Prior art keywords
broken
elevating conveyor
sliding rack
conveyor according
middle frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621060887.4U
Other languages
Chinese (zh)
Inventor
原长锁
谷丽东
吴涛
薛军
张小峰
曹为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Taiyuan Institute of China Coal Technology and Engineering Group
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Taiyuan Institute of China Coal Technology and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Shendong Coal Group Co Ltd, Taiyuan Institute of China Coal Technology and Engineering Group filed Critical China Shenhua Energy Co Ltd
Priority to CN201621060887.4U priority Critical patent/CN206091986U/en
Application granted granted Critical
Publication of CN206091986U publication Critical patent/CN206091986U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a broken elevating conveyor. Broken elevating conveyor includes the chassis, the chassis includes a well structure of an essay and is used for the drive the track of well structure of an essay motion, the track sets up the both sides of a well structure of an essay, the frame slides, a slidable ground setting of sliding is in on the well structure of an essay, material portion receives, receive material portion articulate in slide and put up, it is used for receiving the first feed inlet of material and the first discharge gate of discharge material to receive to be provided with in the material portion, breakage portion, breakage portion is fixed slide and put up, breakage portion is including second feed inlet and second discharge gate, the second feed inlet with first discharge gate is connected, an area of unloading for unloading the material, the second discharge gate is located the top of unloading and taking. The utility model provides a broken elevating conveyor, improved receive material portion receive the material scope, improved the problem that coal falls outward, reduced artifical intensity of labour, has improved and has reprinted and crushing efficiency.

Description

Broken elevating conveyor
Technical field
This utility model is related to underground transportation technical field, more particularly to a kind of broken elevating conveyor.
Background technology
The supporting heading equipment of broken elevating conveyor is used, and realizes the primary breakup to coal, it is ensured that continuative transport.
In prior art, the feeding part of the broken elevating conveyor of traditional crawler type receives the coal from pick anchor transporter Afterwards, the material under being connect by scraper chain is realized broken and transported.Above-mentioned set-up mode has the following disadvantages:First, due to receiving Shovel board in material portion is fixed on chassis, it is impossible to from line slip, therefore is difficult to entangle when broken elevating conveyor splicing scope is improper Just, the cycle of operation number of times for increasing broken elevating conveyor is needed, the purpose that the material feeding of broken elevating conveyor is all reprinted could be realized, caused Reprint and crushing efficiency is low;Second, because anchor driving machine coal breakage amount is big, inappropriate material feeding scope often resulted in and fall now outside coal As, continuative transport is affected, reduce the drivage efficiency of anchor driving machine;3rd, broken elevating conveyor does not have the function of cleaning float coal, makes In the process of walking float coal accumulation is excessive in base plate for forming apparatus, and working condition is deteriorated, mobile difficult, and well ore deposit labor cleaning is floating Coal, needs personnel many, high labor intensive, increased the management difficulty and potential safety hazard of well industrial and mineral.
Therefore, it is necessary to solve above-mentioned technical problem.
Utility model content
This utility model provides a kind of broken elevating conveyor, to solve problems of the prior art, improves feeding part Material feeding scope, improves the problem fallen outside coal, reduces hand labor intensity, improves and reprints and crushing efficiency, increases anchor driving machine Drivage efficiency, improves drivage efficiency, increases driving safety.
This utility model provides a kind of broken elevating conveyor, including chassis, and the chassis includes middle frame and for driving The crawler belt of the dynamic middle frame motion, the crawler belt is arranged on the both sides of the middle frame;Sliding rack, the sliding rack can be slided It is arranged on dynamicly on the middle frame;Feeding part, the feeding part is articulated with the sliding rack, is provided with the feeding part For receiving the first charging aperture of material and discharging the first discharging opening of material;Broken portion, the broken portion is fixed on the cunning Move on frame, the broken portion includes second charging aperture and the second discharging opening, the second charging aperture and the first discharging opening phase Connection;For the material strip that unloads of unloading materials, second discharging opening is located at the top for unloading material strip.
Elevating conveyor is crushed as above, preferably:The broken elevating conveyor also includes described unloading material strip for driving Driving means, the driving means are arranged in the sliding rack, and the outfan of the driving means drives with the material strip that unloads Connection.
Elevating conveyor is crushed as above, preferably:The driving means include drive motor and sprocket wheel, the driving horse Up to being rotatably connected with the sliding rack, the sprocket wheel is connected by rotary shaft with the drive motor, the rotation of the sprocket wheel The rotation axis coincident of axis and the drive motor outfan, the material strip that unloads is set on the sprocket wheel.
Elevating conveyor is crushed as above, preferably:Slide rail is provided with the middle frame, is offered in the sliding rack Slip hole, the slide rail is slidably disposed in the slip hole.
Elevating conveyor is crushed as above, preferably:The quantity of the slide rail is two, and the quantity of the slip hole is two Individual, two slide rails are located in respectively in two slip holes.
Elevating conveyor is crushed as above, preferably:The broken elevating conveyor also includes hoist cylinder, the hoist cylinder First end be connected with the feeding part, the second end of the hoist cylinder is connected with the sliding rack, it is described lifting oil The first end of cylinder is along the scalable setting in direction away from the chassis.
Elevating conveyor is crushed as above, preferably:The broken elevating conveyor also includes passage oil cylinder, the passage oil cylinder First end be connected with the sliding rack, the second end of the passage oil cylinder is connected with the middle frame, it is described passage oil The scalable setting of first end of cylinder.
Elevating conveyor is crushed as above, preferably:The broken portion includes broken motor, broken shaft and crushes to cut Tooth, the broken pick is fixed on the axial plane of the broken shaft, and the broken motor is rotatably connected with the broken shaft.
Elevating conveyor is crushed as above, preferably:The discharge is connected with the sliding rack by bearing pin.
Elevating conveyor is crushed as above, preferably:The discharging takes and is provided with dust excluding hood.
The broken elevating conveyor provided using this utility model, can produce following beneficial effect:Improve receiving for feeding part Material scope, improves the problem fallen outside coal, reduces hand labor intensity, improves reprinting and crushing efficiency, increased pick The drivage efficiency of windlass, improves drivage efficiency, increases driving safety.Simultaneously tunnel float coal is carried out clearly by feeding part shovel board Reason, reduces the operating resistance of equipment, reduces underground labour's labor intensity.
Description of the drawings
Preferred embodiment in the present invention will be described in detail by accompanying drawing below, it will help understand the purpose of the present invention and excellent Point, wherein:
First schematic diagram of the broken elevating conveyor structure that Fig. 1 is provided for this utility model preferred embodiment.
Second schematic diagram of the broken elevating conveyor structure that Fig. 2 is provided for this utility model preferred embodiment.
The structural representation of the sliding rack that Fig. 3 is provided for this utility model preferred embodiment.
Specific embodiment
This utility model is described in detail with reference to embodiment.Wherein identical parts identical accompanying drawing mark Note is represented.It should be noted that the word "front", "rear", "left", "right", "up" and "down" used in describing below is referred to Direction in accompanying drawing, word " interior " and " outward " refer respectively to the direction towards or away from particular elements geometric center.
First schematic diagram of the broken elevating conveyor structure that Fig. 1 is provided for this utility model preferred embodiment, Fig. 2 is this practicality Second schematic diagram of the broken elevating conveyor structure that new preferred embodiment is provided.
As shown in Figure 1 to Figure 2, this utility model provides a kind of broken elevating conveyor, including chassis 1, feeding part 2, broken Portion 3, unload material strip 4 and sliding rack 5.
Referring to Fig. 1 to Fig. 3, the chassis 1 includes middle frame 12 and for driving the middle frame 12 to move Crawler belt 11, the crawler belt 11 is arranged on the both sides of the middle frame 12;The sliding rack 5 is slidably disposed on the centre On frame 12;The feeding part 2 is articulated with the sliding rack 5, for receiving material first is provided with the feeding part 2 and is entered First discharging opening of material mouth and discharge material;The broken portion 3 is fixed in the sliding rack 5, and the broken portion 3 includes second Charging aperture and the second discharging opening, the second charging aperture is connected with first discharging opening;It is described to unload material strip 4 for unloading Material, second discharging opening is located at the top for unloading material strip 4.
Used as a preferred embodiment, the crawler belt 11 arranged on chassis 1 is rotatably connected with middle frame 12, and crawler belt 12 rotates Motion can drive middle frame 12 to move forward, and then drive broken elevating conveyor to move forward therewith.Sliding rack 5 is slippingly arranged on On middle frame 12, feeding part 2 is hinged in sliding rack 5, can in the horizontal direction be carried out on middle frame 12 jointly with sliding rack 5 It is mobile.Simultaneously feeding part 2 can be making feeding part 2 relative to sliding rack 5 and sliding rack 5 between by elastic component or hoist cylinder In the vertical direction produces the motion of lifting.Feeding part 2 can move (herein upper and lower in up and down and back and forth direction It is upper and lower in finger Fig. 1, the left and right in Fig. 1 is referred in front and back), feeding part 2 can be made during sliding, tunnel float coal is cleared up, reduce The resistance that broken elevating conveyor advances, increased driving safety, the labor intensity needed for labor cleaning be reduced, while can move State ground adjusts the position of first charging aperture, for accurately receiving the coal cinder excavated from anchor driving machine, improves material feeding scope, increases Add the percentage ratio of material feeding, improve the problem fallen outside coal.The broken portion 3 for arranging can be fast by the material such as coal cinder for entering etc. Speed is transferred out after crushing by unloading material strip 4, and unload material strip 4 effectively can will trickle down coal cinder fortune thereon from the second discharging opening Transport on leather belt reshipment machine, complete the process of coal breaker reprinting.Wherein feeding part 2, broken portion 3 and unload the nothing of material strip 4 Seam docking, increased the broken of coal cinder and reprints efficiency, and then improve the drivage efficiency of anchor driving machine, and wherein feeding part 2 can be with Including by shovel.
Preferably, the broken elevating conveyor is also included for driving the driving means 42 for unloading material strip 4, described driving to fill Put 42 to be arranged in the sliding rack 5, the outfan of the driving means 42 unloads the drive connection of material strip 4 with described.Driving means 42 drives are unloaded material strip and are rotated on the outfan of driving means 42, and the material unloaded on material strip 4 is transported from the second discharging opening To leather belt reshipment machine, the loading chute of material is completed.Unload material strip 42 and can also be scraper chain, scraper chain is steel chain, is had Larger strength and stiffness, can increase ability of the scraper chain by coal cinder impact, increased the service life of scraper chain.
Further, the driving means 42 include drive motor and sprocket wheel 44, the drive motor and the sliding rack 5 It is rotatably connected, the sprocket wheel 44 is connected by rotary shaft 43 with the drive motor, the rotation axiss of the sprocket wheel 44 and institute The rotation axis coincident of drive motor outfan is stated, the material strip 4 that unloads is set on the sprocket wheel 44.Drive motor is to rotary shaft 43 driving forces for producing, drive rotary shaft 43 to drive sprocket wheel 44 bonded therewith to rotate, and sprocket wheel 44 drives that what is closed to unload material strip 4 operations are transported to coal on leather belt reshipment machine.Wherein, driving means 42 can also include conveying decelerator, convey decelerator The both sides for unloading material strip are arranged symmetrically in, the power of drive motor transmission is remake in rotary shaft 43 through conveying decelerator.It is defeated Send decelerator using Dual Drive induction system, increased the conveying capacity for unloading material strip 4.
The structural representation of the sliding rack that Fig. 3 is provided for this utility model preferred embodiment.
Referring to Fig. 1 to Fig. 3, it is preferred that being provided with slide rail 13 on the middle frame 12, open in the sliding rack 5 Slip hole 51 is provided with, the slide rail 13 is slidably disposed in the slip hole 51.The inwall of slip hole 51 and slide rail 13 Outer wall gap coordinates, and the sliding on slide rail 13 of slip hole 51 further realizes Relative sliding of the sliding rack 5 relative to middle frame 12.
Further, the quantity of the slide rail 13 is two, and the quantity of the slip hole 51 is two, two slide rails 13 are located in respectively in two slip holes 51.The quantity of slide rail 13 is arranged to two, can increase slip hole 51 in slide rail The smoothness of sliding on 13, makes sliding rack 5 directly straddle on slide rail 13, and enters line slip with slide rail 13 relatively.
Used as a preferred implementation process, the broken elevating conveyor also includes hoist cylinder 6, the hoist cylinder 6 First end is connected with the feeding part 2, and the second end of the hoist cylinder 6 is connected with the sliding rack 5, the lifting oil Cylinder 6 is along the scalable setting in direction away from the chassis.Hoist cylinder 6 is feeding part 2 in the above-below direction (upper and lower in Fig. 1 To) swing and carry out the power source of position adjustment.When hoist cylinder 6 stretches out, feeding part 2 is moved towards the direction away from chassis 1, is realized The technique effect of rise;When hoist cylinder 6 is retracted, feeding part 2 is moved towards the direction near chassis 1, realizes the technology effect for declining Really.
Further, the broken elevating conveyor also includes passage oil cylinder 7, the first end of the passage oil cylinder 7 and the cunning Move frame 5 to be connected, the second end of the passage oil cylinder 7 is connected with the middle frame 12, and the first end of the passage oil cylinder 7 can It is flexible to arrange.Passage oil cylinder 7 drives sliding to move in the enterprising line slip of slide rail 13, drives reliable and stable.
Further, the broken portion 3 includes broken motor 31, broken shaft and broken pick, and the broken pick is consolidated It is scheduled on the axial plane of the broken shaft, the broken motor 31 is rotatably connected with the broken shaft.The discharging opening of broken portion 3 and second Between be provided with bolt hole for blanking, particle size after cracking can be adjusted by the size in regulating bolt hole.May be used also in broken portion 3 To be provided with broken decelerator, ensure to crush by way of adding adjust pad in installation bolt on broken motor 31 The relevant position of motor 31 and broken decelerator is required.The broken decelerators of power Jing of the output of broken motor 31 are applied to broken shaft On, broken shaft drives broken pick rotation, and the coal cinder that scraper chain is shipped is crushed, and broken shaft two ends pass through aligning roller axle Support is held, bearing block is arranged in broken portion 3 by bolt-connection, and broken shaft has higher intensity and machining accuracy, crushes Axle can bear greater impact load in shattering process.
Further, the discharge 4 is connected with the sliding rack 5 by bearing pin.Specifically, set in discharge 4 Installing rack is equipped with, installing hole is offered on installing rack, connecting hole is offered in sliding rack 5, after installing hole and connecting hole alignment, pin Axle wears and be attached wherein fixation.
Preferably, described unloading be provided with dust excluding hood on material strip 4.Unloading the dust excluding hood arranged on material strip 4 can effectively by coal The dust escaped in block is limited to dust cover and unloads in the space that material strip 4 is defined, and can effectively purify environment on coalface.
Additionally, broken elevating conveyor also includes hydraulic means 8 and electric device.Wherein, hydraulic means 8 also includes that walking is single Unit, delivery unit and centralized lubrication unit, to ensure that broken elevating conveyor is normally walked.Electric device includes that mine explosion-suppression is simultaneous Safety electric control box, flame-proof mine LED locomotive illuminators, mining vehicular methane monitor breaker, mine explosion-suppression and peace Holotype remote-control transmitting reception system, mine permissible type combination hands free telephone and mine permissible type plug-type temperature sensor, are used for There is provided electric power to support.
The broken elevating conveyor that this utility model is provided, improves the material feeding scope of feeding part 2, improves asking of falling outside coal Topic, reduces hand labor intensity, improves reprinting and crushing efficiency, increased the drivage efficiency of anchor driving machine, improves driving effect Rate, increases driving safety.Simultaneously tunnel float coal is cleared up by feeding part 2, reduce the operating resistance of equipment, dropped Low underground labour's labor intensity.
Finally it should be noted that:Above example only to illustrate the technical solution of the utility model, rather than a limitation; Although being described in detail to this utility model with reference to the foregoing embodiments, it will be understood by those within the art that: It still can modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc. With replacement;And these modifications or replacement, do not make each embodiment technology of essence disengaging this utility model of appropriate technical solution The scope of scheme.

Claims (10)

1. a kind of broken elevating conveyor, it is characterised in that include:
Chassis, the chassis includes middle frame and the crawler belt for driving the middle frame motion, and the crawler belt is arranged on institute State the both sides of middle frame;
Sliding rack, the sliding rack is slidably disposed on the middle frame;
Feeding part, the feeding part is articulated with the sliding rack, be provided with the feeding part for receive material first First discharging opening of charging aperture and discharge material;
Broken portion, the broken portion is fixed in the sliding rack, and the broken portion includes second charging aperture and the second discharging opening, The second charging aperture is connected with first discharging opening;
For the material strip that unloads of unloading materials, second discharging opening is located at the top for unloading material strip.
2. broken elevating conveyor according to claim 1, it is characterised in that:The broken elevating conveyor is also included for driving State the driving means for unloading material strip, the driving means are arranged in the sliding rack, the outfan of the driving means with it is described Unload material strip drive connection.
3. broken elevating conveyor according to claim 2, it is characterised in that:The driving means include drive motor and chain Wheel, the drive motor is rotatably connected with the sliding rack, and the sprocket wheel is connected by rotary shaft with the drive motor, institute The rotation axiss of sprocket wheel and the rotation axis coincident of the drive motor outfan are stated, the material strip that unloads is set in the sprocket wheel On.
4. broken elevating conveyor according to claim 1, it is characterised in that:Slide rail, the cunning are provided with the middle frame Move on frame and offer slip hole, the slide rail is slidably disposed in the slip hole.
5. broken elevating conveyor according to claim 4, it is characterised in that:The quantity of the slide rail is two, the sliding The quantity in hole is two, and two slide rails are located in respectively in two slip holes.
6. broken elevating conveyor according to claim 1, it is characterised in that:The broken elevating conveyor also includes hoist cylinder, The first end of the hoist cylinder is connected with the feeding part, and the second end of the hoist cylinder is connected with the sliding rack Connect, the first end of the hoist cylinder is along the scalable setting in direction away from the chassis.
7. broken elevating conveyor according to claim 1, it is characterised in that:The reprinting disintegrating machine also includes passage oil cylinder, The first end of the passage oil cylinder is connected with the sliding rack, and the second end of the passage oil cylinder is connected with the middle frame Connect, the scalable setting of first end of the passage oil cylinder.
8. the broken elevating conveyor according to claim 1-7 any one, it is characterised in that:The broken portion includes broken electricity Machine, broken shaft and broken pick, the broken pick is fixed on the axial plane of the broken shaft, the broken motor and institute State broken shaft to be rotatably connected.
9. the broken elevating conveyor according to claim 1-7 any one, it is characterised in that:The discharge and the sliding Frame is connected by bearing pin.
10. the broken elevating conveyor according to claim 1-7 any one, it is characterised in that:The discharging takes and is provided with Dust excluding hood.
CN201621060887.4U 2016-09-18 2016-09-18 Broken elevating conveyor Active CN206091986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621060887.4U CN206091986U (en) 2016-09-18 2016-09-18 Broken elevating conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621060887.4U CN206091986U (en) 2016-09-18 2016-09-18 Broken elevating conveyor

Publications (1)

Publication Number Publication Date
CN206091986U true CN206091986U (en) 2017-04-12

Family

ID=58480015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621060887.4U Active CN206091986U (en) 2016-09-18 2016-09-18 Broken elevating conveyor

Country Status (1)

Country Link
CN (1) CN206091986U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113695056A (en) * 2021-08-09 2021-11-26 山东邦迈智能科技有限公司 Multifunctional anchor-guard transshipment crusher

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113695056A (en) * 2021-08-09 2021-11-26 山东邦迈智能科技有限公司 Multifunctional anchor-guard transshipment crusher

Similar Documents

Publication Publication Date Title
US8985704B2 (en) Continuous-extraction mining system
CN101598018B (en) Alpine bolter miner back affiliating travel type breaking and transhipping continuous transporting device
AU2013372975B2 (en) Continuous-extraction mining system
CN111322074A (en) Comprehensive continuous coal mining system and process method for open pit mine
WO2024125076A1 (en) Seven-arm anchor support, transfer and crushing machine
CN111013736A (en) Mobile Screening and Crushing Integrated Machine for Tunneling in Jinggong Coal Mine
CN105201512A (en) Lateral type double-drum opencast machine
CN206091986U (en) Broken elevating conveyor
US20220162941A1 (en) Vehicle and Process for Moving Coarse Ore
CN201439059U (en) Crawler type receiving and reloading crusher
JP7202789B2 (en) tail pulley device
CN106629134A (en) Underground mine continuous ore drawing equipment
US20130214585A1 (en) Continuous-extraction mining system
CN212317990U (en) Comprehensive continuous coal mining system for open pit mine
CN210858713U (en) Mining engineering is with ore chisel to get conveyor
US20140286738A1 (en) Continuous-extraction mining system
CN202876924U (en) Movable crushing station and support travelling device thereof
CN212142828U (en) Movable screening and crushing integrated machine for underground coal mine crossheading
CN106882195A (en) Apply the full-automatic coal crushing transport vehicle on rail
AU2015200488C1 (en) Continuous-extraction mining system
CN219622741U (en) Waste rock throwing and filling system for short roadway
CN201753209U (en) Mining rake-loader
CN118462177A (en) A complete set of equipment for continuous mining and loading of coal in open-pit coal mines and its use method
CN113898352A (en) Broken integration robot of four-arm intelligence anchor fortune

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant