CN205916388U - Surely pile up neatly device fast - Google Patents

Surely pile up neatly device fast Download PDF

Info

Publication number
CN205916388U
CN205916388U CN201620703393.7U CN201620703393U CN205916388U CN 205916388 U CN205916388 U CN 205916388U CN 201620703393 U CN201620703393 U CN 201620703393U CN 205916388 U CN205916388 U CN 205916388U
Authority
CN
China
Prior art keywords
brick
transfer chain
line component
conveying line
chain subassembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620703393.7U
Other languages
Chinese (zh)
Inventor
梁耀棠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keda Clean Energy Co Ltd
Original Assignee
Keda Clean Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Keda Clean Energy Co Ltd filed Critical Keda Clean Energy Co Ltd
Priority to CN201620703393.7U priority Critical patent/CN205916388U/en
Application granted granted Critical
Publication of CN205916388U publication Critical patent/CN205916388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model discloses a surely pile up neatly device fast. It includes the transfer chain subassembly and corresponds the centering mechanism and clamp brick mechanism that the transfer chain subassembly set up, the transfer chain subassembly comprises first transfer chain subassembly and second transfer chain subassembly, second transfer chain subassembly sets up the output at first transfer chain subassembly, centering mechanism corresponds first transfer chain subassembly sets up, erect through an elevating system respectively at the both ends that press from both sides brick mechanism the top of second transfer chain. Every elevating system mainly comprises a chassis, a link and a lift cylinder. The utility model discloses promote ceramic brick automatic packaging line's eager buttress speed greatly, satisfied the more kiln and the automatic demand of packing of polishing line of large -tonnage, and, can not appear can accomplishing the eager buttress of surface irregularities ceramic tiles such as brick modelled after an antique, cultural stone calmly because of the not enough phenomenon by the fracturing of ceramic brick roughness takes place surely piling up neatly the in -process.

Description

One kind quickly cuts buttress device
Technical field
This utility model belongs to Ceramic Tiles packaging facilities technical field and in particular to one kind can improve Ceramic Tiles cuts buttress speed Quickly cut buttress device.
Background technology
For years fast-developing with Chinese pottery industry, while yield is constantly lifted, more and more pottery enterprise Industry is faced with production cost and sharply increases universal phenomenon with lack of labor, especially packs this labor intensity to finished bricks Work post high, with low content of technology, that salary and conditions is low, work under bad environment, mobility of people are big, recruitment and management are all more tired Difficult;By automatic packaging line replacement, manpower completes the packaging of Ceramic Tiles, code support has become universal phenomenon.Only allow production process certainly Dynamicization, reduces labor intensity, allows physical work work post be changed into mental work work post, could solve the problems, such as the recruitment of enterprise with effective Control the problem of production cost.
At present, the technique after the polish line of ceramics factory is: ceramic tile is placed into phase by factor classifications such as certain grade, colors number Answer on brick frame, then go up automatic packaging line carry out packing, piling.However, day by day cruel with ceramic industry competition, producer must not The yield not increasing kiln and polish line with reduces cost: per minute in the past cross brick general 30~40 taking 600 brick polish lines as a example Piece, and the high-speed production lines of present 50 pieces/minute can be found everywhere.Existing automatic packaging line speed is generally not more than 32 pieces/point Clock, i.e. 8 bags/minute, such speed needs two even three packing lines could meet the requirement of a polish line, leads to field Ground, artificial, maintenance cost are required to be doubled and redoubled.Through using on-site verification, existing upper brick machine cuts buttress device due to action Complex, directly affects the speed of brick machine on baling line.
Cut buttress device for a kind of existing upper brick machine as shown in Figure 1 to Figure 3, it mainly includes a conveying line component 1, right Line component 1 should be conveyed and be provided with centering body 2, lifting body 3 and brick-clamping mechanism 4, its action step is:
Step 1: piled bricks 6 (800 bricks: 6 or 600 bricks: 8) enters through conveying line component 1 and cuts buttress station, centering body 2 Action, piled bricks is clapped neat;
Step 2: centering body 2 is retracted, concedes the space of brick folding;
Step 3: lifting body 3 makees jacking action, by piled bricks 6 jack-up to cutting height of embankment degree;
Step 4: brick-clamping mechanism 4 action, by piled bricks (800 bricks: 3 or 600 bricks: 4) clamping above;
Step 5: lifting body 3 makees down maneuver, following piled bricks is dropped back to conveying line component, realizes one point of piled bricks For two;
Step 6: conveying line component action, following piled bricks is delivered to multiple package position;
Step 7: jacking cylinder makees jacking action again, the piled bricks above support;
Step 8: brick-clamping mechanism action, release the clamping to piled bricks above;
Step 9: jacking cylinder makees down maneuver again, remaining piled bricks is dropped back to conveying line component.
Through actual measurement, completing whole process needs 15 seconds, and step 1~step 6 is the working cycle of the first buttress brick, takes 10 seconds; Step 7~step 9 is the working cycle of the second buttress brick, takes 5 seconds.It can be seen that the working cycle of the first buttress brick has become bottleneck, impact The speed of whole wire wrapping.And, above-mentioned cut buttress device busy during, need the pressure brick wheel 41 being arranged on brick-clamping mechanism Carry out spacing, easily cause the problem of pressure break ceramic tile because ceramic tile flatness is not enough.
Utility model content
In place of the purpose of this utility model is for the deficiencies in the prior art, existing upper brick machine is cut with buttress device and ties Structure is improved, and provides one kind quickly to cut buttress device.
For reaching above-mentioned purpose, the technical solution of the utility model is as follows:
One kind quickly cuts buttress device, including conveying line component and the corresponding centering body conveying line component setting and brick folding machine Structure;Described conveying line component is made up of the first conveying line component and the second conveying line component, described second conveying line component setting Outfan in the first conveying line component;Described centering body correspondence described first conveys line component setting;Described brick-clamping mechanism Two ends be erected at the top of described second pipeline respectively by an elevating mechanism.
Preferably, each elevating mechanism includes: a underframe, it is arranged on the side of the second conveying line component;One company Connect frame, be arranged on described underframe by a lifting guidance set;With a lift cylinder, its cylinder part is fixed on described On underframe, its tailpiece of the piston rod is connected with described link.
Further, described lifting guidance set is mainly made up of two lifting guide posts and two fairleads, described two Lifting guide post is vertically provided on described underframe;Each guiding is set in described link and is set in a lifting to be led To on the body of rod of bar.
Further, described lift cylinder is double stroke cylinder.
By adopting said structure, greatly improve Ceramic Tiles automatic packaging line cuts buttress speed to this utility model, meets The demand of more large-tonnage kiln and polish line packing automatically;And, be not in because Ceramic Tiles are smooth during cutting buttress Spend not enough and occurred by the phenomenon of pressure break, can complete calmly the surface irregularity ceramic tile such as Antique Imitation Tiles, Art Stone cuts buttress.
Brief description
Fig. 1 is the side structure schematic view that buttress device cut by existing upper brick machine.
Fig. 2 is the left view structural representation of Fig. 1.
Fig. 3 is the vertical view structural scheme of mechanism of Fig. 1.
Fig. 4 is side structure schematic view of the present utility model.
Fig. 5 is working state schematic representation one of the present utility model.
Fig. 6 is working state schematic representation two of the present utility model.
In figure:
1 conveying line component;11 first conveying line components;12 second conveying line components;2 centering bodies;3 tops Rise mechanism;4 brick-clamping mechanisms;5 elevating mechanisms;51 underframe;52 links;53 lift cylinders;54 lifting guiding Bar;55 fairleads;6 piled bricks.
In conjunction with drawings and Examples, this utility model is described in further detail.
Specific embodiment
As shown in Figures 4 to 6, one kind described in the utility model quickly cuts buttress device, is that buttress dress cut by brick machine on existing Improve on the basis of putting structure, include conveying line component, centering body 2 and brick-clamping mechanism 4.
Described pipeline group is mainly made up of the first conveying line component 11 and the second conveying line component 12, the second pipeline Assembly 12 is arranged on the outfan of the first conveying line component 11.
The corresponding first conveying line component 11 of described centering body 2 is arranged, and its structure adopts existing centering body, equally It is made up of parts such as centering roller, centering cylinder and centering guide posts, will not be described here.
The top that an elevating mechanism 5 is erected at the second pipeline 12 is passed through at the two ends of described brick-clamping mechanism 4 respectively.Should Brick-clamping mechanism equally adopts existing brick-clamping mechanism, equally by crossbeam, brick clamp, brick folding cylinder, cylinder extension rod and gimbal lever etc. Part forms, and will not be described here.
Each elevating mechanism 5 is main to be lifted by 52, lifting guidance set of 51, link of a underframe and one Cylinder 53 forms.Underframe 51 is arranged on the side of the second conveying line component 12.Link 52 passes through this lifting guidance set and arranges On underframe 51, this lifting guidance set is mainly made up of two lifting guide posts 54 and two fairleads 55, this two liftings Guide post 54 is vertically provided on underframe 51, each guiding, and 55 are arranged in link 52 and are set in a lifting guide post On 54 body of rod.Lift cylinder 53 is double stroke cylinder, and its cylinder part is fixed on underframe 51, its tailpiece of the piston rod and link 52 connections.The two ends of brick-clamping mechanism 4 are separately mounted on a link 52.
Operation principle of the present utility model is as follows:
The bat neat centering action of piled bricks is completed on the first conveying line component, the second conveying line component completes to cut to pile up neatly and moves Make, specifically cut buttress action step as follows:
Step 1: brick-clamping mechanism action, piled bricks 6 (800 bricks: 3 or 600 bricks: 4) above is stepped up, now lifting air Cylinder is in middle position;
Step 2: lift cylinder extend out to a high position from middle position, drives brick-clamping mechanism to rise piled bricks above, realizes piled bricks Be divided into two;
Step 3: the second conveying line component action, following piled bricks is delivered to multiple package position;
Step 4: lift cylinder is retracted to low level from a high position, piled bricks above is dropped back to the conveying of the second conveying line component On face;
Step 5: brick-clamping mechanism action, release the clamping to piled bricks.
The manner of execution that this utility model is risen using first brick folding again, declines, out and out to improve Ceramic Tiles automatic Baling line cut buttress speed, it is 15 seconds that traditional method cuts the buttress action cycle, per minute can be only done 4 times, that is, packing speed 8 wrap/ Minute, and the action cycle of the present utility model be 10 seconds, per minute can complete 6 times, that is, packing speed 12 wrap/minute, meet More large-tonnage kiln and the demand of the automatic packing of polish line.It is additionally, since lowering or hoisting gear and adopts double stroke cylinder, cut and make during buttress It is accurately positioned with the middle position of double stroke cylinder, is carried out without using the pressure brick wheel in traditional structure spacing, solved because of pottery Brick flatness is not enough and lead to the problem of pressure break ceramic tile.

Claims (4)

1. one kind quickly cuts buttress device, including conveying line component and the corresponding centering body conveying line component setting and brick folding machine Structure it is characterised in that
Described conveying line component is made up of the first conveying line component and the second conveying line component, described second conveying line component setting Outfan in the first conveying line component;
Described centering body correspondence described first conveys line component setting;
The two ends of described brick-clamping mechanism are erected at the top of described second pipeline respectively by an elevating mechanism.
2. one kind according to claim 1 quickly cuts buttress device it is characterised in that each elevating mechanism includes:
One underframe, is arranged on the side of the second conveying line component;
One link, is arranged on described underframe by a lifting guidance set;With
One lift cylinder, its cylinder part is fixed on described underframe, and its tailpiece of the piston rod is connected with described link.
3. one kind according to claim 2 quickly cuts buttress device it is characterised in that described lifting guidance set is mainly by two Individual lifting guide post and two fairlead compositions, described two lifting guide posts are vertically provided on described underframe;Each guiding It is set in described link and is set on the body of rod of a lifting guide post.
4. one kind according to claim 2 quickly cuts buttress device it is characterised in that described lift cylinder is two-pass gas Cylinder.
CN201620703393.7U 2016-07-04 2016-07-04 Surely pile up neatly device fast Active CN205916388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620703393.7U CN205916388U (en) 2016-07-04 2016-07-04 Surely pile up neatly device fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620703393.7U CN205916388U (en) 2016-07-04 2016-07-04 Surely pile up neatly device fast

Publications (1)

Publication Number Publication Date
CN205916388U true CN205916388U (en) 2017-02-01

Family

ID=57875150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620703393.7U Active CN205916388U (en) 2016-07-04 2016-07-04 Surely pile up neatly device fast

Country Status (1)

Country Link
CN (1) CN205916388U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107572044A (en) * 2016-07-04 2018-01-12 广东科达洁能股份有限公司 One kind quickly cuts pile device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107572044A (en) * 2016-07-04 2018-01-12 广东科达洁能股份有限公司 One kind quickly cuts pile device

Similar Documents

Publication Publication Date Title
CN101492104B (en) Automatic box feeding machine
CN103879789B (en) A kind of Novel palletizer
CN203033680U (en) Crane for finished green bricks
CN104084857B (en) Adobe four sides grinding attachment
CN204162097U (en) Truss-like stacker
CN203697567U (en) Semiautomatic or full-automatic window patching machine lifting device
CN202880426U (en) Brick stacking machine
CN104057376B (en) Vertical refractory brick grinding system
CN201357954Y (en) Automatic box-loading machine
CN207030449U (en) A kind of stacked box brick device applied on ceramic tile packaging line
CN205087596U (en) Automatic setting machine layer brick transposition overhead hoist
CN203714840U (en) Bridge type setting machine
CN205916388U (en) Surely pile up neatly device fast
CN105936423A (en) Sintered brick setting machine
CN207482282U (en) Exempt from support-board type stacking machine for small brick
CN103569614B (en) Conveying system for fly ash block steam-curing
CN107572044A (en) One kind quickly cuts pile device
CN102390678A (en) Jacking and conveying machine
CN106493851A (en) A kind of blank turning machine for realizing accurately overturning adobe
CN207759627U (en) A kind of adobe transverse direction joint dividing device
CN202953545U (en) Brick-holding type brick feeding and separating mechanism
CN202984946U (en) Automatic feeding system of assembled H-shaped steel
CN110498238B (en) Split type lifting platform capable of realizing palletless stacking of building blocks and stacking method using device
CN205087590U (en) Automatic stacking machine
CN204624041U (en) A kind of fastener automatic packaging machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant