CN206034267U - Bridge that can assemble fast - Google Patents

Bridge that can assemble fast Download PDF

Info

Publication number
CN206034267U
CN206034267U CN201620992435.3U CN201620992435U CN206034267U CN 206034267 U CN206034267 U CN 206034267U CN 201620992435 U CN201620992435 U CN 201620992435U CN 206034267 U CN206034267 U CN 206034267U
Authority
CN
China
Prior art keywords
girder
bridge
plate
quick
floorings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620992435.3U
Other languages
Chinese (zh)
Inventor
肖礼经
周志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guansheng Civil Engineering Technology Co.,Ltd.
Original Assignee
Guangdong Guansheng Civil Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guansheng Civil Engineering Technology Co Ltd filed Critical Guangdong Guansheng Civil Engineering Technology Co Ltd
Priority to CN201620992435.3U priority Critical patent/CN206034267U/en
Application granted granted Critical
Publication of CN206034267U publication Critical patent/CN206034267U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a bridge that can assemble fast, including two girders, cross slab and deckings, each girder is opened has the mounting groove, and install respectively in the mounting groove at the both ends of cross slab, and the upper end of cross slab opens and have a plurality of recess, and formation is assembled by a plurality of plate to the decking, the protruding a plurality of arch that is equipped with of lower surface of decking, and each protruding and each recess block, and the upper end of girder is higher than the decking, does benefit to and assembles the bridge fast, quick replacement bridge part.

Description

It is a kind of can quick-assembling bridge
Technical field
This utility model is related to bridge, more particularly to it is a kind of can quick-assembling bridge.
Background technology
At present in the bridge manufacture field of China, concrete prefabricated T beam bridges are applied on Short/Medium Span Bridge widely, But concrete prefabricated T beam bridges have many defects, for example:Complicated construction technique, multiple T beam bridges lateral connections are relatively difficult, And need to arrange multiple tracks diaphragm plate and multiple longitudinal wet joints;Prestressing force form is adopted mostly, due to depositing beam time length not One, the construction error that inverted camber deviation is caused between adjacent beam body is difficult to control to;And it is low using normal concrete tensile strength, easily Produce crack.
Utility model content
In order to overcome the deficiencies in the prior art, the purpose of this utility model be provide it is a kind of can quick-assembling bridge, Beneficial to quick-assembling bridge, quick-replaceable bridge parts.
The purpose of this utility model employs the following technical solutions realization:
It is a kind of can quick-assembling bridge, including two girders, diaphragm plate and floorings, each girder is provided with mounting groove, horizontal The two ends of dividing plate are respectively arranged in mounting groove, and the upper end of diaphragm plate is provided with several grooves, and floorings are spelled by several plates Dress is formed, and the lower surface of floorings is convexly equipped with that several are raised, it is each it is raised engage with each groove, and the upper end of girder is higher than bridge floor Plate.
Preferably, this can the bridge of quick-assembling also include two base plates, each base plate is respectively arranged in each girder Bottom.
Preferably, the base plate is steel plate, and the plate is wafer board.
Preferably, each plate assembling part is located at directly over the diaphragm plate.
Preferably, the lower end of diaphragm plate is supported by girder base portion.
Preferably, the upper end of girder is provided with guardrail, is provided with rubber blanket between girder and guardrail.
Preferably, the upper surface of floorings is equipped with wearing course.
Compared to existing technology, the beneficial effects of the utility model are:
By using superhigh tenacity concrete for making girder, being capable of achieving girder lightness, and superhigh tenacity concrete performance Preferably, bearing capacity is strong, beneficial to reduction beam body sectional dimension;It is integral prefabricated by batch production, beneficial to construction technology is simplified, it is beneficial to Work on the spot amount is reduced, and reduces beam seam;Formed as bridge is assembled by each part, therefore be beneficial to quick-replaceable bridge Part, improves work efficiency.
Description of the drawings
Fig. 1 be this utility model it is a kind of can quick-assembling bridge schematic diagram;
In figure:1st, girder;2nd, diaphragm plate;3rd, floorings;4th, mounting groove;5th, groove;6th, bridge pier;7th, it is raised;8th, base plate;9、 Wearing course;10th, guardrail;11st, rubber blanket;12nd, base portion.
Specific embodiment
Below, with reference to accompanying drawing and specific embodiment, this utility model is described further:
As shown in figure 1, it is a kind of can quick-assembling bridge, including two girders 1, diaphragm plate 2 and floorings 3, each girder 1 Mounting groove 4 is provided with, the two ends of diaphragm plate 2 are respectively arranged in mounting groove 4, and the upper end of diaphragm plate 2 is provided with several grooves 5, excellent Elect the length direction along diaphragm plate 2 as to be uniformly distributed, floorings 3 are formed by several plate (not shown) assembly, floorings 3 Lower surface is convexly equipped with several projections 7, and each raised 7 correspond and engage with each groove 5, so as to floorings 3 are fixed In diaphragm plate 2, and the upper end of girder 1 is higher than floorings 3, and such as floorings 3 are located at 1/2nd of 1 height of girder.
Girder 1 adopts superhigh tenacity concrete for making, and the superhigh tenacity concrete is patent CN201510026894.6 Superhigh tenacity coagulation earth concrete described in (entitled " a kind of superhigh tenacity concrete and preparation method thereof "), therefore can 1 lightness of girder is realized, and superhigh tenacity concrete performance is preferably, bearing capacity is strong, beneficial to reduction 1 sectional dimension of girder.
As shown in figure 1, this can the bridge of quick-assembling also include two base plates 8, each base plate 8 is respectively arranged in each girder 1 Bottom, be more highly preferred to, the base plate 8 be steel plate, in precast main beam 1, by the steel plate as bed die, when girder 1 is pacified During loaded on bridge pier 6, the steel plate can improve the toughness of bridge and increase structural strength.
Preferably, plate is wafer board, and the wafer board equally adopts superhigh tenacity concrete for making.Each girder 1, diaphragm plate 2 and plate by batch production it is integral prefabricated, beneficial to simplify construction technology, beneficial to reduce work on the spot amount, and reduce beam between Seam;Simultaneously because bridge is assembled by each part formed, therefore when bridge needs to be keeped in repair, can be with quick-replaceable rim bridge Part, improves work efficiency.
Preferably, each plate assembling part is located at the surface of the diaphragm plate 2;As 2 weight of diaphragm plate is larger, only rely on Groove 5 is difficult to support, therefore the lower end of diaphragm plate 2 is supported by the base portion 12 of girder 1.
Additionally, the upper end of girder 2 is provided with guardrail 10, rubber blanket 11 is installed between girder 1 and guardrail 10;Floorings 3 Upper surface be equipped with wearing course 9, and the wearing course 9 is preferably Colophonium.
It will be apparent to those skilled in the art that technical scheme that can be as described above and design, make other various It is corresponding to change and deformation, and all these change and deformation should all belong to the protection of this utility model claim Within the scope of.

Claims (7)

1. it is a kind of can quick-assembling bridge, it is characterised in that:Including two girders, diaphragm plate and floorings, each girder is provided with Mounting groove, the two ends of diaphragm plate are respectively arranged in mounting groove, and the upper end of diaphragm plate is provided with several grooves, and floorings are by some Individual plate is assembled to be formed, and the lower surface of floorings is convexly equipped with that several are raised, it is each it is raised engage with each groove, and the upper end of girder Higher than floorings.
2. it is according to claim 1 it is a kind of can quick-assembling bridge, it is characterised in that:This can quick-assembling bridge also Including two base plates, each base plate is respectively arranged in the bottom of each girder.
3. it is according to claim 2 it is a kind of can quick-assembling bridge, it is characterised in that:The base plate is steel plate, described Plate is wafer board.
4. it is according to claim 3 it is a kind of can quick-assembling bridge, it is characterised in that:Each plate assembling part is located at described Directly over diaphragm plate.
5. it is according to claim 4 it is a kind of can quick-assembling bridge, it is characterised in that:The lower end of diaphragm plate is by girder base Portion supports.
6. it is according to claim 5 it is a kind of can quick-assembling bridge, it is characterised in that:The upper end of girder is provided with shield Hurdle, is provided with rubber blanket between girder and guardrail.
7. it is according to claim 6 it is a kind of can quick-assembling bridge, it is characterised in that:The upper surface of floorings is equipped with Wearing course.
CN201620992435.3U 2016-08-29 2016-08-29 Bridge that can assemble fast Active CN206034267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620992435.3U CN206034267U (en) 2016-08-29 2016-08-29 Bridge that can assemble fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620992435.3U CN206034267U (en) 2016-08-29 2016-08-29 Bridge that can assemble fast

Publications (1)

Publication Number Publication Date
CN206034267U true CN206034267U (en) 2017-03-22

Family

ID=58304703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620992435.3U Active CN206034267U (en) 2016-08-29 2016-08-29 Bridge that can assemble fast

Country Status (1)

Country Link
CN (1) CN206034267U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192718A (en) * 2016-08-29 2016-12-07 广东冠生土木工程技术有限公司 A kind of can the bridge of quick-assembling and manufacture method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192718A (en) * 2016-08-29 2016-12-07 广东冠生土木工程技术有限公司 A kind of can the bridge of quick-assembling and manufacture method thereof

Similar Documents

Publication Publication Date Title
CN201873937U (en) Combined bridge with self resistance to crack
CN202047377U (en) Reinforcing structure of concrete box girder
CN101487332A (en) Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab
CN106192718A (en) A kind of can the bridge of quick-assembling and manufacture method thereof
CN105442705A (en) Large-span steel truss structure and installation method thereof
CN206034267U (en) Bridge that can assemble fast
CN108103950A (en) A kind of Combined steel structure highway bridge assembling process
CN204530421U (en) For the prefabricated case beam that the bent cap of falling T bridge floor continuous structure construction pedestal beam body is closely connected
CN103321137B (en) Groove-shaped bridge beam
CN201605527U (en) Steel structure bent cap additionally arranged at top of pier stud
CN205259417U (en) Novel connection structure of steel construction house floor and girder steel
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN107700360A (en) A kind of assembling method of truss bridge section
CN202401394U (en) Crossbeam structure of railway steel-girder cable-stayed bridge decking
CN202865731U (en) Saddle weight steel box structure of steel truss cable-stayed bridge
CN207944318U (en) A kind of railway simple supported box beam
CN201381470Y (en) Assembled variable cross-section composite continuous bridge
CN108660921B (en) Orthotropic steel-ultra-high performance concrete bridge deck structure and construction method thereof
CN207672411U (en) A kind of widening structure of width cantilever boxgirder
CN207091900U (en) Single column pier Concrete Continuous Box Beam with anti-sideward sliding function
CN206205236U (en) A kind of deformed bar truss hollow superimposed sheet
CN206279456U (en) A kind of assembled mass-type foundation comb pier
CN211596417U (en) Slide way beam reaction frame for adjusting linear deviation of steel truss beam
CN204608587U (en) A kind of slab bridge
CN212715644U (en) Steel construction truss girder node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 511400 Unit 701, Building 6, Phase II, Huachuang Animation Industry Park, Shijie Town, Panyu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Guansheng Civil Engineering Technology Co.,Ltd.

Address before: 510000 Guangdong city of Guangzhou province Panyu City Bridge Fu Luo Jia Cun Yi Road 51 garden section Xinrun block 102

Patentee before: GUANGDONG GUANSHENG CIVIL ENGINEERING TECHNOLOGY Co.,Ltd.