Prior art keywords
flange
section steel
hanger
lifting
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620872915.6U
Other languages
Chinese (zh)
Inventor
王世波
杨建平
贺晓雄
王川
王国庆
戴维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201620872915.6U priority Critical patent/CN205953340U/en
Application granted granted Critical
Publication of CN205953340U publication Critical patent/CN205953340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型涉及一种变截面钢管柱塔架安装吊具,其特征在于,所述吊具包括柱顶法兰、法兰盘、吊耳以及筋板,所述法兰盘设置在柱顶法兰上,所述柱顶法兰通过高强螺栓固定,所述吊耳通过筋板固定在柱顶法兰上。该技术方案所述的吊耳通过筋板连接到法兰上,使吊装角度可以随意改变,此设计便于多角度吊装,吊装过程中受力均匀,提高施工效率,保证施工安全。

The utility model relates to a hanger for installing a variable-section steel pipe column tower, which is characterized in that the hanger includes a column top flange, a flange plate, lifting lugs and ribs, and the flange plate is arranged on the top of the column. On the flange, the column top flange is fixed by high-strength bolts, and the lifting lug is fixed on the column top flange by ribs. The lifting lug described in this technical solution is connected to the flange through the rib plate, so that the lifting angle can be changed at will. This design is convenient for multi-angle lifting, and the force is uniform during the lifting process, which improves the construction efficiency and ensures the construction safety.

Description

变截面钢管柱塔架安装吊具Variable cross-section steel pipe column tower installation spreader

技术领域technical field

本实用新型涉及一种吊具,具体涉及一种变截面钢管柱塔架安装吊具,属于施工工具技术领域。The utility model relates to a hanger, in particular to a hanger for installing a variable-section steel pipe column tower, which belongs to the technical field of construction tools.

背景技术Background technique

在变截面钢管柱塔架安装过程中,塔架吊装施工极为频繁。由于塔架变截面、塔架主体结构不能够焊接吊耳和绑扎及两根钢丝绳产生夹角等原因导致吊装施工过程十分繁琐,给安装过程带来极大困难,延长施工施工期及带来施工安全隐患。本领域的技术人员也在尝试新的方案,但是该问题一直没有得到很好的解决,因此,迫切的需要一种新的装置来解决上述技术问题。During the installation process of variable cross-section steel pipe column tower, the tower hoisting construction is extremely frequent. Due to the variable cross-section of the tower, the inability to weld the lifting lugs and the binding of the main structure of the tower, and the angle between the two steel wire ropes, the hoisting construction process is very cumbersome, which brings great difficulties to the installation process, prolongs the construction period and brings construction costs. Security risks. Those skilled in the art are also trying new solutions, but this problem has not been well resolved. Therefore, a new device is urgently needed to solve the above technical problem.

发明内容Contents of the invention

为了解决上述存在的问题,本实用新型公开了一种变截面钢管柱塔架安装吊具,该技术方案克服现有吊具不足之处,提供一种能够在变截面塔架吊装过程中使用的便捷吊具,结构设计合理,使用方便,工作效率高的施工吊具。In order to solve the above existing problems, the utility model discloses a variable-section steel pipe column tower installation sling. Convenient spreader, reasonable structure design, easy to use, high work efficiency construction spreader.

为了实现上述目的,本实用新型的技术方案如下,一种变截面钢管柱塔架安装吊具,其特征在于,所述吊具包括柱顶法兰、法兰盘、吊耳以及筋板,所述法兰盘设置在柱顶法兰上,所述柱顶法兰通过高强螺栓固定,所述吊耳通过筋板固定在柱顶法兰上。该技术方案使塔架吊装过程中受力均匀,结构设计合理,使用方便,工作效率大大提高。In order to achieve the above object, the technical scheme of the utility model is as follows, a variable cross-section steel pipe column tower installation hanger is characterized in that the hanger includes a column top flange, a flange plate, lifting lugs and ribs, the The flange plate is arranged on the column top flange, the column top flange is fixed by high-strength bolts, and the lifting lug is fixed on the column top flange by ribs. The technical scheme makes the force uniform during the hoisting process of the tower, the structural design is reasonable, the use is convenient, and the work efficiency is greatly improved.

作为本实用新型的一种改进,所述吊耳上设置有吊耳孔。所述筋板的数量为两个,所述两个筋板之间设置有加强件。As an improvement of the utility model, the lifting lug is provided with a lifting lug hole. The number of the ribs is two, and a reinforcement is arranged between the two ribs.

相对于现有技术,本实用新型优点如下,1)整体结构简单,设计紧凑,2)该技术方案所述的吊耳通过筋板连接到法兰上,使吊装角度可以随意改变,此设计便于多角度吊装,吊装过程中受力均匀。提高施工效率,保证施工安全;3)该技术方案成本较低,便于进一步的推广应用。Compared with the prior art, the utility model has the following advantages: 1) The overall structure is simple and the design is compact; 2) The lifting lug described in the technical solution is connected to the flange through the rib plate, so that the lifting angle can be changed at will, and the design is convenient Multi-angle hoisting, uniform force during hoisting. Improve construction efficiency and ensure construction safety; 3) The cost of this technical solution is low, which is convenient for further popularization and application.

附图说明Description of drawings

图1为本实用新型整体俯视结构示意图;Fig. 1 is the utility model overall top view structure schematic diagram;

图2为为图1局部放大图;Figure 2 is a partial enlarged view of Figure 1;

图3为本实用新型侧面结构示意图;Fig. 3 is a schematic view of the side structure of the utility model;

图4为图3局部放大图;Figure 4 is a partial enlarged view of Figure 3;

图5为本实用新型立体图。Fig. 5 is a perspective view of the utility model.

图中:1、法兰盘,2、吊耳,3、筋板,4、柱顶法兰,5、加强件。In the figure: 1. Flange, 2. Lifting lug, 3. Rib, 4. Column top flange, 5. Reinforcement.

具体实施方式detailed description

下面结合附图和具体实施方式,进一步阐明本实用新型。应理解下述具体实施方式仅用于说明本实用新型而不用于限制本实用新型的范围。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。Below in conjunction with accompanying drawing and specific embodiment, further illustrate the utility model. It should be understood that the following specific embodiments are only used to illustrate the utility model but not to limit the scope of the utility model. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "inner" and "outer ” refer to directions towards or away from the geometric center of a particular part, respectively.

实施例1:参见图1-图5,一种变截面钢管柱塔架安装吊具,所述吊具包括柱顶法兰4、法兰盘1、吊耳3以及筋板2,所述法兰盘1设置在柱顶法兰4上,所述柱顶法兰4通过高强螺栓固定,所述吊耳3通过筋板2固定在柱顶法兰4上,所述吊耳上设置有吊耳孔,所述筋板的数量为两个,所述两个筋板之间设置有加强,5。该技术方案使塔架吊装过程中受力均匀,结构设计合理,使用方便,工作效率大大提高。Embodiment 1: Referring to Fig. 1-Fig. 5, a kind of spreader for installing steel pipe column tower with variable cross-section, said spreader includes column top flange 4, flange plate 1, lifting lug 3 and rib plate 2, said method The blue plate 1 is set on the column top flange 4, the column top flange 4 is fixed by high-strength bolts, the lifting lug 3 is fixed on the column top flange 4 through the rib plate 2, and the lifting lug is provided with a hanging For the ear hole, the number of the ribs is two, and a reinforcement is arranged between the two ribs, 5. The technical scheme makes the force uniform during the hoisting process of the tower, the structural design is reasonable, the use is convenient, and the work efficiency is greatly improved.

本实用新型方案所公开的技术手段不仅限于上述技术手段所公开的技术手段,还包括由以上技术特征任意组合所组成的技术方案。The technical means disclosed in the solution of the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of any combination of the above technical features.

Claims (3)

1. Variable Section Steel tubing string pylon mounting hanger it is characterised in that described suspender include capital flange, ring flange, hanger with And gusset, described ring flange is arranged on capital flange, and described capital flange is fixed by high-strength bolt, and described hanger passes through muscle Plate is fixed on capital flange.
2. Variable Section Steel tubing string pylon mounting hanger according to claim 1 is it is characterised in that be provided with described hanger Hanger hole.
3. Variable Section Steel tubing string pylon mounting hanger according to claim 1 and 2 is it is characterised in that the number of described gusset Measure as two, between described two gussets, be provided with reinforcement.
CN201620872915.6U 2016-08-12 2016-08-12 Variable cross section steel -pipe column pylon installation hoist Expired - Fee Related CN205953340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620872915.6U CN205953340U (en) 2016-08-12 2016-08-12 Variable cross section steel -pipe column pylon installation hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620872915.6U CN205953340U (en) 2016-08-12 2016-08-12 Variable cross section steel -pipe column pylon installation hoist

Publications (1)

Publication Number Publication Date
CN205953340U true CN205953340U (en) 2017-02-15

Family

ID=57975844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620872915.6U Expired - Fee Related CN205953340U (en) 2016-08-12 2016-08-12 Variable cross section steel -pipe column pylon installation hoist

Country Status (1)

Country Link
CN (1) CN205953340U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479023A (en) * 2020-12-02 2021-03-12 沪东中华造船(集团)有限公司 Hoisting device and hoisting method for enclosure system mounting platform module
CN114148882A (en) * 2021-11-05 2022-03-08 金隆铜业有限公司 Kaldo furnace hoisting method and hoisting tool thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112479023A (en) * 2020-12-02 2021-03-12 沪东中华造船(集团)有限公司 Hoisting device and hoisting method for enclosure system mounting platform module
CN114148882A (en) * 2021-11-05 2022-03-08 金隆铜业有限公司 Kaldo furnace hoisting method and hoisting tool thereof

Similar Documents

Publication Publication Date Title
CN202897799U (en) Lifting appliance for ring-shaped workpiece
CN205953340U (en) Variable cross section steel -pipe column pylon installation hoist
CN203095401U (en) Clasp type rolling-over hoisting tail lug fixture
WO2022111218A1 (en) Pile casing hoisting arm
CN203347324U (en) Holding pole wall attached matched hoop
CN102040165A (en) Temporary supporting piece for installation of ropeway of cabling machine
CN106049896A (en) Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process
CN103193148A (en) Railway locomotive roof lifting component and lifting frame
CN203008391U (en) Reversed T-shaped hoisting connecting piece for prefabricated part hoisting
CN206615914U (en) A kind of steam dryer rolling ring stone tongs
CN201695968U (en) Pipeline holding clamp
CN204224123U (en) A kind of suspension hoisting device installing base husband Saite stove
CN207090858U (en) A kind of storage tank shell hoisting steel plate device
CN205062096U (en) Blast furnace water -cooling wall installation car
CN212687323U (en) Hoisting system for hoisting converter vaporization cooling system equipment
CN204675626U (en) Insulator fast-assembling suspender
CN204454225U (en) A kind of welded structure of solid drawn pipe is without moment of flexure support beam
CN206033024U (en) Pipeline hoist and mount mould
CN204643580U (en) Cement pole lifting chuck device
CN205328438U (en) Handling is from lift -type cylindric spud leg hanging beam
CN205892550U (en) Flexible hoist and mount system of suspension bridge stiffening beam
CN206447497U (en) A kind of light steel truss lifting device
CN206188260U (en) Hoist top ping lift prevents kinking device and hoist
CN204873418U (en) Large -span component hoist device
CN223823173U (en) A sling structure for hoisting large pipe culverts

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 210023 No. 6 Wenlan Road, Xianlin University City, Qixia District, Nanjing City, Jiangsu Province

Patentee after: CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP Co.,Ltd.

Address before: 210046 No. 9 Yaohua Menyaojia Road, Qixia District, Nanjing City, Jiangsu Province

Patentee before: China Construction Installation Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215