CN205921277U - 10 kilovolt high -voltage board transfer car(buggy) - Google Patents
10 kilovolt high -voltage board transfer car(buggy) Download PDFInfo
- Publication number
- CN205921277U CN205921277U CN201620837847.XU CN201620837847U CN205921277U CN 205921277 U CN205921277 U CN 205921277U CN 201620837847 U CN201620837847 U CN 201620837847U CN 205921277 U CN205921277 U CN 205921277U
- Authority
- CN
- China
- Prior art keywords
- spacing
- sides
- buggy
- frame
- transfer car
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Patch Boards (AREA)
Abstract
The utility model relates to a 10 kilovolt high -voltage board transfer car(buggy), including erectting the gallows on the floorbar, be provided with walking round in floorbar both sides, playing the gallows and be the square frame frame, be provided with hoisting accessory in square frame frame upper end, hung spacing frame under hoisting accessory, be provided with the ejector pin of the spacing frame in tight top in spacing frame both sides, the ejector pin is continuous with the montant that plays the gallows both sides, spacing frame includes two spacing horizontal poles of arranging about articulated with the first tie point of living, do not is provided with second, the third tie point of living at two spacing horizontal pole tip, and living at second, third, tie point department is articulated to have a spacing riser. Owing to implement above -mentioned technical scheme, this application simple structure can accomplish the operation of lifting by crane, placing to the cubical switchboard fast, in the transfer process, need not hand, cooperation through spacing frame and gag lever post can with the cubical switchboard steadily in the middle part of the gallows, further reduced time, the cost of transportation, improved transportation efficiency.
Description
Technical field
The application is related to a kind of 10 kilovolts of high-voltage board transfer car(buggy)s.
Background technology
The installation of high-tension switch cabinet is, using lifting vehicle, high-tension switch cabinet is transported to altitude chamber doorway at present, then by manpower
Push-and-pull or be gradually moved into crowbar and reach precalculated position.Not only safety is not high for this means of transportation, and needs operating personnel
Many, generally require a large amount of personnel, high labor intensive, inefficiency, construction cost is high.
In prior art, Publication No. cn202353043u, a kind of entitled high-tension switch cabinet transporter, including base
Partly, lifting part and lifting support section, described base portion is a rectangle base plate, and base plate is provided below running wheel;
Described lifting part is high intensity suspension hook;Described lifting support section is included between two vertical supporting rods, two vertical supporting rods
Cross bar and longeron, described vertical supporting rod and cross bar in one plane, are mutually perpendicular to intersect constitute and erect bracing frame;Described longeron
It is mutually perpendicular to perpendicular bracing frame and not on a plane, between described longeron and perpendicular bracing frame, be provided with inclined support bar.This application
Substantially the transhipment that switch cubicle can be met requires, but its in transport process be prevent switch cubicle rock it is impossible to quickly move, still
Need a small amount of personnel to maintain stablizing of switch cubicle, be also the failure to reduce the demand of personnel, cost to greatest extent.
Content of the invention
The purpose of the application is that propose a kind of double being rapidly completed of need is transported through the 10 of work to switch cubicle
Kilovolt high-voltage board transfer car(buggy).
The purpose of the application is achieved in that 10 kilovolts of high-voltage board transfer car(buggy)s include the upending frame being erected on bottom girder,
Bottom girder both sides are provided with road wheel, described upending frame is square bearer, and square bearer upper end is provided with boom hoisting, play lifting
Put down and be hung with limitting casing, be provided with the push rod pressing closer limitting casing in limitting casing both sides, the montant phase of push rod and upending frame both sides
Even.
Described limitting casing includes being connected two spacing cross bars of point articulated left and right arrangement with the first work, in two spacing yardarms
Portion is respectively arranged with second, third junction point of living, hinged limited location riser at second, third lives junction point.
It is provided with some lifting junction points in order to be connected with switch cubicle at described spacing cross bar and spacing riser inwall.
Due to implementing technique scheme, the application structure is simple, and can quickly switch cubicle be completed with the work lifting by crane, placing
Industry, in transport process, need not be hand steered, switch cubicle can be stablized in the middle part of suspension bracket by the cooperation of limitting casing and gag lever post,
Reduce further time, the cost of transhipment, improve transport efficacy.
Brief description: the concrete structure of the application is given by following drawings and Examples:
Fig. 1 is the structural representation of 10 kilovolts of high-voltage board transfer car(buggy)s;
Fig. 2 is limitting casing structural representation;
Fig. 3 is push rod structure schematic diagram.
Legend: 1, boom hoisting, 2, upending frame, 3, limitting casing, 3-1, second live junction point, 3-2, spacing cross bar, 3-3,
First lives junction point, 3-4, the 3rd lives junction point, 3-5, lifting junction point, 3-6, spacing riser, and 4, push rod, 4-1, push rod top
Head, 4-2, pulley, 4-3, the body of rod, 4-4, internal lock jack panel, 4-5, external lock jack panel, 5, chute, 6, bottom girder, 7, road wheel.
Specific embodiment:
The application is not limited by following embodiments, can be determined specifically according to the technical scheme of the application and practical situation
Embodiment.
Embodiment: as shown in figure 1,10 kilovolts of high-voltage board transfer car(buggy)s include the upending frame 2 being erected on bottom girder 6, in bottom girder 6
Both sides are provided with road wheel 7, and described upending frame 2 is square bearer, square bearer upper end is provided with boom hoisting 1, in boom hoisting 1
Under be hung with limitting casing 3, be provided with the push rod 4 pressing closer limitting casing 3 in limitting casing 3 both sides, push rod 4 is perpendicular with upending frame 2 both sides
Bar is connected.Described boom hoisting 1 is prior art, can be using electric hoist crane or other manually, electrically equipment, its tool
Body structure non-the present application point, here is not described in detail.
As shown in Fig. 2 described limitting casing 3 includes two spacing cross bars of junction point 3-3 hinged left and right arrangement of living with first
3-2, is respectively arranged with the 2nd 3-1, the 3rd junction point 3-4 alive in two spacing cross bar 3-2 ends, in the 2nd 3-1, the 3rd connection alive
Hinged limited location riser 3-6 at point 3-4.
It is provided with some liftings in order to be connected with switch cubicle at described spacing cross bar 3-2 and spacing riser 3-6 inwall to connect
Contact 3-5.
Described first junction point 3-3 alive, the second junction point 3-1 alive, the 3rd junction point 3-4 alive include turning in order to hinged
Axle, is provided with the locking nut locked in rotating shaft.
As shown in figure 3, push rod 4 includes the push rod top 4-1 contacting with spacing riser 3-6, the 4-1 rear end installing of push rod top
Have with externally threaded body of rod 4-3, body of rod 4-3 outer end passes in the montant by upending frame 2 both sides, and wearing with upending frame 2
It is connected with inside and outside locking nut 4-4,4-5 on the body of rod 4-3 inserting place both sides.
At the 4-1 inner face of described push rod top, pulley groove is set, is provided with the pulley 4-2 being arranged above and below in pulley groove,
Pulley 4-2 mono- is located at outside pulley groove and spacing riser 3-6 sliding contact.
As shown in Figure 1,3, for can adjust upper-lower position at upending frame 2 for the push rod 4, on the montant of upending frame 2 both sides
Offer chute 5, aforementioned body of rod 4-3 is passed through by chute 5.
During use, when to indoor transhipment switch cubicle, first the application is moved integrally to switch cubicle position, with back lower place limit
Position frame 3, and be connected with switch cubicle by each lifting junction point 3-5, subsequently limitting casing 3 is limited in by upending frame 2 by push rod 4 and erects
To centerline so that limitting casing 3 can only move up and down, thus preventing limitting casing 3 in transport process from waving.Subsequent start-up rises
Device for hoisting 1 is driven limitting casing 3 and is connected the switch cubicle rise finishing with limitting casing 3.
Upending frame is subsequently promoted to shift to indoor location position, after reaching installation site, reverse starting boom hoisting 1, spacing
The switch cubicle of frame 3 and Qi Nei fixation slowly falls, until switch cubicle is contacted with ground, you can release the limit to limitting casing 3 for the push rod 4
Position effect, completes to transport operation.
The application in transport process, due to not needing hand steered switch cubicle to prevent it from waving, therefore minimum need one people, at most
Also only need two people that switch cubicle can be connected with limitting casing 3, and operate boom hoisting 1, promote upending frame, you can it is right to complete simultaneously
The work being transported to interior of switch cubicle.The application can quickly move, and while saving substantial amounts of manpower, improves
Transport efficacy.
Above technical characteristic constitutes highly preferred embodiment of the present invention, and it has stronger adaptability and optimal enforcement effect
Really, inessential technical characteristic can be increased and decreased according to actual needs, to meet the needs of different situations.
Claims (6)
1. a kind of 10 kilovolts of high-voltage board transfer car(buggy)s, including the upending frame being erected on bottom girder, are provided with road wheel in bottom girder both sides,
Described upending frame is square bearer, square bearer upper end is provided with boom hoisting it is characterised in that: hang limited under boom hoisting
Position frame, is provided with the push rod pressing closer limitting casing, push rod is connected with the montant of upending frame both sides in limitting casing both sides;Described limitting casing
Is connected, including with the first work, the two spacing cross bars arranged in point articulated left and right, be respectively arranged with second in two spacing crossbar end,
3rd junction point alive, hinged limited location riser at second, third lives junction point.
2. 10 kilovolts of high-voltage board transfer car(buggy)s as claimed in claim 1 it is characterised in that: in described spacing cross bar and spacing riser
It is provided with some lifting junction points in order to be connected with switch cubicle at wall.
3. 10 kilovolts of high-voltage board transfer car(buggy)s as claimed in claim 1 it is characterised in that: described first live junction point, second live
Junction point, the 3rd junction point alive are included in order to hinged rotating shaft, are provided with the locking nut locked in rotating shaft.
4. 10 kilovolts of high-voltage board transfer car(buggy)s as claimed in claim 1 it is characterised in that: push rod includes contacting with spacing riser
Push rod comes directly towards, and push rod top rear end is equiped with the externally threaded body of rod, and body of rod outer end is worn in the montant by upending frame both sides
Go out, and be connected with inside and outside locking nut on the body of rod interting place both sides with upending frame.
5. 10 kilovolts of high-voltage board transfer car(buggy)s as claimed in claim 4 it is characterised in that: arrange at the inner face of described push rod top
Pulley groove, is provided with the pulley being arranged above and below in pulley groove, and one, pulley is located at outside pulley groove and spacing riser sliding contact.
6. 10 kilovolts of high-voltage board transfer car(buggy)s as claimed in claim 4 it is characterised in that: open up on the montant of upending frame both sides
There is chute, the aforementioned body of rod is passed through by chute.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620837847.XU CN205921277U (en) | 2016-08-04 | 2016-08-04 | 10 kilovolt high -voltage board transfer car(buggy) |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620837847.XU CN205921277U (en) | 2016-08-04 | 2016-08-04 | 10 kilovolt high -voltage board transfer car(buggy) |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205921277U true CN205921277U (en) | 2017-02-01 |
Family
ID=57870095
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620837847.XU Expired - Fee Related CN205921277U (en) | 2016-08-04 | 2016-08-04 | 10 kilovolt high -voltage board transfer car(buggy) |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205921277U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107069505A (en) * | 2017-04-18 | 2017-08-18 | 国网江苏省电力公司无锡供电公司 | High-voltage board integrated installation device |
| CN113120807A (en) * | 2021-02-26 | 2021-07-16 | 新昌县新明实业有限公司 | Cubical switchboard hydraulic pressure carrier |
-
2016
- 2016-08-04 CN CN201620837847.XU patent/CN205921277U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107069505A (en) * | 2017-04-18 | 2017-08-18 | 国网江苏省电力公司无锡供电公司 | High-voltage board integrated installation device |
| CN107069505B (en) * | 2017-04-18 | 2019-10-22 | 国网江苏省电力公司无锡供电公司 | High voltage cabinet integrated installation device |
| CN113120807A (en) * | 2021-02-26 | 2021-07-16 | 新昌县新明实业有限公司 | Cubical switchboard hydraulic pressure carrier |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102359303B (en) | UHV ordinary line iron tower assembly method | |
| CN205977243U (en) | A platform truck for tunnel water proofing board is laid and reinforcement | |
| CN105236276A (en) | Foldable gantry crane capable of ascending and descending | |
| CN203383148U (en) | Span internal lifting device for small prefabricated box girders | |
| CN104276514A (en) | Ground self-balancing pole and its installation and use method | |
| CN106829781A (en) | Mobile loading and transporting crane and operation method thereof | |
| CN205921277U (en) | 10 kilovolt high -voltage board transfer car(buggy) | |
| CN206858005U (en) | A kind of lorry movable small crane | |
| CN103288002B (en) | Simple combination door frame high-altitude weight hanging apparatus | |
| CN101294369B (en) | Method and device for hanging and transferring bracket of movable mould frame | |
| CN103982141B (en) | A kind of novel rapid transporting drilling machine derrick substructure structure | |
| RU2657890C2 (en) | Mobile attraction assembly and disassembly | |
| CN201083018Y (en) | Mobile multipurpose fast mounting scaffold | |
| CN204324741U (en) | Load switch of transformer suspended core apparatus | |
| CN104552191B (en) | Vehicle commutation upset platform | |
| CN107181198A (en) | Lift single pole crossing frame | |
| CN204150970U (en) | Seat ground self-balancing pole | |
| CN103359625A (en) | Automatic construction equipment for building hoisting and platform elevating of new rural construction | |
| CN202450854U (en) | Portable telescopic fence | |
| CN207801332U (en) | A kind of transmission line of electricity single conductor driving | |
| CN207063484U (en) | Movable operating platform for corridor construction | |
| CN103896153A (en) | Zig-zag derrick for replacing disconnecting link | |
| CN206753616U (en) | For main hole and the urgent lining trolley for keeping away car band of constructing | |
| CN110424265A (en) | A kind of direct hoisting device and hoisting process of bridge prefabricated components within the span | |
| CN212052335U (en) | Tensioning trolley |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20170804 |