CN206000669U - A kind of hydroelectric installation - Google Patents

A kind of hydroelectric installation Download PDF

Info

Publication number
CN206000669U
CN206000669U CN201620916285.8U CN201620916285U CN206000669U CN 206000669 U CN206000669 U CN 206000669U CN 201620916285 U CN201620916285 U CN 201620916285U CN 206000669 U CN206000669 U CN 206000669U
Authority
CN
China
Prior art keywords
worm shaft
pedestal
bearing
hydroelectric installation
tubular track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620916285.8U
Other languages
Chinese (zh)
Inventor
杨海师
何东
黄�俊
舒洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Gearbox Co Ltd
Original Assignee
Chongqing Gearbox Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Gearbox Co Ltd filed Critical Chongqing Gearbox Co Ltd
Priority to CN201620916285.8U priority Critical patent/CN206000669U/en
Application granted granted Critical
Publication of CN206000669U publication Critical patent/CN206000669U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Hydraulic Turbines (AREA)

Abstract

The utility model discloses a kind of hydroelectric installation, including:Pedestal;The tubular track being inclined and mounted on pedestal, tubular track are the first default angle with the angle of inclination of pedestal, and the entrance of tubular track can be turned on water source;The worm shaft in tubular track is may be rotatably mounted at, the output end of worm shaft is connected with generator, and worm shaft is obliquely installed in the second default angle with pedestal;Multiple helical blades on worm shaft, the inwall of that side that the rotating diameter of helical blade is connected with pedestal with tubular track have default gap.The hydroelectric installation that the utility model is provided, during use, under the flow action at water source, helical blade rotates, and drives worm shaft, and rotatory force is passed to generator and is converted to electric power output by worm shaft.The utility model avoids the power generation mode that barrage is built a dam, and ecological, environmental protective, nothing environmental disruption.And by being input into, toward tubular track, the rotation that water can achieve helical blade, improve the utilization rate of current.

