CN206128474U - Steel construction gutter water pipe assembly that falls - Google Patents

Steel construction gutter water pipe assembly that falls Download PDF

Info

Publication number
CN206128474U
CN206128474U CN201621174050.2U CN201621174050U CN206128474U CN 206128474 U CN206128474 U CN 206128474U CN 201621174050 U CN201621174050 U CN 201621174050U CN 206128474 U CN206128474 U CN 206128474U
Authority
CN
China
Prior art keywords
roof boarding
groove
support
supporting part
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621174050.2U
Other languages
Chinese (zh)
Inventor
林福明
张锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Steel Structure Engineering Co Ltd Taishan Steel
Original Assignee
Zhejiang Steel Structure Engineering Co Ltd Taishan Steel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Steel Structure Engineering Co Ltd Taishan Steel filed Critical Zhejiang Steel Structure Engineering Co Ltd Taishan Steel
Priority to CN201621174050.2U priority Critical patent/CN206128474U/en
Application granted granted Critical
Publication of CN206128474U publication Critical patent/CN206128474U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides a steel construction gutter water pipe assembly that falls belongs to mechanical technical field. It has solved the problem that present gutter pipe in the water easily lost efficacy in the ice and snow sky. This steel construction gutter water pipe assembly that falls, locate between support and the roofing body, the roofing body is formed by the concatenation of a plurality of roof boarding, one side of roof boarding has the supporting part no. 1 of downwardly extending to support department, the lower extreme of this supporting part no. 1 have extend to next roof boarding the below with connecting portion that the support links firmly, be formed with the water conservancy diversion way on the connecting portion, the supporting part of next roof boarding and a last roof boarding is equipped with location structure between one, this gutter fall water pipe assembly including locate on the support the slot that extends along support length direction no. 1 with locate a slot bottom and with the pipe in the water no. 1 of a slot intercommunication, the to one side down edge extension of roof boarding is to the top department of slot no. 1, still be equipped with the auxiliary flow system on the support. The utility model has the advantages of structural design is reasonable, long service life, the difficult inefficacy.

Description

The overboard tube assembly of steel construction gutter
Technical field
This utility model belongs to technical field of buildings, is related to a kind of overboard tube assembly of steel construction gutter.
Background technology
The roofing of building has drain function, according to building structure and the difference of appearance requirement, for the gutter of draining Typically there are two kinds of versions:Built-in gutter and external gutter.The interior gutter of steel-structure factory building is typically made up of steel plate, plug-in day Ditch is typically folded by colored steel and is formed.In steel plate, gutter is relatively costly, seeps water easily into Factory Building;External gutter is structurally and functionally Also there is following defect:The form of fracture of existing external gutter is inside and outside highly essentially identical so that existing external gutter When rainwater flow is too urgent, current can go out gutter along the direction of roof boarding groove surface, it is impossible to enter rainwater well Row stops, and current all will not be flowed in external gutter tank, understands some current and flows within doors;Due to external gutter it is general Folded by colored steel and formed, therefore the rigidity of structure of existing external gutter is typically relatively low, structural stability is poor, gutter itself is easy Deformation;Gutter is easily by snow cover, and easily freezes, and causes gutter to lose drainability.
The content of the invention
The purpose of this utility model is there are the problems referred to above for existing technology, it is proposed that a kind of reasonable in design, The good overboard tube assembly of steel construction gutter of drainage effect.
The purpose of this utility model can be realized by following technical proposal:
The overboard tube assembly of this steel construction gutter, between support and roofing body, the cross section of the roofing body is in wave And be spliced by several roof boardings, the middle part of described roof boarding arches upward to form the crest of wave upwards, its both sides point Do not extend at two adjacent troughs of wave, the side of the roof boarding has the supporting part extended downward at support One, the lower end of the supporting part one has the connecting portion being connected with support extended to below next roof boarding, described connecting portion On be formed between the supporting part one of honeycomb duct, next roof boarding and a upper roof boarding and be provided with location structure, it is characterised in that should The overboard tube assembly of gutter include on support along stent length direction extend groove one and located at one bottom of groove and with The downpipe one of the connection of groove one, the oblique lower limb of above-mentioned roof boarding are extended at the top of groove one, on described support also It is provided with secondary flow system.
After rainwater is dropped on roof boarding, the trough of Jing roof boardings is oblique dirty, then goes through in groove one, by overboard Pipe one is discharged.When rainfall is larger or ice and snow weather ice and snow blocks downpipe one, unnecessary rainwater can be arranged through secondary flow system Go out.
In the above-mentioned overboard tube assembly of steel construction gutter, the opposite side of the roof boarding has and extends downwardly a supreme room Supporting part two at the connecting portion of panel, has gap, above-mentioned location structure between described supporting part two and supporting part one Including the location division located at two lower end of supporting part, described location division is resisted against on the connecting portion of a roof boarding, and described props up There is on support part two lateral recessed recess, there is on the supporting part one of a upper roof boarding projection stretched in recess Portion, described lobe are resisted against in the lower wall of next roof boarding recess.
In the above-mentioned overboard tube assembly of steel construction gutter, there is on described connecting portion upper convex portion one, above-mentioned water conservancy diversion Road is located between the upper convex portion one and supporting part one, and the oblique lower limb of the honeycomb duct is extended at secondary flow system.
In the above-mentioned overboard tube assembly of steel construction gutter, described secondary flow system include on support with groove one The groove two be arrangeding in parallel, the oblique lower limb of the roof boarding are extended at the top of groove one across after the groove two, described Groove two in be provided with the downpipe two connected with groove two, the lower end of the downpipe two is connected with the side wall of downpipe one, The oblique lower limb of the honeycomb duct is extended at the top of the groove two.Part at roof boarding trough constitutes roofing body The length of sluice way, the wherein sluice way is greater than the length of honeycomb duct.
In the above-mentioned overboard tube assembly of steel construction gutter, the side of the groove one is water retaining wall one, the groove two Opposite side be water retaining wall two, there is between described groove one and groove two water retaining wall three, the height of the water retaining wall two is high In the height of water retaining wall one, the height of the water retaining wall one is higher than the height of water retaining wall three.
In the above-mentioned overboard tube assembly of steel construction gutter, there is on described connecting portion upper convex portion two, described is convex The bolt being threadedly coupled with water retaining wall two is equipped between portion two and upper convex portion one, between described bolt and connecting portion, is provided with close Packing.
During installation, the first roof boarding is obliquely installed, the lower end of the first roof boarding is fixed on support, subsequently will be next Roof boarding reclines a upper roof boarding, the lobe of a roof boarding is inserted in the recess of next roof boarding, presses down on Next roof boarding, makes location division be resisted against on connecting portion, lobe is resisted against in the lower wall of recess;Continue to install follow-up Roof boarding, until roof boarding is installed entirely.Lower rainwater, flows at the direct Jing roof boardings trough of a part of rain in groove one, Gap between fraction water Jing supporting parts one and support are only is entered in honeycomb duct, is then gone through in groove two, finally Discharged by downpipe two and downpipe one.When amount of rainfall is big, the water in groove one climbs over water retaining wall three and enters in groove two, Flowed out by downpipe two.When ice and snow weather, snow and ice cover is in groove one, and blocks downpipe for the moment, by snow melt into water Climb over water retaining wall three to enter in groove two, flowed out by downpipe two, drainage effect is good, and current may not flow into interior.
Compared with prior art, the overboard tube assembly of this steel construction gutter has advantages below:
Roof boarding is supported with supporting part two by supporting part one, by connecting portion and location division, lobe and Recess realizes the positioning to roof boarding, and rear stability of having good positioning is good, and Radix Saposhnikoviae shake-proof ability is strong;Next roof boarding is pasted during installation A top roof boarding, makes the lobe of a roof boarding be inserted in the recess of next roof boarding, presses down on next roofing Plate, makes location division be resisted against on connecting portion, lobe is resisted against in the lower wall of recess, installs simple and convenient;In support It is upper that groove one and groove two are directly set, save external gutter, reduces cost;When groove one breaks down, groove two can also Work on, effectively prevent current from turning up and entering into and leak within doors.
Description of the drawings
Fig. 1 is a kind of transverse sectional view of preferred embodiment that this utility model is provided.
Fig. 2 is a kind of longitudinal sectional view of preferred embodiment that this utility model is provided.
In figure, 1, support;2nd, roof boarding;3rd, supporting part one;4th, connecting portion;5th, honeycomb duct;6th, groove one;7th, downpipe One;8th, supporting part two;9th, location division;10th, recess;11st, lobe;12nd, groove two;13rd, downpipe two;14th, water retaining wall two; 15th, water retaining wall three;16th, water retaining wall one.
Specific embodiment
The following is specific embodiment of the utility model and combine accompanying drawing, further is made to the technical solution of the utility model Description, but this utility model is not limited to these embodiments.
The cross section of roofing body as shown in Figure 1 is in wave and is spliced by several roof boardings 2, roof boarding 2 Middle part arches upward to form the crest of wave upwards, and its both sides is extended respectively at two adjacent troughs of wave, the roofing The side of plate 2 has and extends downward supporting part 1 at support 1, and the lower end of the supporting part 1 has and extends to next roofing The connecting portion 4 being connected with support 1 below plate 2, is formed with honeycomb duct 5, next roof boarding 2 and a upper roof boarding 2 on connecting portion 4 Supporting part 1 between be provided with location structure.
The overboard tube assembly of this steel construction gutter, between support 1 and roofing body, as shown in Fig. 2 it is included located at support The groove 1 extended along 1 length direction of support and the downpipe 1 connected located at one 6 bottom of groove and with groove 1 on 1, The oblique lower limb of roof boarding 2 is extended at the top of groove 1, and secondary flow system is additionally provided with support 1.
After rainwater is dropped on roof boarding 2, the trough of Jing roof boardings 2 is oblique dirty, then goes through in groove 1, by Downpipe 1 is discharged.When rainfall is larger or ice and snow weather ice and snow blocks downpipe 1, unnecessary rainwater can be through secondary flow System is discharged.
As shown in figure 1, the opposite side of roof boarding 2 has the supporting part extended downwardly at the connecting portion 4 of a supreme roof boarding 2 28, there is between supporting part 28 and supporting part 1 gap, location structure includes the location division 9 located at 28 lower end of supporting part, Location division 9 is resisted against on the connecting portion 4 of a roof boarding 2, has lateral recessed recess 10, a upper room on supporting part 28 There is on the supporting part 1 of panel 2 lobe 11 stretched in recess 10, it is recessed that lobe 11 is resisted against next roof boarding 2 Enter in the lower wall in portion 10.
As shown in figure 1, having upper convex portion one on connecting portion 4, honeycomb duct 5 is located between the upper convex portion one and supporting part 1, The oblique lower limb of honeycomb duct 5 is extended at secondary flow system.
As shown in Fig. 2 secondary flow system includes the groove 2 12 be arrangeding in parallel with groove 1 on support 1, roof boarding 2 oblique lower limb is extended at the top of groove 1 across after the groove 2 12, is provided with and connects with groove 2 12 in groove 2 12 Downpipe 2 13, the lower end of downpipe 2 13 connected with the side wall of downpipe 1, and the oblique lower limb of honeycomb duct 5 extends to this At the top of groove 2 12.Part at 2 trough of roof boarding constitutes the sluice way of roofing body, the wherein length of the sluice way It is greater than the length of honeycomb duct 5.
As shown in Fig. 2 the side of groove 1 is water retaining wall 1, the opposite side of groove 2 12 is water retaining wall 2 14, groove There is between one 6 and groove 2 12 water retaining wall 3 15, the height of the height of water retaining wall 2 14 higher than water retaining wall 1, water retaining wall one Height of 16 height higher than water retaining wall 3 15.
As shown in figure 1, having upper convex portion two on connecting portion 4, it is equipped between upper convex portion two and upper convex portion one and water retaining wall The bolt of 2 14 threaded connections, is provided with sealing gasket between bolt and connecting portion 4.Stream is formed between upper convex portion one and upper convex portion two Road, can carry out water conservancy diversion to the water routed up from honeycomb duct 5.
During installation, the first roof boarding 2 is obliquely installed, the lower end of the first roof boarding 2 is fixed on support 1, subsequently will Next roof boarding 2 reclines a upper roof boarding 2, makes the lobe 11 of a roof boarding 2 be inserted into the recess 10 of next roof boarding 2 It is interior, next roof boarding 2 is pressed down on, location division 9 is resisted against on connecting portion 4, lobe 11 is resisted against under recess 10 On the wall of side;Continue follow-up roof boarding 2 is installed, until roof boarding 2 is installed entirely.Lower rainwater, the direct Jing roofings of a part of rain At 2 trough of plate flow into groove 1 in, fraction water Jing supporting parts 1 and support it is only between gap enter into honeycomb duct 5 It is interior, then go through in groove 2 12, finally discharged by downpipe 2 13 and downpipe 1.When amount of rainfall is big, groove 1 Interior water climbs over water retaining wall 3 15 and enters in groove 2 12, is flowed out by downpipe 2 13.When ice and snow weather, snow and ice cover is in ditch In groove 1, and when blocking downpipe 1, by snow melt into water climb over water retaining wall 3 15 and enter in groove 2 12, by overboard Pipe 2 13 flows out, and drainage effect is good, and current may not flow into interior.
Specific embodiment described herein is only explanation for example to this utility model spirit.This utility model institute Category those skilled in the art can make various modifications or supplement or using similar to described specific embodiment Mode substitute, but without departing from it is of the present utility model spirit or surmount scope defined in appended claims.

Claims (6)

1. the overboard tube assembly of a kind of steel construction gutter, between support (1) and roofing body, the cross section of the roofing body is in wave Line and it is spliced by several roof boardings (2), the middle part of described roof boarding (2) arches upward to form the crest of wave upwards, Its both sides is extended respectively at two adjacent troughs of wave, and the side of the roof boarding (2) has and extends downward support (1) supporting part one (3) at place, the lower end of the supporting part one (3) have extend to below next roof boarding (2) with support (1) Connected connecting portion (4), is formed with honeycomb duct (5), next roof boarding (2) and a upper roof boarding (2) on described connecting portion (4) Supporting part one (3) between be provided with location structure, it is characterised in that the overboard tube assembly of the gutter is included on support (1) The groove one (6) extended along support (1) length direction and the downpipe for being located at one (6) bottom of groove and connecting with groove one (6) One (7), the oblique lower limb of above-mentioned roof boarding (2) is extended at the top of groove one (6), is additionally provided with auxiliary on described support (1) Streaming system.
2. the overboard tube assembly of steel construction gutter according to claim 1, it is characterised in that the roof boarding (2) it is another Side has a supporting part two (8) at connecting portion (4) place for extending downwardly a supreme roof boarding (2), described supporting part two (8) with There is between support part one (3) gap, above-mentioned location structure includes the location division (9) located at two (8) lower end of supporting part, described Location division (9) is resisted against on the connecting portion (4) of a roof boarding (2), is had lateral recessed recessed on described supporting part two (8) Enter portion (10), there is on the supporting part one (3) of a upper roof boarding (2) lobe (11) stretched in recess (10), it is described Lobe (11) be resisted against in the lower wall of next roof boarding (2) recess (10).
3. the overboard tube assembly of steel construction gutter according to claim 2, it is characterised in that have on described connecting portion (4) Have upper convex portion one, above-mentioned honeycomb duct (5) between the upper convex portion one and supporting part one (3), the honeycomb duct (5) it is oblique under Edge is extended at secondary flow system.
4. the overboard tube assembly of steel construction gutter according to claim 3, it is characterised in that described secondary flow system includes setting The groove two (12) be arrangeding in parallel with groove one (6) on support (1), the oblique lower limb of the roof boarding (2) is across the ditch Extend to after groove two (12) at the top of groove one (6), be provided with and falling that groove two (12) is connected in described groove two (12) Water pipe two (13), the lower end of the downpipe two (13) are connected with the side wall of downpipe one (7), the honeycomb duct (5) it is oblique under Edge is extended at the top of the groove two (12).
5. the overboard tube assembly of steel construction gutter according to claim 4, it is characterised in that the side of the groove one (6) For water retaining wall one (16), the opposite side of the groove two (12) is water retaining wall two (14), described groove one (6) and groove two (12) there is between water retaining wall three (15), the height of the height of the water retaining wall two (14) higher than water retaining wall one (16), the gear Height of the height of water wall one (16) higher than water retaining wall three (15).
6. the overboard tube assembly of steel construction gutter according to claim 5, it is characterised in that have on described connecting portion (4) There is upper convex portion two, between described upper convex portion two and upper convex portion one, be equipped with the bolt being threadedly coupled with water retaining wall two (14), institute Sealing gasket is provided between the bolt stated and connecting portion (4).
CN201621174050.2U 2016-11-02 2016-11-02 Steel construction gutter water pipe assembly that falls Expired - Fee Related CN206128474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621174050.2U CN206128474U (en) 2016-11-02 2016-11-02 Steel construction gutter water pipe assembly that falls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621174050.2U CN206128474U (en) 2016-11-02 2016-11-02 Steel construction gutter water pipe assembly that falls

Publications (1)

Publication Number Publication Date
CN206128474U true CN206128474U (en) 2017-04-26

Family

ID=58576174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621174050.2U Expired - Fee Related CN206128474U (en) 2016-11-02 2016-11-02 Steel construction gutter water pipe assembly that falls

Country Status (1)

Country Link
CN (1) CN206128474U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062535A (en) * 2021-03-24 2021-07-02 中国五冶集团有限公司 A roof stainless steel gutter
CN115142618A (en) * 2022-07-25 2022-10-04 上海江河创泫幕墙制造有限公司 Wave type polycarbonate panel roofing system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062535A (en) * 2021-03-24 2021-07-02 中国五冶集团有限公司 A roof stainless steel gutter
CN115142618A (en) * 2022-07-25 2022-10-04 上海江河创泫幕墙制造有限公司 Wave type polycarbonate panel roofing system

Similar Documents

Publication Publication Date Title
CN102900205B (en) Automatic-reversing overflow anti-freezing compound rainwater drainage and collection eaves gutter system and construction method
CN101769048A (en) Automatic draining type full sealing photovoltaic building integrated roof
CN105672545A (en) Two-way photovoltaic shed with crisscross drainage system
CN205100441U (en) Interior drainage daylighting top curtain system
CN217105857U (en) Gutter edge-closing anti-seepage structure in parapet wall
CN207427039U (en) The stent and photovoltaic system of photovoltaic module
CN217105863U (en) Concrete parapet and eaves mouth are gutter structure for sealing connection
CN201351337Y (en) Integral roof of automatic drain type full-seal photovoltaic building
CN221194008U (en) Waterproof installation device in photovoltaic bicycle shed panel gap
CN205776999U (en) A kind of steel building lighting roof
CN216475927U (en) Sunshine room roof drainage system
CN104612341A (en) Canopy
CN110138317A (en) A kind of photovoltaic bracket discharge structure
CN217326129U (en) House building waterproof construction
CN205531037U (en) Take dismantlement formula to ally oneself with roof boarding of fighting with rainwater
CN202227596U (en) Roof longitudinal expansion joint connecting structure
CN201598730U (en) Roof waterproof structure for container type connected movable house
CN208415703U (en) A kind of lighting roof with drainage system
CN216109428U (en) Novel edge-closing canopy
CN219281101U (en) Gutter expansion joint node and gutter structure
CN216156988U (en) Passive ultralow-energy-consumption dry-operation flat roof slope-finding heat-insulation waterproof integrated eaves gutter
CN207739526U (en) A kind of open valley connect system with roof boarding waterproof
CN218843549U (en) Building eave waterproof construction
CN220100227U (en) Expansion joint waterproof construction
CN220644915U (en) A photovoltaic building drainage channel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20171102

CF01 Termination of patent right due to non-payment of annual fee