- CN205999778U CN205999778U CN201620939945.4U CN201620939945U CN205999778U CN 205999778 U CN205999778 U CN 205999778U CN 201620939945 U CN201620939945 U CN 201620939945U CN 205999778 U CN205999778 U CN 205999778U
- Authority
- CN
- China
- Prior art keywords
- padding plate
- upper padding
- bearing
- transfer device
- load transfer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of uniform load transfer device of the bearing for having gradient precast beam, belongs to bridge construction field.The device upper opening, is internally formed a cavity.The main upper padding plate for including to be placed on bearing, on upper padding plate section metal bellows, along one becket of connection on bellows.Bellows is closely connected with upper padding plate and becket.Becket is pasted onto on the embedded board of prefabricated soffit, and holds out against fixation by the threaded rod through upper padding plate.Upper padding plate has mud jacking hole and slurry outlet, screws in madjack pipe and grout outlet respectively.High-strength mortar is pressed into into cavity by madjack pipe, slurries is just had after pressure is full and is flowed out from slurry outlet.The utility model simple structure, is easy to field fabrication, easy for installation, is suitable for acclive prefabricated beam support and installs, it is to avoid seat empty and the serious non-uniform phenomenon of stress occurs.
Description
Technical field
The utility model belongs to bridge construction field, is related to a kind of uniform load transfer device of bearing for having gradient precast beam, can
Avoid the occurrence of seat empty and the serious non-uniform phenomenon of stress.
Background technology
At present, in middle or small bridge beam, adopt high elastic rubber sheet-type support more, its planform generally circular in cross section or
Rectangle.The bridge pad of this form is for conventional orthogonal, horizontal plate-girder, a kind of preferable form of can yet be regarded as.In recent years, with
The high speed development of urban road and highway, substantial amounts of curved bridge, slope bridge is occurred in that, sometimes bridge bottom surface is more than
There is the gradient in direction across bridge, in vertical bridge to there is also the gradient.This brings great difficulty to the installation of bearing.Even level is propped up
Seat, in 4 bearings of one piece of prefabricated board, it would still be possible to there is the bearing for coming to nothing.In view of construction error, it is impossible in the pre- of beam slab
When processed, make each Bearing Seat Force uniform by the thickness or angle of inclination of the embedded board of every piece of prefabricated board of adjustment.Mishandling, then
The pressure distribution that beam slab passes to pier by bridge pad is just very uneven, and the bias of generation causes that bridge pad is monolateral to be received
Power, i.e. bridge pad have that stress is overweight, the phenomenon that another side does not almost stress.
Requirement that laminated rubber bearing can only horizontal positioned stress, therefore by adjust base-plate method not
A difficult problem installed by the bearing of the beam slab that can solve very well to there is slope.Utility model as Patent No. ZL01239234.0 is disclosed
A kind of adjustable basin type bridge pedestal, is provided with basin ring on its lower seat board, and the basin ring is by adjustable screw mechanism and lower seat board
Connection.After rotary screw mechanism, the absolute altitude of bearing can be adjusted by increaseing or decreasing the quantity of steel pad.The device is applied to plate
During formula rubber support, the situation effect to bridge bottom surface level is preferable, and the precast beam that all there is inclination to both direction is then incompetent
For power.
Although certain adjustment effect can be played using the coronal circular plate rubber bearing of Intermediate Gray projection, when top is tied
When the beam body gradient of structure is larger, monolateral stress can not still obtain basic solution.The invention of Publication No. CN105239502A is special
Profit discloses a kind of bridge pad uniform load transfer device and its installation method.Its stressed regulating device is steel plate spherical crown polymer
Mortar structure, because construction error, the size of wherein spherical crown are difficult to meet field requirement, increased installation difficulty.Publication No.
The patent of invention of CN101220578A discloses a kind of regulatable supporter, by disposing a press expansion body on bearing, then
Curable liquid is injected into press expansion body, so as to more ideally solve the problems, such as that beam body has slope.Which dilates change
Body vertical and lateral dimension during press-in curable liquid changes, a generally flexible pocket.Because of press expansion body
Typically it is made by rubber, needs custom-made, and aging with rubber, the absolute altitude of beam slab can change, because of each rubber
The degree of aging of colloid is not necessarily identical, and portion of standoff still occurs unbalance stress and phenomenon of coming to nothing.In addition, which dilates change
Body widthwise size after deformation and size wayward.
