CN205916939U - Rope system is arranged to well drilling wire rope bistable formula - Google Patents
Rope system is arranged to well drilling wire rope bistable formula Download PDFInfo
- Publication number
- CN205916939U CN205916939U CN201620676025.8U CN201620676025U CN205916939U CN 205916939 U CN205916939 U CN 205916939U CN 201620676025 U CN201620676025 U CN 201620676025U CN 205916939 U CN205916939 U CN 205916939U
- Authority
- CN
- China
- Prior art keywords
- rope
- drilling
- winch
- wire rope
- winding jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
本实用新型公开了一种钻井钢丝绳双稳式排绳系统,包括高位排绳器和低位排绳器,高位排绳器安装在井架的中部,低位排绳器安装在底座上部及绞车滚筒上方,钻井钢丝绳固定端连接在死绳固定器上,另一端经天车缠绕在绞车的滚筒上,从天车到绞车滚筒之间的钻井钢丝绳依次穿过高位排绳器和低位排绳器。本实用新型的装置,在一个钻机系统中,将绞车排绳器的数量由一个设计为至少两个,并且按照不同结构钻机形式和使用要求,合理布置排绳器位置,最大程度减小甚至消除钻井钢丝绳的摆动量,增加钻井钢丝绳工作的稳定性并保证其在绞车滚筒上排列有序,防止绞车滚筒乱绳、确保钻机钢丝绳工作缠绳整齐。
The utility model discloses a bistable type rope arrangement system for drilling steel wire ropes, which comprises a high-position rope arrangement device and a low-position rope arrangement device. The fixed end of the drilling wire rope is connected to the dead rope holder, and the other end is wound on the drum of the winch through the crown block, and the drilling wire rope from the crown block to the drawworks drum passes through the high-level rope guide and the low-level rope guide in sequence. In the device of the utility model, in a drilling rig system, the number of drawworks rope guides is designed from one to at least two, and the position of the rope guides is reasonably arranged according to the form and use requirements of different structural drilling rigs, so as to minimize or even eliminate The swinging amount of the drilling wire rope increases the stability of the drilling wire rope and ensures that it is arranged in an orderly manner on the winch drum, preventing the rope from being messed up on the winch drum and ensuring that the wire rope of the drilling rig is neatly wound.
Description
技术领域technical field
本实用新型属于机械设备技术领域,涉及一种钻井钢丝绳双稳式排绳系统。The utility model belongs to the technical field of mechanical equipment, and relates to a double-stable rope arranging system for drilling steel wire ropes.
背景技术Background technique
石油钻机钻井钢丝绳在绞车滚筒上工作时出现乱绳(排列不整齐)问题长期困扰着钻井工作的正常进行。乱绳问题不仅影响钻井工作效率、绞车性能,而且直接影响钢丝绳的寿命,并随时可能对设备和人身安全带来威胁。为此,认真研究和解决好钻井钢丝绳缠绳问题已是迫在眉睫。The problem of disordered (irregularly arranged) wire ropes in oil drilling rigs when working on the winch drum has long plagued the normal operation of drilling work. Rope disorder not only affects drilling efficiency and drawworks performance, but also directly affects the life of wire ropes, and may pose a threat to equipment and personal safety at any time. For this reason, it is imminent to seriously study and solve the problem of drilling wire rope winding.
当前,石油钻机钻井排绳设备普遍采用在钻井绞车上方安装一个排绳器的形式,这种结构存在以下缺点:1)由于井架高度的影响,往往引起钢丝绳长距离产生摆动、振动,此时,仅靠绞车上方距离较近的单排绳器无法起到稳绳排绳效果。2)受钻井绞车安装位置到钻井井口距离的影响,尤其对于低位安装绞车来说,通常绞车距离井口位置较远,使得钢丝绳垂直偏角较大,钢丝绳自身的重力致使钢丝绳中间部位下垂度增加,其造成钢丝绳工作时的摆动量和偏角显著增大,仅靠单排绳器是不能够完全起到排绳作用,绞车极易发生滚筒乱绳。At present, oil drilling rig drilling equipment generally adopts the form of installing a rope puller above the drilling winch. This structure has the following disadvantages: 1) Due to the influence of the height of the derrick, the steel wire rope often swings and vibrates over a long distance. At this time, The effect of stabilizing and arranging ropes cannot be achieved only by relying on the single-row rope device with a relatively short distance above the winch. 2) Affected by the distance from the installation position of the drilling winch to the wellhead, especially for winches installed at low positions, the drawworks are usually far away from the wellhead, which makes the vertical deflection angle of the wire rope larger, and the gravity of the wire rope itself increases the sag of the middle part of the wire rope. As a result, the swing amount and deflection angle of the steel wire rope are significantly increased during work, and the single-row rope device cannot fully play the role of rope arrangement, and the winch is very prone to drum rope disorder.
实用新型内容Utility model content
本实用新型的目的是提供一种钻井钢丝绳双稳式排绳系统,解决了现有技术中存在钻井绞车缠绳乱绳的问题。The purpose of the utility model is to provide a drilling wire rope bistable rope-laying system, which solves the problem of entangled and disordered ropes in the drilling winch in the prior art.
本实用新型所采用的技术方案是,一种钻井钢丝绳双稳式排绳系统,包括高位排绳器和低位排绳器,高位排绳器安装在井架的中部,低位排绳器安装在底座上部及绞车滚筒上方,钻井钢丝绳固定端连接在死绳固定器上,另一端经天车缠绕在绞车的滚筒上,从天车到绞车滚筒之间的钻井钢丝绳依次穿过高位排绳器和低位排绳器。The technical scheme adopted in the utility model is a bistable rope-releasing system for drilling steel wire ropes, including a high-position rope arranger and a low-position rope arranger. And above the winch drum, the fixed end of the drilling wire rope is connected to the dead rope holder, and the other end is wound on the drum of the winch through the crown block. Rope.
本实用新型的钻井钢丝绳双稳式排绳系统,其特征还在于:The bistable rope arrangement system for drilling steel wire rope of the utility model is also characterized in that:
高位排绳器的结构是,包括两个对称设置的固定座,每个固定座连接有一个单轮滑车,绕过两个单轮滑车的悬挂钢丝绳端头共同连接有连接架,连接架固定安装在导绳组支架上,导绳组支架上沿走绳路线的前后两端设置有至少两组滚轮总成。The structure of the high-position rope arrangement is that it includes two symmetrically arranged fixed seats, each fixed seat is connected with a single-wheel pulley, and the ends of the suspension wire ropes bypassing the two single-wheel blocks are connected together with a connecting frame, and the connecting frame is fixed and installed. On the guide rope group support, at least two groups of roller assemblies are arranged on the front and rear ends of the guide rope group support along the rope running route.
导绳组支架中部还安装有第三对滚轮总成,第三对滚轮总成与两端的滚轮总成垂直设置。The third pair of roller assemblies is also installed in the middle part of the guide rope group bracket, and the third pair of roller assemblies is vertically arranged with the roller assemblies at both ends.
低位排绳器的结构是:包括导向套总成,在导向套总成中穿有两个横向平行光杠,每个横向平行光杠的两端均通过两端支架固定在绞车或井架上,在导向套总成中另外穿有两个纵向平行光杠,该两个纵向平行光杠上分别套装有一个滑轮,该对滑轮外圆上的绳槽相对,一起组成一个导轮组。The structure of the low-position rope rower is: including the guide sleeve assembly, in which two horizontal parallel light rods are worn, and the two ends of each horizontal parallel light rod are fixed on the drawworks or the derrick through the brackets at both ends. In addition, two longitudinal parallel light rods are worn in the guide sleeve assembly, and a pulley is respectively sleeved on the two longitudinal parallel light rods, and the rope grooves on the outer circle of the pair of pulleys are opposite to form a guide wheel group together.
本实用新型的有益效果是,采用双排绳联合工作方式,高位排绳器安装在井架中部位置,其主要功能是在钢丝绳工作时起到稳绳的效果,低位排绳器安装于钻井绞车上部,其主要功能是起到排绳的作用。两个排绳器一起联合工作,可满足正常钻井工况下稳绳排绳的效果,确保钻井钢丝绳正常工作时在绞车滚筒上整齐缠绳。结构简单、操作方便、适应各种陆地、海洋石油钻机形式,能够有效改善钻井钢丝绳的工作状态、提高钢丝绳在绞车滚筒的排列质量。The beneficial effect of the utility model is that the joint working mode of double rows of ropes is adopted, the high-position rope arranging device is installed in the middle of the derrick, and its main function is to stabilize the rope when the wire rope is working, and the low-position rope arranging device is installed on the upper part of the drilling drawworks , its main function is to play the role of rope. The two rope pullers work together to meet the effect of stable and row rope under normal drilling conditions, and ensure that the drilling wire rope is neatly wound on the drawworks drum when it is working normally. The structure is simple, the operation is convenient, and it is suitable for various types of land and offshore oil drilling rigs. It can effectively improve the working state of the drilling wire rope and improve the arrangement quality of the wire rope on the winch drum.
与现有技术相比具有以下效果和特点:1)能够有效控制钻井钢丝绳在工作时的摆动量,提高钢丝绳排绳质量。2)可以有效防止钢丝绳自重带来的中部下垂及由此产生的钢丝绳与竖直方向上夹角的增加,确保钻井钢丝绳在直线状态下工作。3)两个排绳器可采用同一结构形式,在工作中可达到互换目的,同时可形成备份。如果一个排绳器出现故障,利用另一个排绳器也可继续实现正常钻井。4)该结构通用性强,可根据不同结构的钻机,选择采用双排绳器或多排绳器形式。5)可延长钻井钢丝绳的寿命,降低钻井成本,同时确保钻井的安全性。Compared with the prior art, the utility model has the following effects and characteristics: 1) It can effectively control the swing amount of the drilling wire rope during work, and improve the quality of the wire rope rowing. 2) It can effectively prevent the sagging of the middle part caused by the self-weight of the wire rope and the resulting increase in the angle between the wire rope and the vertical direction, ensuring that the drilling wire rope works in a straight line. 3) The two rope pullers can adopt the same structural form, which can achieve the purpose of interchange during work, and can form a backup at the same time. If one rope rower fails, normal drilling can be continued with the other rope rower. 4) The structure has strong versatility. According to the drilling rigs with different structures, the form of double-row rope winch or multi-row rope winch can be selected. 5) It can prolong the life of the drilling wire rope, reduce the drilling cost, and ensure the safety of drilling at the same time.
附图说明Description of drawings
图1是本实用新型在井架上的的安装位置示意图;Fig. 1 is a schematic diagram of the installation position of the utility model on the derrick;
图2是本实用新型实施例1的结构示意图;Fig. 2 is the structural representation of the utility model embodiment 1;
图3是本实用新型实施例2的结构示意图。Fig. 3 is a schematic structural view of Embodiment 2 of the utility model.
图中,1.高位排绳器,2.低位排绳器,3.绞车,4.底座,5.死绳固定器,6.钻井钢丝绳,7.井架,8.天车,11.固定座,12.单轮滑车,13.悬挂钢丝绳,14.连接架,15.滚轮总成,16.导绳组支架,21.两端支架,22.横向平行光杠,23.导向套总成,24.纵向平行光杠,25.导轮组。In the figure, 1. High-position rope extractor, 2. Low-position rope extractor, 3. Winch, 4. Base, 5. Dead rope fixer, 6. Drilling wire rope, 7. Derrick, 8. Crane, 11. Fixing seat , 12. Single-wheel pulley, 13. Suspension wire rope, 14. Connecting frame, 15. Roller assembly, 16. Guide rope group bracket, 21. Two-end bracket, 22. Horizontal parallel light rod, 23. Guide sleeve assembly, 24. longitudinal parallel feed rod, 25. guide wheel group.
具体实施方式detailed description
下面结合附图和具体实施方式对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
参照图1,本实用新型的结构是,包括高位排绳器1和低位排绳器2,高位排绳器1安装在井架7的中部,低位排绳器2安装在底座4上部及绞车3滚筒上方,钻井钢丝绳6固定端连接在死绳固定器5上,另一端经天车8缠绕在绞车3的滚筒上,从天车8到绞车3滚筒之间的钻井钢丝绳6依次穿过高位排绳器1和低位排绳器2。Referring to Fig. 1, the structure of the present utility model is that it includes a high-position rope discharger 1 and a low-position rope discharger 2, the high-position rope discharger 1 is installed in the middle of the derrick 7, and the low-position rope discharger 2 is installed on the upper part of the base 4 and the drum of the winch 3 Above, the fixed end of the drilling wire rope 6 is connected to the dead rope holder 5, and the other end is wound on the drum of the drawworks 3 through the crown block 8, and the drilling wire rope 6 from the crown block 8 to the drum of the drawworks 3 passes through the high-level rope in turn device 1 and low-level rope controller 2.
绞车3滚筒缠绕钢丝绳时,高位排绳器1对钻井钢丝绳6中间处的较大摆动幅度加以限制,主要起到稳绳作用;低位排绳器2对接近绞车滚筒处钻井钢丝绳6较小摆动幅度加以约束,同时起到排绳作用。高位排绳器1、低位排绳器2的位置和数量根据钻机结构形式及绞车现场的排绳状况而做适时调整,合理布置。When winding the steel wire rope on the drum of the winch 3, the high-position rope release device 1 limits the large swing range of the drilling wire rope 6 in the middle, and mainly plays a role in stabilizing the rope; the low-position rope release device 2 has a small swing range of the drilling wire rope 6 near the drawworks drum To be restrained, at the same time play the role of rowing rope. The position and quantity of the high-position rope arrangement 1 and the low-position rope arrangement 2 are timely adjusted and arranged reasonably according to the structure of the drilling rig and the rope arrangement on the winch site.
高位排绳器1与低位排绳器2的结构可以设置为一致或采用不同结构,还可以通过主动排绳器或其他形式的排绳器或稳绳器等替换。The structures of the high-position rope guide 1 and the low-position rope guide 2 can be set to be the same or adopt different structures, and can also be replaced by active rope guides or other forms of rope guides or rope stabilizers.
参照图2,高位排绳器1(实施例1)的结构是,包括两个对称设置的固定座11,每个固定座11连接有一个单轮滑车12,两个单轮滑车12绕过的悬挂钢丝绳13端头缸体连接有连接架14,连接架14固定安装在导绳组支架16上,导绳组支架16上(沿走绳路线的前后两端)设置有至少两组滚轮总成15;同时在导绳组支架16中部还安装有第三对滚轮总成15,第三对滚轮总成15与两端的滚轮总成15垂直设置(以便从纵向及横向两个方向协同夹紧钻井钢丝绳6)。Referring to Fig. 2, the structure of the high-position rope row device 1 (embodiment 1) is to include two symmetrically arranged fixed seats 11, each fixed seat 11 is connected with a single-wheel tackle 12, and the two single-wheel tackles 12 bypass The cylinder body at the end of the suspension wire rope 13 is connected with a connecting frame 14, and the connecting frame 14 is fixedly installed on the guide rope group support 16. 15; At the same time, a third pair of roller assemblies 15 is also installed in the middle of the guide rope group bracket 16, and the third pair of roller assemblies 15 are vertically arranged with the roller assemblies 15 at both ends (so as to cooperate to clamp the drilling well from both longitudinal and lateral directions). Wire rope 6).
实施例1排绳器的工作原理是:两个固定座11通过连接件紧固在钻机井架或底座的两侧,单轮滑车12与固定座11钩环连接,悬挂钢丝绳13一端连接并拉紧连接架14的一端,悬挂钢丝绳13的另一端绕过两个单轮滑车12与连接架14的另一端连接并拉紧,两对滚轮总成15分别安装在导绳组支架16的两端,连接架14焊接在导绳组支架16的中部。导绳组支架16为组焊结构件,每对滚轮总成51含两个滑轮,滑轮采用耐磨金属材料制作。该排绳器工作时,钻井钢丝绳6穿过三对滚轮总称5,同时,钻井钢丝绳6通过三对滚轮总称5带动连接架4在两组单轮滑车2之间左右自由滑动,排绳目的即可达到。The working principle of the rope rower in Embodiment 1 is: two fixing seats 11 are fastened on both sides of the derrick or the base of the drilling rig through connecting pieces, the single-wheel pulley 12 is connected with the hook and ring of the fixing seats 11, and one end of the hanging wire rope 13 is connected and tightened. One end of the connecting frame 14, the other end of the suspension wire rope 13 goes around two single-wheel tackles 12 and is connected with the other end of the connecting frame 14 and tensioned. Connecting frame 14 is welded in the middle part of guide rope group support 16. The guide rope group support 16 is a welded structural part, and every pair of roller assemblies 51 contains two pulleys, and the pulleys adopt wear-resistant metal materials to make. When the rope arranging device is working, the drilling wire rope 6 passes through three pairs of rollers, collectively referred to as 5, and at the same time, the drilling wire rope 6 drives the connecting frame 4 to slide freely left and right between two groups of single-wheel tackles 2 through the three pairs of rollers, collectively referred to as 5. reachable.
参照图3,低位排绳器2(实施例2)的结构是:包括导向套总成23,在导向套总成23中穿有两个横向平行光杠22,每个横向平行光杠22的两端均通过两端支架21固定在绞车或井架上,在导向套总成23中另外穿有两个纵向平行光杠24,该两个纵向平行光杠24上分别套装有一个滑轮,该对滑轮外圆上的绳槽相对,一起组成一个导轮组25。With reference to Fig. 3, the structure of low-position rope row device 2 (embodiment 2) is: comprise guide sleeve assembly 23, in guide sleeve assembly 23 are worn with two horizontal parallel light rods 22, each horizontal parallel light rod 22 Both ends are fixed on the drawworks or the derrick through the brackets 21 at both ends, and two longitudinal parallel light rods 24 are additionally worn in the guide sleeve assembly 23, and a pulley is respectively set on the two longitudinal parallel light rods 24. The rope groove on the pulley outer circle is opposite, forms a guide wheel group 25 together.
实施例2排绳器的工作原理是:两端支架21固定在绞车或井架上的两端,两端支架21之间连接有两根横向光杠22,导向套总成23与横向平行光杠22滑动接触,导向套总成23可沿横向平行光杠22水平方向自由移动;两根纵向平行光杠24固定在导向套总成23上,导轮组25与纵向平行光杠24之间滑动接触,导轮组25的一对滑轮一起沿纵向平行光杠24自由移动。该排绳器工作时,钻井钢丝绳6穿过导轮组25的一对滑轮绳槽,钻井钢丝绳6带动导轮组25可在两根纵向平行光杠24上自由滑动,同时,钻井钢丝绳6还通过导轮组25、纵向平行光杠24带动导向套总成23在两根横向平行光杠22上自由滑动,实现两个方向的自由移动,排绳目的即可达到。The working principle of embodiment 2 rope row device is: two ends brackets 21 are fixed on the two ends on winch or derrick, two horizontal light rods 22 are connected between two end brackets 21, guide sleeve assembly 23 and horizontal parallel light rods 22 sliding contact, the guide sleeve assembly 23 can move freely along the horizontal direction of the horizontal parallel light bars 22; two longitudinal parallel light bars 24 are fixed on the guide sleeve assembly 23, and the guide wheel group 25 slides between the longitudinal parallel light bars 24 contact, a pair of pulleys of the guide wheel set 25 move freely along the longitudinal parallel light bar 24 together. When the rope rower works, the drilling wire rope 6 passes through a pair of pulley rope grooves of the guide wheel group 25, and the drilling wire rope 6 drives the guide wheel group 25 to freely slide on the two longitudinal parallel light rods 24. At the same time, the drilling wire rope 6 also The guide wheel assembly 25 and the longitudinal parallel light bars 24 drive the guide sleeve assembly 23 to slide freely on the two horizontal parallel light bars 22 to realize free movement in two directions, and the purpose of arranging the ropes can be achieved.
本实用新型的双稳式排绳系统,在一个钻机系统中,将绞车排绳器的数量由一个设计为至少两个,并且按照不同结构钻机形式和使用要求,合理布置排绳器位置,最大程度减小甚至消除钻井钢丝绳的摆动量,增加钻井钢丝绳工作的稳定性并保证其在绞车滚筒上排列有序,彻底解决绞车滚筒乱绳、确保钻机钢丝绳工作缠绳整齐。In the bistable rope arranging system of the utility model, in one drilling rig system, the number of drawworks arranging devices is designed from one to at least two, and the position of the arranging devices is reasonably arranged according to the form and use requirements of different structural drilling rigs, the maximum Reduce or even eliminate the swing of the drilling wire rope to a certain extent, increase the stability of the drilling wire rope and ensure that it is arranged in an orderly manner on the winch drum, completely solve the messy rope of the winch drum, and ensure that the drilling rig wire rope is neatly wound.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620676025.8U CN205916939U (en) | 2016-06-29 | 2016-06-29 | Rope system is arranged to well drilling wire rope bistable formula |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620676025.8U CN205916939U (en) | 2016-06-29 | 2016-06-29 | Rope system is arranged to well drilling wire rope bistable formula |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205916939U true CN205916939U (en) | 2017-02-01 |
Family
ID=57874808
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620676025.8U Expired - Fee Related CN205916939U (en) | 2016-06-29 | 2016-06-29 | Rope system is arranged to well drilling wire rope bistable formula |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205916939U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107954358A (en) * | 2017-11-11 | 2018-04-24 | 华强方特(芜湖)文化科技有限公司 | A kind of adjustable roller rope guide |
| CN108341359A (en) * | 2018-01-16 | 2018-07-31 | 宝鸡石油机械有限责任公司 | A kind of servo-actuated Winch Wire Rope Ranging Device |
-
2016
- 2016-06-29 CN CN201620676025.8U patent/CN205916939U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107954358A (en) * | 2017-11-11 | 2018-04-24 | 华强方特(芜湖)文化科技有限公司 | A kind of adjustable roller rope guide |
| CN107954358B (en) * | 2017-11-11 | 2023-10-13 | 华强方特(芜湖)文化科技有限公司 | Adjustable roller rope guide |
| CN108341359A (en) * | 2018-01-16 | 2018-07-31 | 宝鸡石油机械有限责任公司 | A kind of servo-actuated Winch Wire Rope Ranging Device |
| CN108341359B (en) * | 2018-01-16 | 2019-08-20 | 宝鸡石油机械有限责任公司 | A kind of servo-actuated Winch Wire Rope Ranging Device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202643182U (en) | A Wire Rope Compensation System for a Single Arm Portal Crane | |
| CN205916939U (en) | Rope system is arranged to well drilling wire rope bistable formula | |
| CN103183034A (en) | Parallel flexible cable suspension system guide rail rope deflection restraining mechanism and method | |
| CN2926478Y (en) | Rotary-dug driller | |
| CN104942564B (en) | A kind of offshore vessel carries the installation method of the large-tonnage bearing pin on jib-type crane arm support | |
| CN207497924U (en) | A spreader offset device | |
| CN104627885A (en) | Guiding device for optimizing steel wire rope elevation angle | |
| CN205187709U (en) | Ship unloaders bracket dolly weight overspeed device tensioner | |
| CN113148838B (en) | A tower crane rope supporting device | |
| CN206970077U (en) | A kind of construction site hoist engine | |
| CN212222219U (en) | Adjustable arch rib installation hoisting device | |
| CN105110205A (en) | Reverse disassembling method for tower crane | |
| CN203612860U (en) | Steel wire rope winding device of large portal crane | |
| CN210118125U (en) | Cable towing device of continuous mining machine | |
| CN204057014U (en) | A kind of roller frame and belt feeder | |
| JP5781797B2 (en) | Catenary support trolley rope hanging method | |
| CN202390140U (en) | Hoist with adjustable drum axis angle | |
| CN217650790U (en) | Hang and draw link and gate to hang and draw device | |
| CN214467503U (en) | River-crossing index system of hydrological flow measurement device | |
| CN213387583U (en) | Four corners rig drilling machine main hoist wire rope winding displacement mechanism | |
| CN208249760U (en) | A kind of steady rope device of big rope of winch | |
| CN203456799U (en) | A double-bundled conductor hoisting frame equipped with rollers | |
| CN202467697U (en) | Casing stabbing board | |
| CN209835518U (en) | Oil cylinder lifting type lifting system for drilling | |
| JP2003040575A (en) | Container crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20170629 |