- CN206034264U CN206034264U CN201620916149.9U CN201620916149U CN206034264U CN 206034264 U CN206034264 U CN 206034264U CN 201620916149 U CN201620916149 U CN 201620916149U CN 206034264 U CN206034264 U CN 206034264U
- Authority
- CN
- China
- Prior art keywords
- bridge
- floor
- bridge floor
- shelter
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a novel steel construction shelter bridge foundation structure, novel steel construction shelter bridge foundation structure, including the two rows of piers setting up side by side and the bridge floor that is located the pier top, the bridge floor top is provided with the corridor room, connects through moving about freely and quickly roof beam check architecture between the pier, and the junction all is located the one end of being close to the bridge floor bottom on the pier, moves about freely and quickly roof beam check architecture and includes a plurality of girder steel, and wherein, the girder steel is according to following structure setting: connect through the girder steel between two adjacent piers move towards to set up along the bridge floor, along moving towards also to be connected through the girder steel between two adjacent piers that the vertically direction set up with the bridge floor, the bridge thickness of having solved current shelter bridge is great, influences the problem that people's car passed.
Description
Technical field
This utility model belongs to bridge construction technical field, is related to a kind of new steel structure shelter bridge base structure.
Background technology
Existing shelter bridge basis generally includes abutment and bridge pier, and abutment and bridge pier are then connected to basis, is ensureing that shelter bridge is whole
On the premise of body stability and safety, the thickness of its bridge is larger, and it is big to often result in the part drop that abutment connected with road surface,
People's car is affected to pass through, while cost is also high.
Utility model content
This utility model provide a kind of new steel structure shelter bridge base structure, with solve the bridge thickness of existing shelter bridge compared with
Greatly, the problem for affecting people's car current.
The technical scheme adopted by this utility model is that new steel structure shelter bridge base structure, including two for being set up in parallel
Row's bridge pier and the bridge floor above bridge pier, it is characterised in that be provided with corridor room above bridge floor, by beam lattice in length and breadth between bridge pier
Architecture connects, and junction is respectively positioned on one end of close bridge floor bottom on bridge pier, and beam lattice architecture includes several in length and breadth
Girder steel, wherein, girder steel is according to following structure setting:Move towards to connect by girder steel between the two neighboring bridge pier for arranging along bridge floor,
Move towards to connect also by girder steel between the two neighboring bridge pier that vertical direction is arranged along with bridge floor.
Further, the epimere of each bridge pier is bridge post, and each girder steel is all connected between each bridge post, each bridge post from
Under supreme bridge floor and each layer of corridor room through connection shelter bridge agent structure, the agent structure in corridor room includes several steel constructions
Column, each column are parallel with bridge post.
Further, move towards to be connected with level system between the two neighboring bridge post that vertical direction is arranged along with bridge floor
Beam.
Further, the basis of underwater foundation is connected to below each bridge pier by cushion cap.
Further, the bottom for being connected to bridge floor is run through at each bridge capital end by bearing.
Further, the corridor room of two or more than two is arranged side by side on bridge floor, it is two neighboring vertical in every corridor room
Between post, and the adjacent upright posts in adjacent two corridors room between connect to form frame structure by longitudinal and cross beam;Wherein, indulge
Beam and crossbeam are girder steel, and longeron is arranged along the direction vertical with bridge floor, and crossbeam moves towards arrangement along bridge floor.
The beneficial effects of the utility model are, it is adaptable to the shelter bridge structure of large span, ensure shelter bridge stability in the large and
On the premise of safety, the thickness of its bridge can greatly reduce, and reduce cost, also reduce the ratio that blocks water of shelter bridge.
Description of the drawings
Fig. 1 is the structural representation of this utility model new steel structure shelter bridge base structure.
In figure, 1. bridge post, 2. bridge pier, 3. horizontal binder, 4. girder steel, 5. bridge floor, 6. bearing, 7. cushion cap, 8. basic.
Specific embodiment
With reference to the accompanying drawings and detailed description this utility model is described in detail.
This utility model provides a kind of new steel structure shelter bridge base structure, referring to Fig. 1, including two rows being set up in parallel
Bridge pier 2 and the bridge floor 5 above bridge pier 2, are provided with corridor room above bridge floor 5.Near the one of 5 bottom of bridge floor on each bridge pier 2
End is connected by beam lattice architecture in length and breadth.Beam lattice architecture includes several girder steels 4 in length and breadth.Wherein, girder steel 4 is according to following
Structure setting:Move towards to connect by girder steel 4 between each bridge pier 2 for arranging along bridge floor, edge is moved towards vertical direction with bridge floor and set
Connect also by girder steel 4 between the bridge pier two-by-two 2 put.
As shelter bridge load-bearing is than larger, and highway bridge load-bearing is less, if directly built above existing highway bridge
If corridor room, the load of common road bridge floor can be caused to increase 35-40 times, necessarily so that its beam thickness is greatly increased, resulted in
When the beam bottom of highway bridge and shelter bridge is in same plane, the bridge floor of the bridge floor and shelter bridge of highway bridge is difficult to be in sustained height.
If the fine strain of millet of bridge floor 5 is thicker than height, the abutment at shelter bridge two ends will be very high, then need to build higher step by bridge and ground
Connection, gives people the current shelter bridge of car and causes difficulty.
It is and in this utility model, will be connected by beam lattice architecture in length and breadth between bridge post 1 two-by-two, and mixed using reinforcing bar
Solidifying soil is poured and is formed so that form firm tower structure between each bridge post 1, and the load undertaken on bridge floor 5 can pass through
This in length and breadth beam lattice architecture be transferred on bridge pier 2, and bridge floor is not subject to, so so that the beam thickness of bridge floor 5 can be much
It is thick less than the beam of common shelter bridge so that when the beam bottom of shelter bridge and highway bridge is located at same level, the bridge floor of highway bridge and
The bridge floor of shelter bridge is also at sustained height, it is ensured that the overall planarization in road surface.
By taking the shelter bridge of 20 meters of across footpaths as an example, due to 35~40 times that the load of shelter bridge is common road bridge, if according to general
The structure design of bridge accessible by road, then the fine strain of millet thickness of bridge floor 5 need to be designed as 2.5~3 meters, and adopt the application new steel structure shelter bridge
The structure of base structure, the fine strain of millet thickness of bridge floor 5 only need to be designed as 0.8~1 meter, greatly save the cost of shelter bridge.
The basis 8 of underwater foundation is connected to below each bridge pier 2 by cushion cap 7;Each 2 epimere of bridge pier is bridge post 1, each
Girder steel 4 is all connected between each bridge post 1, is connected to the bottom of bridge floor 5 above each bridge post 1 by bearing 6.Walk with bridge floor on edge
Horizontal binder 3 is connected between the post of bridge two-by-two 1 arranged to vertical direction.Horizontal binder 3 can increase by two bridge posts 1
Between stability.
Each bridge post 1 is from bottom to up through the agent structure of the bridge floor 5 and each layer of corridor room of connection shelter bridge.Wherein corridor room
Agent structure includes several steel structural upright columns, girder and secondary beam, and each column is parallel with bridge post 1, girder and secondary beam and bridge post 1
Vertically.
When a corridor room is arranged on bridge floor 5, connected by longitudinal and cross beam between the two neighboring column in corridor room
Form frame structure;It is when the corridor room of two or more than two is arranged side by side on bridge floor 5, two neighboring vertical in every corridor room
Between post, and the adjacent upright posts in adjacent two corridors room between connect to form frame structure by longitudinal and cross beam.
Wherein, longitudinal and cross beam is girder steel 4, and along the direction vertical with bridge floor 9, longeron arranges that crossbeam is along bridge floor 9
Move towards arrangement.As each bridge post 1 runs through in the agent structure of bridge floor 5 and each layer of corridor room of shelter bridge, so from bottom to up
The integral structure shelter bridge of abutment under upper frame has been constructed just.So, the load in every layer of corridor room is just by accordingly in length and breadth
Joist support is carried on a shoulder pole, and by per layer of beam in length and breadth by load transfer to bridge pier 2 so that the Integral Loading of shelter bridge is born by bridge pier 2, and
Bridge floor 5 is not subject to so that beam thickness can be far smaller than that the beam of common shelter bridge is thick.
A kind of construction method of new steel structure shelter bridge base structure of this utility model is:First on request bridge foundation,
I.e. cushion cap and bridge pier etc. are built up;Again each concrete bridge post 1 is constructed to upwards at the position of 5 bottom of bridge floor, then will
The built-in fitting of steel construction is nuzzled the top of each bridge post 1 in advance, then with girder steel 4 by the built-in fitting connection at the top of each bridge post 1 shape
Into beam lattice architecture in length and breadth, then each girder steel 4 is linked together with corresponding bridge post 1 by concrete casting;Finally, exist
Frame structure corridor room is built on bridge floor 5, specially:Each bridge post 1 continues up construction, and through connection shelter bridge bridge floor 9 to
In the agent structure in every corridor room, by the adjacent upright posts between the two neighboring column in corridor room, and/or two neighboring corridor room it
Between by girder steel 4 connection form frame structure.
To sum up, bridge structure under the exclusive upper frame of this utility model is material is thus formed, wherein beam lattice system is tied in length and breadth
Frame structure between structure and corridor room is steel construction.The load of shelter bridge is just transformed into bridge post 1,2 and of bridge pier successively by girder steel 4
On basis 8, and bridge floor 5 is not subject to load so that beam thickness can be far smaller than that the beam of common shelter bridge is thick.And, this utility model
The structure on each 1 top of bridge post is connected using girder steel 4, the engineering time can be caused to shorten;Meanwhile, it is being unsuitable for taking completely in river surface
Where hall frame, shelter bridge basis is built using this utility model new steel structure shelter bridge base structure, deep water can be solved and be applied
A difficult problem for work.
Claims (6)
1. new steel structure shelter bridge base structure, including two row's bridge piers (2) being set up in parallel and the bridge floor being located above bridge pier (2)
(5), it is characterised in that be provided with corridor room above bridge floor (5), by beam lattice architecture in length and breadth between bridge pier (2)
Connection, junction are respectively positioned on bridge pier (2) near one end of the bridge floor (5) bottom, and the lattice architecture of beam in length and breadth includes
Several girder steels (4), wherein, girder steel (4) is according to following structure setting:Along bridge floor move towards arrange two neighboring bridge pier (2) it
Between connected by girder steel (4), along moving towards between the two neighboring bridge pier (2) that vertical direction is arranged also by girder steel with bridge floor
(4) connect.
2. new steel structure shelter bridge base structure as claimed in claim 1, it is characterised in that each bridge pier (2) it is upper
Duan Weiqiao posts (1), each described girder steel (4) are all connected between each bridge post (1), and each described bridge post (1) is passed through from bottom to up
The agent structure of the bridge floor (5) and each layer of corridor room of connection shelter bridge is worn, the agent structure in the corridor room includes several steel constructions
Column, each described column are parallel with bridge post (1).
3. new steel structure shelter bridge base structure as claimed in claim 2, it is characterised in that along vertical with bridge floor (5) trend
Direction arrange two neighboring bridge post (1) between be connected with horizontal binder (3).
4. the new steel structure shelter bridge base structure as described in any one in claim 1-3, it is characterised in that described in each
The basis (8) of underwater foundation is connected to below bridge pier (2) by cushion cap (7).
5. new steel structure shelter bridge base structure as claimed in claim 2 or claim 3, it is characterised in that described each bridge post (1) is pushed up
End is by bearing (6) through the bottom for being connected to bridge floor (5).
6. new steel structure shelter bridge base structure as claimed in claim 1 or 2, it is characterised in that on bridge floor (5) side by side
The corridor room of two or more than two is provided with, between the two neighboring column in per corridor room, and adjacent two corridors room
Adjacent upright posts between connect to form frame structure by longitudinal and cross beam;Wherein, longitudinal and cross beam is girder steel (4), and
Longeron arranged along the direction vertical with bridge floor (9), and crossbeam moves towards arrangement along bridge floor (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620916149.9U CN206034264U (en) | 2016-08-22 | 2016-08-22 | Novel steel construction shelter bridge foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620916149.9U CN206034264U (en) | 2016-08-22 | 2016-08-22 | Novel steel construction shelter bridge foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206034264U true CN206034264U (en) | 2017-03-22 |
Family
ID=58306005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620916149.9U Active CN206034264U (en) | 2016-08-22 | 2016-08-22 | Novel steel construction shelter bridge foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206034264U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120531A (en) * | 2016-08-22 | 2016-11-16 | 田海荣 | New steel structure shelter bridge base structure and construction method thereof |
CN108797302A (en) * | 2018-06-28 | 2018-11-13 | 中南林业科技大学 | A kind of laminated wood shelter bridge |
-
2016
- 2016-08-22 CN CN201620916149.9U patent/CN206034264U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120531A (en) * | 2016-08-22 | 2016-11-16 | 田海荣 | New steel structure shelter bridge base structure and construction method thereof |
CN108797302A (en) * | 2018-06-28 | 2018-11-13 | 中南林业科技大学 | A kind of laminated wood shelter bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101824800B (en) | Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam | |
CN102839678B (en) | Structure for improving rigidity and stability of foundation pit steel support | |
CN101215819B (en) | Separated double-layer bridge-floor cable stayed bridge | |
CN105625572A (en) | Prefabricated prestressed concrete frame beam-column joint making disparate use of high performance materials | |
CN203247495U (en) | Pedestrian rope bridge | |
CN111502347A (en) | Three-layer single-column assembled elevated station for rail transit | |
CN107245953A (en) | The bent device and crossed construction method of a kind of multilayer bridge structure | |
CN104652288A (en) | Construction system of cast-in-situ large-tonnage box girder for soft soil foundation and construction method | |
CN206034264U (en) | Novel steel construction shelter bridge foundation structure | |
CN203768785U (en) | Corrugated steel web combined bridge allowing passing through on double layers | |
CN206034271U (en) | Novel shelter bridge concrete foundation structure | |
CN203603073U (en) | Reinforced concrete lattice type composite platform beam of elevated station | |
CN202369930U (en) | Door opening type bearing framed bent device for multiplayer concrete box girder | |
CN207260605U (en) | A kind of super plane structure construction material transport system | |
CN214271705U (en) | Bent cap reinforcing bar ligature bed-jig | |
CN106120531A (en) | New steel structure shelter bridge base structure and construction method thereof | |
CN105603878B (en) | A kind of quick method for traversing in concrete box girder high-altitude | |
CN115787710A (en) | Station and bridge combined construction structure based on single-column station and construction method thereof | |
CN209854576U (en) | Trolley for construction of cover plate culvert or channel | |
CN205115988U (en) | Part earth anchor height tower cable -stay bridge structure | |
CN212771950U (en) | Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam | |
CN106120541A (en) | Novel gallery bridge concrete foundation structure and construction method thereof | |
CN107288025A (en) | The asymmetric span of formula is held in one kind mixing thrust CFST Arch Bridge | |
CN208917696U (en) | A kind of superelevation beam-column type bracket | |
CN207130736U (en) | Formwork support for assisting reverse construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |