CN206090827U - Have embedded steel construction of bathroom precast floor plank assembly house - Google Patents
Have embedded steel construction of bathroom precast floor plank assembly house Download PDFInfo
- Publication number
- CN206090827U CN206090827U CN201620960195.9U CN201620960195U CN206090827U CN 206090827 U CN206090827 U CN 206090827U CN 201620960195 U CN201620960195 U CN 201620960195U CN 206090827 U CN206090827 U CN 206090827U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- layer
- embedded
- groups
- prefabricated floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本实用新型公开了钢结构住宅技术领域的一种带有卫生间预制楼板嵌入式钢结构装配住宅,包括三组平行设置的H型钢立柱,三组所述H型钢立柱的底部设置有住宅地基,三组所述H型钢立柱的外壁中央位置设置有嵌入卡座,整套住宅构件采用标准化设计,工厂统一化生产,保证施工工艺及质量,嵌入式钢结构装配卫生间预制楼板和房间预制楼板,以替代传统的现浇式混凝土楼板,既提高装配效率,又能保证卫生间管线的铺设,本实用新型结构简单,设计合理,工业化程度高,施工周期短,自重轻,造价便宜,空间利用率大,抗震性能好,安全性能高,建筑造型丰富,装修方便,使用寿命长,具有良好的市场前景。
The utility model discloses a prefabricated floor slab embedded steel structure assembly house with toilets in the technical field of steel structure houses, comprising three groups of H-shaped steel columns arranged in parallel, the bottoms of the three groups of H-shaped steel columns are provided with residential foundations, three The central position of the outer wall of the H-shaped steel column mentioned in the group is equipped with an embedded card seat. The whole set of residential components adopts a standardized design, and the factory uniformly produces to ensure the construction process and quality. The cast-in-place concrete floor slab can not only improve the assembly efficiency, but also ensure the laying of bathroom pipelines. The utility model has the advantages of simple structure, reasonable design, high degree of industrialization, short construction period, light weight, low cost, large space utilization rate, and good seismic performance. Good, high safety performance, rich architectural shapes, convenient decoration, long service life, and good market prospects.
Description
技术领域technical field
本实用新型涉及钢结构住宅技术领域,具体为一种带有卫生间预制楼板嵌入式钢结构装配住宅。The utility model relates to the technical field of steel structure houses, in particular to a steel structure assembly house with a prefabricated floor plate embedded in a bathroom.
背景技术Background technique
目前,市场上的钢结构住宅技术主要有三种:一种是低层轻钢龙骨住宅技术;第二种是中高层钢结构支撑体系+砌块墙体;第三种是中高层钢结构支撑体系+轻质墙板技术;第一种技术相对比较成熟,但由于主结构采用冷弯薄壁型钢承载能力有限不太适合做多层、高层建筑,难以大规模推广。第二种由于存在大量现场砌筑工作,与建筑产业化的理念相去甚远,不符合未来的发展方向。第三种技术仍在发展中也远未成熟,还存在一些技术上的问题,它的最大的问题是由于内外墙采用均采用灌浆轻质墙板,在于主结构连接处容易产生由结构位移引起的裂缝,这一现象在一些高层住宅建筑中特别易于发生,在已建成一些试点小区,这种问题比较突出。除一述三种结构外,还有一种嵌入式钢结构装配化建筑体系,它是一种绿色新型装配式钢结构建筑体系它基于模数化的“双模数”协调及“模块组合”技术为建筑主要特征和以嵌入式钢结构、PC大板等为特点的工业化建筑技术体系,该技术贯穿于建筑(住宅)的设计、加工、安装、设备安装、装饰装修、智能家居等全过程,实现了房屋建造全过程的工业化、集约化和社会化,但是现有的嵌入式钢结构装配住宅还存在着卫生间的楼板没有从新定制,还需后续施工处理的问题,为此,我们提出了一种带有卫生间预制楼板嵌入式钢结构装配住宅。At present, there are mainly three types of steel structure residential technologies on the market: one is low-rise light steel keel residential technology; the second is medium and high-rise steel structure support system + block wall; the third is medium and high-rise steel structure support system + Lightweight wall panel technology; the first technology is relatively mature, but because the main structure adopts cold-formed thin-walled steel with limited bearing capacity, it is not suitable for multi-storey and high-rise buildings, and it is difficult to promote on a large scale. The second type is far from the concept of building industrialization due to the large amount of on-site masonry work and does not conform to the future development direction. The third technology is still in development and is far from mature, and there are still some technical problems. The biggest problem is that both the inner and outer walls are made of grouted lightweight wall panels, which is easy to cause structural displacement at the connection of the main structure. This phenomenon is particularly prone to occur in some high-rise residential buildings, and this problem is more prominent in some pilot communities that have been built. In addition to the three structures described above, there is also an embedded steel structure assembly building system, which is a green new type of assembly steel structure building system based on the modular "double module" coordination and "module combination" technology It is the main feature of the building and an industrialized building technology system characterized by embedded steel structures and PC panels. This technology runs through the entire process of building (residential) design, processing, installation, equipment installation, decoration, and smart home. The industrialization, intensification and socialization of the whole process of building construction have been realized, but the existing built-in steel structure assembly houses still have the problem that the floor slab of the bathroom has not been customized, and follow-up construction is still required. For this reason, we propose a A prefabricated floor slab embedded steel structure assembly house with bathroom.
实用新型内容Utility model content
本实用新型的目的在于提供一种带有卫生间预制楼板嵌入式钢结构装配住宅,以解决上述背景技术中提出的现有的嵌入式钢结构装配住宅还存在着卫生间的楼板没有从新定制,还需后续施工处理的问题。The purpose of this utility model is to provide a prefabricated floor embeded steel structure assembly house with bathroom, to solve the existing embedded steel structure assembly house proposed in the above background technology, there is still no re-customization of the floor slab of the bathroom, and the need Subsequent construction issues.
为实现上述目的,本实用新型提供如下技术方案:一种带有卫生间预制楼板嵌入式钢结构装配住宅,包括三组平行设置的H型钢立柱,三组所述H型钢立柱的底部设置有住宅地基,三组所述H型钢立柱的外壁中央位置设置有嵌入卡座,左侧两组所述嵌入卡座之间设置有卫生间预制楼板,右侧两组所述嵌入卡座之间设置有房间预制楼板,三组所述H型钢立柱的顶部设置有H型钢悬梁,所述H型钢悬梁的顶部设置有H型钢支撑柱,所述H型钢支撑柱的顶部设置有屋顶。In order to achieve the above purpose, the utility model provides the following technical solutions: a prefabricated bathroom prefabricated floor embedded steel structure assembly house, including three groups of H-shaped steel columns arranged in parallel, the bottom of the three groups of H-shaped steel columns is provided with a residential foundation , the central position of the outer wall of the three groups of H-shaped steel columns is provided with an embedded deck, the left two sets of embedded decks are provided with toilet prefabricated floors, and the right two groups of embedded decks are provided with room prefabricated For the floor slab, the tops of the three groups of H-shaped steel columns are provided with H-shaped steel suspension beams, the tops of the H-shaped steel suspension beams are provided with H-shaped steel support columns, and the tops of the H-shaped steel support columns are provided with roofs.
优选的,所述卫生间预制楼板包括钢筋桁架承重层,所述钢筋桁架承重层的顶部设置有隔音棉层,所述隔音棉层顶部设置有天然沥青防水层,所述天然沥青防水层的顶部设置有阻燃酚醛树脂层,所述阻燃酚醛树脂层的内腔设置有预制线管,所述所述阻燃酚醛树脂层的顶部设置有装饰面层,所述装饰面层的顶部设置有防滑纹路,所述钢筋桁架承重层的底部设置有防火涂料层。Preferably, the bathroom prefabricated floor includes a steel truss load-bearing layer, the top of the steel truss load-bearing layer is provided with a sound-insulating cotton layer, the top of the sound-insulating cotton layer is provided with a natural asphalt waterproof layer, and the top of the natural asphalt waterproof layer is provided There is a flame-retardant phenolic resin layer, the inner cavity of the flame-retardant phenolic resin layer is provided with a prefabricated wire tube, the top of the flame-retardant phenolic resin layer is provided with a decorative surface layer, and the top of the decorative surface layer is provided with a non-slip The bottom of the load-bearing layer of the steel truss is provided with a fireproof coating layer.
优选的,所述H型钢立柱、嵌入卡座、悬梁和H型钢支撑柱的外壁设置有防火防腐蚀涂料层。Preferably, the outer walls of the H-shaped steel columns, embedded decks, suspension beams and H-shaped steel support columns are provided with a fireproof and anti-corrosion paint layer.
优选的,所述屋顶为轻质陶粒混凝土屋顶。Preferably, the roof is a lightweight ceramsite concrete roof.
优选的,所述嵌入卡座通过焊接方式固定连接在H型钢立柱的外壁中央位置。Preferably, the embedded card seat is fixedly connected to the central position of the outer wall of the H-shaped steel column by welding.
与现有技术相比,本实用新型的有益效果是:本实用新型整套住宅构件采用标准化设计,工厂统一化生产,保证施工工艺及质量,嵌入式钢结构装配卫生间预制楼板和房间预制楼板,以替代传统的现浇式混凝土楼板,既提高装配效率,又能保证卫生间管线的铺设,本实用新型结构简单,设计合理,工业化程度高,施工周期短,自重轻,造价便宜,空间利用率大,抗震性能好,安全性能高,建筑造型丰富,装修方便,使用寿命长,具有良好的市场前景。Compared with the prior art, the beneficial effect of the utility model is that the whole set of residential components of the utility model adopts a standardized design, the factory uniform production ensures the construction process and quality, and the embedded steel structure assembles the prefabricated floor slab of the bathroom and the prefabricated room of the room, so as to Instead of traditional cast-in-place concrete floor slabs, it can not only improve assembly efficiency, but also ensure the laying of bathroom pipelines. The utility model has simple structure, reasonable design, high degree of industrialization, short construction period, light weight, low cost and high space utilization rate. Good seismic performance, high safety performance, rich architectural shapes, convenient decoration, long service life, and good market prospects.
附图说明Description of drawings
图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型卫生间预制楼板结构示意图。Fig. 2 is a structural schematic diagram of a prefabricated floor slab for a toilet of the present invention.
图中:1住宅地基、2H型钢立柱、3嵌入卡座、4卫生间预制楼板、41钢筋桁架承重层、42隔音棉层、43天然沥青防水层、44阻燃酚醛树脂层、45预制线管、46装饰面层、47防滑纹路、48防火涂料层、5房间预制楼板、6H型钢悬梁、7H型钢支撑柱、8屋顶。In the figure: 1 residential foundation, 2H-shaped steel column, 3 embedded deck, 4 bathroom prefabricated floor, 41 reinforced truss load-bearing layer, 42 sound-proof cotton layer, 43 natural asphalt waterproof layer, 44 flame-retardant phenolic resin layer, 45 prefabricated wire pipe, 46 decorative surface layer, 47 anti-slip texture, 48 fireproof coating layer, 5 room prefabricated floor, 6H-shaped steel suspension beam, 7H-shaped steel support column, 8 roof.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-2,本实用新型提供一种技术方案:一种带有卫生间预制楼板嵌入式钢结构装配住宅,包括三组平行设置的H型钢立柱2,三组所述H型钢立柱2的底部设置有住宅地基1,三组所述H型钢立柱2的外壁中央位置设置有嵌入卡座3,左侧两组所述嵌入卡座3之间设置有卫生间预制楼板4,右侧两组所述嵌入卡座3之间设置有房间预制楼板5,三组所述H型钢立柱2的顶部设置有H型钢悬梁6,所述H型钢悬梁6的顶部设置有H型钢支撑柱7,所述H型钢支撑柱7的顶部设置有屋顶8。Please refer to Fig. 1-2, the utility model provides a kind of technical scheme: a kind of house with prefabricated bathroom prefabricated floor embedment steel structure assembly, including three groups of H-shaped steel columns 2 arranged in parallel, three groups of said H-shaped steel columns 2 The bottom is provided with a residential foundation 1, the central position of the outer wall of the three groups of H-shaped steel columns 2 is provided with an embedded deck 3, the left two groups of embedded decks 3 are provided with a bathroom prefabricated floor 4, and the right two groups are provided with a prefabricated floor. Prefabricated room slabs 5 are arranged between the embedded decks 3, and H-shaped steel suspension beams 6 are arranged on the tops of the three groups of H-shaped steel columns 2, and H-shaped steel support columns 7 are arranged on the tops of the H-shaped steel suspension beams 6. A roof 8 is provided on the top of the shaped steel support column 7 .
其中,所述卫生间预制楼板4包括钢筋桁架承重层41,所述钢筋桁架承重层41的顶部设置有隔音棉层42,所述隔音棉层42顶部设置有天然沥青防水层43,所述天然沥青防水层43的顶部设置有阻燃酚醛树脂层44,所述阻燃酚醛树脂层44的内腔设置有预制线管45,所述所述阻燃酚醛树脂层44的顶部设置有装饰面层46,所述装饰面层46的顶部设置有防滑纹路47,所述钢筋桁架承重层41的底部设置有防火涂料层48,钢筋桁架承重层41的作用是承载卫生间预制楼板4上的所有重量,隔音棉层42的设置,为了防止卫生间水的噪声通过卫生间预制楼板4传递到楼下,天然沥青防水层43具有良好的防水性,能有效的防止水分渗透卫生间预制楼板4,阻燃酚醛树脂层44具有良好的阻燃性,预制线管45的设置,使得卫生间后续管道和线路的安装非常方便,装饰面层46起到装饰卫生间预制楼板4的作用,防滑纹路47增加装饰面层46的防滑性能,防止装饰面层46上有水使人滑倒,防火涂料层48进一步增强卫生间预制楼板4的防火性;所述H型钢立柱2、嵌入卡座3、悬梁6和H型钢支撑柱7的外壁设置有防火防腐蚀涂料层,增强了H型钢立柱2、嵌入卡座3、悬梁6和H型钢支撑柱7的防火性能和抗腐蚀能力,提高了住宅的安全性,延长使用寿命;所述屋顶8为轻质陶粒混凝土屋顶,轻质陶粒混凝土屋顶具有防水性能好,重量轻的特点;所述嵌入卡座3通过焊接方式固定连接在H型钢立柱2的外壁中央位置,焊接连接方式更牢固,结构更坚固。Wherein, the bathroom prefabricated floor 4 includes a steel bar truss load-bearing layer 41, the top of the steel bar truss load-bearing layer 41 is provided with a sound-insulating cotton layer 42, and the top of the sound-insulating cotton layer 42 is provided with a natural asphalt waterproof layer 43, and the natural asphalt The top of the waterproof layer 43 is provided with a flame retardant phenolic resin layer 44, the inner cavity of the flame retardant phenolic resin layer 44 is provided with a prefabricated wire tube 45, and the top of the flame retardant phenolic resin layer 44 is provided with a decorative surface layer 46 , the top of the decorative surface layer 46 is provided with anti-skid lines 47, the bottom of the steel truss load-bearing layer 41 is provided with a fireproof coating layer 48, the role of the steel truss load-bearing layer 41 is to carry all the weight on the bathroom prefabricated floor 4, sound insulation The setting of the cotton layer 42, in order to prevent the noise of the bathroom water from being transmitted to the downstairs through the bathroom prefabricated floor 4, the natural asphalt waterproof layer 43 has good water resistance and can effectively prevent moisture from penetrating the bathroom prefabricated floor 4, and the flame-retardant phenolic resin layer 44 It has good flame retardancy, and the setting of the prefabricated line pipe 45 makes the installation of subsequent pipelines and lines in the bathroom very convenient. The decorative surface layer 46 plays the role of decorating the prefabricated floor 4 in the bathroom, and the anti-slip texture 47 increases the anti-skid performance of the decorative surface layer 46 , preventing people from slipping due to water on the decorative surface layer 46, and the fireproof coating layer 48 further enhances the fire resistance of the prefabricated floor slab 4 in the bathroom; A fire-proof and anti-corrosion paint layer is provided, which enhances the fire performance and corrosion resistance of the H-shaped steel column 2, the embedded deck 3, the suspension beam 6 and the H-shaped steel support column 7, improves the safety of the house, and prolongs the service life; the roof 8 is a lightweight ceramsite concrete roof. The lightweight ceramsite concrete roof has the characteristics of good waterproof performance and light weight; the embedded card seat 3 is fixedly connected to the central position of the outer wall of the H-shaped steel column 2 by welding, and the welding connection method is more Strong, stronger structure.
工作原理:住宅安装时,通过住宅地基1来固定H型钢立柱2,将卫生间预制楼板4左右两侧嵌入在左侧两组嵌入卡座3的内腔,通过紧固螺栓将卫生间预制楼板4固定嵌入卡座3上,再将房间预制楼板5左右两侧嵌入在右侧两组嵌入卡座3的内腔,通过紧固螺栓将房间预制楼板5固定嵌入卡座3上,然后通过紧固螺栓将H型钢悬梁6固定在H型钢立柱2的顶部,通过紧固螺栓将H型钢支撑柱7固定在H型钢悬梁6的顶部,最后将屋顶8安装在H型钢支撑柱7的顶部,本实用新型结构简单,设计合理,工业化程度高,施工周期短,自重轻,造价便宜,空间利用率大,抗震性能好,安全性能高,建筑造型丰富,装修方便,使用寿命长,具有良好的市场前景。Working principle: During residential installation, the H-shaped steel column 2 is fixed through the residential foundation 1, the left and right sides of the bathroom prefabricated floor 4 are embedded in the inner cavity of the left two sets of embedded card holders 3, and the bathroom prefabricated floor 4 is fixed by fastening bolts Embed in the card base 3, then embed the left and right sides of the room prefabricated floor 5 into the inner cavity of the right two groups of embedded card seats 3, fix the room prefabricated floor 5 into the card base 3 by fastening bolts, and then use the fastening bolts Fix the H-shaped steel suspension beam 6 on the top of the H-shaped steel column 2, fix the H-shaped steel support column 7 on the top of the H-shaped steel suspension beam 6 by fastening bolts, and finally install the roof 8 on the top of the H-shaped steel support column 7. The utility model The structure is simple, the design is reasonable, the degree of industrialization is high, the construction period is short, the weight is light, the cost is cheap, the space utilization rate is large, the seismic performance is good, the safety performance is high, the architectural shape is rich, the decoration is convenient, the service life is long, and it has a good market prospect.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620960195.9U CN206090827U (en) | 2016-08-27 | 2016-08-27 | Have embedded steel construction of bathroom precast floor plank assembly house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620960195.9U CN206090827U (en) | 2016-08-27 | 2016-08-27 | Have embedded steel construction of bathroom precast floor plank assembly house |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206090827U true CN206090827U (en) | 2017-04-12 |
Family
ID=58474202
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620960195.9U Expired - Fee Related CN206090827U (en) | 2016-08-27 | 2016-08-27 | Have embedded steel construction of bathroom precast floor plank assembly house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206090827U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107762161A (en) * | 2017-10-17 | 2018-03-06 | 新疆农业大学 | A kind of energy-saving assembled system of steel residential structure and installation method |
| CN108755386A (en) * | 2018-07-05 | 2018-11-06 | 宁波它山奇境文化旅游发展有限公司 | Prefabricated assembled concrete structure leisure plank road and its construction method |
| RU189898U1 (en) * | 2019-03-13 | 2019-06-07 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский государственный архитектурно-строительный университет" | BUILDING MODULE FOR BUILDING BUILDINGS |
-
2016
- 2016-08-27 CN CN201620960195.9U patent/CN206090827U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107762161A (en) * | 2017-10-17 | 2018-03-06 | 新疆农业大学 | A kind of energy-saving assembled system of steel residential structure and installation method |
| CN107762161B (en) * | 2017-10-17 | 2019-09-10 | 新疆农业大学 | A kind of energy-saving assembled system of steel residential structure and installation method |
| CN108755386A (en) * | 2018-07-05 | 2018-11-06 | 宁波它山奇境文化旅游发展有限公司 | Prefabricated assembled concrete structure leisure plank road and its construction method |
| RU189898U1 (en) * | 2019-03-13 | 2019-06-07 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский государственный архитектурно-строительный университет" | BUILDING MODULE FOR BUILDING BUILDINGS |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203247737U (en) | Light steel keel composite board partition wall | |
| CN204940928U (en) | Packaged type aluminium alloys house | |
| CN205444458U (en) | Integrated assembled steel construction building | |
| CN107989233A (en) | The prefabricated curtain wall structure and its construction method of lightgage steel joist sand aerating plate | |
| CN209817185U (en) | Sound insulation and absorption space structure | |
| CN107190884A (en) | A kind of new many high-rise hot-rolled steel section composite light-weight steel shear wall combined structure systems | |
| CN103993679A (en) | Bolt connecting joint structure of low-rise fabricated composite wall house | |
| CN204282709U (en) | Diatom veneer rock wool composite wall | |
| CN206090827U (en) | Have embedded steel construction of bathroom precast floor plank assembly house | |
| RU92037U1 (en) | QUICK BUILDING BUILDING | |
| CN205296452U (en) | Embedded steel construction assembly house stand fire resistive construction | |
| CN206737461U (en) | A kind of light-weight building sandwich system | |
| CN110397158A (en) | A kind of boxboard steel construction assembled architecture system | |
| CN205296607U (en) | Embedded steel construction assembly house roof boarding mounting structure | |
| CN207277542U (en) | A kind of Novel steel-wooden frame structure | |
| CN110670758B (en) | Fabricated steel structure building based on fiber reinforced clad wood substrate and construction method | |
| CN204940529U (en) | The side elevation system in aluminium alloys house | |
| CN204662717U (en) | A prefabricated reinforced concrete fireproof partition structure in stairwell | |
| CN105442699A (en) | Efficient double-slab-column integrated envelope integration building and manufacturing and installing method thereof | |
| CN204676927U (en) | Module intelligence anti-seismic heat-preservation one splicing structure house | |
| CN205382727U (en) | Lightweight steel construction house | |
| CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
| CN118241796A (en) | Construction of steel building shell | |
| CN217924220U (en) | Connecting device of outer wallboard and girder steel in assembled house | |
| CN205296572U (en) | Embedded steel construction assembly house side fascia |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |