CN205975584U - Foundation pile for hydraulic engineering - Google Patents
Foundation pile for hydraulic engineering Download PDFInfo
- Publication number
- CN205975584U CN205975584U CN201620951282.8U CN201620951282U CN205975584U CN 205975584 U CN205975584 U CN 205975584U CN 201620951282 U CN201620951282 U CN 201620951282U CN 205975584 U CN205975584 U CN 205975584U
- Authority
- CN
- China
- Prior art keywords
- pile
- foundation pile
- hydraulic engineering
- screw rod
- center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a hydraulic engineering technical field especially relates to a foundation pile for hydraulic engineering. The to -be -solved technical problem of the utility model is to provide a foundation pile for hydraulic engineering that the foundation pile fixed firm, be difficult to rock, ground labour saving and time saving, simple structure, convenient operation during the end are squeezed into to the foundation pile. In order to solve the technical problem, the utility model provides a such foundation pile for hydraulic engineering is including pile head, the central pile body, bottom plate, foundation pile roof, bolster bearing housing, step, screw rod, toper piece, nut, inserted bar, connecting plate etc. The pile head top is equipped with the central pile body, and the bottom is equipped with the bottom plate in the internal cavity that is equipped with of central pile, cavity, is equipped with the step in the middle of the top of bottom, and central pile body top is equipped with the foundation pile roof, and the foundation pile roof is equipped with bolster bearing housing in the middle of the bottom, is equipped with the screw rod between bolster bearing housing and the step. The utility model discloses utilize during the inserted bar level stretches into soil, support fixedly to the foundation pile, prevent that the foundation pile from rocking.
Description
Technical field
This utility model is related to hydraulic engineering technical field, more particularly, to a kind of hydraulic engineering foundation pile.
Background technology
Hydraulic engineering is the every engineering built in order to control, using the water resources and environment with protection earth's surface and underground
The general name built.For eliminating water damage and the engineering developing water resource and building.It is divided into flood control works, agriculture by its service object
Field hydraulic engineering, hydraulic power project, navigation channel and port engineering, water supply and drainage system, environmental bydraulic engineering engineering, polder work
Journey etc..Can be the hydraulic engineering of the plurality of target such as flood control, water supply, irrigation, generating service simultaneously, referred to as comprehensively utilize water conservancy work
Journey.Hydraulic engineering needs to build dam, dike, spillway, sluice, water inlet, channel, crosses the different types of water such as mortise, log chute, fish pass
Work building, to realize its target.Foundation pile is one of building structure technical term, its implication will be understood it should be understood that
What is pile foundation, multi-column pier foundation and single-pile foundation.Pile foundation:By stake be connected to the basis that the cushion cap of stake top collectively constitutes.
If pile body is all embedded in soil, cushion cap bottom surface is contacted with the soil body, then referred to as embedded footing on piles, low capped pile foundation;If basseting and hold in pile body top
Platform bottom is located at more than ground, then referred to as elevated footing on piles.Building pile foundation is usually embedded footing on piles, low capped pile foundation plinth.
When current hydraulic engineering is built, need, using substantial amounts of foundation pile, to be used for building water conservancy based on utilizing foundation pile
Engineering construction, the foundation pile of existing hydraulic engineering exist foundation pile fix not firm, easily rock, foundation pile squeezes into time-consuming expense during ground end
Power, complex structure, the shortcoming of complex operation, therefore need that a kind of foundation pile of research and development is fixed, be not easy to rock, foundation pile squeezes into ground badly
The hydraulic engineering foundation pile that time saving and energy saving during bottom, structure is simple and convenient to operate.
Utility model content
(1)Technical problem to be solved
This utility model in order to overcome the foundation pile of existing hydraulic engineering fix not firm, easily rock, foundation pile squeezes into ground
Waste time and energy during bottom, the shortcoming of complex structure, complex operation, the technical problems to be solved in the utility model be provide a kind of foundation pile
Fixed, be not easy to rock, that foundation pile is squeezed into is time saving and energy saving during ground end, structure is simple and convenient to operate hydraulic engineering foundation pile.
(2)Technical scheme
In order to solve above-mentioned technical problem, this utility model provides such a hydraulic engineering foundation pile, includes stake
Head, center pile body, base plate, foundation pile top board, top chock, step, screw rod, circular cone, nut, inserted link, connecting plate, tooth
Wheel, tooth bar and T-shaped connecting rod, pile crown top is provided with center pile body, is provided with cavity in Center stake body, and cavity inner bottom part is provided with base plate,
It is provided with step, center pile body top is provided with foundation pile top board, foundation pile top board is provided with upper bearing (metal) in the middle of bottom in the middle of bottom dome
Seat, is provided with screw rod, in cavity, by-level is provided with connecting plate, screw rod upper and lower is all provided between top chock and step
There is nut, nut is coordinated with screw rod, is provided with circular cone, the center pile body upper and lower left and right sides all has little outside nut
Hole, little in the hole is provided with inserted link, and one end of inserted link is contacted with circular cone, and screw rod top is provided with gear, and center pile body top left side is opened
There is guide hole, in guide hole, be provided with T-shaped connecting rod, T-shaped connecting rod right-hand member is connected with tooth bar, tooth bar is located on rear side of gear, and wheel and rack is nibbled
Close.
Preferably, pile crown periphery uniform intervals have thread groove.
Preferably, also include triangle fixture block, center pile body left and right sides uniform intervals are provided with triangle fixture block.
Preferably, pile crown be shaped as coniform.
Preferably, circular cone be shaped as conical round table shape.
Preferably, inserted link outer end is tapered.
Operation principle:When hydraulic engineering needs using this foundation pile, first T-shaped connecting rod is pulled out, tooth bar is moved to the left, tooth
Wheel inverts therewith, and then drives screw rod reversion, and nut inverts spiral therewith and declines, and circular cone also can move down, and makes inserted link not
Center pile body can be stretched out;Then just this foundation pile can be squeezed into ground end, after being driven into correct position, manually promote T-shaped connecting rod to
Move right, band carry-over bar moves right, and gear is clockwise therewith, and then drive screw rod clockwise, nut clockwise spiral therewith, cone
Shape block moves up therewith, and inserted link moves in the lateral surface of circular cone, and inserted link reaches Center stake in vitro, is then inserted into soil
Interior.So inserted link just preferably can fix foundation pile, so that foundation pile will not be rocked.
Because pile crown periphery uniform intervals have thread groove, when foundation pile is squeezed into ground end, can be down to beat in rotation, spiral shell
Ground end is squeezed in rotation, more easily control can squeeze into ground end, use manpower and material resources sparingly.
Because also including triangle fixture block, center pile body left and right sides uniform intervals are provided with triangle fixture block, triangle
Fixture block preferably can fix foundation pile, prevents foundation pile from rocking, and foundation pile can also be made to be more difficult to extract simultaneously.
Because being shaped as of pile crown is coniform, when foundation pile down squeezes into ground end, cone shape pile crown is easily down beaten, section
Human-saving material resources.
Because circular cone be shaped as conical round table shape, during circular cone spiral, inserted link circular cone outer surface move
Convenient.
Because inserted link outer end is tapered, inserted link can be made to be easier to insert in soil, preferably fix foundation pile.
(3)Beneficial effect
This utility model is horizontally extended in soil using inserted link, foundation pile is supported fix, prevents foundation pile from rocking, reach
Foundation pile is fixed, be not easy to rock, that foundation pile squeezes into is time saving and energy saving during ground end, structure is simple and convenient to operate effect.
Brief description
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second main structure diagram of the present utility model.
Fig. 3 is the third main structure diagram of the present utility model.
Being labeled as in accompanying drawing:1- pile crown, 2- center pile body, 3- base plate, 4- cavity, 5- foundation pile top board, 6- top chock,
7- step, 8- screw rod, 9- circular cone, 10- nut, 11- inserted link, 12- aperture, 13- connecting plate, 14- gear, 15- tooth bar,
16- guide hole, 17-T type connecting rod, 18- thread groove, 19- triangle fixture block.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further described.
Embodiment 1
A kind of hydraulic engineering foundation pile, as Figure 1-3, include pile crown 1, center pile body 2, base plate 3, foundation pile top board 5,
Top chock 6, step 7, screw rod 8, circular cone 9, nut 10, inserted link 11, connecting plate 13, gear 14, tooth bar 15 and T-shaped company
Bar 17, pile crown 1 top is provided with center pile body 2, is provided with cavity 4 in center pile body 2, and cavity 4 inner bottom part is provided with base plate 3, and bottom is pushed up
It is provided with step 7, center pile body 2 top is provided with foundation pile top board 5, foundation pile top board 5 is provided with top chock in the middle of bottom in the middle of portion
6, be provided with screw rod 8 between top chock 6 and step 7, in cavity 4, by-level is provided with connecting plate 13, screw rod 8 top and under
Portion is equipped with nut 10, and nut 10 is coordinated with screw rod 8, is provided with circular cone 9 outside nut 10, and center pile body 2 upper and lower is left
Right both sides all have aperture 12, are provided with inserted link 11 in aperture 12, and one end of inserted link 11 is contacted with circular cone 9, and screw rod 8 top is provided with
Gear 14, center pile body 2 top left side has guide hole 16, is provided with T-shaped connecting rod 17 in guide hole 16, and T-shaped connecting rod 17 right-hand member is connected with
Tooth bar 15, tooth bar 15 is located on rear side of gear 14, and gear 14 is engaged with tooth bar 15.
The peripheral uniform intervals of pile crown 1 have thread groove 18.
Also include triangle fixture block 19, center pile body 2 left and right sides uniform intervals are provided with triangle fixture block 19.
Being shaped as of pile crown 1 is coniform.
Circular cone 9 be shaped as conical round table shape.
Inserted link 11 outer end is tapered.
Operation principle:When hydraulic engineering needs using this foundation pile, first T-shaped connecting rod 17 is pulled out, tooth bar 15 is to moving to left
Dynamic, gear 14 inverts therewith, and then drives screw rod 8 to invert, and nut 10 invert spiral decline therewith, and circular cone 9 also can be to moving down
Dynamic, make inserted link 11 will not stretch out center pile body 2;Then just this foundation pile can be squeezed into ground end, after being driven into correct position, manually
Promote T-shaped connecting rod 17 to move right, band carry-over bar 15 moves right, and gear 14 is clockwise therewith, and then drive screw rod 8 clockwise, spiral shell
Mother 10 clockwise spiral therewith, circular cone 9 moves up therewith, and inserted link 11 moves in the lateral surface of circular cone 9, and inserted link 11 is stretched
Outside Chu Dao center pile body 2, it is then inserted in soil.So inserted link 11 just preferably can fix foundation pile, so that foundation pile will not be shaken
Dynamic.
Because the peripheral uniform intervals of pile crown 1 have thread groove 18, when foundation pile is squeezed into ground end, can with rotation down
Beat, ground end squeezed into by spiral, more easily control can squeeze into ground end, use manpower and material resources sparingly.
Because also including triangle fixture block 19, center pile body 2 left and right sides uniform intervals are provided with triangle fixture block 19, three
Angular fixture block 19 preferably can fix foundation pile, prevents foundation pile from rocking, and foundation pile can also be made to be more difficult to extract simultaneously.
Because being shaped as of pile crown 1 is coniform, when foundation pile down squeezes into ground end, cone shape pile crown 1 is easily down beaten,
Use manpower and material resources sparingly.
Because circular cone 9 be shaped as conical round table shape, during circular cone 9 spiral, inserted link 11 is in circular cone 9 outer surface
Conveniently moving.
Because inserted link 11 outer end is tapered, inserted link 11 can be made to be easier to insert in soil, preferably fix foundation pile.
Embodiment described above only have expressed preferred implementation of the present utility model, and its description is more concrete and detailed,
But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that it is common for this area
For technical staff, without departing from the inventive concept of the premise, some deformation, improvement and replacement can also be made, these are all
Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.
Claims (6)
1. a kind of hydraulic engineering foundation pile is it is characterised in that include pile crown(1), center pile body(2), base plate(3), foundation pile top
Plate(5), top chock(6), step(7), screw rod(8), circular cone(9), nut(10), inserted link(11), connecting plate(13)、
Gear(14), tooth bar(15)With T-shaped connecting rod(17), pile crown(1)Top is provided with center pile body(2), center pile body(2)Inside it is provided with chamber
Body(4), cavity(4)Inner bottom part is provided with base plate(3), in the middle of bottom dome, it is provided with step(7), center pile body(2)Top sets
There is foundation pile top board(5), foundation pile top board(5)It is provided with top chock in the middle of bottom(6), top chock(6)And step(7)Between
It is provided with screw rod(8), cavity(4)Interior by-level is provided with connecting plate(13), screw rod(8)Upper and lower is equipped with nut(10),
Nut(10)With screw rod(8)Cooperation, nut(10)Outside is provided with circular cone(9), center pile body(2)The upper and lower left and right sides
All have aperture(12), aperture(12)Inside it is provided with inserted link(11), inserted link(11)One end and circular cone(9)Contact, screw rod(8)On
Portion is provided with gear(14), center pile body(2)Top left side has guide hole(16), guide hole(16)Inside it is provided with T-shaped connecting rod(17), T-shaped
Connecting rod(17)Right-hand member is connected with tooth bar(15), tooth bar(15)Positioned at gear(14)Rear side, gear(14)With tooth bar(15)Engagement.
2. a kind of hydraulic engineering foundation pile according to claim 1 is it is characterised in that pile crown(1)Periphery is evenly-spaced
There is thread groove(18).
3. a kind of hydraulic engineering foundation pile according to claim 1 is it is characterised in that also include triangle fixture block
(19), center pile body(2)Left and right sides uniform intervals are provided with triangle fixture block(19).
4. a kind of hydraulic engineering foundation pile according to claim 1 is it is characterised in that pile crown(1)Be shaped as coniform.
5. a kind of hydraulic engineering foundation pile according to claim 1 is it is characterised in that circular cone(9)Be shaped as taper
Round table-like.
6. a kind of hydraulic engineering foundation pile according to claim 1 is it is characterised in that inserted link(11)Outer end is tapered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620951282.8U CN205975584U (en) | 2016-08-27 | 2016-08-27 | Foundation pile for hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620951282.8U CN205975584U (en) | 2016-08-27 | 2016-08-27 | Foundation pile for hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975584U true CN205975584U (en) | 2017-02-22 |
Family
ID=58036305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620951282.8U Active CN205975584U (en) | 2016-08-27 | 2016-08-27 | Foundation pile for hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975584U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653873A (en) * | 2017-08-29 | 2018-02-02 | 薛江炜 | Hermaphroditic stake |
CN107830317A (en) * | 2017-09-13 | 2018-03-23 | 合肥惠科金扬科技有限公司 | A kind of high outdoor minitype display screen of stability |
CN108589700A (en) * | 2018-04-27 | 2018-09-28 | 芜湖千创智能科技有限公司 | A kind of agricultural greenhouse spud pile |
CN109105070A (en) * | 2018-09-17 | 2019-01-01 | 北京中沪农业技术研究院(普通合伙) | A kind of agricultural planting pillar |
CN109137891A (en) * | 2018-10-24 | 2019-01-04 | 俞权东 | Architecture foundation pile structure |
CN112814023A (en) * | 2020-12-30 | 2021-05-18 | 安徽先河建筑工程有限公司 | Pile-plate type retaining wall and construction method thereof |
CN114059744A (en) * | 2021-10-18 | 2022-02-18 | 嘉博联合设计股份有限公司 | Prefabricated assembly type ground and manufacturing method |
-
2016
- 2016-08-27 CN CN201620951282.8U patent/CN205975584U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107653873A (en) * | 2017-08-29 | 2018-02-02 | 薛江炜 | Hermaphroditic stake |
CN107830317A (en) * | 2017-09-13 | 2018-03-23 | 合肥惠科金扬科技有限公司 | A kind of high outdoor minitype display screen of stability |
CN108589700A (en) * | 2018-04-27 | 2018-09-28 | 芜湖千创智能科技有限公司 | A kind of agricultural greenhouse spud pile |
CN109105070A (en) * | 2018-09-17 | 2019-01-01 | 北京中沪农业技术研究院(普通合伙) | A kind of agricultural planting pillar |
CN109137891A (en) * | 2018-10-24 | 2019-01-04 | 俞权东 | Architecture foundation pile structure |
CN112814023A (en) * | 2020-12-30 | 2021-05-18 | 安徽先河建筑工程有限公司 | Pile-plate type retaining wall and construction method thereof |
CN112814023B (en) * | 2020-12-30 | 2022-03-04 | 安徽先河建筑工程有限公司 | Pile-plate type retaining wall and construction method thereof |
CN114059744A (en) * | 2021-10-18 | 2022-02-18 | 嘉博联合设计股份有限公司 | Prefabricated assembly type ground and manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205975584U (en) | Foundation pile for hydraulic engineering | |
CN205329747U (en) | Gardens construction furrow making dveice | |
CN202595796U (en) | Water taking structure for riverbed surface water | |
CN204212177U (en) | A kind of double doing in the hole of stand column pile cheats diaphragm wall structure | |
CN103711436B (en) | A kind of photovoltaic plant foundation pit excavating gear | |
CN203978467U (en) | From moving platform-type brill anchor car | |
CN210003315U (en) | Caving coal support breaker | |
CN204282382U (en) | A kind of equipment by decompression drainage quick blocking precipitation pipe well | |
CN203430543U (en) | Expansion anchor rod | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN206289630U (en) | A kind of hydraulic engineering pile-drawing machine | |
CN205188944U (en) | Reinforcing concrete circular pile | |
CN108517875A (en) | A kind of bridge pattern foundation pit supporting structure and its construction method | |
CN205591239U (en) | Cofferdam structure | |
CN205046564U (en) | Modular cofferdam structure | |
CN203848836U (en) | Column type marking pier | |
CN204959781U (en) | Dewatering well plugging device | |
CN203222808U (en) | Foundation processing structure for floating sluice | |
CN109944235B (en) | Dig a with preventing hole collapse device soon | |
CN204080888U (en) | Vertical telescopic digging apparatus | |
CN203514325U (en) | Foundation pit stair support system with gravity type cement cob wall in combination with single rank of piles | |
CN203510465U (en) | Stirring device capable of fully stirring concrete | |
CN203639940U (en) | Retaining wall for hydraulic engineering | |
CN207608803U (en) | A kind of road surface of town road is emergent to fill out hole device | |
CN205636678U (en) | Novel sealed water gate device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |