Background technology
With carrying out in a deep going way for China's energy-saving and emission-reduction work, northern area is especially conditional in China some areas,
Many coal-burning power plants are all transformed into the cogeneration power plant that winter can be nearby residents heat supply.The benefit of cogeneration of heat and power is,
While the steam-electric power of high-quality can be utilized, for nearby residents area heating heat energy is provided, it is to avoid heat power generating system
Cold end loss, significantly improves capacity usage ratio, while power plant can collect heating cost, improves profit from power plant.
However, power plant carries out in the winter time cogeneration of heat and power, and also to there are some to this operational mode of resident's heat supply technical
Deficiency, using the method for operation of electricity determining by heat more than current power plant, heating load and the generated energy of power plant have fixed corresponding relation, i.e.,
After power plant's heating demand determines, the generation load of power plant is also fixed therewith, is to ensure heat supply, and the generation load of power plant can not
Change, therefore the flexibility of power generating capacity receives greatly restriction.With the continuous development of China's renewable energy power generation,
The especially continuous rising of wind-powered electricity generation installation scale, electrical network is more and more for the peak regulation requirement of fired power generating unit.Due to being with wind-powered electricity generation
The new renewable energy power generation extremely unstable for representing, grid requirements routine fired power generating unit undertakes increasing peak regulation task,
This is accomplished by the flexibility that fired power generating unit improves self generating Load Regulation.It is former in order to coordinate the online of renewable energy power generation
Thermal power plant unit to need not participate in peak regulation also will gradually bear the mission of peak load regulation network, therefore thermal power plant unit electricity determining by heat
The method of operation will be adapted to no longer, it is necessary to carry out thermoelectricity decoupling.
At present existing thermoelectricity decouples about two kinds of mode, and one kind is that stand-by boiler is set up in heat network system, works as electricity
Factory during heat capacity decline, starts stand-by boiler, to supplement the breach of power plant's heat capacity, this heat because generation load is reduced
Electrolysis coupling mode, the stand-by boiler due to needing newly-built full capacity, thus cost of investment is larger, because stand-by boiler needs frequently
Start and stop, operation and maintenance cost are also very high.Gas fired-boiler being adopted stand-by boiler, although in terms of dust and sulfur dioxide (SO2) emissions more
With environment-friendly advantage, but current gas fired-boiler is showed in terms of NOx abatement and not projected, and also there is NOx emission exceeded
Problem.
The mode of another kind of thermoelectricity decoupling is that heat-storing device is arranged in heat supply network, in power plants generating electricity load height, heat capacity
When strong, energy-storage system stores certain heat energy, when power plant because when reducing the reduction of generation load heating load, being filled using energy storage
The deficiency of the heat supplement power plant heat supply of storage is put, after power plant load rises, power plant's heat supplement energy storage device is recycled
Heat accumulation.Energy-accumulating medium is usually hot water, it is therefore desirable to build very huge storage tank, and the method floor space is big, investment
High cost, heat storage capacity is limited with lasting heating time.Therefore, in order that cogeneration units can participate in peak regulation, in addition it is also necessary to
More flexible thermoelectricity decouples scheme.
The content of the invention
For solve for steam power plant's electricity determining by heat operational mode, the low problem that cannot undertake peak regulation task of unit flexibility,
The utility model proposes a kind of thermoelectricity from station boiler steam pumping decouples heating system, using the system can spend it is relatively low into
Originally can realize that thermoelectricity is decoupled.
