CN205934225U - Preparation type two -tier creelo - Google Patents

Preparation type two -tier creelo Download PDF

Info

Publication number
CN205934225U
CN205934225U CN201620805125.6U CN201620805125U CN205934225U CN 205934225 U CN205934225 U CN 205934225U CN 201620805125 U CN201620805125 U CN 201620805125U CN 205934225 U CN205934225 U CN 205934225U
Authority
CN
China
Prior art keywords
bobbin
work
preparation
spindle
creelo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620805125.6U
Other languages
Chinese (zh)
Inventor
蒋雪明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wujiang Jinye Weaving Co Ltd
Original Assignee
Wujiang Jinye Weaving Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang Jinye Weaving Co Ltd filed Critical Wujiang Jinye Weaving Co Ltd
Priority to CN201620805125.6U priority Critical patent/CN205934225U/en
Application granted granted Critical
Publication of CN205934225U publication Critical patent/CN205934225U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a preparation type two -tier creelo, its characterized in that: still include tension device, the tube of working, prepare the tube, pull spindle and support, be provided with a plurality of work tubes respectively in the both sides of warping creel, every work tube corresponds one and prepares the tube, is provided with at work tube end and pulls the spindle, and be provided with at preparation tube end and pull the spindle, spindle movable mounting is pulled on the support through the end to the work tube, prepare the tube through the end pull spindle movable mounting on the support, be provided with a plurality of tension device at the warping creel, the hard waste of yarn is carried to the warping creel warping through the tension device who corresponds on the work tube, the yarn tail of work tube yarn is connected with the hard waste that prepares the tube yarn. The utility model discloses increased substantially work efficiency, it is also more convenient to use.

Description

A kind of preparation type two-tier creelo
Technical field
The utility model is related to spool rack, more particularly to a kind of preparation type two-tier creelo.
Background technology
Yarn package form used by warping process is generally the bobbin that doff operation provides, the basic training of spool rack The bobbin used by these warpings can exactly be placed.Spool rack is often referred to simply as bobbin cradle, can by bobbin cradle draw most Warping radical is referred to as bobbin cradle capacity.Current spool rack complex structure, it is impossible to quickly exchange warping cylinder for, changes speed Slowly, significantly reduce the efficiency of warping, impact is normal to be produced.
Utility model content
In order to solve the problems of the prior art, the utility model provides a kind of preparation type two-tier creelo.
In order to solve the above problems, technical solution adopted in the utility model is:
A kind of preparation type two-tier creelo, including warping creel and base, is provided with warping creel, its feature exists on base In:Also include tensioner, the bobbin that works, prepare bobbin, pull spindle and support, be respectively arranged with the both sides of warping creel many Individual work bobbin, each work bobbin described corresponds to a preparation bobbin, is provided with work bobbin end and pulls spindle, pre- Standby bobbin end is provided with pulls spindle, and described work bobbin is movably installed on support by the spindle of pulling of end, described Preparation bobbin is movably installed on support by the spindle of pulling of end, and warping creel is provided with multiple tensioners, described work Make the loose thread of yarn on bobbin and warping creel warping be delivered to by corresponding tensioner, the yarn tail of described work cone yarn with The loose thread of preparation cone yarn is connected.
A kind of aforesaid preparation type two-tier creelo it is characterised in that:Be provided with described support and work bobbin number Identical work bobbin operating position and work bobbin creeling position, described work bobbin can switch to work by pulling spindle Make bobbin operating position or work bobbin creeling position.
A kind of aforesaid preparation type two-tier creelo it is characterised in that:It is provided with described support and prepare bobbin number Identical preparation bobbin operating position and preparation bobbin creeling position, described preparation bobbin can by pull spindle switch to pre- Standby bobbin operating position or preparation bobbin creeling position.
A kind of aforesaid preparation type two-tier creelo it is characterised in that:Described tensioner adopts straining pulley.
A kind of aforesaid preparation type two-tier creelo it is characterised in that:Described work bobbin is located at corresponding preparation bobbin Differing heights.
A kind of aforesaid preparation type two-tier creelo it is characterised in that:Described work bobbin and preparation bobbin are vertically located at On same straight line.
The beneficial effect that the utility model is reached:The utility model preparation type two-tier creelo, in work bobbin end It is provided with and pulls spindle, be provided with preparation bobbin end and pull spindle, warping creel is provided with multiple tensioners, described work The loose thread making yarn on bobbin is delivered to warping creel warping by corresponding tensioner, and described work bobbin can be by pulling Spindle switches to work bobbin operating position or work bobbin creeling position.Described preparation bobbin can be by pulling spindle switching To preparation bobbin operating position or preparation bobbin creeling position, the yarn tail of described work cone yarn and the yarn preparing cone yarn Head is connected., after the yarn on work bobbin is finished, just the automatic yarn continuation drawn on preparation bobbin is whole for the utility model Warp, pulls empty cylinder to corresponding creeling position when creeling, after changing full cylinder, turns back corresponding operating position, as new pre- Standby bobbin, two bobbins are replaced mutually, prepare each other, operating efficiency is greatly improved, using also convenient.
Brief description
Fig. 1 is the structural representation of the utility model preparation type two-tier creelo.
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is further described.Following examples are only used for this is clearly described The technical scheme of utility model, and protection domain of the present utility model can not be limited with this.
As shown in figure 1, a kind of preparation type two-tier creelo, including warping creel 2 and base 1, base 1 is provided with whole Through frame 2, also include tensioner 6, work bobbin 3, preparation bobbin 4, pull spindle 5 and support, in the both sides of warping creel 2 respectively It is provided with multiple work bobbins 3, each work bobbin 3 described corresponds to a preparation bobbin 4, is provided with work bobbin 3 end Pull spindle 5, be provided with and pull spindle 5 in preparation bobbin 4 end, what described work bobbin 3 passed through end pulls spindle 5 activity It is installed on support, described preparation bobbin 4 is movably installed on support by the spindle 5 of pulling of end, is provided with warping creel 2 Multiple tensioners 6, on described work bobbin 3, the loose thread of yarn is delivered to warping creel 2 warping by corresponding tensioner 6, The yarn tail of described work bobbin 3 yarn is connected with the loose thread of preparation bobbin 4 yarn.
The bobbin 3 number identical that is provided with described support and works work bobbin operating position and work bobbin creeling position Put, described work bobbin 3 can switch to work bobbin operating position or work bobbin creeling position by pulling spindle 5.Institute State and on support, be provided with and prepare bobbin 4 number identical preparation bobbin operating position and preparation bobbin creeling position, described pre- Standby bobbin 4 can switch to preparation bobbin operating position or preparation bobbin creeling position by pulling spindle 5.Described tensioner 6 adopt straining pulley.Described work bobbin 3 is located at differing heights with corresponding preparation bobbin 4, is so easy to operating personnel and is changed Cylinder, improves speed.Described work bobbin 3 and preparation bobbin 4 are vertically located along the same line.
In sum, the utility model preparation type two-tier creelo, is provided with work bobbin 3 end and pulls spindle 5, Preparation bobbin 4 end is provided with pulls spindle 5, and warping creel 2 is provided with multiple tensioners 6, yarn on described work bobbin 3 Loose thread warping creel 2 warping is delivered to by corresponding tensioner 6, described work bobbin 3 can be switched by pulling spindle 5 To work bobbin operating position or work bobbin creeling position.Described preparation bobbin 4 can switch to preparation by pulling spindle 5 Bobbin operating position or preparation bobbin creeling position, the yarn tail of described work bobbin 3 yarn and the loose thread phase preparing bobbin 4 yarn Connect.After the yarn on work bobbin 3 is finished, just the automatic yarn drawn on preparation bobbin 4 continues warping to the utility model, When creeling, empty cylinder is pulled to corresponding creeling position, after changing full cylinder, turn back corresponding operating position, as new preparation drum Son, two bobbins are replaced mutually, prepare each other, operating efficiency is greatly improved, using also convenient.
Of the present utility model general principle, principal character and advantage have been shown and described above.The technical staff of the industry It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally The principle of utility model, on the premise of without departing from the utility model spirit and scope, the utility model also has various change And improvement, these changes and improvements both fall within the range of claimed the utility model.The utility model claims scope By appending claims and its equivalent thereof.

Claims (6)

1. a kind of preparation type two-tier creelo, including warping creel and base, base is provided with warping creel it is characterised in that: Also include tensioner, the bobbin that works, prepare bobbin, pull spindle and support, be respectively arranged with the both sides of warping creel multiple Work bobbin, each work bobbin described corresponds to a preparation bobbin, is provided with work bobbin end and pulls spindle, in preparation Bobbin end is provided with pulls spindle, and described work bobbin is movably installed on support by the spindle of pulling of end, described pre- Standby bobbin is movably installed on support by the spindle of pulling of end, and warping creel is provided with multiple tensioners, described work On bobbin, the loose thread of yarn is delivered to warping creel warping by corresponding tensioner, the yarn tail of described work cone yarn with pre- The loose thread of standby cone yarn is connected.
2. a kind of preparation type two-tier creelo according to claim 1 it is characterised in that:It is provided with and work on described support Make bobbin number identical work bobbin operating position and work bobbin creeling position, described work bobbin can be by pulling ingot Son switches to work bobbin operating position or work bobbin creeling position.
3. a kind of preparation type two-tier creelo according to claim 2 it is characterised in that:Be provided with described support with advance Standby bobbin number identical preparation bobbin operating position and preparation bobbin creeling position, described preparation bobbin can be by pulling ingot Son switches to preparation bobbin operating position or preparation bobbin creeling position.
4. a kind of preparation type two-tier creelo according to claim 3 it is characterised in that:Described tensioner adopts tension force Wheel.
5. a kind of preparation type two-tier creelo according to claim 4 it is characterised in that:Described work bobbin is pre- with corresponding Standby bobbin is located at differing heights.
6. a kind of preparation type two-tier creelo according to claim 5 it is characterised in that:Described work bobbin and preparation drum Son is vertically located along the same line.
CN201620805125.6U 2016-07-28 2016-07-28 Preparation type two -tier creelo Expired - Fee Related CN205934225U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620805125.6U CN205934225U (en) 2016-07-28 2016-07-28 Preparation type two -tier creelo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620805125.6U CN205934225U (en) 2016-07-28 2016-07-28 Preparation type two -tier creelo

Publications (1)

Publication Number Publication Date
CN205934225U true CN205934225U (en) 2017-02-08

Family

ID=57926411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620805125.6U Expired - Fee Related CN205934225U (en) 2016-07-28 2016-07-28 Preparation type two -tier creelo

Country Status (1)

Country Link
CN (1) CN205934225U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012171A (en) * 2016-07-28 2016-10-12 吴江金叶织造有限公司 Standby type two-tier creel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106012171A (en) * 2016-07-28 2016-10-12 吴江金叶织造有限公司 Standby type two-tier creel

Similar Documents

Publication Publication Date Title
CN201148496Y (en) Ball warp beaming machine with multi-flection tension ring pressure device
CN205934225U (en) Preparation type two -tier creelo
CN205313726U (en) Vertical spinning machine is with dividing silk device
CN202864575U (en) Yarn winding object directly applicable to weaving, embroidering or sewing
CN105540332A (en) Domestic simple bobbin winder and production method thereof
CN103848269A (en) High-speed silk yarn winder
CN204980598U (en) Twisting frame after improvement
CN204999398U (en) Doubling device
CN203960464U (en) A kind of creel for Gas in Ultra-thin Metal Wires warping
CN203612029U (en) Yarn hanging cart
CN201817673U (en) Tension control device suitable for low-speed warp knitting
CN102660821B (en) Mother yarn fiber splitting and warping all-in-one machine
CN205934226U (en) Simple warp creel
CN105129507A (en) Improved doubling machine
CN206858721U (en) The novel elevating winding mechanism of GAUDINO spinning frames
CN205973237U (en) Be applied to drum hank winder's high -efficient feeding structure
CN206477086U (en) A kind of high twisting frame of glass fibre twisting machine
CN106012171A (en) Standby type two-tier creel
CN201420142Y (en) Warping device and warping shaft
CN204847604U (en) High -efficient cone winder
CN203960458U (en) A kind of yarn is coiled into device
CN213707354U (en) Novel inverted barrel rack
CN202297925U (en) Direct weft spare yarn forming transmission mechanism for spinning frame
CN203420022U (en) Spinning and winding machine
CN213011240U (en) Yarn rewinding machine capable of uniformly winding yarn

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20170728

CF01 Termination of patent right due to non-payment of annual fee