Content of the invention
The purpose of this utility model is to solve above-mentioned the deficiencies in the prior art and problem, there is provided one kind has slope
The uniform load transfer device of bearing of degree precast beam.The device is by upper padding plate, metal bellows, sealing ring and by upper padding plate
Bolt, the grout outlet for penetrating inboard aperture and pulp-inlet pipe composition that apertura lateralis is screwed in, form a sky with beam body lower surface after installation
Chamber, the cavity can be pressed into high-strength mortar by pulp-inlet pipe for closed in addition to the pore of grout outlet and pulp-inlet pipe.Bellows makes this
Device vertically scalable, so as to full-bridge using a kind of specification the device.The top and bottom of bellows respectively with sealing ring
Paste closely with upper padding plate.When installing the device, precession bolt, makes sealing ring closely close with the embedded board of beam body bottom surface upwards
Patch.Though metal bellows in the installation process of the device can longitudinal extension, after being bolted, shape is fixed, pressure
During slurry lateral dimension also change little, negligible.The device is easy to building site to make, easy for installation.
Further, the material of sealing ring is metal.The sealing ring rigidity of metal is larger, acts in the pressure of lower square bolt
Under, it can be ensured that the adhesive glue during mud jacking between sealing ring and embedded board does not ftracture.
The utility model simple structure, is easy to field fabrication, easy for installation, is suitable for acclive prefabricated beam support and installs,
Avoid the occurrence of seat empty and the serious non-uniform phenomenon of stress.Just by the device fix in position before mud jacking, during mud jacking
Also without observable deformation, for designing predetermined shape after slurry solidification in cavity.
Description of the drawings
Fig. 1 the utility model along indulge bridge to upright plane sectional view;
Fig. 2 precast beam schematic diagram;
Fig. 3 upright plane sectional view in local of the present utility model;
The top view of Fig. 4 upper padding plate;
The mark of in figure:1- sealing ring, 2- metal bellows, 3- upper padding plate, 4- apertura lateralis, 5- inboard aperture, 6- rubber are propped up
Seat, 7- lower bolster, 8- pinner, 9- embedded board, the prefabricated soffit of 10-, the prefabricated beam sides of 11-, 12- precast beam end face, 13- spiral shell
Bolt, 14- grout outlet, 15- pulp-inlet pipe, 16- bridge beam body.
Specific embodiment
Specific embodiment of the utility model is the following is, and combines accompanying drawing and the technical solution of the utility model is retouched
State, but the utility model is not limited to these embodiments.
Embodiment one
The corresponding schematic diagram of the present embodiment is shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4.Device in the present embodiment mainly includes upper padding plate
3rd, metal bellows 2 is connected with upper padding plate 3 and sealing ring 1 by epoxide-resin glue with sealing ring 1, metal bellows 2, so as to
Ensure that impermeability and the intensity of seam.The size of their threes matches.The edge of upper padding plate 3 is to the edge of rubber support 6
Minimum dimension is 3 centimeters.The thickness of upper padding plate 3 and sealing ring 1 is 1 centimeter.In compressive state, metal bellows 2 is formed
The wall thickness of cylinder is 1 centimeter, and the diameter of inboard aperture 5 and apertura lateralis 4 is 1 centimeter, and inboard aperture 5 and apertura lateralis 4 all have internal thread.
Bridge beam body 16 has prefabricated beam sides 11, precast beam end face 12 and prefabricated soffit 10, is embedded with pre-buried on prefabricated soffit 10
Plate 9.During the beam body 16 that builds a bridge, in each 6 one height adjustable temporary support of other placement of rubber support.Adjustment bridge beam body
After 16 horizontal level, it is placed on temporary support, temporary support is adjusted, makes the absolute altitude at the control point of bridge beam body 16
Meet design requirement.
Lower bolster 7, and strictly placement design attitude placement rubber support 6 is disposed on pinner 8, and guarantees its level.Will
Device of the present utility model is installed on rubber support 6, it is ensured that upper padding plate 3 is symmetrical in rubber support 6, inboard aperture 5 and apertura lateralis 4
Expose.In 1 upper surface uniform application epoxide-resin glue of sealing ring.Outwards side opening 4 screws in bolt 13 from bottom to top, screws in successively each
Bolt 13, it is to avoid sealing ring 1 produces excessive inclination, until the epoxide-resin glue contact embedded board 9 on sealing ring 1, and extrude
Colloid more uniform till.
After epoxy resin adhesive curing and after reaching the intensity of regulation, it is installed into grout outlet 14 into inboard aperture 5 respectively and enters slurry
Pipe 15.The length that pulp-inlet pipe 15 is screwed in is slightly larger than 1 centimeter, and 14 top of grout outlet releases 1 centimeter after arriving to embedded board 9 again.Can lead to
Cross pulp-inlet pipe 15 and high-strength mortar is slowly pressed into, when grout outlet 14 has slurries to flow out, then slowly grout outlet 14 is closed, in this mistake
Cheng Zhong, quick pressure injection high-strength mortar.Closing grout outlet 14 and pulp-inlet pipe 15, to be solidified, temporary support is removed, that is, completes bearing
Install.
Claims (2)
1. the uniform load transfer device of a kind of bearing for having gradient precast beam, it is characterised in that:By upper padding plate(3), metal bellows
(2), sealing ring(1), and pass through upper padding plate(3)On apertura lateralis(4)The bolt of screw-in(13), penetrate inboard aperture(5)Pulp
Pipe(14)And pulp-inlet pipe(15)Composition, forms a cavity with beam body lower surface after installation, and the cavity removes grout outlet(14)With enter
Slurry pipe(15)Pore outside for closed, pulp-inlet pipe can be passed through(15)Press-in high-strength mortar.
2. the uniform load transfer device of a kind of bearing for having gradient precast beam according to claim 1, it is characterised in that:Sealing ring
(1)Material be metal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620939945.4U CN205999778U (en) | 2016-08-25 | 2016-08-25 | A kind of uniform load transfer device of the bearing for having gradient precast beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620939945.4U CN205999778U (en) | 2016-08-25 | 2016-08-25 | A kind of uniform load transfer device of the bearing for having gradient precast beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205999778U true CN205999778U (en) | 2017-03-08 |
Family
ID=58196894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620939945.4U Expired - Fee Related CN205999778U (en) | 2016-08-25 | 2016-08-25 | A kind of uniform load transfer device of the bearing for having gradient precast beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205999778U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914250A (en) * | 2019-03-13 | 2019-06-21 | 上海市政工程设计研究总院(集团)有限公司 | A kind of the automatic adjusument pallet device and its construction method of prefabrication and assembly construction bridge |
-
2016
- 2016-08-25 CN CN201620939945.4U patent/CN205999778U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914250A (en) * | 2019-03-13 | 2019-06-21 | 上海市政工程设计研究总院(集团)有限公司 | A kind of the automatic adjusument pallet device and its construction method of prefabrication and assembly construction bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105484157B (en) | Positioning device and construction method of capping beam of prefabricated bridge | |
US5016338A (en) | Method for adjusting the vertical position of a frame on a foundation | |
CN102817324B (en) | Construction method for quickly installing pot rubber bearing by using epoxy resin mortar | |
CN110409317B (en) | Swivel spherical hinge and mounting method thereof | |
CN101634149A (en) | Prestressed anchor foundation pit support and construction method | |
JP2012102601A (en) | Height-adjustable bearing device for structure and height adjustment method of bearing device for structure | |
CN205999778U (en) | A kind of uniform load transfer device of the bearing for having gradient precast beam | |
CN102747782B (en) | A kind of adjustable steel structure support seat positioner | |
CN206986733U (en) | A kind of back-grouting device for track bridge spherical bearing | |
CN109555311A (en) | Adjustable waterproof guide wall form board support construction and its operational method | |
CN206554254U (en) | A kind of hinged column base structure of Steel Portal Frames | |
CN105887590A (en) | Height direction adjusting system and method after railway foundation subsidence | |
CN207244435U (en) | A kind of anchor and height-adjustable supports suitable for beam bridge | |
CN202187285U (en) | Basin type rubber support of cast-in-situ bridge | |
CN209339158U (en) | A kind of assembled deep foundation pit supporting structure | |
CN202302576U (en) | Adjustable foundation bolt for mounting equipment with larger vibration | |
CN108149926A (en) | Split bolt component and its application in water conservancy formwork for placing system | |
CN203730920U (en) | Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines | |
CN207348413U (en) | A kind of entirety ground sequence placing formwork supporting system | |
CN209339179U (en) | Levelling pre-buried structure for large scale equipment installation | |
CN208251057U (en) | Post-tensioning pile composite foundation | |
CN209066882U (en) | A kind of shear wall formwork installs size control device | |
CN106012820A (en) | Mounting method of bridge support | |
CN111779038A (en) | Partition variable permeability coefficient suspension type diaphragm wall structure and construction method thereof | |
CN212534193U (en) | Equipment foundation convenient to quick adjustment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170308 Termination date: 20190825 |