The utility model is to be achieved through the following technical solutions:
A kind of thermoelectricity from station boiler steam pumping decouples heating system, including station boiler, steam turbine, turbine generator
Machine, condensate pump, low-pressure heater, oxygen-eliminating device, feed pump and high-pressure heater, also including condensing heat exchanger, the pressure reducer that draws gas,
Extraction heater and heat supply network user;
The steam inlet of condensing heat exchanger is connected with steam turbine high back pressure steam discharge, or the intermediate pressure cylinder and low pressure (LP) cylinder with steam turbine
Between steam pumping communicating pipe be connected, condensing heat exchanger condense water out be connected with condensate pump entrance;Heat supply network user's water return outlet
Jing heat supply networks water pump is connected with the heat supply network water inlet of condensing heat exchanger, condensing heat exchanger heat supply network water out and extraction heater hot net water
Entrance is connected, and extraction heater heat supply network water out is connected with heat supply network user, and condensing heat exchanger heat supply network water out is also added by drawing gas
Hot device bypass is connected with heat supply network user;
The Jing pressure reducers that draw gas in extraction heater steam inlet extract heat source stream from the superheat section of station boiler or reheating section;
Extraction heater condensation-water drain is connected with oxygen-eliminating device deoxygenation water tank.
Steam turbine feedwater heating system is sent back to by condensate pump after heat supply network water condensation into the steam in condensing heat exchanger
System;Heat supply network backwater elder generation is re-fed into extraction heater and adds Jing after condensing heat exchanger extracted steam from turbine or the heating of high back pressure turbine discharge
Heat, finally sends heat supply network back to.
Extraction heater extracts steam from station boiler as heat source stream, its low pressure that position is station boiler of drawing gas
After superheater, after pendant superheater, before high temperature superheater or after low-temperature reheater;
Steam first passes through pressure reducer step-down of drawing gas from after station boiler extraction, is sent to extraction heater, adds drawing gas
Condensed water is formed in hot device after condensation heat, oxygen-eliminating device is delivered to by the road;The extraction heater bypass that extraction heater is arranged, root
Heat supply network backwater is set to heat through extraction heater by control valve switch according to load condition, or it is straight without extraction heater
Pick toward heat supply network user.
When condensing heat exchanger is sufficient to the heating efficiency of heat supply network backwater, heat supply network is returned into the steam in condensing heat exchanger
Water is heated to desired heat supply temperature, and heat supply network backwater directly send after being heated in condensing heat exchanger through extraction heater bypass
Toward heat supply network user, now extraction heater does not work, not from station boiler steam pumping;
When condensing heat exchanger is not enough to the heating efficiency of heat supply network backwater, then opens heat supply network backwater and enter extraction heater
Pipeline, closes extraction heater bypass, is continued to hot net water heat temperature raising using extraction heater, adjusts from station boiler to taking out
The amount of drawing gas of vapour heater, the temperature for making the heat supply network water out of extraction heater meets heating demand.
Compared with prior art, the utility model has following beneficial technique effect:
The thermoelectricity from station boiler steam pumping that the utility model is provided decouples heating system, and heat supply network backwater is mainly using solidifying
Vapour heat exchanger is heated, and extraction heater is further added by behind condensing heat exchanger, and the heat source stream of extraction heater is from power station
The superheat section of boiler or reheating section are extracted;Wherein condensing heat exchanger utilizes steam turbine high back pressure steam discharge, or from Steam Turbine Through IP Admission
Between low pressure (LP) cylinder communicating pipe steam pumping heating heat supply network backwater, steam itself is pumped after heat supply network water condensation by condensate
Back-steam turbine feed heating system;Heat supply network backwater first passes through and is re-fed into taking out after extracted steam from turbine or the heating of high back pressure turbine discharge
Vapour heater is heated, and finally sends heat supply network back to;Extraction heater is utilized from station boiler as the auxiliary heater meanses of hot net water
The high temperature and high pressure steam of extraction as extraction heater thermal source, by adjusting from the amount of drawing gas of boiler, you can regulation draw gas plus
The heating load of hot device, makes the heat supply water temperature for being sent to heat supply network reach requirement.Such that it is able to realize that thermoelectricity is decoupled, cogeneration of heat and power electricity is made
Factory has the peak modulation capacity for coordinating electrical network, when power generating capacity is reduced, heat capacity can be kept not reduce.
When turbine generating system is in high load capacity, steam-turbine flow is very big, from steam turbine, low pressure (LP) cylinder
Between communicating pipe extract steam or high back pressure turbine discharge be enough in condensing heat exchanger a heat supply network backwater be heated to supply
The temperature of heat request, heat supply network backwater is routed directly to heat supply network and uses after being heated in condensing heat exchanger through extraction heater bypass
Family, now extraction heater do not work, be not required to from station boiler draw gas;
After turbine generating system is required reduction load by peak load regulation network, steam-turbine flow is reduced, from steamer
The steam or high back pressure turbine discharge that communicating pipe in machine, between low pressure (LP) cylinder is extracted also is corresponded to and reduced, and condensing heat exchanger is to warm
The heating efficiency of net backwater declines, and the temperature of condensing heat exchanger heat supply network water out does not reach heating demand, and now, opening is drawn gas and added
Hot device pipeline, closes extraction heater bypass, continues, to hot net water heat temperature raising, to adjust from station boiler using extraction heater
To the amount of drawing gas of extraction heater, the temperature for making extraction heater heat supply network water out reaches heating demand, so as to ensure in steamer
When machine generation load is reduced, the heat capacity to heat supply network user does not subtract, and realizes that thermoelectricity is decoupled.
The utility model can also lift the denitration environmental-protecting performance of Power Station Boiler in Low Loads:Generally drop in power plants generating electricity load
When low, station boiler load is also reduced, and the comparison that at this time Rear of Utility Boiler flue-gas temperature declines is severe, and cigarette temperature declines can be made
SCR (Selective Catalytic Reduction, the SCR) thrashing of boiler tail, denitrating system
Excision, causes environmental pollution;And heating system of the present utility model is adopted, in station boiler load reduction, due to from boiler
Steam heat-absorbent surface stage casing has been extracted some vapor out and has sent to extraction heater, because the extraction in advance of some vapor causes boiler rear portion
The steam flow of heat exchanger is reduced, and residual steam declines to the cooling capacity of flue gas, and the cooling capacity of boiler smoke is reduced, because
And the exhaust gas temperature of boiler tail can be improved, so that station boiler will not cause exhaust gas temperature mistake because of load reduction
It is low, it is to avoid the out of stock thrashings of SCR, it is ensured that denitrating system normally runs under boiler at low load.
Specific embodiment
The utility model is described in further detail with reference to specific embodiment, described is to the utility model
Explanation rather than restriction.
Referring to Fig. 1 or Fig. 2, a kind of thermoelectricity from station boiler steam pumping decouples heating system, including station boiler 1, vapour
Turbine 2, steam turbine generator 3, condensate pump 5, low-pressure heater 6, oxygen-eliminating device 7, feed pump 8 and high-pressure heater 9, also including solidifying
Vapour heat exchanger 4, the pressure reducer 10 that draws gas, extraction heater 11 and heat supply network user 13;
The steam inlet of condensing heat exchanger 4 is connected with steam turbine high back pressure steam discharge, or the intermediate pressure cylinder and low pressure with steam turbine 2
Steam pumping communicating pipe between cylinder is connected, and condensing heat exchanger 4 condenses water out and is connected with the entrance of condensate pump 5;Heat supply network user 13
Water return outlet Jing heat supply networks water pump 14 is connected with the heat supply network water inlet of condensing heat exchanger 4, and the heat supply network water out of condensing heat exchanger 4 adds with drawing gas
The heat supply network water inlet of hot device 11 is connected, and the heat supply network water out of extraction heater 11 is connected with heat supply network user 13, the hot net water of condensing heat exchanger 4
Outlet is also connected by extraction heater bypass 12 with heat supply network user 13;
The steam inlet Jing of extraction heater 11 pressure reducers 10 that draw gas extract thermal source from the superheat section of station boiler 1 or reheating section
Steam;The condensation-water drain of extraction heater 11 is connected with the deoxygenation water tank of oxygen-eliminating device 7.
In said system, using steam turbine high back pressure steam discharge, or the communicating pipe between Steam Turbine Through IP Admission and low pressure (LP) cylinder
Heating heat supply network backwater, steam itself is sent back to steam turbine feedwater heating system after heat supply network water condensation to steam pumping by condensate pump
System;Heat supply network backwater to be first passed through and be re-fed into extraction heater heating after extracted steam from turbine or the heating of high back pressure turbine discharge, finally
Send heat supply network back to;
Meanwhile, one steam of the extraction from station boiler is adopted as the heat source stream of extraction heater, position of drawing gas
Positioned at superheater stage casing or reheater stage casing, can be station boiler low-pressure superheater after, after pendant superheater, high temperature
Before superheater or after low-temperature reheater, position of specifically drawing gas needs to be carried out according to the structure and operational factor of actual boiler
It is determined that;From after station boiler extraction, first pass through the pressure reducer that draws gas makes pressure suitably reduce to steam, is sent to extraction heater,
Condensed water is formed after condensation heat in extraction heater, deaerator storage tank is delivered to by the road;Arrange in extraction heater and draw gas
Heater by-pass, can be such that hot net water heats through extraction heater according to load condition by control valve switch, or without
Cross extraction heater and be routed directly to heat supply network user.
Therefore, when condensing heat exchanger 4 is sufficient to the heating efficiency of heat supply network backwater, the steam in condensing heat exchanger 4
The heat supply temperature that heat supply network backwater is heated to requiring, through extraction heater after heat supply network backwater is heated in condensing heat exchanger 4
Bypass 12 is routed directly to heat supply network user 13, and now extraction heater 11 does not work, not from the steam pumping of station boiler 1;
When condensing heat exchanger 4 is not enough to the heating efficiency of heat supply network backwater, then opens heat supply network backwater and enter extraction heater
11 pipeline, closes extraction heater bypass 12, continues, to hot net water heat temperature raising, to adjust from power station using extraction heater 12
Boiler 1 to the amount of drawing gas of extraction heater 11, the temperature for making the heat supply network water out of extraction heater 11 meet heating demand.
Further, the described steam inlet of extraction heater 11 is connected with the outlet of pressure reducer 10 of drawing gas, extraction heater
11 condensation-water drains are connected with the deoxygenation water tank of oxygen-eliminating device 7;The extraction opening phase drawn gas in entrance and the station boiler 1 of pressure reducer 10
Even, the entrance of the pressure reducer 10 that specifically draws gas is connected with the steam header before two grades of direct-contact desuperheaters of station boiler 1.
The main-steam outlet of described station boiler 1 is connected with the high pressure cylinder steam inlet of steam turbine 2, the height of steam turbine 2
Cylinder pressure steam (vapor) outlet is connected with the reheated steam entrance of station boiler 1, reheated steam outlet and the steam turbine 2 of station boiler 1
Intermediate pressure cylinder steam inlet is connected, and the intermediate pressure cylinder steam (vapor) outlet of steam turbine 2 is by communicating pipe and the low pressure (LP) cylinder steam inlet of steam turbine 2
It is connected, the high pressure cylinder of steam turbine 2, intermediate pressure cylinder, low pressure (LP) cylinder are coaxial with steam turbine generator 3 to be connected.
Referring to Fig. 1, if condensing heat exchanger 4 is from Steam Turbine Through IP Admission, low pressure (LP) cylinder communicating pipe steam pumping, the middle pressure of steam turbine 2
Steam pumping communicating pipe is connected with the steam inlet of condensing heat exchanger 4 between cylinder, low pressure (LP) cylinder, and condensing heat exchanger 4 condenses water out and coagulates
Vapour device 15 is connected;The low pressure (LP) cylinder steam drain of steam turbine 2 is connected with condenser 15, the condensation water out of condenser 15 and condensate pump
5 entrances are connected;
Referring to Fig. 2, if condensing heat exchanger 4 adopts high back pressure steam discharge heat supply, the low pressure (LP) cylinder exhaust vent of steam turbine 2 and condensing
The steam inlet of heat exchanger 4 is connected, and condensing heat exchanger 4 condenses water out and is connected with the entrance of condensate pump 5.
The described outlet of condensate pump 5 is connected with the entrance of low-pressure heater 6, and low-pressure heater 6 is exported and the entrance of oxygen-eliminating device 7
It is connected, the outlet of oxygen-eliminating device 7 is connected with the entrance of feed pump 8, the outlet of feed pump 8 is connected with the entrance of high-pressure heater 9, high-pressure heater
9 outlets are connected with the economizer entrance of station boiler 1.
Below so that the system is applied to using the subcritical thermal power generators of 300MW of the back pressure turbine with heat supply as an example
Illustrate.
Referring to Fig. 2, the system capital equipment includes:Station boiler 1, steam turbine 2, steam turbine generator 3, condensing heat exchanger 4,
Condensate pump 5, low-pressure heater 6, oxygen-eliminating device 7, feed pump 8, high-pressure heater 9, the pressure reducer 10 that draws gas, extraction heater 11,
Extraction heater bypass 12, heat supply network user 13, heat supply network water pump 14, wherein, the main-steam outlet of station boiler 1 and the high pressure of steam turbine 2
Cylinder steam inlet is connected, and the high pressure cylinder steam (vapor) outlet of steam turbine 2 is connected with the reheated steam entrance of station boiler 1, the reheating of station boiler 1
Steam (vapor) outlet is connected with the intermediate pressure cylinder steam inlet of steam turbine 2, and the intermediate pressure cylinder steam (vapor) outlet of steam turbine 2 is by communicating pipe and steam turbine 2
Low pressure (LP) cylinder steam inlet is connected, and the low pressure (LP) cylinder exhaust vent of steam turbine 2 is connected with the steam inlet of condensing heat exchanger 4, the main shaft of steam turbine 2
It is connected with the main shaft of steam turbine generator 3, condensing heat exchanger 4 condenses water out and is connected with the entrance of condensate pump 5, and condensate pump 5 is exported
It is connected with the entrance of low-pressure heater 6, the outlet of low-pressure heater 6 is connected with the entrance of oxygen-eliminating device 7, the outlet of oxygen-eliminating device 7 enters with feed pump 8
Mouth is connected, and the outlet of feed pump 8 is connected with the entrance of high-pressure heater 9, and the outlet of high-pressure heater 9 enters with the economizer of station boiler 1
Mouth is connected, and the entrance of pressure reducer 10 that draws gas is connected with the steam header before two grades of direct-contact desuperheaters of station boiler 1, and draw gas pressure reducer
10 outlets are connected with the steam inlet of extraction heater 11, and the condensation-water drain of extraction heater 11 is connected with the deoxygenation water tank of oxygen-eliminating device 7;
The water return outlet of heat supply network user 13 is connected with the entrance of heat supply network water pump 14, and heat supply network water pump 14 is exported and the heat supply network water inlet phase of condensing heat exchanger 4
Even, the heat supply network water out of condensing heat exchanger 4 is connected with the heat supply network water inlet of extraction heater 11, the heat supply network water out of extraction heater 11 and
Heat supply network user 13 is connected, and extraction heater 13 arranges extraction heater bypass 12.
Steam turbine 2 is using by pressure type steam turbine, and exhaust steam pressure about 200kPa, turbine discharge is solidifying into condensing heat exchanger 4
Tie heat release and be condensed into condensate in itself, condensate is extracted out and is sent to low-pressure heater by condensate pump 5 from condensing heat exchanger,
Condensate is sent to oxygen-eliminating device 7 in low-pressure heater 6 after preliminary intensification, and Jing feed pumps 8 pressurize after heating deoxygenation in oxygen-eliminating device
After become feedwater and be sent to high-pressure heater 9, station boiler 1 is sent into after further heating up in high-pressure heater, feed water in power station
The steam for ultimately becoming HTHP in boiler after a series of heating surface stepped heating out sends to vapour from station boiler
The high pressure cylinder expansion acting of turbine 2, steam is sent to again station boiler 1 and carries out reheating after discharging from the high pressure cylinder of steam turbine 2, from electricity
Stand boiler 1 reheater out after be sent to the intermediate pressure cylinder expansion work of steam turbine 2, steam is discharged from the intermediate pressure cylinder of steam turbine 2
By in, low pressure (LP) cylinder vapor communication pipe be sent to low pressure (LP) cylinder expansion work of the steam from steam turbine 2, the high, medium and low cylinder pressure of steam turbine with
Steam turbine generator is coaxially connected, and steam turbine is rotated and drives electrical power generators, and turbine low pressure cylinder steam discharge sends into condensing heat exchanger 4;
Condensing heat exchanger 4 is sent to from the heat supply network backwater of heat supply network user 13 after the pressurization of heat supply network water pump 14 to heat, from solidifying
Vapour heat exchanger is out heated through the heat exchanger 11 that draws gas afterwards or directly by the recuperator bypass that draws gas sends heat supply network user back to.Draw gas heating
Using the steam extracted from station boiler as hot vapour source is added, draw gas device 11 two grades of spray desuperheatings that position is station boiler 1
Steam header before device, after steam header of the steam from before two grades of direct-contact desuperheaters of station boiler is extracted out, first passes through decompression of drawing gas
Device 10 is depressurized to appropriate pressure, is sent to extraction heater 11, and condensed water, Jing are formed after condensation heat in extraction heater
Pipeline delivers to oxygen-eliminating device 7;Extraction heater bypass 12 is set in extraction heater, hot net water can be made through drawing gas by regulation
Heater is heated or is routed directly to heat supply network user without extraction heater.
The system realizes that the course of work that thermoelectricity is decoupled is:
When turbine generating system is in high load capacity, the displacement of steam turbine 2 is very big, the foot in condensing heat exchanger 4
Heat supply network backwater is heated to the temperature of heating demand, through heating of drawing gas after heat supply network backwater is heated in condensing heat exchanger 4
Device bypass 12 is routed directly to heat supply network user 13, and now extraction heater 11 does not work, and does not draw gas from station boiler 1;
After turbine generating system is required reduction load by peak load regulation network, the exhaust steam flow of steam turbine 2 is reduced, and condensing is changed
Hot device 4 declines to the heating efficiency of heat supply network backwater, and the temperature of condensing heat exchanger heat supply network water out does not reach heating demand, then opens
The pipeline of extraction heater 11, closes extraction heater bypass 12, is continued to hot net water using the heating efficiency of extraction heater 11
Heat temperature raising, is adjusted from station boiler to the amount of drawing gas of extraction heater 11, and making the temperature of extraction heater heat supply network water out expires
Sufficient heating demand, so as to when steam turbine power generation load reduction, it is ensured that the heat capacity to heat supply network user does not subtract, so as to reality
Existing thermoelectricity decoupling.
The major parameter of said system device is as shown in table 1.
The thermoelectricity decoupling heating system major parameter of the subcritical thermal power generations of the 300MW of table 1
On the one hand the utility model can realize that thermoelectricity is decoupled, and enable cogeneration power plant to have the peak regulation for coordinating electrical network
Power, when power generating capacity is reduced, keeps heat capacity not reduce;On the other hand the denitration of Power Station Boiler in Low Loads can be lifted
Environmental-protecting performance:When power plants generating electricity load reduction, extraction some vapor is sent to and is taken out from before two grades of direct-contact desuperheaters of station boiler
Vapour heater, because extracting out in advance for some vapor causes the steam flow of the several heat exchangers in boiler rear portion to reduce, to boiler smoke
The cooling capacity of gas reduces, thus can improve the exhaust gas temperature of boiler tail, so that station boiler will not be because of load
Reduction causes exhaust gas temperature too low, it is to avoid the out of stock thrashings of SCR, improves environmental-protecting performance.
Example given above is to realize the utility model preferably example, and the utility model is not limited to above-mentioned enforcement
Example.Any nonessential addition that those skilled in the art is made according to the technical characteristic of technical solutions of the utility model,
Replace, belong to protection domain of the present utility model.