CN206174513U - Bathroom - Google Patents

Bathroom Download PDF

Info

Publication number
CN206174513U
CN206174513U CN201621168778.4U CN201621168778U CN206174513U CN 206174513 U CN206174513 U CN 206174513U CN 201621168778 U CN201621168778 U CN 201621168778U CN 206174513 U CN206174513 U CN 206174513U
Authority
CN
China
Prior art keywords
base
area
installation hole
hole
base flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621168778.4U
Other languages
Chinese (zh)
Inventor
廖宝江
王丽滨
杨建帆
涂立波
王卓周
黄赫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Electrical Locomotive Co Ltd
Original Assignee
Guangzhou Electrical Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Electrical Locomotive Co Ltd filed Critical Guangzhou Electrical Locomotive Co Ltd
Priority to CN201621168778.4U priority Critical patent/CN206174513U/en
Application granted granted Critical
Publication of CN206174513U publication Critical patent/CN206174513U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sanitary Device For Flush Toilet (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model provides a bathroom, includes the base body, the base body be equipped with first base turn -ups, second base turn -ups, third base turn -ups and fourth base turn -ups all around, the mounting hole is reserved to the third that the second that be equipped with the first reservation mounting hole that is used for installing the squatting pan on the base body, is used for installation ground leaking emission water pipe was reserved the mounting hole, was used for to install the wash -basin drain pipe, is equipped with the hole for hoist on first base turn -ups, second base turn -ups, third base turn -ups and fourth base turn -ups. Because the mounting hole is reserved to the third that the second that be equipped with the first reservation mounting hole that is used for installing the squatting pan on the base body, is used for installation ground leaking emission water pipe was reserved the mounting hole, was used for to install the wash -basin drain pipe, can make things convenient for like this the squatting pan, the overall arrangement of leaking emission water pipe and wash -basin, the hole for hoist in making things convenient for assembly process is sling the base body simultaneously, and is easy to assemble.

Description

Toilet
Technical field
The utility model is related to modularized house field, and in particular to a kind of toilet.
Background technology
At present, either office, production, commercial or inhabitation are built, and particularly small building is by conventional on-site Build, to the conversion of factorial praluction entire combination Housing system.The advantage in entire combination house can be achieved on factorial praluction, Efficiency high, speed of application is fast, the advantages of standardize high, but currently with the house of block combiner toilet structure not Having carries out special design, assembles cumbersome.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of rationally distributed, easy for installation toilet.
In order to solve above-mentioned technical problem, the utility model includes base body, in base body first base is formed around Flange, second base flange, the 3rd base flange and the 4th base flange, be provided with base body for squatting pan is installed One reserving installation hole, the second reserving installation hole, pre- for installing the 3rd of hand basin drainpipe for installing ground leaking drainage pipe Installing hole is stayed, on first base flange, second base flange, the 3rd base flange and the 4th base flange hole for hoist is provided with. Because be provided with base body for install squatting pan the first reserving installation hole, for install ground leaking drainage pipe second reserve Installing hole, the 3rd reserving installation hole for installing hand basin drainpipe, so can facilitate squatting pan, leaking drainage pipe and wash The layout of hand basin, while base body is sling during hole for hoist ease of assembly, it is convenient to install.
As further improvement of the utility model, the first space bar and the second space bar are provided with base body, first Space bar is located at the medium position of base body and toilet is divided into wash one's hands area and shower area, and the second space bar is located in shower area And be vertically arranged with the first space bar, shower is divided into the first shower area and the second shower area by the second space bar, and first reserves Installing hole is located at the first shower area and the second shower area, and the quantity of second reserving installation hole is two, the second reserved installation Hole is located at area of washing one's hands, and the quantity of the 3rd reserving installation hole is three, and the 3rd reserving installation hole is located at area of washing one's hands.
As further improvement of the utility model, wash one's hands area and be provided with first base flange two it is the 3rd pre- Installing hole is stayed, the 3rd reserving installation hole is provided with wash one's hands area and close 4th base flange, in the 3rd reserving installation hole Place is provided with hand basin, and at the first reserving installation hole squatting pan is provided with.
As further improvement of the utility model, in the first shower area and the second shower area shower bath is provided with.
As further improvement of the utility model, first is provided with first base flange and enters doorway.
As further improvement of the utility model, screw shell is provided with hole for hoist.
Used as further improvement of the utility model, the base body is glass fiber reinforced cement body.
In sum, the utility model has the advantages that rationally distributed, easy for installation.
Description of the drawings
Come that the utility model is described in more detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the schematic diagram of base body of the present utility model.
Fig. 2 is schematic diagram of the present utility model.
Specific embodiment
By shown in Fig. 1 to Fig. 2, the utility model includes base body 1, and the base body 1 is glass fiber reinforced cement body, First base flange 2, second base flange 3, the 3rd base flange 4 and the 4th base flange 5 are formed around in base body 1, The first space bar 6 and the second space bar 7 are provided with base body 1, the first space bar 6 is located at the medium position of base body 1 and incites somebody to action Toilet is divided into wash one's hands area 12 and shower area, and the second space bar 7 is located in shower area and is vertically arranged with the first space bar 6, the Shower is divided into the first shower area 8 and the second shower area 9 by two space bars 7, is provided with the first shower area 8 and the second shower area 9 For installing the first reserving installation hole 10 of squatting pan 11, squatting pan 11 is provided with the first reserving installation hole 10, in area of washing one's hands 12 be provided with two for install ground leaking drainage pipe the second reserving installation hole 13 and three for installing the drainpipe of hand basin 15 3rd reserving installation hole 14, is provided with hand basin 15, the reserving installation hole 14 of two of which the 3rd at the 3rd reserving installation hole 14 It is located at wash one's hands area 12 and close first base flange 2, also one the 3rd reserving installation hole 14 is located at and is turned near the 4th base At side 5, on first base flange 2, second base flange 3, the 3rd base flange 4 and the 4th base flange 5 hole for hoist is provided with 16, screw shell is provided with hole for hoist 16, shower bath 17 is provided with the first shower area 8 and the second shower area 9, at the first bottom Seat flange 2 is provided with first and enters doorway 18.Because being provided with the first reserving installation hole for installing squatting pan 11 on base body 1 10th, for installing the second reserving installation hole 13 of leaking drainage pipe, for installing the drainpipe of hand basin 15 the 3rd reserve installation Hole 14, so can facilitate squatting pan 11, leaking drainage pipe and hand basin 15 layout, while the ease of assembly process of hole for hoist 16 It is middle that base body 1 is sling, it is convenient to install.The toilet has the first shower area 8, the second shower area 9 and area 12 of washing one's hands, and layout is closed Reason.In the first door for entering at doorway 18 to install toilet.First base flange 2, second base flange 3, the and of the 3rd base flange 4 4th base flange 5 is used to be connected with the metope of toilet.

Claims (7)

1. a kind of toilet, including base body, it is characterised in that:First base flange, the second bottom are formed around in base body Seat flange, the 3rd base flange and the 4th base flange, are provided with for installing the first of squatting pan the reserved installation on base body Hole, the second reserving installation hole, the 3rd reserving installation hole for installing hand basin drainpipe for installing ground leaking drainage pipe, First base flange, second base flange, the 3rd base flange and the 4th base flange are provided with hole for hoist.
2. the toilet as described in claim 1, it is characterised in that:The first space bar and the second interval are provided with base body Plate, the first space bar is located at the medium position of base body and toilet is divided into wash one's hands area and shower area, and the second space bar is located at It is vertically arranged in shower area and with the first space bar, shower is divided into the first shower area and the second shower area by the second space bar, First reserving installation hole is located at the first shower area and the second shower area, and the quantity of second reserving installation hole is two, and second Reserving installation hole is located at area of washing one's hands, and the quantity of the 3rd reserving installation hole is three, and the 3rd reserving installation hole is located at area of washing one's hands.
3. the toilet as described in claim 2, it is characterised in that:Two are provided with wash one's hands area and close first base flange 3rd reserving installation hole, at wash one's hands area and close 4th base flange the 3rd reserving installation hole is provided with, reserved the 3rd Hand basin is installed at installing hole, at the first reserving installation hole squatting pan is provided with.
4. the toilet as described in claim 2, it is characterised in that:Shower dress is provided with the first shower area and the second shower area Put.
5. the toilet as described in claim 1, it is characterised in that:First is provided with first base flange and enters doorway.
6. the toilet as described in claim 1, it is characterised in that:Screw shell is provided with hole for hoist.
7. the toilet as described in claim 1, it is characterised in that:The base body is glass fiber reinforced cement body.
CN201621168778.4U 2016-10-26 2016-10-26 Bathroom Active CN206174513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621168778.4U CN206174513U (en) 2016-10-26 2016-10-26 Bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621168778.4U CN206174513U (en) 2016-10-26 2016-10-26 Bathroom

Publications (1)

Publication Number Publication Date
CN206174513U true CN206174513U (en) 2017-05-17

Family

ID=58680137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621168778.4U Active CN206174513U (en) 2016-10-26 2016-10-26 Bathroom

Country Status (1)

Country Link
CN (1) CN206174513U (en)

Similar Documents

Publication Publication Date Title
CN106049903A (en) Assembled bathroom and construction method for same
CN206174513U (en) Bathroom
CN106854939A (en) A kind of new prefabricated integral vacuum toilet
CN205421458U (en) New water-saving toilet
CN204252576U (en) Concealed type integral bathroom system
CN207485024U (en) Energy saving integral bathroom
CN205857814U (en) A kind of assembled toilet
CN207727649U (en) A kind of use in toilet water-saving device
CN210530414U (en) Wash and defend integral type device and bathroom thereof
CN105863304B (en) A kind of toilet of repeatable utilization space
CN203684334U (en) Water cycling system
CN103882920B (en) Bathroom drain cross-layer flushing unit
CN101372837A (en) Residential Water Saving System
CN203307886U (en) Combined sanitary ware
CN201943379U (en) Bathroom device
CN201614646U (en) Water-saving urinal
CN201326201Y (en) Water-saving device for a building
CN203947531U (en) Bathroom drain cross-layer flushing unit
CN204876015U (en) Vertical water conservation urinal
CN204826130U (en) Can stealthy toilet bowl
CN219491172U (en) Water-saving toilet
CN202672285U (en) Environment-friendly water-saving toilet tank
CN201025319Y (en) Four-pass water sinking bender
CN201746894U (en) Wastewater use system using washing water to flush toilets
CN201180302Y (en) Equipment for reutilizing wastewater of water-closet bowl

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant