction, and is one of the main development directions of the future structural system .
但是,钢-混凝土组合梁的搭建耗时比较长,首先要搭建好主体钢结构,然后在钢结构基础上进行浇筑,浇筑过程需要耗用大量的时间,并且在浇筑过程中也会产生大量的扬尘。However, the construction of steel-concrete composite beams takes a long time. First, the main steel structure must be built, and then poured on the basis of the steel structure. The pouring process takes a lot of time and will also generate a lot of Dust.
实用新型内容Utility model content
本实用新型的目的在于,提供一种开孔腹板式组合梁,可实现100%全装配式施工,建造过程更为简单,同时显著减少建筑垃圾的产生。最大程度上减少现浇混凝土施工作业,显著减小施工扬尘,从而减少粉尘污染。The purpose of the utility model is to provide an open-hole web-type composite beam, which can realize 100% fully assembled construction, the construction process is simpler, and at the same time, the generation of construction waste is significantly reduced. Minimize the construction work of cast-in-place concrete and significantly reduce construction dust, thereby reducing dust pollution.
为解决上述技术问题,本实用新型采用如下的技术方案:In order to solve the problems of the technologies described above, the utility model adopts the following technical solutions:
一种开孔腹板式组合梁,包括钢结构梁,钢结构梁的顶部固定有开孔腹板连接件,开孔腹板连接件由翼缘和腹板组成,翼缘固定在腹板的一端,腹板的另一端固定在钢结构梁上,腹板上设有均匀分布的孔位,翼缘的两侧设有均匀分布的槽孔,翼缘两侧的槽孔交错设置,槽孔可以圆形、矩形、梯形等;孔位的形状可以是矩形、梯形、半圆形、圆形等;开孔腹板连接件一侧设有第一钢筋混凝土预制板,另一侧设有第二钢筋混凝土预制板,第一钢筋混凝土预制板和第二钢筋混凝土预制板均位于钢结构梁的翼缘上;还包括下层连接钢筋,下层连接钢筋穿过孔位一端位于第一钢筋混凝土预制板内,另一端位于第二钢筋混凝土预制板内;翼缘的上方均匀铺设有若干上层连接钢筋,上层连接钢筋一端位于第一钢筋混凝土预制板上方,另一端位于第二钢筋混凝土预制板上方,上层连接钢筋绑扎在第一钢筋混凝土预制板和第二钢筋混凝土预制板上;第一钢筋混凝土预制板、第二钢筋混凝土预制板和钢结构梁的上方填充有粘合材料。A perforated web type composite beam, comprising a steel structure beam, a perforated web connector is fixed on the top of the steel structure beam, the perforated web connector is composed of a flange and a web, and the flange is fixed at one end of the web , the other end of the web is fixed on the steel structure beam, the web is provided with evenly distributed holes, and both sides of the flange are provided with evenly distributed slots, the slots on both sides of the flange are arranged alternately, and the slots can be Circular, rectangular, trapezoidal, etc.; the shape of the hole can be rectangular, trapezoidal, semicircular, circular, etc.; one side of the opening web connector is provided with a first reinforced concrete prefabricated slab, and the other side is provided with a second The reinforced concrete prefabricated slab, the first reinforced concrete prefabricated slab and the second reinforced concrete prefabricated slab are located on the flange of the steel structure beam; it also includes the lower connecting steel bar, and the end of the lower layer connecting steel bar passing through the hole is located in the first reinforced concrete precast slab , the other end is located in the second reinforced concrete precast slab; a number of upper connecting steel bars are evenly laid on the top of the flange, one end of the upper connecting steel bars is located above the first reinforced concrete precast slab, and the other end is located above the second reinforced concrete precast slab. The steel bars are bound on the first reinforced concrete prefabricated slab and the second reinforced concrete prefabricated slab; the upper parts of the first reinforced concrete prefabricated slab, the second reinforced concrete prefabricated slab and the steel structure beam are filled with adhesive materials.
作为其中一种可实施方式,第一钢筋混凝土预制板和第二钢筋混凝土预制板均包括混凝土预制板、W型钢筋和顶部钢筋,混凝土预制板内设有内置钢筋,W型钢筋的底部和所述内置钢筋相连,W型钢筋的顶部和所述顶部钢筋相连;顶部钢筋上绑扎有面层钢筋,面层钢筋和顶部钢筋垂直。As one of the possible implementations, the first reinforced concrete prefabricated slab and the second reinforced concrete prefabricated slab include a concrete prefabricated slab, a W-shaped steel bar and a top steel bar, and a built-in steel bar is arranged in the concrete prefabricated slab, and the bottom of the W-shaped steel bar and the top steel bar The above-mentioned built-in reinforcement is connected, and the top of the W-shaped reinforcement is connected with the top reinforcement; the top reinforcement is bound with a surface reinforcement, and the surface reinforcement is perpendicular to the top reinforcement.
具体的,下层连接钢筋位于第一钢筋混凝土预制板上方的长度等于其位于第二钢筋混凝土预制板上方的长度。Specifically, the length of the lower connecting steel bars located above the first prefabricated reinforced concrete slab is equal to the length above the second prefabricated reinforced concrete slab.
前述的开孔腹板式组合梁中,所述孔位成梯形。将孔位设计成梯形,一方面是为了防止腹板遮挡穿孔,减小粘合材料的截面面积,导致粘合材料局部强度降低;另一方面是为了便于加工,腹板可以直接采用H型钢进行切割,将H型钢一切为二,然后在翼缘上开设槽孔,从而提高加工速度,加快施工进程,切割方式如图3所示。In the aforementioned open-hole web-type composite beam, the holes are trapezoidal. The hole position is designed to be trapezoidal. On the one hand, it is to prevent the web from covering the perforation, reduce the cross-sectional area of the bonding material, and reduce the local strength of the bonding material; on the other hand, for the convenience of processing, the web can be directly made of H-shaped steel. Cutting, cutting the H-shaped steel into two, and then opening slots on the flange, so as to improve the processing speed and speed up the construction process. The cutting method is shown in Figure 3.
与现有技术相比,本实用新型的组合梁具有以下优点:Compared with the prior art, the composite beam of the present invention has the following advantages:
1、现有钢结构标准节点设计和施工方法同样适用于本结构。1. The existing steel structure standard joint design and construction methods are also applicable to this structure.
2、本结构设计满足现有设计规范的所有要求。2. The structural design meets all the requirements of the existing design specifications.
3、楼板整体性强,楼板与框架整体结构刚度得到提高。3. The integrity of the floor is strong, and the overall structural rigidity of the floor and the frame is improved.
4、挠度显著减少,建筑结构性能得到大幅提高。4. The deflection is significantly reduced, and the structural performance of the building is greatly improved.
5、通过对比计算,型钢用量可减少12%-17%,显著降低建造成本。5. Through comparative calculation, the amount of section steel can be reduced by 12%-17%, which significantly reduces the construction cost.
6、本结构使用预制混凝土空心板,可显著减小楼板自重,从而增强整体结构抗震性能,同时显著降低混凝土的整体用量。6. The structure uses prefabricated concrete hollow slabs, which can significantly reduce the weight of the floor slab, thereby enhancing the seismic performance of the overall structure, and at the same time significantly reducing the overall amount of concrete.
7、在保证或提高结构整体刚度得前提下,由于本结构的应用,使得组合梁的总高度降低,从而增加了楼层净高,进而增加可用空间。7. On the premise of ensuring or improving the overall rigidity of the structure, due to the application of this structure, the total height of the composite beam is reduced, thereby increasing the net height of the floor and increasing the usable space.
8、现场施工工艺步骤清晰,可实现100%全装配式施工,建造过程更为简单,同时显著减少建筑垃圾的产生。8. The on-site construction process steps are clear, 100% fully assembled construction can be realized, the construction process is simpler, and the generation of construction waste is significantly reduced.
9、最大程度上减少现浇混凝土施工作业,显著减小施工扬尘,从而减少粉尘污染,达到“绿色施工”的标准。9. Minimize the construction work of cast-in-place concrete and significantly reduce construction dust, thereby reducing dust pollution and meeting the "green construction" standard.
10、可达到建筑标准化,构配件生产工厂化,施工机械化和组织管理科学化的要求。10. It can meet the requirements of building standardization, factory production of components, mechanization of construction and scientific organization and management.
附图说明Description of drawings
图1是本实用新型的一种实施例的结构示意图;Fig. 1 is the structural representation of a kind of embodiment of the utility model;
图2是本实用新型的一种实施例的剖面图;Fig. 2 is a sectional view of an embodiment of the utility model;
图3是开孔腹板连接件的结构示意图;Fig. 3 is a structural schematic diagram of a perforated web connector;
图4是开孔腹板连接件的一种实施例的结构示意图。Fig. 4 is a schematic structural view of an embodiment of a perforated web connector.
附图标记:1-钢结构柱,2-钢结构梁,3-开孔腹板连接件,4-下层连接钢筋,5-第一钢筋混凝土预制板,6-面层钢筋,7-上层连接钢筋,8-翼缘,9-腹板,10-孔位,11-顶部钢筋,12-W型钢筋,13-混凝土预制板,14-第二钢筋混凝土预制板,15-内置钢筋,16-槽孔。Reference signs: 1-steel structure column, 2-steel structure beam, 3-opening web connection piece, 4-lower connecting reinforcement, 5-first reinforced concrete prefabricated slab, 6-surface reinforcement, 7-upper connection Reinforcement, 8-flange, 9-web, 10-hole, 11-top reinforcement, 12-W type reinforcement, 13-concrete prefabricated slab, 14-second reinforced concrete prefabricated slab, 15-built-in reinforcement, 16- slot.
下面结合附图和具体实施方式对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and specific embodiment, the utility model is further described.
具体实施方式detailed description
本实用新型的实施例1:如图1和图2所示,一种开孔腹板式组合梁,包括钢结构梁2,钢结构梁2的顶部固定有开孔腹板连接件3,开孔腹板连接件3由翼缘8和腹板9组成,翼缘8固定在腹板9的一端,腹板9的另一端固定在钢结构梁2上,腹板9上设有均匀分布的孔位10,翼缘8的两侧设有均匀分布的槽孔16,翼缘8两侧的槽孔16交错设置,所述孔位10成梯形;开孔腹板连接件3一侧设有第一钢筋混凝土预制板5,另一侧设有第二钢筋混凝土预制板14,第一钢筋混凝土预制板5和第二钢筋混凝土预制板14均位于钢结构梁2的翼缘上;还包括下层连接钢筋4,下层连接钢筋4穿过孔位10一端位于第一钢筋混凝土预制板5内,另一端位于第二钢筋混凝土预制板14内;翼缘8的上方均匀铺设有若干上层连接钢筋7,上层连接钢筋7一端位于第一钢筋混凝土预制板5上方,另一端位于第二钢筋混凝土预制板14上方,上层连接钢筋7绑扎在第一钢筋混凝土预制板5和第二钢筋混凝土预制板14上;第一钢筋混凝土预制板5、第二钢筋混凝土预制板14和钢结构梁2的上方填充有粘合材料。Embodiment 1 of the present utility model: as shown in Figures 1 and 2, a perforated web-type composite beam includes a steel structure beam 2, and the top of the steel structure beam 2 is fixed with a perforated web connector 3, and the perforated web The web connector 3 is composed of a flange 8 and a web 9, the flange 8 is fixed on one end of the web 9, the other end of the web 9 is fixed on the steel structural beam 2, and the web 9 is provided with evenly distributed holes Position 10, the two sides of the flange 8 are provided with evenly distributed slots 16, the slots 16 on both sides of the flange 8 are arranged alternately, the holes 10 are trapezoidal; the side of the opening web connector 3 is provided with a second A reinforced concrete prefabricated slab 5, the other side is provided with a second reinforced concrete prefabricated slab 14, the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 are located on the flange of the steel structure beam 2; also includes the lower layer connection Steel bar 4, the lower connecting steel bar 4 passes through the hole position 10, one end is located in the first reinforced concrete precast slab 5, and the other end is located in the second reinforced concrete precast slab 14; a number of upper connecting steel bars 7 are evenly laid on the top of the flange 8, and the upper layer One end of the connecting reinforcement 7 is located above the first reinforced concrete prefabricated slab 5, and the other end is positioned above the second reinforced concrete prefabricated slab 14, and the upper connecting reinforcement 7 is bound on the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14; Adhesive material is filled above the first reinforced concrete prefabricated slab 5 , the second reinforced concrete prefabricated slab 14 and the steel structure beam 2 .
实施例2:如图1和图2所示,一种开孔腹板式组合梁,包括钢结构梁2,钢结构梁2的顶部固定有开孔腹板连接件3,开孔腹板连接件3由翼缘8和腹板9组成,翼缘8固定在腹板9的一端,腹板9的另一端固定在钢结构梁2上,腹板9上设有均匀分布的孔位10,翼缘8的两侧设有均匀分布的槽孔16,翼缘8两侧的槽孔16交错设置,所述孔位10成梯形;开孔腹板连接件3一侧设有第一钢筋混凝土预制板5,另一侧设有第二钢筋混凝土预制板14,第一钢筋混凝土预制板5和第二钢筋混凝土预制板14均位于钢结构梁2的翼缘上;还包括下层连接钢筋4,下层连接钢筋4穿过孔位10一端位于第一钢筋混凝土预制板5内,另一端位于第二钢筋混凝土预制板14内;翼缘8的上方均匀铺设有若干上层连接钢筋7,上层连接钢筋7一端位于第一钢筋混凝土预制板5上方,另一端位于第二钢筋混凝土预制板14上方,上层连接钢筋7绑扎在第一钢筋混凝土预制板5和第二钢筋混凝土预制板14上;第一钢筋混凝土预制板5、第二钢筋混凝土预制板14和钢结构梁2的上方填充有粘合材料。Embodiment 2: As shown in Figures 1 and 2, a perforated web-type composite beam includes a steel structure beam 2, a perforated web connector 3 is fixed on the top of the steel structure beam 2, and the perforated web connector 3 is composed of a flange 8 and a web 9, the flange 8 is fixed on one end of the web 9, the other end of the web 9 is fixed on the steel structure beam 2, and the web 9 is provided with evenly distributed holes 10, the wing Evenly distributed slots 16 are arranged on both sides of the flange 8, and the slots 16 on both sides of the flange 8 are arranged alternately, and the holes 10 are trapezoidal; one side of the opening web connector 3 is provided with a first reinforced concrete prefabricated slab 5, the other side is provided with a second reinforced concrete prefabricated slab 14, the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 are both located on the flange of the steel structure beam 2; One end of the connecting steel bar 4 passing through the hole 10 is located in the first reinforced concrete prefabricated slab 5, and the other end is located in the second reinforced concrete prefabricated slab 14; above the flange 8, a number of upper connecting steel bars 7 are evenly laid, and one end of the upper connecting steel bar 7 Located above the first reinforced concrete prefabricated slab 5, the other end is positioned above the second reinforced concrete prefabricated slab 14, the upper connecting steel bars 7 are bound on the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14; the first reinforced concrete prefabricated The board 5 , the second reinforced concrete prefabricated board 14 and the steel structure beam 2 are filled with adhesive material.
第一钢筋混凝土预制板5和第二钢筋混凝土预制板14均包括混凝土预制板13、W型钢筋12和顶部钢筋11,混凝土预制板13内设有内置钢筋15,W型钢筋12的底部和所述内置钢筋15相连,W型钢筋12的顶部和所述顶部钢筋11相连。顶部钢筋11上绑扎有面层钢筋6,面层钢筋6和顶部钢筋11垂直。The first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 all comprise concrete prefabricated slab 13, W-shaped steel bar 12 and top steel bar 11, and built-in steel bar 15 is provided in the concrete prefabricated slab 13, the bottom of W-shaped steel bar 12 and all The built-in steel bar 15 is connected, and the top of the W-shaped steel bar 12 is connected with the top steel bar 11. The top reinforcement 11 is bound with surface reinforcement 6, and the surface reinforcement 6 is perpendicular to the top reinforcement 11.
实施例3:如图1和图2所示,一种开孔腹板式组合梁,包括钢结构梁2,钢结构梁2的顶部固定有开孔腹板连接件3,开孔腹板连接件3由翼缘8和腹板9组成,翼缘8固定在腹板9的一端,腹板9的另一端固定在钢结构梁2上,腹板9上设有均匀分布的孔位10,翼缘8的两侧设有均匀分布的槽孔16,翼缘8两侧的槽孔16交错设置,所述孔位10成梯形;开孔腹板连接件3一侧设有第一钢筋混凝土预制板5,另一侧设有第二钢筋混凝土预制板14,第一钢筋混凝土预制板5和第二钢筋混凝土预制板14均位于钢结构梁2的翼缘上;还包括下层连接钢筋4,下层连接钢筋4穿过孔位10一端位于第一钢筋混凝土预制板5内,另一端位于第二钢筋混凝土预制板14内;翼缘8的上方均匀铺设有若干上层连接钢筋7,上层连接钢筋7一端位于第一钢筋混凝土预制板5上方,另一端位于第二钢筋混凝土预制板14上方,上层连接钢筋7绑扎在第一钢筋混凝土预制板5和第二钢筋混凝土预制板14上;第一钢筋混凝土预制板5、第二钢筋混凝土预制板14和钢结构梁2的上方填充有粘合材料。Embodiment 3: As shown in Figures 1 and 2, a perforated web-type composite beam includes a steel structure beam 2, a perforated web connector 3 is fixed on the top of the steel structure beam 2, and the perforated web connector 3 is composed of a flange 8 and a web 9, the flange 8 is fixed on one end of the web 9, the other end of the web 9 is fixed on the steel structure beam 2, and the web 9 is provided with evenly distributed holes 10, the wing Evenly distributed slots 16 are arranged on both sides of the flange 8, and the slots 16 on both sides of the flange 8 are arranged alternately, and the holes 10 are trapezoidal; one side of the opening web connector 3 is provided with a first reinforced concrete prefabricated slab 5, the other side is provided with a second reinforced concrete prefabricated slab 14, the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 are both located on the flange of the steel structure beam 2; One end of the connecting steel bar 4 passing through the hole 10 is located in the first reinforced concrete prefabricated slab 5, and the other end is located in the second reinforced concrete prefabricated slab 14; above the flange 8, a number of upper connecting steel bars 7 are evenly laid, and one end of the upper connecting steel bar 7 Located above the first reinforced concrete prefabricated slab 5, the other end is positioned above the second reinforced concrete prefabricated slab 14, the upper connecting steel bars 7 are bound on the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14; the first reinforced concrete prefabricated The board 5 , the second reinforced concrete prefabricated board 14 and the steel structure beam 2 are filled with adhesive material.
第一钢筋混凝土预制板5和第二钢筋混凝土预制板14均包括混凝土预制板13、W型钢筋12和顶部钢筋11,混凝土预制板13内设有内置钢筋15,W型钢筋12的底部和所述内置钢筋15相连,W型钢筋12的顶部和所述顶部钢筋11相连。下层连接钢筋4位于第一钢筋混凝土预制板5上方的长度等于其位于第二钢筋混凝土预制板14上方的长度。顶部钢筋11上绑扎有面层钢筋6,面层钢筋6和顶部钢筋11垂直。The first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 all comprise concrete prefabricated slab 13, W-shaped steel bar 12 and top steel bar 11, and built-in steel bar 15 is provided in the concrete prefabricated slab 13, the bottom of W-shaped steel bar 12 and all The built-in steel bar 15 is connected, and the top of the W-shaped steel bar 12 is connected with the top steel bar 11. The length of the lower connecting steel bars 4 located above the first reinforced concrete prefabricated slab 5 is equal to the length above the second reinforced concrete prefabricated slab 14 . The top reinforcement 11 is bound with surface reinforcement 6, and the surface reinforcement 6 is perpendicular to the top reinforcement 11.
本实用新型的组合梁适用于多种不同跨度的结构,如大型体育馆、酒店、物流仓库、停车场,办公楼等。能与交错桁架结合使用,大幅度改善结构的整体布局,使布局更加灵活、合理。The composite beam of the utility model is suitable for various structures with different spans, such as large gymnasiums, hotels, logistics warehouses, parking lots, office buildings and the like. It can be used in combination with staggered trusses to greatly improve the overall layout of the structure, making the layout more flexible and reasonable.
本实用新型的组合梁的工艺流程:The technological process of the composite beam of the present utility model:
步骤1:首先将钢结构梁2采用传统的连接形式固定在钢结构柱1上,如:螺栓连接。Step 1: First, the steel structure beam 2 is fixed on the steel structure column 1 by a traditional connection form, such as bolt connection.
步骤2:然后将开孔腹板连接件3的腹板9焊接在钢结构梁2的顶部(步骤2和步骤1也可以顺序倒换)。Step 2: Then weld the web 9 of the opening web connector 3 to the top of the steel structural beam 2 (step 2 and step 1 can also be reversed in sequence).
步骤3:将第一钢筋混凝土预制板5和第二钢筋混凝土预制板14的端部放置在钢结构梁2的翼缘上;Step 3: placing the ends of the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 on the flange of the steel structure beam 2;
步骤4:将连接钢筋4插入孔位10内,并保持孔位10两侧的连接钢筋4两端等长。Step 4: Insert the connecting steel bar 4 into the hole 10, and keep the two ends of the connecting steel bar 4 on both sides of the hole 10 equal in length.
步骤5:在第一钢筋混凝土预制板5和第二钢筋混凝土预制板14上绑扎面层钢筋6。Step 5: Bind the surface layer reinforcement bars 6 on the first reinforced concrete prefabricated slab 5 and the second reinforced concrete prefabricated slab 14 .
步骤6:在面层钢筋6上绑扎上层连接钢筋7,然后灌注粘合材料,粘合材料可通过槽孔16灌注,如果没有槽孔16,则粘合材料很难灌注,如翼缘8的正下方,而此处是受力的关键点,直接影响整体的稳定性。由于槽孔16均匀分布,所以粘合材料能够均匀灌注,防止出现灌注盲区;翼缘8两侧的槽孔16交错设置,能够使翼缘8的受力更加均匀,从而提高整体的可靠性。Step 6: Bind the upper layer connecting steel bar 7 on the surface layer steel bar 6, then pour the adhesive material, the adhesive material can be poured through the slot 16, if there is no slot 16, the adhesive material is difficult to pour, such as the flange 8 directly below, and here is the key point of stress, which directly affects the stability of the whole. Since the slots 16 are evenly distributed, the adhesive material can be evenly poured to prevent blind filling areas; the slots 16 on both sides of the flange 8 are arranged alternately, which can make the force on the flange 8 more uniform, thereby improving the overall reliability.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621081656.1U CN206189739U (en) | 2016-09-26 | 2016-09-26 | Perforated web formula combination beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621081656.1U CN206189739U (en) | 2016-09-26 | 2016-09-26 | Perforated web formula combination beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206189739U true CN206189739U (en) | 2017-05-24 |
Family
ID=58729680
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621081656.1U Expired - Fee Related CN206189739U (en) | 2016-09-26 | 2016-09-26 | Perforated web formula combination beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206189739U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109838022A (en) * | 2019-04-03 | 2019-06-04 | 曹友国 | A kind of modularized combination type floor support plate |
| CN111119390A (en) * | 2020-01-19 | 2020-05-08 | 浙江大学建筑设计研究院有限公司 | A kind of reinforced concrete laminated board connected by folded plate and preparation method thereof |
-
2016
- 2016-09-26 CN CN201621081656.1U patent/CN206189739U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109838022A (en) * | 2019-04-03 | 2019-06-04 | 曹友国 | A kind of modularized combination type floor support plate |
| CN111119390A (en) * | 2020-01-19 | 2020-05-08 | 浙江大学建筑设计研究院有限公司 | A kind of reinforced concrete laminated board connected by folded plate and preparation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108049498B (en) | Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure | |
| CN101851984B (en) | Prefabricated steel-concrete composite beam | |
| CN104831617A (en) | Steel-super high performance concrete composite beam based on ribbed plate type bridge deck and construction method | |
| CN207063269U (en) | The beam-column node structure of assembled floor | |
| CN102839601A (en) | Consolidated structure of steel piers and caps of portal-type rigid frame overpass and its construction method | |
| CN104032854B (en) | Assembled T-shaped mixing coupled wall and construction method thereof | |
| CN108179809A (en) | The connection method of assembled steel tendon concrete frame structure component | |
| CN106760036B (en) | A kind of prefabricated steel-combined concrete shear wall | |
| CN113356405A (en) | Prefabricated composite wall structure based on embedded profile steel and construction method thereof | |
| CN103195259A (en) | Foam concrete prefabricated slab and method for reinforcing concrete structure by same | |
| CN108086488A (en) | Assembled frame-shear structure wall splitlevel connection structure and assembling method | |
| CN102071746A (en) | T-shaped connecting node for superposed external wall and prefabricated internal wall of shear wall structure | |
| CN207686092U (en) | A kind of assembled overlapped hollow floor system | |
| CN206189739U (en) | Perforated web formula combination beam | |
| CN104032855B (en) | Assembled cross mixing coupled wall and construction method thereof | |
| CN206189248U (en) | High strength perforated web formula combination beam | |
| CN216475803U (en) | A Novel Prefabricated Floor Structure Applied to Shear Wall System | |
| CN207919891U (en) | A kind of assembled partial precast part external wrapping concrete combination beam | |
| CN101581113B (en) | Connecting structure for precast concrete board and beam, construction method and building | |
| CN104032862B (en) | Assembled girder steel seam line L shape mixing coupled wall and construction method thereof | |
| CN103498530B (en) | A kind of prestressing force perforation shape web T-steel concrete combination beam | |
| CN104032859B (en) | Assembled L-shaped mixing coupled wall and construction method thereof | |
| CN106836641A (en) | Side sticking steel plate formula Combined concrete coupling beam | |
| CN206070871U (en) | A kind of web with openings formula combination beam | |
| CN107012986A (en) | Multilayer steel-enclosed concrete members composite coupling beams |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 |