Description

A kind of hydroelectric installation
Technical field
The utility model is related to TRT field, more particularly to a kind of hydroelectric installation.
Background technology
At present, China is generated electricity mainly by thermal power generation, as current oil, natural gas, coal resources are increasingly short so that Cost of electricity-generating is high, and environmental pollution is serious.Traditional hydroelectric generation typically by the way of dam retaining is repaiied, using water fall impact The hydraulic turbine rotarily drives electrical power generators.This hydroelectric generation mode gigantic project, current utilization rate are low, inject capital into many, with When retaining a large amount of arable lands can be caused to disappear, population is migrated in a large number, is not suitable for that China human mortality is many, and arable land is few, and rivers dry season is longer National conditions.
Therefore, current utilization rate during generating how is improved, reduces cost of electricity-generating, it is to avoid environmental pollution is art technology Personnel's technical problem urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of hydroelectric installation, to improve current utilization rate during generating, reduces Cost of electricity-generating, it is to avoid environmental pollution.
To achieve these goals, the utility model provides following scheme:
A kind of hydroelectric installation, including:
Pedestal;
The tubular track being inclined and mounted on the pedestal, the tubular track are first with the angle of inclination of the pedestal Default angle, the entrance of the tubular track can be turned on water source;
The worm shaft in the tubular track is may be rotatably mounted at, the output end of the worm shaft is connected with generator, and The worm shaft is obliquely installed in the second default angle with the pedestal;
Multiple helical blades on the worm shaft, the rotating diameter of the helical blade and the tubular track The inwall of that side being connected with the pedestal has default gap.
Preferably, in above-mentioned hydroelectric installation, the number of the helical blade is 2-5, and the helical-blade Piece is distributed on the worm shaft.
Preferably, in above-mentioned hydroelectric installation, the first default angular range and the second default angle Degree scope is 31 degree to 37 degree.
Preferably, in above-mentioned hydroelectric installation, the axis coinciding of the axle center of the worm shaft and the tubular track, And the default interstice coverage is the 0.11%-0.15% of the rotating diameter of the helical blade.
Preferably, in above-mentioned hydroelectric installation, the guiding groove on the top for also including to be arranged on pedestal, the guiding groove It is arranged between entrance and the water source of the tubular track.
Preferably, in above-mentioned hydroelectric installation, bearing block and bearing are also included;
On the pedestal, the outer ring of the bearing is arranged on the bearing block bearing block, the bearing Inner ring the worm shaft is installed.
Preferably, in above-mentioned hydroelectric installation, the bearing block includes top chock and step;
The bearing includes upper bearing (metal) and lower bearing;
In the upper bearing (metal), the upper bearing (metal) is arranged on the top chock, institute on the top of the worm shaft Top chock is stated on the pedestal;
In the lower bearing, the lower bearing is arranged on the step, institute for the bottom of the worm shaft Step is stated on the pedestal.
Preferably, in above-mentioned hydroelectric installation, the bearing is water lubriucated bearing.
Preferably, in above-mentioned hydroelectric installation, gearbox, the input of the gearbox and the worm screw are also included The output end connection of axle, the output end of the gearbox are connected with the input of the generator.
Preferably, in above-mentioned hydroelectric installation, first shaft coupling and second shaft coupling are also included;
The first shaft coupling is used for connecting the input of the gearbox and the output end of the worm shaft;
The second shaft coupling is used for connecting the output end of gearbox and the input of the generator.
It can be seen from above-mentioned technical scheme that, the hydroelectric installation that the utility model is provided, during use, water source is defeated Enter tubular track, as worm shaft is may be rotatably mounted in tubular track, tubular track inclination is on pedestal, and worm shaft Also arrange with basement tilt, therefore, under the flow action at water source, helical blade rotates, and drives worm shaft, worm shaft will Rotatory force is passed to generator and is converted to electric power output.The utility model avoids the power generation mode that barrage is built a dam, with ecological ring Protect, nothing the advantage of environmental disruption.And by being input into, toward tubular track, the rotation that water can achieve helical blade, improve current Utilization rate.
Description of the drawings
In order to be illustrated more clearly that the utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying novelty work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
The structural representation of the hydroelectric installation that Fig. 1 is provided for the utility model;
The cross section structure diagram of the hydroelectric installation that Fig. 2 is provided for the utility model.
Wherein, Tu1-2Zhong:
Pedestal 1, bracing frame 101, upper support frame 102, lower bracing frame 103, tubular track 2, worm shaft 3, generator 4, spiral shell Vane piece 5, guiding groove 6, bearing block 7, bearing 8, top chock 701, step 702, upper bearing (metal) 801, lower bearing 802, increasing Fast case 9, first shaft coupling 10, second shaft coupling 11.
Specific embodiment
In order that those skilled in the art is better understood from the technical solution of the utility model, below in conjunction with the accompanying drawings and tool The utility model is described in further detail for body embodiment.
Embodiment one
Fig. 1-2 is referred to, the utility model discloses a kind of hydroelectric installation, including pedestal 1, tubular track 2, worm screw Axle 3 and helical blade 5.Wherein, pedestal 1 is concrete pedestal 1 or metal support pedestal 1, and tubular track 2 is inclined and mounted on On pedestal 1, for the ease of the installation of tubular track 2, dismounting and maintenance, tubular track 2 is bolted on pedestal 1, Specifically, bracing frame 101 can be installed on pedestal 1, tubular track 2 is installed by bracing frame 101;Tubular track 2 and pedestal 1 Angle of inclination is the first default angle, and the entrance of tubular track 2 can be turned on water source;Worm shaft 3 may be rotatably mounted at cylinder In shape track 2, the output end of worm shaft 3 is connected with generator 4, and worm shaft 3 is inclined in the second default angle with pedestal 1 and set Put;Multiple helical blades 5 on the worm shaft 3, the rotating diameter of helical blade 5 and tubular track 2 be connected with pedestal 1 that The inwall of side has default gap, and default gap refers to that current, when tubular track 2 is flowed down, can drive helical-blade herein The gap that piece 5 is rotated.
The hydroelectric installation that the utility model is provided, during use, water source is input into tubular track 2, in the current at water source Under effect, multiple helical blades 5 are driven to rotate successively, and then drive worm shaft 3 to rotate, and rotatory force is passed to and sent out by worm shaft 3 Motor 4 is converted to electric power output.The utility model avoids the power generation mode that barrage is built a dam, with ecological, environmental protective, broken nothing environment Bad advantage.And by being input into, toward tubular track 2, the rotation that water can achieve helical blade 5, improve the utilization rate of current.
Embodiment two
The water in hydroelectric installation and embodiment one in another embodiment, in the present embodiment is provided in the utility model The structure of power generation device is similar to, and something in common is just repeated no more, only introduces difference.
In the present embodiment, piscine organism is impacted in order to avoid worm shaft 3 rotates, the utility model discloses worm screw The rotating speed of axle 3 is less than 50rpm.
In an embodiment, the number for specifically disclosing helical blade 5 is 2-5, and helical blade 5 is distributed on worm shaft On 3, the rotating torque for realizing helical blade 5 to worm shaft 3 is uniform.
Utility model people of the present utility model is obtained through repeatedly arduous experiment:When the first default angular range and When second default angular range is 31 degree to 37 degree, the utilization rate highest of current.Now, the axle center of worm shaft 3 and tubular The axis coinciding of track 2, and default interstice coverage is the 0.11%-0.15% of the rotating diameter of helical blade 5, so may be used also To ensure little tubular track 2 is used, current utilization rate is improved further.
It is transported in tubular track 2 for the ease of water source, the utility model discloses hydroelectric installation also includes to arrange In the guiding groove 6 on the top of pedestal 1, guiding groove 6 is arranged between the entrance of tubular track 2 and water source.Guiding groove 6 can also be used Tubular structure replaces.Guiding groove 6 is arranged on the end face on the top of pedestal 1, is easy to form difference in height with tubular track 2.
Further, the utility model discloses hydroelectric installation also includes bearing block 7 and bearing 8, by 8 He of bearing Bearing block 7 realizes being rotatably connected for worm shaft 3 and tubular track 2;Wherein, bearing block 7 is arranged on pedestal 1, outside bearing 8 On bearing block 7, the inner ring of bearing 8 installs worm shaft 3 to circle.
Closer, the utility model specifically discloses bearing block 7 includes top chock 701 and step 702;Axle Holding 8 includes upper bearing (metal) 801 and lower bearing 802;In upper bearing (metal) 801, upper bearing (metal) 801 is installed in upper on the top of worm shaft 3 On bearing block 701, top chock 701 is arranged on pedestal 1, for the ease of realizing the installation of top chock 701 and pedestal 1, Upper support frame 102 is installed on pedestal 1, top chock 701 is on upper support frame 102;The bottom of worm shaft 3 is arranged on lower axle Hold in 802, on step 702, step 702 is arranged on pedestal 1, for the ease of under realization lower bearing 802 Bearing block 702 and the installation of pedestal 1, install lower bracing frame 103 on pedestal 1, and step 702 is arranged on lower bracing frame 103 On.By upper bearing (metal) 801 and lower bearing 802 being respectively mounted on the top of worm shaft 3 and bottom, realize stablizing to worm shaft 3 Support.
It should be noted that the number of bearing block 7 and bearing 8 can also be arranged as required to.
Wherein, the top of worm shaft 3 refers to worm shaft 3 near that end of generator 4, and the bottom of worm shaft 3 refers to worm screw Axle 3 is away from that end of generator 4.
As upper bearing (metal) 801 is typically in the upper end of current liquid level, and lower bearing 802 is usually under the current page End, it is therefore preferable that upper bearing (metal) 801 adopts grease lubrication bearing, it is desirable to which upper bearing (metal) 801 can be born radially with sealing structure Power and thrust;It is preferred that lower bearing 802 is water lubriucated bearing, radial load can be born.
In order to improve the generating efficiency of generator 4, the utility model discloses hydroelectric installation also includes gearbox 9, The input of gearbox 9 is connected with the output end of worm shaft 3, and the output end of gearbox 9 is connected with the input of generator 4.Its In, gearbox 9 can adopt parallel stage gear drive, it would however also be possible to employ toothed belt transmission, can also be mixed using gear and transmission belt The mode of transmission is closed, and then generator 4 is passed to after the rotating speed for realizing transmitting worm shaft 3 is improved.
For the ease of realizing the connection of gearbox 9 and worm shaft 3 and gearbox 9 and generator 4, the utility model discloses Hydroelectric installation also includes first shaft coupling 10 and second shaft coupling 11;First shaft coupling 10 is used for connecting the defeated of gearbox 9 Enter the output end at end and worm shaft 3;Second shaft coupling 11 is used for connecting the output end of gearbox 9 and the input of generator 4.
The hydroelectric installation that the utility model is provided, during use, water source is input into tubular track 2, in the current at water source Under effect, multiple uniform helical blades 5 are driven to rotate successively, and then drive worm shaft 3 to rotate, and power is passed by worm shaft 3 To gearbox 9, after 9 speedup of gearbox, rotatory force is passed to generator 4 and is converted to electric power output.The utility model is avoided The power generation mode that barrage is built a dam, with ecological, environmental protective, nothing the advantage of environmental disruption.And by being input into water toward tubular track 2 be The rotation of achievable helical blade 5, improves the utilization rate of current.
The utility model has advantages below:
(1) compared with the utility model is generated electricity with conventional hydraulic, having evaded traditional power station needs Store water, and quantities is big, Investment is big, it also avoid immigrant, soil erosion, changes the harm such as ecoclimate environment;
(2) rotary speed of the utility model helical blade 5 will not be impacted to biologies such as fish slowly;
(3) large-scale with respect to device of the prior art heavy, substantial amounts of civil engineering etc. is needed, the utility model is adopted By hydroelectric installation integral installation, few to environmental disruption.
" first ", " second " in the utility model etc. is in description and is distinguished, and does not have other particular meanings.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or new using this practicality Type.Multiple modifications to these embodiments will be apparent for those skilled in the art, be determined herein The General Principle of justice can be realized in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with novel features.

Claims (10)

1. a kind of hydroelectric installation, it is characterised in that include:
Pedestal (1);
The tubular track (2) being inclined on the pedestal (1), the inclination angle of tubular track (2) and the pedestal (1) Spend for the first default angle, the entrance of tubular track (2) can be turned on water source;
May be rotatably mounted at the worm shaft (3) in tubular track (2), the output end of worm shaft (3) and generator (4) Connect, and the worm shaft (3) is obliquely installed in the second default angle with the pedestal (1);
Multiple helical blades (5) on the worm shaft (3), the rotating diameter of helical blade (5) and the cylinder The inwall of that side that shape track (2) is connected with the pedestal (1) has default gap.
2. hydroelectric installation according to claim 1, it is characterised in that the number of helical blade (5) is 2-5 Individual, and the helical blade (5) is distributed on the worm shaft (3).
3. hydroelectric installation according to claim 1, it is characterised in that the first default angular range and described The preset range of second angle is 31 degree to 37 degree.
4. hydroelectric installation according to claim 1, it is characterised in that the axle center of worm shaft (3) and the cylinder The axis coinciding of shape track (2), and the default interstice coverage is the 0.11%- of the rotating diameter of helical blade (5) 0.15%.
5. hydroelectric installation according to claim 1, it is characterised in that also include to be arranged on the top of pedestal (1) Guiding groove (6), guiding groove (6) are arranged between the entrance of tubular track (2) and the water source.
6. hydroelectric installation according to claim 1, it is characterised in that also include bearing block (7) and bearing (8);
Described bearing block (7), on pedestal (1), the outer ring of bearing (8) is arranged on bearing block (7), The inner ring of bearing (8) installs worm shaft (3).
7. hydroelectric installation according to claim 6, it is characterised in that described bearing block (7) include top chock And step (702) (701);
Described bearing (8) include upper bearing (metal) (801) and lower bearing (802);
In upper bearing (metal) (801), described upper bearing (metal) (801) are arranged on the upper shaft on the top of worm shaft (3) In bearing (701), described top chock (701) are on pedestal (1);
In lower bearing (802), described lower bearing (802) are arranged on the lower axle for the bottom of worm shaft (3) In bearing (702), described step (702) are on pedestal (1).
8. hydroelectric installation according to claim 7, it is characterised in that described lower bearing (802) are water lubriucated bearing.
9. the hydroelectric installation according to any one in claim 1-8, it is characterised in that also include gearbox (9), The input of gearbox (9) is connected with the output end of the worm shaft (3), the output end of gearbox (9) with described The input connection of generator (4).
10. hydroelectric installation according to claim 9, it is characterised in that also include first shaft coupling (10) and second Shaft coupling (11);
Described first shaft coupling (10) are used for connecting the input of the gearbox (9) and the output end of the worm shaft (3);
Described second shaft coupling (11) are used for connecting the output end of gearbox (9) and the input of the generator (4).
CN201620916285.8U 2016-08-22 2016-08-22 A kind of hydroelectric installation Expired - Fee Related CN206000669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620916285.8U CN206000669U (en) 2016-08-22 2016-08-22 A kind of hydroelectric installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620916285.8U CN206000669U (en) 2016-08-22 2016-08-22 A kind of hydroelectric installation

Publications (1)

Publication Number Publication Date
CN206000669U true CN206000669U (en) 2017-03-08

Family

ID=58196639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620916285.8U Expired - Fee Related CN206000669U (en) 2016-08-22 2016-08-22 A kind of hydroelectric installation

Country Status (1)

Country Link
CN (1) CN206000669U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089552A (en) * 2016-08-22 2016-11-09 重庆齿轮箱有限责任公司 A kind of hydroelectric installation
CN108590917A (en) * 2018-04-28 2018-09-28 武俊洲 A kind of efficient water turbine of the self-complementary energization of interior empty external pressure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089552A (en) * 2016-08-22 2016-11-09 重庆齿轮箱有限责任公司 A kind of hydroelectric installation
CN108590917A (en) * 2018-04-28 2018-09-28 武俊洲 A kind of efficient water turbine of the self-complementary energization of interior empty external pressure

Similar Documents

Publication Publication Date Title
CN106089552A (en) A kind of hydroelectric installation
CN204357630U (en) A kind of pile foundation vertical shaft direct drive tidal power generating device
WO2012016415A1 (en) Double-reverse-direction folding-type horizontal axial tidal energy turbine
CN109026511A (en) A kind of floatation type trunnion axis runner wave-energy power generation equipment and its application
CN107355338B (en) A flowing water power generation device
CN206000669U (en) A kind of hydroelectric installation
CN204458194U (en) A kind of energy-efficient hydroelectric generator
CN109026514A (en) A kind of ocean power generating device reducing power generation process inhibition
CN107461291B (en) Down-stroke type waterwheel for low-head miniature hydropower station
CN109973314A (en) A new type of offshore floating feng shui synchronous generator set
CN202645835U (en) Automatic blade opening/closing type ocean current energy power generation device
CN204610121U (en) A kind of direct current double click type horizontal shaft water-turbine
CN105134454A (en) Low-speed vertical-axis water generator
CN104165115A (en) Hydroelectric power generation device and method
CN210769146U (en) Wind-solar-wave multi-energy integrated offshore power generation device
CN203189197U (en) Novel self-starting Darrieus-Savonius combined vertical shaft wind turbine
CN108223238A (en) A kind of wave turbine and ocean wave turbine formula hydropower generating device
US20170250590A1 (en) System for Method for Generating Hydro Electricity
CN105649859A (en) Thrust-free horizontal mixed-flow water turbine generator set for double-ended drive and generating method of thrust-free horizontal mixed-flow water turbine generator set
CN203532155U (en) Fluid energy collection and conversion device and energy transfer and output device and generating equipment
CN205078392U (en) Take acceleration mechanism's vertical axis rivers generator
CN106401838B (en) The concentric blade self-locking turbine of multiaxis
CN103470443B (en) Fluid energy collection and conversion device and energy transferring output unit and power generating equipment
CN205078391U (en) Low -speed vertical axis rivers generator
CN210106057U (en) Double-runner combined water turbine driven naturally by river water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20210822