CN206052680U - A kind of gradual change type treatment of soft foundation transition section structure - Google Patents

A kind of gradual change type treatment of soft foundation transition section structure Download PDF

Info

Publication number
CN206052680U
CN206052680U CN201620945795.8U CN201620945795U CN206052680U CN 206052680 U CN206052680 U CN 206052680U CN 201620945795 U CN201620945795 U CN 201620945795U CN 206052680 U CN206052680 U CN 206052680U
Authority
CN
China
Prior art keywords
stiffener
changeover portion
discharging consolidation
consolidation
gradual change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620945795.8U
Other languages
Chinese (zh)
Inventor
梁江伟
杨煜祥
胡继生
孙广铎
张立德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City No2 Municipal Engineering Co Ltd
Original Assignee
Guangzhou City No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City No2 Municipal Engineering Co Ltd filed Critical Guangzhou City No2 Municipal Engineering Co Ltd
Priority to CN201620945795.8U priority Critical patent/CN206052680U/en
Application granted granted Critical
Publication of CN206052680U publication Critical patent/CN206052680U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model is related to a kind of gradual change type treatment of soft foundation transition section structure, mainly include composite foundation changeover portion and discharging consolidation changeover portion, linkage section is additionally provided between composite foundation changeover portion and discharging consolidation changeover portion, changeover portion foundation surface is equipped with sand bedding course from bottom to up, subgrade soils and piling prepressing soil, braided geotextile is equipped with the middle of sand bedding course, and it is embedded with some weeper drains for being passed through drainage ditch on both sides of the road, the ground of composite foundation changeover portion has some campshed shape stiffeners of vertical road direction, several rows of water consolidation stiffener is provided between adjacent two campsheds shape stiffener, along the length of the discharging consolidation stiffener of road direction, the thickness of subgrade soils and piling prepressing soil successively decreases toward composite foundation section direction;Discharging consolidation changeover portion is arranged below some row's discharging consolidation stiffeners from sand bedding course to ground, and a campshed shape stiffener is provided between adjacent two rows discharging consolidation stiffener, and the length along the stake shape stiffener of road direction is successively decreased toward discharging consolidation section direction.

Description

A kind of gradual change type treatment of soft foundation transition section structure
Technical field
This utility model is related to Municipal Road Engineering treatment of soft foundation field, more particularly to a kind of gradual change type treatment of soft foundation transition Segment structure.
Background technology
In Municipal Road Engineering, a road or several roads connecting are sometimes for adopting two or more Method carry out treatment of soft foundation, the changeover portion of two kinds of treatments of soft foundation receives the dual of road surface dead load and live load afterwards for a long time Effect so that this changeover portion becomes the weak link of whole road, the especially thicker mud of changeover portion presence, and Road surface is subject under long-term over loading load action, it is possible that the Vertical Cracks of ground, so that affecting ground superstructure Quality.By taking two methods of plastic draining board preloading and cement mixing pile as an example, set in the joining place of two kinds of processing methods The changeover portion of 15m is put, its transition segment process then carries out applying for cement mixing pile first to carry out piling prepressing after the completion for the treatment of precompressed Work (as shown in Figure 1).The mechanical mixed type changeover portion of this comparison can substantially be regarded one as and be different from both process sides The mixing entirety section of method, it yet suffers from the phenomenon that stress change is differed with the joining place of two kinds of processing methods, not Solve problem well.With reference to other substantial amounts of built or projects under construction, and the correlative theses and periodical of various data bases are consulted, More rational settling mode is not proposed to this problem all, some engineerings are even ignored this problem, do not carry out changeover portion process, i.e. institute " as hard as crossing " mode of meaning.
Utility model content
In view of the shortcomings of the prior art, the purpose of this utility model is to provide a kind of gradual change type treatment of soft foundation transition Segment structure, improves the changeover portion quality of two kinds for the treatment of of soft foundation linkings.
For achieving the above object, this utility model can be achieved by the following technical programs:
A kind of gradual change type treatment of soft foundation transition section structure, the changeover portion include composite foundation changeover portion and discharging consolidation mistake Cross section, between the composite foundation changeover portion and discharging consolidation changeover portion, be additionally provided with linkage section, the changeover portion foundation surface from Down to sand bedding course, subgrade soils and piling prepressing soil is above equipped with, braided geotextile is equipped with the middle of the sand bedding course and is buried The ground for having some weeper drains for being passed through drainage ditch on both sides of the road, the composite foundation changeover portion has vertical road direction Some campshed shape stiffeners, several rows of water consolidation stiffener is provided between adjacent two campsheds shape stiffener, along road direction The thickness of the length, subgrade soils and piling prepressing soil of discharging consolidation stiffener successively decreases toward composite foundation section direction;The draining Consolidation changeover portion is arranged below some row's discharging consolidation stiffeners from sand bedding course to ground, adjacent two rows discharging consolidation stiffener it Between be provided with a campshed shape stiffener, the length along the stake shape stiffener of road direction is successively decreased toward discharging consolidation section direction.
Further, the sand bedding course is divided into three layers, and intermediate layer lays one between adjacent two layers sand bedding course than upper and lower thickness Layer braided geotextile.
Further, the weeper drain is embedded in the intermediate layer of sand bedding course.
Further, the thickness of the subgrade soils and piling prepressing soil is no more than 30cm.
Further, the adjacent stake shape stiffener and discharging consolidation stiffener are equilateral triangle arrangement.
Further, the stake shape stiffener is cement mixing pile, broken stone pile, reinforcing soil pile, Y shape driven cast-in-place pile, thin One of which in wall cartridge type driven cast-in-place pile and static pressure pipe pile.
Further, the discharging consolidation stiffener is plastic draining board or husky well.
This utility model construction technology is fairly simple, and the gradual change type structure can effectively solve the problem that road surface in long-term sound load Dual function under there is the phenomenon of Vertical Cracks, it is to avoid the destruction of roadbed superstructure, improve changeover portion this road The quality of weak link.
Description of the drawings
Fig. 1 is the changeover portion connected structure figure of present technology;
Fig. 2 is changeover portion standard section figure of the present utility model;
Fig. 3 is the partial enlarged drawing of A in Fig. 2;
Fig. 4 is changeover portion linking skiagraph of the present utility model;
Fig. 5 is changeover portion plane arrangement structure figure of the present utility model;
In figure:1- changeover portions, 11- composite foundation changeover portions, 12- discharging consolidation changeover portions, 2- sand bedding courses, 3- subgrade soils, 4- piling prepressings soil, 5- braided geotextiles, 6- weeper drains, 7- drainage ditch, 8- stake shape stiffeners, 9- discharging consolidation stiffeners, 10- composite foundation sections, 20- discharging consolidation sections.
Specific embodiment
This utility model is further described below in conjunction with accompanying drawing and specific embodiment:
As shown in figs. 2 to 4, gradual change type treatment of soft foundation transition section structure described in the utility model, changeover portion 1 include being combined Ground changeover portion 11 and discharging consolidation changeover portion 12, the company of being additionally provided between composite foundation changeover portion 11 and discharging consolidation changeover portion 12 Connect in section, linkage section and do not set a shape stiffener 8 and discharging consolidation stiffener 9, composite foundation changeover portion 11 is close to composite foundation section 10, discharging consolidation changeover portion 12 is close to discharging consolidation section 20.1 foundation surface of changeover portion is equipped with sand bedding course 2, roadbed from bottom to up Soil 3 and piling prepressing soil 4, subgrade soils 3 and piling prepressing soil 4 all should layered rolling, be not more than 30cm per thickness degree.Sand bedding course 2 Centre is equipped with braided geotextile 5, and is embedded with some weeper drains 6 for being passed through drainage ditch 7 on both sides of the road, weeper drain 6 Bury one at a certain distance.Sand bedding course 2 is preferably divided into three layers, intermediate layer than upper and lower thickness, between adjacent two layers sand bedding course 2 One layer of braided geotextile 5 of laying, weeper drain 6 are embedded in the intermediate layer of sand bedding course 2.
As shown in figure 4, the ground of composite foundation changeover portion 11 has some row's equal lengths of vertical road direction Stake shape stiffener 8, is provided with several rows of water consolidation stiffener 9 between adjacent two campsheds shape stiffener 8, along the different rows' of road direction The thickness of length, subgrade soils 3 and piling prepressing soil 4 of discharging consolidation stiffener 9 successively decrease toward 10 direction of composite foundation section.Row Water consolidation changeover portion 12 is arranged below the discharging consolidation stiffener 9 of some row's equal lengths, adjacent two row from sand bedding course 2 to ground A campshed shape stiffener 8 is provided between discharging consolidation stiffener 9, along the length of the stake shape stiffener 8 of the different rows of road direction Successively decrease toward 20 direction of discharging consolidation section.Stake shape stiffener that later stage is constructed 8 is just through pending ground and reaches at design Reason depth, without through sand bedding course 2;Discharging consolidation stiffener 9 need to run through ground mud and braided geotextile 5 and go directly sand Bed course 2.
As shown in figure 5, adjacent studs shape stiffener 8 and discharging consolidation stiffener 9 are equilateral triangle arrangement.
The computational methods of each parameter of this utility model are as follows:1 length of changeover portion is assumed for L, composite foundation transition section length For L1,12 length of discharging consolidation changeover portion is L2, and connection segment length is L3, then L=L1+L2+L3;Assume to reinforce per horizontally-arranged stake shape The stake of thing 8 is long to be S1, between row and row pilespacing be R1, the long gradual change amount of stake (i.e. discharging consolidation stiffener 9 between row and row between Away from) for B2;The plate length that stiffener 9 is consolidated per transversal draining is S2, and plate is away from for R2 between row and row, the long gradual change amount of plate (i.e. stake shape The spacing between row and row of stiffener 8) for B1;Then B1 and B2 are the smaller the better in principle, because B1 and B2 are less, which is less because of the settleability residual quantity that stake/plate length is brought, and It is less plus residual quantity is comprehensively settled caused by other factors, more readily satisfy foundation quality requirement;But B1 and B2 are too small, cause Changeover portion is oversize, is that construction increased difficulty, it is proposed that value is that 0.1~0.2 times of stake/plate is long.
Composite foundation section 10 can adopt cement mixing pile method;Discharging consolidation section 20 can adopt preloading, also can use true The methods such as empty precompressed/Combined Vacuum-surcharge Preloading replace.Therefore stake shape stiffener 8 can use cement mixing pile, also can with broken stone pile, Reinforcing soil pile, Y shape driven cast-in-place pile, thin-walled cartridge type driven cast-in-place pile and static pressure pipe pile etc. it is all kinds of with fashion of extrusion changing ground The stiffener of bearing capacity replaces;Discharging consolidation stiffener 9 can use plastic draining board, also can be all kinds of with discharging consolidation with Sha Jing etc. Mode replaces come the stiffener for changing foundation bearing capacity.Sum it up, the stiffener length of two kinds of foundation treatment modes is in transition Section does the protection model that this structure successively decreased step by step belongs to this utility model claim all along the direction that processes of the opposing party Within enclosing.
For a person skilled in the art, other can be made various corresponding according to above technical scheme and design Change and deformation, and all these change and deformation should all belong to this utility model scope of the claims it It is interior.

Claims (7)

1. a kind of gradual change type treatment of soft foundation transition section structure, it is characterised in that:The changeover portion include composite foundation changeover portion and Discharging consolidation changeover portion, is additionally provided with linkage section, the changeover portion between the composite foundation changeover portion and discharging consolidation changeover portion Foundation surface is equipped with sand bedding course, subgrade soils and piling prepressing soil from bottom to up, and braiding geotechnique is equipped with the middle of the sand bedding course Cloth and some weeper drains for being passed through drainage ditch on both sides of the road are embedded with, the ground of the composite foundation changeover portion has Some campshed shape stiffeners of vertical road direction, are provided with several rows of water consolidation stiffener between adjacent two campsheds shape stiffener, The thickness of length, the subgrade soils and piling prepressing soil along the discharging consolidation stiffener of road direction is passed toward composite foundation section direction Subtract;The discharging consolidation changeover portion is arranged below some row's discharging consolidation stiffeners, adjacent two rows draining from sand bedding course to ground Consolidation stiffener between be provided with a campshed shape stiffener, along road direction stake shape stiffener length toward discharging consolidation section direction Successively decrease.
2. gradual change type treatment of soft foundation transition section structure according to claim 1, it is characterised in that:The sand bedding course is divided into three Layer, intermediate layer lay one layer of braided geotextile than upper and lower thickness, between adjacent two layers sand bedding course.
3. gradual change type treatment of soft foundation transition section structure according to claim 2, it is characterised in that:The weeper drain is buried In the intermediate layer of sand bedding course.
4. gradual change type treatment of soft foundation transition section structure according to claim 1, it is characterised in that:The subgrade soils and preloading The thickness of pre- firming is no more than 30cm.
5. gradual change type treatment of soft foundation transition section structure according to claim 1, it is characterised in that:The adjacent stake shape is reinforced Thing and discharging consolidation stiffener are equilateral triangle arrangement.
6. gradual change type treatment of soft foundation transition section structure according to claim 1, it is characterised in that:The stake shape stiffener is In cement mixing pile, broken stone pile, reinforcing soil pile, Y shape driven cast-in-place pile, thin-walled cartridge type driven cast-in-place pile and static pressure pipe pile wherein It is a kind of.
7. the gradual change type treatment of soft foundation transition section structure according to claim 1 or 6, it is characterised in that:The discharging consolidation Stiffener is plastic draining board or husky well.
CN201620945795.8U 2016-08-26 2016-08-26 A kind of gradual change type treatment of soft foundation transition section structure Active CN206052680U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620945795.8U CN206052680U (en) 2016-08-26 2016-08-26 A kind of gradual change type treatment of soft foundation transition section structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620945795.8U CN206052680U (en) 2016-08-26 2016-08-26 A kind of gradual change type treatment of soft foundation transition section structure

Publications (1)

Publication Number Publication Date
CN206052680U true CN206052680U (en) 2017-03-29

Family

ID=58381477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620945795.8U Active CN206052680U (en) 2016-08-26 2016-08-26 A kind of gradual change type treatment of soft foundation transition section structure

Country Status (1)

Country Link
CN (1) CN206052680U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185022A (en) * 2019-07-10 2019-08-30 中铁二局第一工程有限公司 A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN110952389A (en) * 2019-12-17 2020-04-03 同济大学 Pile combined structure construction method for controlling uneven settlement of transition section of high-speed railway bridge
CN111455972A (en) * 2020-04-10 2020-07-28 中钢集团马鞍山矿山研究总院股份有限公司 Comprehensive treatment method for preventing bottom bulging instability of deep and soft foundation waste dump
CN111501722A (en) * 2020-05-21 2020-08-07 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method
CN111519600A (en) * 2020-04-10 2020-08-11 中钢集团马鞍山矿山研究总院股份有限公司 A consolidate and pile structure that is used for dark soft base refuse dump to prevent pucking unstability
CN111549750A (en) * 2020-05-20 2020-08-18 浙江水利水电学院 Pond and sluice connection section foundation structure for controlling uneven settlement and construction method thereof
CN112921946A (en) * 2021-01-28 2021-06-08 武汉大学 Reinforcing system and reinforcing method for liquefiable site reinforced gravel pile composite foundation embankment
CN114575209A (en) * 2022-03-31 2022-06-03 浙江数智交院科技股份有限公司 Road rigid pile and preloading soft foundation treatment transition structure and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185022A (en) * 2019-07-10 2019-08-30 中铁二局第一工程有限公司 A kind of constructing structure and method of plastic draining board and CFG treatment of soft foundation changeover portions
CN110952389A (en) * 2019-12-17 2020-04-03 同济大学 Pile combined structure construction method for controlling uneven settlement of transition section of high-speed railway bridge
CN111455972A (en) * 2020-04-10 2020-07-28 中钢集团马鞍山矿山研究总院股份有限公司 Comprehensive treatment method for preventing bottom bulging instability of deep and soft foundation waste dump
CN111519600A (en) * 2020-04-10 2020-08-11 中钢集团马鞍山矿山研究总院股份有限公司 A consolidate and pile structure that is used for dark soft base refuse dump to prevent pucking unstability
CN111549750A (en) * 2020-05-20 2020-08-18 浙江水利水电学院 Pond and sluice connection section foundation structure for controlling uneven settlement and construction method thereof
CN111501722A (en) * 2020-05-21 2020-08-07 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method
CN111501722B (en) * 2020-05-21 2022-06-03 中铁工程设计咨询集团有限公司 Vacuum preloading and CFG (cement fly-ash gravel) long and short combined pile foundation treatment method
CN112921946A (en) * 2021-01-28 2021-06-08 武汉大学 Reinforcing system and reinforcing method for liquefiable site reinforced gravel pile composite foundation embankment
CN114575209A (en) * 2022-03-31 2022-06-03 浙江数智交院科技股份有限公司 Road rigid pile and preloading soft foundation treatment transition structure and construction method

Similar Documents

Publication Publication Date Title
CN206052680U (en) A kind of gradual change type treatment of soft foundation transition section structure
CN103628378B (en) One is highway widening embankment structure and construction method near water
CN103074891A (en) Double-layer plastic sleeve bulk material and concrete stiffness core composite pile and construction method thereof
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN102359096A (en) Method for strengthening deep soft soil foundation by sealing
CN106676993B (en) Reinforced broken stone frame structure roadbed reinforcing system and reinforcing method thereof
CN206438358U (en) A kind of highway soft soil widening of subgrade ruggedized construction
CN105649005A (en) Geogrid combined grouting electro-osmosis construction method for ultra-soft soil
CN106676991A (en) Expansive soil embankment structure improved and reinforced by sandwich method and construction method
CN104746412A (en) Construction method of collapsible loess embankment
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN103790151B (en) Plugging structure and construction method after a kind of soft soil roadbed draining precompressed
CN104060601A (en) Construction method utilizing pile foundations of precast construction piles for ground treatment
CN105089072A (en) Anti-seepage structure of basement bottom board and construction method
CN104695419A (en) Soft soil roadbed construction method
CN201785743U (en) Vacuum preloading consolidated soft soil foundation for combining sand wells and water discharging plates
CN206245155U (en) A kind of firm road structure of embankment
CN212405094U (en) High water content clay fill foundation drainage system
CN101591907B (en) One-piece vacuum preloading method for quickly treating hydraulic fill hedoro foundation
CN203741814U (en) Blocking structure used after soft soil roadbed drainage prepressing
CN210238543U (en) Inclined slope surface layered backfill dynamic compaction leveling structure
CN111851185A (en) Self-compacting cement soil widening roadbed and construction method
CN106337430A (en) Underwater composite foundation reinforcement treatment method
CN111021171A (en) Method for widening soft soil roadbed in frozen soil area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant