CN206108848U - Stride across block device - Google Patents

Stride across block device Download PDF

Info

Publication number
CN206108848U
CN206108848U CN201621161599.8U CN201621161599U CN206108848U CN 206108848 U CN206108848 U CN 206108848U CN 201621161599 U CN201621161599 U CN 201621161599U CN 206108848 U CN206108848 U CN 206108848U
Authority
CN
China
Prior art keywords
block
guide rail
crossing frame
leap
block system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621161599.8U
Other languages
Chinese (zh)
Inventor
张书豪
孟庆强
苏秀成
王成
董四清
刘学文
熊织明
陈海波
罗本壁
张甲雷
刘靖国
郎福堂
刘春田
梅丰
李瑞山
张为民
王佳
李春波
范伟捷
侯先智
陈兰
王艳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOJI YINGUANG POWER MACHINES Co Ltd
GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
State Grid Ac Engineering Construction Co
State Grid Corp of China SGCC
Beijing Electric Power Transmission and Transformation Co
Original Assignee
BAOJI YINGUANG POWER MACHINES Co Ltd
GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd
State Grid Ac Engineering Construction Co
State Grid Corp of China SGCC
Beijing Electric Power Transmission and Transformation Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOJI YINGUANG POWER MACHINES Co Ltd, GUANGDONG POWER TRANSMISSION AND TRANSFORMATION ENGINEERING Co Ltd, State Grid Ac Engineering Construction Co, State Grid Corp of China SGCC, Beijing Electric Power Transmission and Transformation Co filed Critical BAOJI YINGUANG POWER MACHINES Co Ltd
Priority to CN201621161599.8U priority Critical patent/CN206108848U/en
Application granted granted Critical
Publication of CN206108848U publication Critical patent/CN206108848U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model discloses a stride across block device relates to electric wire netting construction technical field, the problem of solution be provide that a fail safe nature height, technique are feasible, the stride across block device of construction convenience, economical rationality. The main technical scheme who adopts does: first block system and with the first mirror symmetry's of block system second block system, first block system and second block system are at a distance of the predetermined distance, first block system includes: the guide rail promotes the structure setting on crossing structure, the guide rail promotes the structure and can remove along crossing structure, the first end of block structure rotates with guide rail promotion structure to be connected for remove along crossing structure under the drive of guide rail promotion structure, it connects respectively in the second end of crossing structure and block structure to receive and release the structure for when the block structure removes to preset position along crossing structure, receive and release the structure and be in tensile state, make the relative crossing structure of block structure expand.

Description

It is a kind of to cross over block device
Technical field
This utility model is related to power grid construction technical field, more particularly to a kind of across block device.
Background technology
With economic fast development, the power construction fast development of various places.Increasing power circuit is across at a high speed Highway, high-speed railway etc..As the highway that is spanned or high-speed railway are all charging operations, prolonged block can be with phase The work closed between unit becomes relatively complicated, affects the normal job run duration.Therefore, how to build at short notice across More block device, it is ensured that power transmission line construction can be carried out with safe efficient.
At present, the power transmission line construction unit of early stage have accumulated the technology of various leap blocks, be with Phyllostachys pubescens Mazei ex H.de Lebaie frame tower earliest Block is carried out, but this method security reliability is relatively low;Later stage is to adopt steel construction, although improves safety, solve leap The difficulty of construction, but, the working time of block is longer.And, Phyllostachys pubescens Mazei ex H.de Lebaie crosses over block device and steel pipe crosses over block device very Difficulty is built, and builds across block installation area is larger and there is soil requisition and young crops compensation issue temporarily.
Utility model content
In view of this, main purpose of the present utility model is, there is provided a kind of to cross over block device, it is therefore an objective to provide a kind of Security reliability height, technical feasibility, easy construction, the leap block device of economical rationality.
To reach above-mentioned purpose, this utility model mainly provides following technical scheme:
This utility model provides a kind of across block device, and which includes:First block system and with the first block system Second block system of system specular, the first block system are predetermined distance with the second block system;It is described First block system includes:
Crossing frame;
Guide rail lift structure, the guide rail lift structure are arranged in the crossing frame;The guide rail lift structure can Move along the crossing frame;
Block structure, the first end of the block structure are rotated with the guide rail lift structure and are connected, for leading described Move along the crossing frame under the drive of rail lift structure;
Folding structure, the folding structure are connected to the second end of the crossing frame and the block structure, are used for When the block structure is moved to precalculated position along the crossing frame, the folding structure is in extended state, makes described The relatively described crossing frame of block structure is launched.
The purpose of this utility model and solve its technical problem and can also be applied to the following technical measures to achieve further.
Block device is crossed over as previously described, wherein, the crossing frame is configured to by two adjacent ribs sides of square framework The H type structure for extending.
Block device is crossed over as previously described, wherein, the crossing frame is configured to by cube frame and H type framework composition Form.
Block device is crossed over as previously described, wherein, the block structure includes two cantilever arms and multiple insulating bars, institute The two ends for stating insulating bar are connected with two cantilever arms respectively.
Block device crossed over as previously described, wherein, the cantilever arm is had rectangular section and is connected with the rectangular section Conical section;The rectangular section is connected with the crossing frame.
Block device is crossed over as previously described, wherein, the guide rail lift structure includes:
Guide rail, the guide rail are arranged in the crossing frame;
Lifting truck, the lifting truck are connected with the first end of the guide rail and the block structure respectively.
Block device is crossed over as previously described, wherein, the guide rail lift structure includes:
Guide slide mechanism, the guide slide mechanism are connected with the guide rail and the block structure respectively, for drawing Lead the block structure movement.
Block device is crossed over as previously described, wherein, the guide rail includes:
Straight rail, the straight rail are arranged along the first seamed edge of the crossing frame;
Ramp, one end of the ramp are connected with the straight rail, the other end of the ramp and the second of the crossing frame Seamed edge connects;
Wherein, first seamed edge is relative with second seamed edge.
Block device is crossed over as previously described, wherein, the guide rail also includes:
Curved track, the two ends of the curved track are connected with the straight rail and the ramp respectively.
Block device is crossed over as previously described, wherein, the folding structure includes:
Rise and fall rope, and described one end for rising and falling rope is connected with the second end of the block structure, the other end of the rope that rises and falls It is connected with the crossing frame;
Protection rope, it is described protection rope one end be connected with the middle part of the block structure, it is described protection rope the other end and The crossing frame connection.
By above-mentioned technical proposal, one kind that this utility model is provided at least has following advantages across block device:
The technical scheme that this utility model embodiment is provided is provided by the first block system and second of specular Block system, the guide rail lift structure in the first block system are arranged in crossing frame, and block structure is connected with guide rail lift structure Connect, folding structure connects crossing frame and block structure respectively so that when under drive of the block structure in guide rail lift structure along When crossing frame is moved to precalculated position, the block structure of the first block system is launched with respect to the crossing frame of the first block system, the The block structure of two block systems with respect to the second block system crossing frame launch so that the block structure of the first block system with The block structure docking of the second block system, so as to realize block.Compared with the leap that prior art, this utility model embodiment are provided The block device block time is shorter, security reliability is high, technical feasibility, easy construction, economical rationality.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model Art means, and being practiced according to the content of description, with preferred embodiment of the present utility model and coordinate accompanying drawing detailed below Describe in detail bright as after.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are Some embodiments of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, Can be with according to these other accompanying drawings of accompanying drawings acquisition.
The front view of the first structure of the leap block device that Fig. 1 is provided for this utility model embodiment;
The top view of the first structure of the leap block device that Fig. 2 is provided for this utility model embodiment;
The front view of block structure in the leap block device that Fig. 3 is provided for this utility model embodiment;
The side view of block structure in the leap block device that Fig. 4 is provided for this utility model embodiment;
The front view of second structure of the leap block device that Fig. 5 is provided for this utility model embodiment;
The knot of the first block system in second structure of the leap block device that Fig. 6 is provided for this utility model embodiment Structure schematic diagram.
Specific embodiment
Further to illustrate that this utility model is to reach technological means and effect that predetermined utility model purpose is taken, Below in conjunction with accompanying drawing and preferred embodiment, to according to the utility model proposes the specific embodiment of technical scheme, structure, spy Levy and its effect, describe in detail as after.In the following description, what different " embodiment " or " embodiment " referred to is not necessarily same One embodiment.Additionally, the special characteristic, structure or feature in one or more embodiments can be combined by any suitable form.
Such as the structural representation of the leap block device that Fig. 1 is provided for this utility model embodiment.With reference to Fig. 1 and Fig. 2 institutes Show, include across block device:First block system 1 and the second block system 2 with 1 specular of the first block system, the One block system 1 is predetermined distance with the second block system 2.Wherein, preset distance can be the width or height of highway The width of fast railway, when being embodied as, needs to set according to the actual requirements, and this utility model embodiment is not specifically limited.The One block system 1 includes:Crossing frame 11, guide rail lift structure 12, block structure 13 and folding structure 14.Guide rail lift structure 12 It is arranged in crossing frame 11.Guide rail lift structure 12 can be moved along crossing frame 11.The first end and guide rail of block structure 13 Lift structure 12 rotates connection, for moving along crossing frame 11 under the drive of guide rail lift structure 12.14 points of folding structure Second end of crossing frame 11 and block structure 13 is not connected to, for being moved to pre-determined bit along crossing frame 11 when block structure 13 When putting, folding structure 14 is in extended state, launches 13 relative crossing frame 11 of block structure.Wherein, precalculated position is first When the crossing frame 11 of the 13 relative first block system 1 of block structure of block system 1 is launched, the block with the second block system 2 When the crossing frame 11 of the relative second block system 2 of structure 13 is launched, the block structure 13 of the first block system 1 and the second block system The block structure 13 of system 2 is docked, now, position of the block structure 13 in crossing frame 11.
In the present embodiment, 2 specular of the first block system 1 and the second block system, in other words, the first block system System 1 is identical with the structure of the second block system 2, and the first block system 1 and the second block system 2 are oppositely arranged.In reality Using in, the first block system 1 and the second block system 2 are placed on the both sides in construction orientation, or, it is placed on height highway Both sides, or, the both sides of high-speed railway.Explanation is needed exist for, when the block structure 13 relative first of the first block system 1 When the crossing frame 11 of block system 1 is launched, the crossing frame of the 13 relative second block system 2 of block structure of the second block system 2 11 launch, and the block structure 13 of the first block system 1 is docked with the block structure 13 of the second block system 2.
In the present embodiment, the guide rail lift structure 12 in the first block system 1 is carried with the guide rail in the second block system 2 It can be an entirety to rise structure 12, so as to realize that the synchronization for controlling two block structures 13 by a guide rail lift structure 12 is carried Rise, synchronously incline, synchronously lodge and synchronous protection, simplify structure, realize the purpose automatically controlled across block.
This utility model embodiment is provided by the first block system 1 and the second block system 2 of specular, and first Guide rail lift structure 12 in block system 1 is arranged in crossing frame 11, and block structure 13 is connected with guide rail lift structure 12, is received Put structure 14 and connect crossing frame 11 and block structure 13 respectively so that when under drive of the block structure 13 in guide rail lift structure 12 When being moved to precalculated position along crossing frame 11, the leap of the 13 relative first block system 1 of block structure of the first block system 1 Frame 11 launches, and the crossing frame 11 of the 13 relative second block system 2 of block structure of the second block system 2 is launched so that the first envelope The block structure 13 of net system 1 is docked with the block structure 13 of the second block system 2, so as to realize block.Compared with prior art, this Utility model embodiment provide the leap block device block time it is shorter, security reliability is high, technical feasibility, easy construction, Economical rationality.
Further, the crossing frame 11 described in above-mentioned utility model embodiment is configured to by the two adjacent of square framework The H type structure that seamed edge extends.In the present embodiment, crossing frame 11 using across large-scale, important leap thing frequently with group Qualified constitutional formula crossing frame 11, with stability it is strong, bracing wire dependency degree is low, anti-broken string ability strong, mechanized construction degree is high, speed Spend fast and low cost and other advantages.In the specific implementation, the main trestle column of 11 pillar of crossing frame is 13 meters, and horizontally-arranged spacing is 13 meters, often Duan Gaodu is 6 meters.In actual applications, increase mast on the main row's column of the second row of crossing frame 11, install on mast top and lead Rail lift structure 12, carries out lodge control and protection to block structure 13 by folding structure 14, and the top of mast adopts taper Column.In order to share impulsive force suffered by block structure 13,11 stress of overall crossing frame is lifted, increase horizontal on both sides mast top Beam, beam height exceed the tip height of block structure 13, and 13 apex distance of block structure is 11.7 meters to the maximum, and mast height is designed as 13 meters, beam height is 12.5 meters, can reach 50 meters of spans, can meet the crossing construction of most railways or highway. In actual applications, the assembling of crossing frame 11 can be installed without the need for crane so that group by carrying out erection & lift from lifting pole ETL estimated time of loading is quick, easy construction.Preferably, in order that the foundation of crossing frame 11 is consolidated, described in above-mentioned utility model embodiment Crossing frame 11 be configured to be formed by cube frame and H type framework composition.The leap block that this utility model embodiment is provided Device, by the crossing frame 11 for adopting combination lattice frame, Stability Analysis of Structures, intensity are higher, anti-broken string impact capacity is significantly improved, pacified Full reliability is high.Meanwhile, the assembling of crossing frame 11 is without the need for crane, it is adaptable to various orographic conditions.
Further, with reference to shown in Fig. 3 and Fig. 4, the block structure 13 described in above-mentioned utility model embodiment includes two Individual cantilever arm 131 and multiple insulating bars 132, the two ends of insulating bar 132 are connected with two cantilever arms 131 respectively.Wherein, cantilever arm 131 have rectangular section and the conical section being connected with rectangular section, and rectangular section is connected with crossing frame 11.The sectional dimension of rectangular section is 600mm × 600mm, the material of rectangular section is aluminum alloy materials.The material of conical section is insulant.Cantilever arm 131 is wound with Epoxy resin fiberglass winding pipe.In actual applications, the single-unit length of conical section can be saved using 5 meters, the list of rectangular section Section length can be saved using 6 meters.Certainly, the single-unit length of rectangular section and conical section can adopt other sizes, for example, 3 meters section, 4 meters of sections or 5 meters of sections.Concrete to need to be chosen according to actual landform, this utility model embodiment is not specifically limited.Require supplementation with It is, in rectangular section and conical section, to be connected using flange between each section.Wherein, insulating bar 132 is twined using epoxy resin fiberglass Around pipe, 50 × 10 × 10000mm of specification Φ.Assembling when, as cantilever arm 131 is lifted, by cantilever arm 131 it is top successively according to Every 2 meter ampere fills 1 insulating bar 132.The leap block device block provided in this utility model embodiment is screened reliability, model of screening Enclose wider.Meanwhile, cantilever arm 131 and insulating bar 132 adopt glass steel material, greatly alleviate the weight across block device Amount so that across block device good insulating, convenient transportation.
Further, the guide rail lift structure 12 described in above-mentioned utility model embodiment includes:Guide rail 121 and lifting are little Car 122.Guide rail 121 is arranged in crossing frame 11, and lifting truck 122 is connected with the first end of guide rail 121 and block structure 13 respectively Connect.That is, lifting truck 122 is connected with the top of the mast in crossing frame 11.Block process is:Folding structure 14 and envelope The cantilever arm 131 of web frame 13 connects, and in 131 lifting process of cantilever arm, multiple insulating bars 132 are sequentially arranged at cantilever arm 131 On, and construction section is locked, until cantilever arm 131 is all assembled and is finished.After the assembling of cantilever arm 131 is finished, lifted little Car 122 is connected with the cone section of the cantilever arm 131 of block structure 13, and lifting truck 122 is carried to cantilever arm 131 by motor Rise, while loosening folding structure 14,131 relative crossing frame 11 of cantilever arm is launched (lodge), up to stretching for the first block system 1 The cantilever arm 131 for going out arm 131 with the second block system 2 is overlapped, so as to complete block.Therefore, carry in this utility model embodiment For leap block device can realize fast construction, quick close-up, simple to operate, efficiency is higher.
When being embodied as, the guide rail 121 described in above-mentioned utility model embodiment includes:Straight rail 1211 and ramp 1212. Straight rail 1211 is arranged along the first seamed edge of crossing frame 11.One end of ramp 1212 is connected with straight rail 1211, ramp 1212 it is another One end is connected with the second seamed edge of crossing frame 11.Wherein, the first seamed edge is relative with the second seamed edge.In order that straight rail 1211 and ramp Seamlessly transit between 1212, it is preferred that with reference to shown in Fig. 5 and Fig. 6, the guide rail 121 described in above-mentioned utility model embodiment is also Including:Curved track 1213.The two ends of curved track 1213 are connected with straight rail 1211 and ramp 1212 respectively.In actual applications, directly Rail 1211 adopts rack-track, for the lodging and recovery of cantilever arm 131.
Further, in order that cantilever arm 131 slides along guide rail 121, leading described in above-mentioned utility model embodiment Rail lift structure 12 includes:Guide slide mechanism 123.Guide slide mechanism 123 is connected with guide rail 121 and block structure 13 respectively Connect, for guiding block structure 13 to move.In other words, guide slide mechanism 123 is arranged on guide rail 121, is oriented to skate machine Structure 123 is locked with the cantilever arm 131 of block structure 13, it is ensured that guide slide mechanism 123 guides cantilever arm 131 on guide rail 121 It is mobile.During cantilever arm 131 is lifted, guide slide mechanism 123 is moved along curved track 1213, cantilever arm 131 Start lodging under the guiding of guide slide mechanism 123.When guide slide mechanism 123 reaches the top of ramp 1212, it is oriented to Slide mechanism 123 is locked with ramp 1212, and guide slide mechanism 123 is separated with cantilever arm 131, and cantilever arm 131 is continued to lift up, directly Cantilever arm 131 to the first block system 1 is overlapped with the cantilever arm 131 of the second block system 2, so as to complete block.
Further, the folding structure 14 described in above-mentioned utility model embodiment includes:Rise and fall rope 141 and protection rope 142.One end of fluctuating rope 141 is connected with the second end of block structure 13, and the other end of the rope 141 that rises and falls is connected with crossing frame 11. One end of protection rope 142 is connected with the middle part of block structure 13, and the other end of protection rope 142 is connected with crossing frame 11.
It should be noted that word "comprising" does not exclude the presence of part not listed in the claims or component.Positioned at part Or the word "a" or "an" before component does not exclude the presence of multiple such parts or component.Word first, second, and Third use does not indicate that any order.These words can be construed to title.
Above example only to illustrate the technical solution of the utility model, rather than a limitation;Although with reference to aforementioned reality Apply example to be described in detail this utility model, it will be understood by those within the art that:Which still can be to front State the technical scheme described in each embodiment to modify, or equivalent is carried out to which part technical characteristic;And these Modification is replaced, and does not make the essence of appropriate technical solution depart from the spirit and model of each embodiment technical scheme of this utility model Enclose.

Claims (10)

1. it is a kind of to cross over block device, it is characterised in that to include:First block system and with the first block system image pair The the second block system for claiming, the first block system are predetermined distance with the second block system;First block System includes:
Crossing frame;
Guide rail lift structure, the guide rail lift structure are arranged in the crossing frame;The guide rail lift structure can be along The crossing frame movement;
Block structure, the first end of the block structure are rotated with the guide rail lift structure and are connected, for carrying in the guide rail Rise;
Folding structure, the folding structure are connected to the second end of the crossing frame and the block structure, for working as State block structure along the crossing frame be moved to precalculated position when, the folding structure be in extended state, make the block The relatively described crossing frame of structure is launched.
2. leap block device according to claim 1, it is characterised in that the crossing frame is configured to by square framework Two adjacent ribs sides extend H type structure.
3. leap block device according to claim 1, it is characterised in that the crossing frame is configured to by cube frame Form with H type framework composition.
4. the leap block device according to Claims 2 or 3, it is characterised in that the block structure includes that two are stretched out Arm and multiple insulating bars, the two ends of the insulating bar are connected with two cantilever arms respectively.
5. leap block device according to claim 4, it is characterised in that the cantilever arm have rectangular section and with it is described The conical section of rectangular section connection;The rectangular section is connected with the crossing frame.
6. leap block device according to claim 1, it is characterised in that the guide rail lift structure includes:
Guide rail, the guide rail are arranged in the crossing frame;
Lifting truck, the lifting truck are connected with the first end of the guide rail and the block structure respectively.
7. leap block device according to claim 6, it is characterised in that the guide rail lift structure includes:
Guide slide mechanism, the guide slide mechanism are connected with the guide rail and the block structure respectively, for guiding State the movement of block structure.
8. leap block device according to claim 6, it is characterised in that the guide rail includes:
Straight rail, the straight rail are arranged along the first seamed edge of the crossing frame;
Ramp, one end of the ramp are connected with the straight rail, the second seamed edge of the other end of the ramp and the crossing frame Connection;
Wherein, first seamed edge is relative with second seamed edge.
9. leap block device according to claim 8, it is characterised in that the guide rail also includes:
Curved track, the two ends of the curved track are connected with the straight rail and the ramp respectively.
10. leap block device according to claim 1, it is characterised in that the folding structure includes:
Fluctuating rope, described one end for rising and falling rope are connected with the second end of the block structure, the other end and institute restricted that rise and fall State crossing frame connection;
Protection rope, it is described protection rope one end be connected with the middle part of the block structure, it is described protection restrict the other end with it is described Crossing frame connects.
CN201621161599.8U 2016-11-01 2016-11-01 Stride across block device Active CN206108848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621161599.8U CN206108848U (en) 2016-11-01 2016-11-01 Stride across block device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621161599.8U CN206108848U (en) 2016-11-01 2016-11-01 Stride across block device

Publications (1)

Publication Number Publication Date
CN206108848U true CN206108848U (en) 2017-04-19

Family

ID=58527203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621161599.8U Active CN206108848U (en) 2016-11-01 2016-11-01 Stride across block device

Country Status (1)

Country Link
CN (1) CN206108848U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106586921A (en) * 2016-11-01 2017-04-26 国家电网公司 Crossing block device
CN107317290A (en) * 2017-06-19 2017-11-03 天津送变电工程公司 A kind of stay cable type block structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106586921A (en) * 2016-11-01 2017-04-26 国家电网公司 Crossing block device
CN107317290A (en) * 2017-06-19 2017-11-03 天津送变电工程公司 A kind of stay cable type block structure

Similar Documents

Publication Publication Date Title
CN203377546U (en) High speed railway spanning construction apparatus
CN105236277A (en) Full-automatic electrified net blocking trolley and net blocking method thereof
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN105226560B (en) A kind of crossing frame and its construction method
CN104164833A (en) Telescopic emergency bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN206108848U (en) Stride across block device
CN104909312A (en) Electric operating vehicle
CN106586921A (en) Crossing block device
CN106486924A (en) A kind of power circuit wire-binding device in leap river
CN205429566U (en) Crossing structure
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN106654993A (en) Power transmission line erecting apparatus
CN110184898A (en) The steel skeleton segment of Cable stayed Bridge Main Tower anchorage zone and king-post construction method
CN203833394U (en) Labor-saving winding tool flexible in winding and unwinding
CN205170216U (en) Full -automatic electrified block car
CN206438353U (en) A kind of traveling process becomes across track-laying machine automatically
CN204983693U (en) Hoist device slides in mountain area corridor truss high altitude
CN206364443U (en) A kind of block structure
CN206108640U (en) Crossing structure with guide rail lift system
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN112310885A (en) Automatic combination crossing system
CN204727562U (en) A kind of electric power operation car
CN107780689A (en) A kind of intelligent three-dimensional parking apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant