CN206172179U - Tie up slideway of mao bamboo - Google Patents
Tie up slideway of mao bamboo Download PDFInfo
- Publication number
- CN206172179U CN206172179U CN201620824559.0U CN201620824559U CN206172179U CN 206172179 U CN206172179 U CN 206172179U CN 201620824559 U CN201620824559 U CN 201620824559U CN 206172179 U CN206172179 U CN 206172179U
- Authority
- CN
- China
- Prior art keywords
- moso bamboo
- sliding roller
- bamboo
- moso
- traction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 title abstract description 14
- 235000017491 Bambusa tulda Nutrition 0.000 title abstract description 14
- 235000015334 Phyllostachys viridis Nutrition 0.000 title abstract description 14
- 241001330002 Bambuseae Species 0.000 title abstract description 12
- 239000011425 bamboo Substances 0.000 title abstract description 12
- 244000302661 Phyllostachys pubescens Species 0.000 claims abstract description 59
- 235000003570 Phyllostachys pubescens Nutrition 0.000 claims abstract description 59
- 230000009916 joint effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 241000209128 Bambusa Species 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 2
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 2
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 235000009120 camo Nutrition 0.000 description 2
- 235000005607 chanvre indien Nutrition 0.000 description 2
- 239000011487 hemp Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W90/00—Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation
- Y02W90/10—Bio-packaging, e.g. packing containers made from renewable resources or bio-plastics
Landscapes
- Tires In General (AREA)
- Orthopedics, Nursing, And Contraception (AREA)
Abstract
本实用新型公开了捆扎毛竹的运输滑道,所述的滑辊单元与滑辊单元之间设置连接杆,所述的连接杆两端均与滑辊单元固定连接。本实用新型砍伐后的毛竹利用捆扎绳捆扎好,通过牵引杆可以起到导向和抬起的作用,牵引绳起到牵引和固定牵引杆的作用,方便毛竹的运输;捆扎好的毛竹通过牵引杆抬起,放到滑辊单元上,并通过牵引绳和牵引杆共同作用人工将毛竹运输下山。
The utility model discloses a transportation slideway for bundling moso bamboo. A connecting rod is arranged between the sliding roller unit and both ends of the connecting rod are fixedly connected with the sliding roller unit. The cut bamboo of the utility model is bundled with a binding rope, and the traction bar can play the role of guiding and lifting, and the traction rope plays the role of pulling and fixing the draw bar, which is convenient for the transportation of the moso bamboo; Lift it up, put it on the sliding roller unit, and manually transport the moso bamboo down the mountain through the joint action of the traction rope and the traction bar.
Description
本实用新型申请为申请号为:2016202268781,申请日为:2016-03-23,发明名称为:毛竹捆扎结构及其运输滑道的分案申请。The utility model application is the application number: 2016202268781, the application date is: 2016-03-23, and the invention name is: the divisional application of the moso bamboo binding structure and its transportation slideway.
技术领域technical field
本实用新型涉及林木砍伐领域,更具体的说,本实用新型涉及捆扎毛竹的运输滑道。The utility model relates to the field of tree felling, more specifically, the utility model relates to a transport slideway for bundling moso bamboo.
背景技术Background technique
目前,当前毛竹产业已经做大做强,国内万亩竹海基地较多,竹产品多种多样,在这些产业蓬勃发展的同时,存在原材料毛竹运输下山的技术瓶颈,为解决砍伐的毛竹下山困难问题,主要有一下几种方法,一种是在山上砍伐的毛竹为图省事直接放向山下,多数毛竹下山时冲撞石壁沟,造成毛竹表皮“拖花”,甚至劈裂,影响品质,销售价格大打折扣。另一种采用人工扛毛竹下山方法,一次扛1~2根下山;还有一次扛3~5根,扛在较细(或较粗)的一端,另一端在林道上拖动,这种方法运送人消耗的大量的能力,一路下山,需要休息若干次,运送量低,还存在负重下山,道路难走等安全隐患等。At present, the current moso bamboo industry has become bigger and stronger. There are many 10,000-mu bamboo sea bases in China and a variety of bamboo products. While these industries are booming, there is a technical bottleneck in the transportation of raw moso bamboo down the mountain. There are mainly several methods for the problem. One is to save the trouble and put the moso bamboo directly down the mountain. Most of the moso bamboos collide with the stone wall ditch when they go down the mountain, causing the bamboo skin to "drag" or even split, affecting the quality and sales price. Big discount. Another method is to manually carry moso bamboo down the mountain, carrying 1 to 2 bamboos down the mountain at a time; there is also a method of carrying 3 to 5 bamboos at one time, on the thinner (or thicker) end, and dragging the other end on the forest road. Carrying people consumes a lot of capacity, and they need to rest several times all the way down the mountain. The transportation volume is low, and there are still safety hazards such as going down the mountain with heavy loads and difficult roads.
实用新型内容Utility model content
本实用新型的目的在于解决现有上述的问题,提供了一种毛竹捆扎结构及其运输滑道。The purpose of the utility model is to solve the existing above-mentioned problems, and provide a moso bamboo binding structure and a transport slideway thereof.
为实现以上目的,本实用新型的技术方案是一种毛竹捆扎结构,包括若干根毛竹,所述的毛竹的根部处于同一端,所述的毛竹根部设置捆扎绳,所述的若干根毛竹的根部中间设置牵引杆,所述的牵引杆一端设置在若干根毛竹的相互产生的缝隙内,所述的牵引杆另一端自由悬空,所述的牵引杆与捆扎绳之间设置牵引绳,所述的牵引绳一端与捆扎绳固定连接,所述的牵引绳的另一端与牵引杆的自由悬空端固定连接。砍伐后的毛竹利用捆扎绳捆扎好,通过牵引杆可以起到导向和抬起的作用,牵引绳起到牵引和固定牵引杆的作用,方便毛竹的运输。In order to achieve the above purpose, the technical solution of the utility model is a moso bamboo binding structure, including several moso bamboos, the roots of the moso bamboos are at the same end, the roots of the moso bamboos are provided with binding ropes, and the roots of the moso bamboos are A traction rod is arranged in the middle, and one end of the traction rod is arranged in the gaps between several moso bamboos, the other end of the traction rod is free to hang in the air, and a traction rope is arranged between the traction rod and the binding rope. One end of the traction rope is fixedly connected with the binding rope, and the other end of the traction rope is fixedly connected with the free hanging end of the traction rod. The felled moso bamboo is tied up with a binding rope, and the traction bar can play the role of guiding and lifting, and the traction rope plays the role of pulling and fixing the traction bar, which is convenient for the transportation of moso bamboo.
可选的,所述的捆扎绳上设置捆扎活结,所述的捆扎活结内设置锁紧杆,所述的锁紧杆一端设置在捆扎活结内,所述的锁紧杆另一端设置在毛竹缝隙内。为 了毛竹捆扎更近,通过锁紧杆一端插入捆扎活结内转动可以捆扎的更紧,锁紧杆另一端插入毛竹缝隙,防止锁紧杆晃动后捆扎绳变松。Optionally, a binding slipknot is arranged on the binding rope, a locking rod is arranged in the binding slipknot, one end of the locking rod is arranged in the binding slipknot, and the other end of the locking rod is arranged in the gap of the moso bamboo Inside. In order to tie the moso bamboo closer, insert one end of the locking rod into the binding slipknot and rotate to make the binding tighter, and insert the other end of the locking rod into the gap of the moso bamboo to prevent the binding rope from becoming loose after the locking rod shakes.
可选的,所述的捆扎绳与毛竹根部端面的距离为30cm~50cm。Optionally, the distance between the binding rope and the end face of the bamboo root is 30cm-50cm.
一种运输上述捆扎毛竹的运输滑道,包括若干滑辊单元,所述的滑辊单元与滑辊单元之间设置连接杆,所述的连接杆两端均与滑辊单元固定连接。捆扎好的毛竹通过牵引杆抬起,放到滑辊单元上,并通过牵引绳和牵引杆共同作用人工将毛竹运输下山。A transportation chute for transporting the above-mentioned bundled moso bamboo, comprising several sliding roller units, connecting rods are arranged between the sliding roller units, and both ends of the connecting rods are fixedly connected to the sliding roller units. The bundled moso bamboo is lifted by the traction bar, placed on the sliding roller unit, and the moso bamboo is manually transported down the mountain through the joint action of the traction rope and the traction bar.
可选的,所述的滑辊单元包括支撑架,所述的支撑架上设置滑辊杆,所述的滑辊杆与支撑架活动连接。支撑架起到支撑作用,滑辊杆可以有效的防止毛竹刮花和裂开。Optionally, the sliding roller unit includes a supporting frame, a sliding roller bar is arranged on the supporting frame, and the sliding roller bar is movably connected with the supporting frame. The support frame plays a supporting role, and the sliding roller bar can effectively prevent the moso bamboo from being scratched and cracked.
可选的,所述的支撑架包括两根支撑杆,所述的两根支撑杆交叉设置。Optionally, the support frame includes two support rods, and the two support rods are arranged crosswise.
可选的,所述的滑辊杆离地面的高度为5cm~20cm。Optionally, the height of the sliding roller bar from the ground is 5cm-20cm.
可选的,所述的滑辊杆上两个支撑架的距离为2m~3m。Optionally, the distance between the two supporting frames on the sliding roller bar is 2m-3m.
本实用新型具有以下有益效果:砍伐后的毛竹利用捆扎绳捆扎好,通过牵引杆可以起到导向和抬起的作用,牵引绳起到牵引和固定牵引杆的作用,方便毛竹的运输;捆扎好的毛竹通过牵引杆抬起,放到滑辊单元上,并通过牵引绳和牵引杆共同作用人工将毛竹运输下山。The utility model has the following beneficial effects: the felled moso bamboo is bound with a binding rope, and the traction bar can play the role of guiding and lifting, and the traction rope plays the role of traction and fixing the traction bar, which is convenient for the transportation of moso bamboo; The moso bamboo is lifted by the traction bar, placed on the sliding roller unit, and the moso bamboo is manually transported down the mountain through the joint action of the traction rope and the traction bar.
附图说明Description of drawings
图1是毛竹捆扎的一种结构示意图;Fig. 1 is a kind of structural representation of moso bamboo bundle;
图2是运输滑道的一种结构示意图。Fig. 2 is a schematic structural view of the transport slideway.
1、毛竹捆;2、滑辊单元;3、连接杆;11、捆扎绳;12、捆扎活结;13、牵引杆;14、牵引绳;15、毛竹;16、锁紧杆;21、支撑架;22、滑辊杆;23、支撑杆。1. Moso bamboo bundle; 2. Sliding roller unit; 3. Connecting rod; 11. Binding rope; 12. Binding slipknot; 13. Traction bar; 14. Traction rope; 15. Moso bamboo; 16. Locking rod; 21. Support frame ; 22, sliding roller bar; 23, support rod.
具体实施方式detailed description
下面结合具体实施例,并结合附图,对本实用新型的技术方案作进一步的说明:Below in conjunction with specific embodiment, and in conjunction with accompanying drawing, the technical scheme of the utility model is further described:
实施例:毛竹捆扎结构(见附图1),包括若干根毛竹15,所述的毛竹15的根部处于同一端,所述的毛竹15根部设置捆扎绳11,所述的若干根毛竹15的根部中间设置牵引杆13,所述的牵引杆13一端设置在若干根毛竹15的相互 产生的缝隙内,所述的牵引杆13另一端自由悬空,所述的牵引杆13与捆扎绳11之间设置牵引绳14,所述的牵引绳14一端与捆扎绳11固定连接,所述的牵引绳11的另一端与牵引杆13的自由悬空端固定连接,所述的捆扎绳11上设置捆扎活结12,所述的捆扎活结12内设置锁紧杆16,所述的锁紧杆16一端设置在捆扎活结12内,所述的锁紧杆16另一端设置在毛竹缝隙内,所述的捆扎绳11与毛竹15根部端面的距离为30cm~50cm。Embodiment: moso bamboo binding structure (see accompanying drawing 1), comprises several moso bamboos 15, and the root of described moso bamboo 15 is at the same end, and described moso bamboo 15 roots is provided with binding rope 11, and the root of described some moso bamboos 15 A drawbar 13 is arranged in the middle, and one end of the drawbar 13 is arranged in the gaps between several moso bamboos 15, the other end of the drawbar 13 is free to hang, and the drawbar 13 and the binding rope 11 are arranged between A traction rope 14, one end of the traction rope 14 is fixedly connected to the binding rope 11, the other end of the traction rope 11 is fixedly connected to the free hanging end of the traction bar 13, and the binding slipknot 12 is arranged on the binding rope 11, Locking rod 16 is arranged in described binding slipknot 12, and one end of described locking rod 16 is arranged in binding slipknot 12, and the other end of described locking rod 16 is arranged in the gap of moso bamboo, and described binding rope 11 and The distance between the end faces of the 15 roots of moso bamboo is 30cm~50cm.
砍伐后的毛竹捆扎为6~8根毛竹,按照粗的一端放置一起,且基本对齐堆放,从中抽一根距离毛竹捆粗端2.5~3m作为牵引杆,起到导向和抬起作用。在毛竹捆粗的一端,距离粗端点30~50cm处,用直径1~1.5cm的布条绳或麻绳捆扎。The felled moso bamboos are bundled into 6-8 moso bamboos, which are placed together according to the thick end, and are basically aligned and stacked. One of the moso bamboo bundles is 2.5-3m away from the thick end of the moso bamboo bundle as a traction rod, which plays the role of guiding and lifting. At the thick end of the moso bamboo bundle, at a distance of 30-50 cm from the thick end, tie it with a cloth rope or hemp rope with a diameter of 1-1.5 cm.
毛竹捆扎的为将不同绳或麻绳,在指定位置,将两端打成活结,再用一根长25~35cm左右锁紧杆,从活结的下端插入,将锁紧杆逆时针旋转数圈,紧固捆扎绳,直至毛竹捆牢固,最后将锁紧杆竖直插入毛竹捆的缝隙,再用牵引绳一端与牵引杆连接,另一端与毛竹捆连接。For moso bamboo tying, tie different ropes or hemp ropes into slipknots at designated positions, then use a 25-35cm long locking rod, insert it from the lower end of the slipknot, and rotate the locking rod counterclockwise several times , tighten the binding rope until the bamboo bundle is firm, and finally insert the locking rod vertically into the gap of the bamboo bundle, and then connect one end of the traction rope to the drawbar and the other end to the bamboo bundle.
一种运输上述捆扎毛竹的运输滑道(见附图2),包括若干滑辊单元2,所述的滑辊单元2与滑辊单元2之间设置连接杆3,所述的连接杆3两端均与滑辊单元2固定连接,滑辊单元2包括支撑架21,所述的支撑架21上设置滑辊杆22,所述的滑辊杆22与支撑架21活动连接,所述的支撑架21包括两根支撑杆23,所述的两根支撑杆23交叉设置,所述的滑辊杆22离地面的高度为5cm~20cm,所述的滑辊杆22上两个支撑架21的距离为2m~3m。A transport chute (see accompanying drawing 2) for transporting the above-mentioned bundled moso bamboo, comprising several sliding roller units 2, connecting rods 3 are arranged between the sliding roller units 2 and the sliding roller units 2, and the connecting rods 3 are two Both ends are fixedly connected with the sliding roller unit 2, and the sliding roller unit 2 includes a supporting frame 21, and a sliding roller bar 22 is arranged on the supporting frame 21, and the described sliding roller bar 22 is movably connected with the supporting frame 21, and the supporting Frame 21 comprises two support rods 23, and described two support rods 23 are arranged crosswise, and the height of described sliding roller rod 22 from the ground is 5cm~20cm, and the height of two supporting frames 21 on described sliding roller rod 22 The distance is 2m~3m.
根据原有毛竹林道打桩、设置运输滑道;具体操作为在原有竹林道两侧对称打桩,并就地砍伐直径15~20cm的毛竹,截断成1.5~2m长,两端放置在交叉桩上。每个桩位有两根桩交叉,在交叉点用铁丝固定,交叉点距地面5~20cm,交叉点上两桩长为30~50cm。同侧两桩位之间的距离为2~3m;滑道的铺设,是在原有毛竹林道上铺设,不破坏原有的生态环境,且交叉桩设置距离为2-3m,其上放置毛竹,毛竹可以自由滚动,使得毛竹捆基本全部与滑道接触,仅毛竹梢与地面接触,有效的减少了毛竹捆与地面的摩擦。According to the original moso bamboo forest road piling and set up transport slides; the specific operation is symmetrical piling on both sides of the original bamboo forest road, and cut down the moso bamboo with a diameter of 15-20cm on the spot, cut it into 1.5-2m long, and place the two ends on cross piles. Each pile position has two piles intersecting, fixed with iron wire at the intersection point, the intersection point is 5-20cm from the ground, and the length of the two piles on the intersection point is 30-50cm. The distance between the two piles on the same side is 2-3m; the laying of the slideway is laid on the original moso bamboo forest road without destroying the original ecological environment, and the distance between the cross piles is 2-3m, and the moso bamboo is placed on it. The bamboo can roll freely, so that the bundle of moso bamboo is basically in contact with the slideway, and only the tip of the bamboo is in contact with the ground, which effectively reduces the friction between the bundle of moso bamboo and the ground.
上述具体实施方式用来解释说明本实用新型,而不是对本实用新型进行限制,在本实用新型的精神和权利要求的保护范围内,对本实用新型做出的任何修 改和改变,都落入本实用新型的保护范围。The above-mentioned specific embodiments are used to explain the utility model, rather than to limit the utility model. Within the spirit of the utility model and the protection scope of the claims, any modifications and changes made to the utility model all fall into the scope of the utility model. A new type of protection.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620824559.0U CN206172179U (en) | 2016-03-23 | 2016-03-23 | Tie up slideway of mao bamboo |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620824559.0U CN206172179U (en) | 2016-03-23 | 2016-03-23 | Tie up slideway of mao bamboo |
| CN201620226878.1U CN205708042U (en) | 2016-03-23 | 2016-03-23 | Moso Bamboo Bundle Structure |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620226878.1U Division CN205708042U (en) | 2016-03-23 | 2016-03-23 | Moso Bamboo Bundle Structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206172179U true CN206172179U (en) | 2017-05-17 |
Family
ID=57314631
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620226878.1U Expired - Fee Related CN205708042U (en) | 2016-03-23 | 2016-03-23 | Moso Bamboo Bundle Structure |
| CN201620824559.0U Expired - Fee Related CN206172179U (en) | 2016-03-23 | 2016-03-23 | Tie up slideway of mao bamboo |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620226878.1U Expired - Fee Related CN205708042U (en) | 2016-03-23 | 2016-03-23 | Moso Bamboo Bundle Structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (2) | CN205708042U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109335452A (en) * | 2018-08-24 | 2019-02-15 | 浙江大学湖州市南太湖现代农业科技推广中心 | The method of transporting bamboo materials down the mountain without the power of the pipeline |
-
2016
- 2016-03-23 CN CN201620226878.1U patent/CN205708042U/en not_active Expired - Fee Related
- 2016-03-23 CN CN201620824559.0U patent/CN206172179U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109335452A (en) * | 2018-08-24 | 2019-02-15 | 浙江大学湖州市南太湖现代农业科技推广中心 | The method of transporting bamboo materials down the mountain without the power of the pipeline |
Also Published As
| Publication number | Publication date |
|---|---|
| CN205708042U (en) | 2016-11-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103754504A (en) | Tower crane jib packing device, packing system and packing method | |
| CN206172179U (en) | Tie up slideway of mao bamboo | |
| CN201151613Y (en) | Hoisting device at bottom of large-scale case roof beam pocket | |
| CN203439447U (en) | Steel pipe packing frame | |
| CN204110086U (en) | A kind of steel pipe transmission dolly | |
| CN204139064U (en) | Bridge floor hogging moment whole bundle intelligent tensioning car | |
| CN203213077U (en) | Willow stone pillow bundling and throwing machine | |
| CN207918270U (en) | A kind of straight thread reinforced bar handling apparatus | |
| CN206465069U (en) | A kind of wire spool storing unit | |
| CN206060047U (en) | A kind of line construction scissors crossing take-up instrument | |
| CN104860192B (en) | Special log grab bucket | |
| CN204297970U (en) | Heavy-duty machinery lifting movement system | |
| CN206111235U (en) | Car is transferred to anchor rope | |
| CN202880084U (en) | Self-adaptive quick banding rope | |
| CN204776352U (en) | Novel fishing net packing device | |
| CN103276616A (en) | Novel hauling rope with a plurality of branches | |
| CN206232309U (en) | A kind of glomeration building concrete hollow block wall piece banding system | |
| CN206051271U (en) | A kind of bar dowel bin | |
| CN208119477U (en) | Grounding wire pole bundled device | |
| CN204118598U (en) | Hand-hold type wire-unfolding rack | |
| CN215555712U (en) | Belt strap locking device for binding materials | |
| CN205367548U (en) | Mountain region pole transport means | |
| CN204579869U (en) | Sheet tied up by flue-cured tobacco | |
| CN204096181U (en) | Removable straw bundle releasing apparatus | |
| CN206720565U (en) | High-speed rod steel coil handling special hanger |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 310013 No. 223 Tianmu Mountain Road, Zhejiang, Hangzhou Patentee after: ZHEJIANG HUMANITIES LANDSCAPE CO.,LTD. Address before: 310013 No. 223 Tianmu Mountain Road, Zhejiang, Hangzhou Patentee before: ZHEJIANG HUMANITIES LANDSCAPE Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |