CN205972077U - Automatic foaming system that overlaps of air conditioner internal unit - Google Patents
Automatic foaming system that overlaps of air conditioner internal unit Download PDFInfo
- Publication number
- CN205972077U CN205972077U CN201620909956.8U CN201620909956U CN205972077U CN 205972077 U CN205972077 U CN 205972077U CN 201620909956 U CN201620909956 U CN 201620909956U CN 205972077 U CN205972077 U CN 205972077U
- Authority
- CN
- China
- Prior art keywords
- foam
- cylinder
- trough
- air
- receiving tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000005187 foaming Methods 0.000 title description 4
- 239000006260 foam Substances 0.000 claims abstract description 127
- 239000000463 material Substances 0.000 claims abstract description 22
- 238000004519 manufacturing process Methods 0.000 claims abstract description 20
- 238000003825 pressing Methods 0.000 claims abstract description 15
- 238000004378 air conditioning Methods 0.000 claims description 13
- 238000013459 approach Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000004806 packaging method and process Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000003993 interaction Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004092 self-diagnosis Methods 0.000 description 1
Landscapes
- Molding Of Porous Articles (AREA)
Abstract
一种空调内机自动套泡沫系统,包括用于装泡沫的料槽,料槽的底部设有第一电机用于推送料槽内的泡沫,料槽的侧壁设有出料口,出料口处设有提升滑道,与出料口相对的侧壁设有第一气缸用于将泡沫推出出料口送至提升滑道内,提升滑道通过第二气缸驱动上升,提升滑道远离料槽的一侧设有泡沫输送组件,泡沫输送组件通过第三气缸驱动以远离或靠近提升滑道,泡沫输送组件包括收料筒,提升滑道内的泡沫通过第四气缸送至收料筒内,收料筒内设有输送带,输送带通过第二电机驱动以带动收料筒内的泡沫移动,收料筒远离提升滑道的一端设有开口,压泡沫机构通过开口将泡沫压合至空调内机的端部。上述自动套泡沫系统无需人工操作,可提高工作效率和生产线的产能。
An air conditioner internal unit automatic cover foam system, including a trough for filling foam, the bottom of the trough is provided with a first motor for pushing the foam in the trough, the side wall of the trough is provided with a discharge port, and the discharge port There is a lifting slideway at the opening, and the side wall opposite to the discharge opening is provided with a first cylinder for pushing the foam out of the discharge opening into the lifting slideway, and the lifting slideway is driven up by the second cylinder, and the lifting slideway is far away from the material. One side of the tank is provided with a foam conveying assembly, which is driven by the third cylinder to move away from or close to the lifting chute. The foam conveying assembly includes a receiving tube, and the foam in the lifting chute is sent to the receiving tube through the fourth cylinder. There is a conveyor belt inside the receiving tube, and the conveyor belt is driven by the second motor to drive the foam in the receiving tube to move. There is an opening at the end of the receiving tube away from the lifting slide, and the foam pressing mechanism presses the foam to the air conditioner through the opening. end of the inner unit. The above-mentioned automatic cover foam system does not require manual operation, which can improve work efficiency and production capacity of the production line.
Description
技术领域technical field
本实用新型属于空调技术领域,特别是涉及一种空调内机自动套泡沫系统。The utility model belongs to the technical field of air conditioners, in particular to an automatic cover foam system for an air conditioner inner unit.
背景技术Background technique
目前多数空调内机包装生产线主要是靠人工去完成,人工在空调内机两端套泡沫时,需要先套一端的泡沫,然后再套另一端的泡沫,套泡沫效率低,导致生产线产能低。而随着近几年人工劳动力成本不断上升,通过增加人手的方式来提高产能则不适于企业的发展。因此,有必要设计一种更好的空调内机套泡沫系统,以解决上述问题。At present, most packaging production lines of air-conditioning internal units are mainly completed manually. When manually covering both ends of the air-conditioning internal unit with foam, it is necessary to cover one end with foam first, and then cover the other end with foam. The efficiency of foam covering is low, resulting in low production capacity of the production line. However, with the continuous increase in labor costs in recent years, it is not suitable for the development of enterprises to increase production capacity by increasing manpower. Therefore, it is necessary to design a better air conditioner inner machine cover foam system to solve the above problems.
实用新型内容Utility model content
针对现有技术存在的问题,本实用新型提供一种采用机器替代人工,提高工作效率,进而提高生产线产能的空调内机自动套泡沫系统。Aiming at the problems existing in the prior art, the utility model provides an automatic cover foam system for an air-conditioning inner unit which uses machines instead of labor to improve work efficiency and further increase production capacity of the production line.
为了实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种空调内机自动套泡沫系统,包括用于装泡沫的料槽,所述料槽的底部设有第一电机用于推送所述料槽内的泡沫,所述料槽的侧壁设有出料口,所述出料口处设有提升滑道,与所述出料口相对的侧壁设有第一气缸用于将所述泡沫推出所述出料口送至所述提升滑道内,所述提升滑道通过第二气缸驱动上升,所述提升滑道远离所述料槽的一侧设有泡沫输送组件,所述泡沫输送组件通过第三气缸驱动以远离或靠近所述提升滑道,所述泡沫输送组件包括收料筒,所述提升滑道内的泡沫通过第四气缸送至所述收料筒内,所述收料筒内设有输送带,所述输送带通过第二电机驱动以带动所述收料筒内的所述泡沫移动,所述收料筒远离所述提升滑道的一端设有开口,压泡沫机构通过所述开口将所述泡沫压合至所述空调内机的端部。An air-conditioning internal unit automatic cover foam system, including a trough for holding foam, the bottom of the trough is provided with a first motor for pushing the foam in the trough, and the side wall of the trough is provided with A discharge port, the discharge port is provided with a lifting slideway, and the side wall opposite to the discharge port is provided with a first cylinder for pushing the foam out of the discharge port into the lifting slideway , the lifting chute is driven up by the second air cylinder, and the side of the lifting chute away from the trough is provided with a foam conveying assembly, and the foam conveying assembly is driven by the third air cylinder to move away from or close to the lifting chute The foam conveying assembly includes a receiving tube, and the foam in the lifting slideway is sent to the receiving tube through the fourth cylinder, and a conveyor belt is arranged in the receiving tube, and the conveyor belt passes through the second The motor is driven to drive the foam in the material receiving barrel to move, and the end of the material receiving barrel away from the lifting slide is provided with an opening, and the foam pressing mechanism presses the foam to the air conditioner through the opening end of the machine.
进一步,所述料槽的下方设有导杆,所述导杆上装设有推块,所述料槽的底壁设有开槽,所述推块的顶部进入所述开槽内,所述第一电机驱动所述推块在所述开槽内沿所述导杆移动。Further, a guide rod is provided below the trough, a push block is installed on the guide rod, a slot is provided on the bottom wall of the chute, and the top of the push block enters the slot, and the The first motor drives the push block to move along the guide rod in the slot.
进一步,所述第一气缸安装于所述料槽的外壁,所述第一气缸的活塞杆端部固定有推板,所述推板被所述第一气缸驱动进入所述料槽内以推动所述泡沫。Further, the first cylinder is installed on the outer wall of the trough, and the end of the piston rod of the first cylinder is fixed with a push plate, and the push plate is driven into the trough by the first cylinder to push the foam.
进一步,所述提升滑道的上方设有限位板,所述限位板与所述收料筒的顶壁平齐。Further, a limiting plate is provided above the lifting slideway, and the limiting plate is flush with the top wall of the receiving tube.
进一步,所述第四气缸安装于所述收料筒的侧壁,所述第四气缸的活塞杆端部固定有拉板,所述拉板被所述第四气缸驱动以靠近或远离所述收料筒,以将所述提升滑道内的泡沫拉至所述收料筒内。Further, the fourth cylinder is installed on the side wall of the receiving cylinder, and the end of the piston rod of the fourth cylinder is fixed with a pull plate, and the pull plate is driven by the fourth cylinder to approach or move away from the The receiving barrel is used to pull the foam in the lifting chute into the receiving barrel.
进一步,所述收料筒的下方设有安装板,所述安装板上固定有滑块,所述收料筒的底壁设有滑轨,当所述收料筒被所述第三气缸驱动移动时,所述滑轨沿所述滑块直线移动。Further, a mounting plate is provided under the receiving tube, a slider is fixed on the mounting plate, and a slide rail is provided on the bottom wall of the receiving tube, when the receiving tube is driven by the third cylinder When moving, the slide rail moves linearly along the slider.
进一步,所述第二电机的输出轴通过同步带连接于转动轴,所述转动轴上固定有皮带轮,所述输送带套设于所述皮带轮,通过所述第二电机带动所述皮带轮转动,进而带动所述输送带转动,以运送其上的泡沫。Further, the output shaft of the second motor is connected to the rotating shaft through a synchronous belt, a pulley is fixed on the rotating shaft, the conveyor belt is sleeved on the pulley, and the pulley is driven to rotate by the second motor, Then drive the conveyor belt to rotate to transport the foam thereon.
进一步,所述收料筒远离所述料槽的一端设有出口,所述出口与所述开口分别位于所述收料筒相对的两侧壁,所述出口的尺寸与所述泡沫的尺寸相当,所述开口的尺寸小于所述出口的尺寸。Further, an outlet is provided at the end of the receiving barrel away from the trough, and the outlet and the opening are respectively located on the opposite side walls of the receiving barrel, and the size of the outlet is equivalent to the size of the foam , the size of the opening is smaller than the size of the outlet.
进一步,所述压泡沫机构包括固定于生产线支架上的第五气缸,所述第五气缸的端部固定有压板,通过所述第五气缸驱动所述压板穿过所述开口以推动所述泡沫直至其套于所述空调内机的端部。Further, the foam pressing mechanism includes a fifth air cylinder fixed on the support of the production line, a pressing plate is fixed at the end of the fifth air cylinder, and the fifth air cylinder drives the pressing plate through the opening to push the foam Until it is sleeved on the end of the air conditioner inner unit.
进一步,所述料槽设有两个,分别装设方向相反的两种泡沫,两种所述泡沫通过上述自动套泡沫系统驱动以套接于所述空调内机相对的两端部。Further, the trough is provided with two kinds of foams in opposite directions respectively, and the two kinds of foams are driven by the above-mentioned automatic foam covering system to be socketed on opposite ends of the air conditioner internal unit.
本实用新型的有益效果:The beneficial effects of the utility model:
通过第一电机将料槽内的泡沫推动到出料口处,然后通过第一气缸将泡沫推动到提升滑道内,再通过第二气缸将提升滑道提升至所述收料筒处,通过第四气缸将泡沫由提升滑道送至收料筒内,再通过收料筒内的输送带将泡沫运送至其出口处,与此同时,第三气缸控制收料筒相对料槽移动,从而使收料筒移动到压泡沫工位,然后通过压泡沫机构将收料筒内的泡沫压合至所述空调内机的端部,上述所有动作均可通过电控系统自动控制,无需人工操作,可实现自动套泡沫功能,提高工作效率,进而提高生产线的产能。The foam in the trough is pushed to the discharge port by the first motor, then the foam is pushed into the lifting slideway by the first cylinder, and then the lifting slideway is lifted to the receiving barrel by the second cylinder, and the second cylinder is used to lift the foam The four cylinders send the foam from the lifting chute to the receiving tube, and then transport the foam to its outlet through the conveyor belt in the receiving tube. At the same time, the third cylinder controls the moving of the receiving tube relative to the chute, so that The receiving barrel moves to the foam pressing station, and then presses the foam in the receiving barrel to the end of the air conditioner internal unit through the foam pressing mechanism. All the above actions can be automatically controlled by the electronic control system without manual operation. It can realize the function of automatic foaming, improve work efficiency, and then increase the production capacity of the production line.
附图说明Description of drawings
图1为本实用新型空调内机自动套泡沫系统安装于生产线的结构示意图;Fig. 1 is the structural schematic diagram of the automatic cover foam system of the air conditioner internal unit of the present invention installed on the production line;
图2为本实用新型空调内机自动套泡沫系统的结构示意图;Fig. 2 is a structural schematic diagram of the automatic cover foam system of the air conditioner internal unit of the utility model;
图3为本实用新型空调内机自动套泡沫系统的从后方看的结构示意图;Fig. 3 is a structural schematic view from the rear of the automatic cover foam system of the air conditioner internal unit of the utility model;
图4为本实用新型空调内机自动套泡沫系统的从下方看的结构示意图;Fig. 4 is a structural schematic view from below of the automatic cover foam system of the air conditioner internal unit of the present invention;
图5为本实用新型空调内机自动套泡沫系统中泡沫输送组件的结构示意图;Fig. 5 is a structural schematic diagram of the foam conveying component in the automatic foam system of the air conditioner internal unit of the present invention;
图中,1—料槽、2—泡沫、3—第一电机、4—导杆、5—推块、6—开槽、7—第一气缸、8—推板、9—出料口、10—提升滑道、11—挡板、12—第二气缸、13—限位板、14—收料筒、15—安装板、16—第三气缸、17—第四气缸、18—拉板、19—滑块、20—滑轨、21—第二电机、22—同步带、23—转动轴、24—皮带轮、25—输送带、26—出口、27—开口、28—限位罩、29—第五气缸、30—压板、31—固定板、32—活动板。In the figure, 1—material trough, 2—foam, 3—first motor, 4—guide rod, 5—push block, 6—grooving, 7—first cylinder, 8—push plate, 9—outlet, 10—lift slideway, 11—baffle plate, 12—second cylinder, 13—limit plate, 14—receiving barrel, 15—installation plate, 16—third cylinder, 17—fourth cylinder, 18—pull plate , 19—slider, 20—slide rail, 21—second motor, 22—synchronous belt, 23—rotating shaft, 24—pulley, 25—conveyor belt, 26—exit, 27—opening, 28—limiting cover, 29—the fifth cylinder, 30—press plate, 31—fixed plate, 32—movable plate.
具体实施方式detailed description
下面结合附图和具体实施例对本实用新型做进一步的详细说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail.
如图1,本实用新型提供一种空调内机自动套泡沫系统,属于空调包装生产线的其中一个工序,设置于包装生产线的一侧,用于在包装生产线上的空调内机的两端自动套泡沫,通过机械机构及电控系统能够实现空调内机自动套泡沫功能。本实用新型自动套泡沫系统设有两套,分别将方向相反的两种泡沫同时套在空调内机的两端,提高生产效率。As shown in Figure 1, the utility model provides an automatic cover foam system for the air conditioner inner unit, which belongs to one of the processes of the air conditioner packaging production line. Foam, through the mechanical mechanism and electronic control system, the function of automatically covering the air conditioner with foam can be realized. The automatic covering foam system of the utility model is provided with two sets, which respectively cover two kinds of foams in opposite directions on the two ends of the air conditioner inner unit at the same time, so as to improve the production efficiency.
如图2至图4,自动套泡沫系统包括料槽1,料槽1的上方开口设置,可以向料槽1内加泡沫2。料槽1的前侧壁底部设有出料口9,出料口9可供一个泡沫2穿过,料槽1的后侧壁底部设有第一气缸7,第一气缸7安装于料槽1的外部,第一气缸7的端部固定有推板8,后侧壁与推板8对应的位置处设有缺口(未标号),缺口的尺寸小于泡沫2的尺寸,推板8被第一气缸7驱动经过缺口进入料槽1内,以将料槽1内的泡沫2推出出料口9。料槽1的下方设有推动机构用于将料槽1内的泡沫2推动到出料口9的位置,推动机构包括第一电机3、导杆4及推块5,优选的,第一电机3为步进电机,推块5装设于导杆4上,料槽1的底壁设有开槽6,推块5的顶部进入开槽6内,第一电机3可驱动推块5在开槽6内沿导杆4移动,从而不断的将离出料口9较远处的泡沫2推动到出料口9的位置。As shown in Fig. 2 to Fig. 4, the automatic cover foam system includes a material trough 1, the upper opening of the material trough 1 is set, and foam 2 can be added into the material trough 1. The bottom of the front side wall of the trough 1 is provided with a discharge port 9, and the discharge port 9 can allow a foam 2 to pass through. The bottom of the rear side wall of the trough 1 is provided with a first cylinder 7, and the first cylinder 7 is installed in the trough. 1, the end of the first cylinder 7 is fixed with a push plate 8, the rear side wall is provided with a gap (unlabeled) at the position corresponding to the push plate 8, the size of the gap is smaller than the size of the foam 2, and the push plate 8 is covered by the second A cylinder 7 drives through the gap and enters the material trough 1 to push the foam 2 in the material trough 1 out of the discharge port 9 . The bottom of the chute 1 is provided with a push mechanism for pushing the foam 2 in the chute 1 to the position of the discharge port 9. The push mechanism includes a first motor 3, a guide rod 4 and a push block 5. Preferably, the first motor 3 is a stepping motor, the push block 5 is installed on the guide rod 4, the bottom wall of the trough 1 is provided with a slot 6, and the top of the push block 5 enters the slot 6, and the first motor 3 can drive the push block 5 in the The groove 6 moves along the guide rod 4, thereby continuously pushing the foam 2 farther away from the discharge port 9 to the position of the discharge port 9.
出料口9的前方设有提升滑道10,提升滑道10与出料口9相接,经过出料口9出来的泡沫2进入提升滑道10内。除了与出料口9相接的一侧,提升滑道10的其它三侧边均设有挡板11,将泡沫2限制在挡板11范围内。提升滑道10的上方一侧设有固定板31,固定板31上安装有第二气缸12,第二气缸12的活塞杆端部固定于提升滑道10的底部,通过第二气缸12驱动提升滑道10上下移动。提升滑道10的上方设有限位板13,当提升滑道10上升到泡沫2的顶部抵触到限位板13时,第二气缸12停止,提升滑道10停止移动,此时泡沫2正对于泡沫输送组件。The place ahead of the discharge port 9 is provided with a lifting slideway 10, and the lifting slideway 10 is connected with the discharge port 9, and the foam 2 coming out through the discharge port 9 enters the lifting slideway 10. Except for the side connected to the discharge port 9 , the other three sides of the lifting slideway 10 are provided with baffles 11 to limit the foam 2 within the scope of the baffles 11 . The upper side of the lifting slideway 10 is provided with a fixed plate 31, the second cylinder 12 is installed on the fixed plate 31, the end of the piston rod of the second cylinder 12 is fixed on the bottom of the lifting slideway 10, and the second cylinder 12 is used to drive the lifting Slideway 10 moves up and down. The top of the lifting slideway 10 is provided with a limiting plate 13. When the lifting slideway 10 rises to the top of the foam 2 and touches the limiting plate 13, the second cylinder 12 stops, and the lifting slideway 10 stops moving. Foam delivery components.
如图4及图5,泡沫输送组件设置于提升滑道10的上方及前方,用于将泡沫2由提升滑道10输送至空调内机的端部。泡沫输送组件包括收料筒14,收料筒14呈L形,收料筒14的延伸方向与料槽1相垂直,收料筒14后端开口设置,供泡沫2进入。收料筒14的顶壁与限位板13平齐,两者处于同一高度,因此可供泡沫2由提升滑道10进入收料筒14内。收料筒14的侧壁设有第四气缸17,第四气缸17的活塞杆端部固定有拉板18,拉板18被第四气缸17驱动以靠近或远离收料筒14,当拉板18远离收料筒14,即向后移动至贴到料槽1时,第四气缸17驱动拉板18向前移动,以将提升滑道10内的泡沫2拉至收料筒14内。收料筒14的下方设有安装板15,安装板15上固定有滑块19,收料筒14的底壁设有滑轨20,滑块19装设于滑轨20上,可与滑轨20相对移动。安装板15的底部固定有第三气缸16,第三气缸16的一端设有活动板32,活动板32可被第三气缸16驱动而移动,活动板32固定于收料筒14上,故收料筒14可跟随活动板32相对安装板15向前移动,从而使收料筒14配合包装生产线上空调内机的位置。当收料筒14被第三气缸16驱动向前移动时,滑轨20沿滑块19向前直线移动,收料筒14靠近包装生产线。As shown in Fig. 4 and Fig. 5, the foam conveying assembly is arranged above and in front of the lifting slideway 10, and is used for conveying the foam 2 from the lifting slideway 10 to the end of the air conditioner indoor unit. The foam conveying assembly includes a material receiving tube 14, which is L-shaped. The extending direction of the material receiving tube 14 is perpendicular to the trough 1, and the rear end of the material receiving tube 14 is open for the foam 2 to enter. The top wall of the receiving tube 14 is flush with the limiting plate 13 , and both are at the same height, so that the foam 2 can enter the receiving tube 14 from the lifting slideway 10 . The side wall of the material receiving tube 14 is provided with a fourth cylinder 17, and the end of the piston rod of the fourth cylinder 17 is fixed with a pull plate 18, and the pull plate 18 is driven by the fourth cylinder 17 to approach or move away from the material receiving tube 14, when the pull plate 18 is away from the material receiving tube 14, that is, when it moves backward to stick to the trough 1, the fourth cylinder 17 drives the pull plate 18 to move forward to pull the foam 2 in the lifting slideway 10 into the material receiving tube 14. The bottom of the material receiving tube 14 is provided with a mounting plate 15, the mounting plate 15 is fixed with a slide block 19, the bottom wall of the material receiving tube 14 is provided with a slide rail 20, and the slide block 19 is installed on the slide rail 20, which can be connected with the slide rail 20 relative moves. The bottom of mounting plate 15 is fixed with the 3rd air cylinder 16, and one end of the 3rd air cylinder 16 is provided with movable plate 32, and movable plate 32 can be driven by the 3rd air cylinder 16 and moves, and movable plate 32 is fixed on the receiving tube 14, so receives The material cylinder 14 can follow the movable plate 32 and move forward relative to the installation plate 15, so that the material receiving cylinder 14 can match the position of the air conditioner internal unit on the packaging production line. When the receiving tube 14 is driven forward by the third cylinder 16, the slide rail 20 moves forward linearly along the slider 19, and the receiving tube 14 is close to the packaging production line.
收料筒14的一端设有第二电机21,优选的第二电机21为AC电机,第二电机21的输出轴通过同步带22连接于转动轴23,转动轴23上固定有皮带轮24,皮带轮24上套设有输送带25,通过第二电机21带动皮带轮24转动,进而带动输送带25转动,以将输送带25上的泡沫2从收料筒14的后端运送至前端。收料筒14的前端左右两侧壁分别设有开口27和出口26,其中出口26的方向与收料筒14的延伸方向相垂直,出口26的尺寸与泡沫2的尺寸相当,开口27的尺寸小于出口26的尺寸,防止泡沫2从开口27出去。出口26的四周套设有限位罩28,可以将泡沫2限制在内,防止泡沫2偏斜。One end of the receiving barrel 14 is provided with a second motor 21, the preferred second motor 21 is an AC motor, the output shaft of the second motor 21 is connected to the rotating shaft 23 by a synchronous belt 22, and the rotating shaft 23 is fixed with a pulley 24, the pulley 24 is provided with a conveyor belt 25, and the second motor 21 drives the belt pulley 24 to rotate, and then drives the conveyor belt 25 to rotate, so that the foam 2 on the conveyor belt 25 is transported from the rear end of the receiving tube 14 to the front end. The left and right side walls of the front end of the receiving tube 14 are respectively provided with an opening 27 and an outlet 26, wherein the direction of the outlet 26 is perpendicular to the extending direction of the receiving tube 14, the size of the outlet 26 is equivalent to the size of the foam 2, and the size of the opening 27 Smaller than the size of the outlet 26 , the foam 2 is prevented from exiting the opening 27 . A limiting cover 28 is sheathed around the outlet 26, which can limit the foam 2 and prevent the foam 2 from deflecting.
收料筒14在靠近开口27、远离出口26的一侧设有压泡沫机构,压泡沫机构包括固定于包装生产线的支架上的第五气缸29,第五气缸29的端部固定有压板30,通过第五气缸29驱动压板30穿过开口27进入收料筒14内,以推动泡沫2沿限位罩28移动,直至其套于空调内机的端部。The receiving tube 14 is provided with a foam pressing mechanism on the side close to the opening 27 and away from the outlet 26. The foam pressing mechanism includes a fifth cylinder 29 fixed on the support of the packaging production line. The end of the fifth cylinder 29 is fixed with a pressing plate 30. The fifth cylinder 29 drives the pressing plate 30 through the opening 27 and enters the material receiving barrel 14 to push the foam 2 to move along the limit cover 28 until it is placed on the end of the air conditioner interior unit.
在本实施例中,料槽1设有两个,两个料槽1并排设置,分别装设方向相反的两种泡沫,每个料槽1均设有上述自动套泡沫系统,两种泡沫2通过上述自动套泡沫系统驱动以同时套接于空调内机相对的两端部,提高工作效率,进而提高生产线的产能。In this embodiment, two troughs 1 are provided, and the two troughs 1 are arranged side by side, and two kinds of foams in opposite directions are installed respectively, and each trough 1 is equipped with the above-mentioned automatic cover foam system. Driven by the above-mentioned automatic cover foam system to simultaneously cover the opposite ends of the air conditioner inner unit, the work efficiency is improved, and the production capacity of the production line is increased.
采用本实用新型的自动套泡沫系统一次套泡沫的过程为:首先通过第一电机3将料槽1内的泡沫2推送到出料口9的位置,电眼检测到泡沫2到达位置后,停止推送泡沫2,然后第一气缸7动作推动泡沫2从出料口9到达提升滑道10内,然后第二气缸12动作,把泡沫2提升到与收料筒14相当的高度处,然后第四气缸17动作把泡沫2由提升滑道10推送至输送带25上,然后第三气缸16动作,将收料筒14向前移动到与空调内机相对应的位置处,同时由第二电机21带动输送带25转动,进而带动泡沫2移动到收料筒14的前端。泡沫2到达指定位置后,第五气缸29穿过开口27推动泡沫2压合至空调内机的端部。另一个自动套泡沫系统的机械结构及实现过程均相同,两个可同时进行。The process of using the automatic foam covering system of the present utility model is as follows: firstly, the foam 2 in the trough 1 is pushed to the position of the discharge port 9 by the first motor 3, and after the electric eye detects that the foam 2 reaches the position, stop pushing Foam 2, then the first cylinder 7 acts to push the foam 2 from the discharge port 9 to the lifting slide 10, then the second cylinder 12 acts to lift the foam 2 to a height equivalent to the receiving tube 14, and then the fourth cylinder 17 action to push the foam 2 from the lifting slideway 10 to the conveyor belt 25, and then the third cylinder 16 acts to move the receiving cylinder 14 forward to the position corresponding to the air conditioner inner unit, and at the same time, it is driven by the second motor 21 The conveyor belt 25 rotates, and then drives the foam 2 to move to the front end of the receiving tube 14 . After the foam 2 reaches the designated position, the fifth cylinder 29 pushes the foam 2 through the opening 27 and presses it to the end of the air conditioner inner unit. The mechanical structure and realization process of another automatic cover foam system are the same, and the two can be carried out at the same time.
上述第一电机3、第二电机21、第一气缸7、第二气缸12、第三气缸16、第四气缸17及第五气缸29均连接于电控系统,无需人工操作,实现自动套泡沫功能。电控系统主要包括S7-200SMART PLC控制器系统和人机交互触摸屏系统,S7-200SMART PLC控制器系统还包括有第一电机控制系统、电眼信号采集系统、气缸及输送带执行系统、机构点动控制系统、自诊断报警系统、故障保护系统;人机交互触摸屏系统包括有西门子SMART LINE触摸屏,人机交互触摸屏系统通过以太网通讯系统与S7-200SMART PLC控制器系统相互连接建立数据信息双向传送,从而设定路线参数,实现自动套泡沫的功能。The first motor 3, the second motor 21, the first cylinder 7, the second cylinder 12, the third cylinder 16, the fourth cylinder 17 and the fifth cylinder 29 are all connected to the electric control system, without manual operation, to realize automatic foaming Features. The electric control system mainly includes the S7-200SMART PLC controller system and the human-computer interaction touch screen system. The S7-200SMART PLC controller system also includes the first motor control system, electric eye signal acquisition system, cylinder and conveyor belt execution system, mechanism inching Control system, self-diagnosis alarm system, fault protection system; human-computer interaction touch screen system includes Siemens SMART LINE touch screen, human-computer interaction touch screen system is connected with S7-200SMART PLC controller system through Ethernet communication system to establish two-way transmission of data information, Thereby setting the route parameters and realizing the function of automatic foaming.
以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围内。The above embodiments are only used to illustrate the technical solution of the utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the utility model can be modified or equivalently replaced , without departing from the purpose and scope of the technical solution, which should be covered by the scope of the claims of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620909956.8U CN205972077U (en) | 2016-08-19 | 2016-08-19 | Automatic foaming system that overlaps of air conditioner internal unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620909956.8U CN205972077U (en) | 2016-08-19 | 2016-08-19 | Automatic foaming system that overlaps of air conditioner internal unit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205972077U true CN205972077U (en) | 2017-02-22 |
Family
ID=58031993
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620909956.8U Withdrawn - After Issue CN205972077U (en) | 2016-08-19 | 2016-08-19 | Automatic foaming system that overlaps of air conditioner internal unit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205972077U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106144077A (en) * | 2016-08-19 | 2016-11-23 | 广东省自动化研究所 | A kind of air-conditioning internal machine overlaps foaming system automatically |
-
2016
- 2016-08-19 CN CN201620909956.8U patent/CN205972077U/en not_active Withdrawn - After Issue
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106144077A (en) * | 2016-08-19 | 2016-11-23 | 广东省自动化研究所 | A kind of air-conditioning internal machine overlaps foaming system automatically |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106144077B (en) | An automatic cover foam system for air conditioner inner unit | |
| CN104139982A (en) | Punching material collecting and disc arranging machine | |
| CN105846383B (en) | Cable channel cover plate Intelligent ventilating apparatus | |
| CN201634227U (en) | Automatic feeding mechanism of sheet metal for arc expulsion element | |
| CN203485497U (en) | Automatic carton packaging machine | |
| CN206050237U (en) | A kind of air-conditioning internal machine boxing system | |
| CN204642279U (en) | Injection machine automatic collecting device | |
| CN204946718U (en) | A kind of encapsulation and Winder | |
| CN207861353U (en) | A kind of relay collecting equipment | |
| CN203390641U (en) | Automatic material receiving box | |
| CN203975935U (en) | Punching press rewinding circulating plate machine | |
| CN207209452U (en) | A kind of automatic charging device | |
| CN203903978U (en) | Cotton automatic filling equipment for pillow case | |
| CN104118601B (en) | Bar cigarette is dosed device and is mended cigarette method | |
| CN203740199U (en) | Automatic box support feeding mechanism | |
| CN204354259U (en) | The efficient compression molding system of a kind of vacuum heat-insulating plate | |
| CN207773615U (en) | A kind of full-automatic nailing punch-out equipment and its control system | |
| CN103331808A (en) | Automatic feeding device for gantry type double-station hydraulic brick making machine | |
| CN206751647U (en) | Glass heat bender | |
| CN206981620U (en) | A kind of sheet material feeding device | |
| CN205356948U (en) | A typical structure of fast loading and unloading without stopping the machine | |
| CN211517918U (en) | Automatic prefabricating equipment for small prefabricated parts | |
| CN204211100U (en) | A battery automatic receiving and boxing mechanism | |
| CN203018540U (en) | Device for punching blade | |
| CN202947438U (en) | Paper pulp egg tray automatic drying device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20170222 Effective date of abandoning: 20190806 |
|