CN205908907U - Salvage head of plugging into fast - Google Patents
Salvage head of plugging into fast Download PDFInfo
- Publication number
- CN205908907U CN205908907U CN201620805425.4U CN201620805425U CN205908907U CN 205908907 U CN205908907 U CN 205908907U CN 201620805425 U CN201620805425 U CN 201620805425U CN 205908907 U CN205908907 U CN 205908907U
- Authority
- CN
- China
- Prior art keywords
- section
- connecting head
- main body
- seal circle
- leak
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007789 sealing Methods 0.000 claims abstract description 29
- 230000008439 repair process Effects 0.000 claims abstract description 28
- 230000002093 peripheral effect Effects 0.000 abstract description 15
- 238000000034 method Methods 0.000 description 6
- 241000309551 Arthraxon hispidus Species 0.000 description 5
- 238000009434 installation Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Landscapes
- Pipe Accessories (AREA)
Abstract
本实用新型涉及一种抢修快速接驳头,包括固定接驳头主体、滑动接驳头主体、第一防漏密封圈、第二防漏密封圈、第三防漏密封圈,其中第一防漏密封圈、第二防漏密封圈分别安装在固定接驳头主体第一端、第二端的端口内壁上;所述滑动接驳头主体包括套取段和接驳段,套取段与接驳段连接及连通;套取段的外周直径小于固定接驳头主体的内周直径,部分套取段通过固定接驳头主体的第一端或第二端套入固定接驳头主体内,第一防漏密封圈或第二防漏密封圈与套取段的外周表面紧密接触;接驳段的外周直径、内周直径与固定接驳头主体的外周直径、内周直径相等;第三防漏密封圈安装在接驳段的端口内壁上。
The utility model relates to a fast repair joint, which comprises a main body of a fixed joint, a main body of a sliding joint, a first leak-proof seal ring, a second leak-proof seal ring and a third leak-proof seal ring. The leak-proof sealing ring and the second leak-proof sealing ring are respectively installed on the inner wall of the port at the first end and the second end of the main body of the fixed joint; The section is connected and communicated; the outer peripheral diameter of the sleeved section is smaller than the inner peripheral diameter of the fixed joint body, and part of the sleeved section is inserted into the fixed joint body through the first end or the second end of the fixed joint body. The first leak-proof sealing ring or the second leak-proof sealing ring is in close contact with the outer peripheral surface of the sleeve section; the outer peripheral diameter and inner peripheral diameter of the connection section are equal to the outer peripheral diameter and inner peripheral diameter of the main body of the fixed connection head; the third The leak-proof sealing ring is installed on the inner wall of the port of the connecting section.
Description
技术领域technical field
本发明涉及管道技术领域,更具体地,涉及一种抢修快速接驳头。The invention relates to the technical field of pipelines, and more specifically, to a quick repair joint.
背景技术Background technique
目前日常生活管道的抢修施工中,当管道被外来因素破坏时,往往需要第一时间找到能控制该抢修段的上游开关控制设备进行关闭截流处理,再对管材破裂处进行截断,然后使用接驳头将截断处的管材两端接驳起来,完成整个的抢修工作。但是,现有技术在进行接驳时,由于提供的接驳头的安装程序太过复杂,导致整个过程耗费的时间大大增加。所以抢修的及时性不够灵活。At present, in the emergency repair construction of daily life pipelines, when the pipeline is damaged by external factors, it is often necessary to find the upstream switch control equipment that can control the emergency repair section at the first time to shut down and intercept the flow, and then cut off the rupture of the pipe, and then use the connection Connect the two ends of the pipe at the cut-off point with the head to complete the entire repair work. However, when connecting in the prior art, because the installation procedure of the provided connecting head is too complicated, the time spent in the whole process is greatly increased. Therefore, the timeliness of rush repair is not flexible enough.
实用新型内容Utility model content
本发明为解决以上现有技术的难题,提供了一种抢修快速接驳头,该接驳头的安装方便快捷,能够满足快速抢修的需要。In order to solve the above problems in the prior art, the present invention provides a rapid repair joint, which is convenient and quick to install and can meet the needs of rapid repair.
为实现以上实用新型目的,采用的技术方案是:For realizing above utility model purpose, the technical scheme that adopts is:
一种抢修快速接驳头,包括固定接驳头主体、滑动接驳头主体、第一防漏密封圈、第二防漏密封圈、第三防漏密封圈,其中第一防漏密封圈、第二防漏密封圈分别安装在固定接驳头主体第一端、第二端的端口内壁上;所述滑动接驳头主体包括套取段和接驳段,套取段与接驳段连接及连通;套取段的外周直径小于固定接驳头主体的内周直径,部分套取段通过固定接驳头主体的第一端或第二端套入固定接驳头主体内,第一防漏密封圈或第二防漏密封圈与套取段的外周表面紧密接触;接驳段的外周直径、内周直径与固定接驳头主体的外周直径、内周直径相等;第三防漏密封圈安装在接驳段的端口内壁上。A rapid repair joint head, including a fixed joint head main body, a sliding joint head main body, a first leak-proof sealing ring, a second leak-proof sealing ring, and a third leak-proof sealing ring, wherein the first leak-proof sealing ring, The second leak-proof sealing ring is respectively installed on the inner wall of the port at the first end and the second end of the fixed connector main body; Connected; the outer peripheral diameter of the sleeve section is smaller than the inner diameter of the fixed joint body, part of the sleeve section is inserted into the fixed joint body through the first end or the second end of the fixed joint body, and the first leak-proof The sealing ring or the second leak-proof sealing ring is in close contact with the outer peripheral surface of the sleeve section; the outer peripheral diameter and inner peripheral diameter of the connection section are equal to the outer peripheral diameter and inner peripheral diameter of the fixed joint body; the third leak-proof sealing ring Installed on the inner wall of the port of the connection section.
用户在使用抢修快速接驳头对管道进行抢修时,只需要将固定接驳头主体的第一端或第二端与截断的管道的一端连接起来,然后通过拉伸移动套取段来对套取段套入固定接驳头主体的深度进行调整,然后将滑动接驳头主体的接驳段与截断的管道的另一端连接起来,即可完成整个抢修的过程。When the user uses the quick repair joint to repair the pipeline, he only needs to connect the first end or the second end of the main body of the fixed joint with one end of the cut pipe, and then adjust the sleeve by stretching and moving the sleeve. The depth of the section inserted into the main body of the fixed joint is adjusted, and then the joint section of the main body of the sliding joint is connected with the other end of the truncated pipeline to complete the entire emergency repair process.
上述方案中,固定接驳头主体的第一端、第二端内设置有防漏密封圈,滑动接驳头主体的接驳段的端口内设置有防漏密封圈,所以固定接驳头主体的第一端或第二端与截断的管道的一端的连接为软性连接,固定接驳头主体的第一端或第二端与套取段的连接为软性连接,接驳段与截断的管道的另一端的连接为软性连接,防漏密封圈对以上三处的连接进行密封,避免接驳后出现漏水的情况。In the above scheme, the first end and the second end of the main body of the fixed joint are provided with leak-proof sealing rings, and the ports of the connecting section of the main body of the sliding joint are provided with leak-proof sealing rings, so the main body of the fixed joint The connection between the first or second end of the pipe and one end of the truncated pipeline is a flexible connection, the connection between the first or second end of the fixed joint body and the sleeve section is a flexible connection, and the connection between the connection section and the cut-off The connection at the other end of the pipeline is a soft connection, and the leak-proof sealing ring seals the above three connections to avoid water leakage after connection.
本发明提供的抢修快速接驳头的安装使用方便快捷,能够对管道进行快速抢修,甚至在抢修的过程中无需进行截流,从而减少不必要的工序。The rapid repair joint head provided by the present invention is convenient and quick to install and use, and can quickly repair the pipeline, and even does not need to cut off the flow during the repair process, thereby reducing unnecessary procedures.
优选地,固定接驳头主体第一端、第二端的端口内壁上沿其径向方向分别开设有一环状的凹槽,凹槽的直径大于固定接驳头主体的内周直径,第一防漏密封圈、第二防漏密封圈分别安装在固定接驳头主体第一端、第二端端口的凹槽内。Preferably, the inner walls of the ports at the first end and the second end of the fixed joint main body are respectively provided with an annular groove along the radial direction thereof, and the diameter of the groove is larger than the inner peripheral diameter of the fixed joint main body. The leakage sealing ring and the second leakage-proof sealing ring are respectively installed in the grooves of the ports at the first end and the second end of the main body of the fixed connection head.
优选地,所述接驳段的端口内壁上沿其径向方向开设有一环状的凹槽,凹槽的直径大于接驳段的内周直径,第三防漏密封圈安装在接驳段端口的凹槽内。Preferably, an annular groove is formed on the inner wall of the port of the connection section along its radial direction, the diameter of the groove is larger than the inner diameter of the connection section, and the third leak-proof sealing ring is installed on the port of the connection section. in the groove.
优选地,在将套取段套入固定接驳头主体时,需要根据被截断的管道两端的距离对套取段套入固定接驳头主体的长度进行调整,为了方便这一调整过程,本发明提供的抢修快速接驳头还包括有长度定位调节套,所述长度定位调节套的内壁面上开设有内螺纹;所述套取段中部的外表面上开设有外螺纹;长度定位调节套套取在套取段中部的外表面上,长度定位调节套通过其内壁面上的内螺纹与套取段外表面上的外螺纹与套取段连接。Preferably, when inserting the sleeve section into the main body of the fixed joint, it is necessary to adjust the length of the sleeve section inserted into the main body of the fixed joint according to the distance between the two ends of the cut-off pipe. In order to facilitate this adjustment process, this The emergency repair quick connector provided by the invention also includes a length positioning adjustment sleeve, the inner wall surface of the length positioning adjustment sleeve is provided with internal threads; the outer surface of the middle part of the sleeve extraction section is provided with external threads; the length positioning adjustment sleeve It is taken on the outer surface of the middle part of the sheathing section, and the length positioning adjustment sleeve is connected with the sheathing section through the internal thread on the inner wall surface and the outer thread on the outer surface of the sheathing section.
上述方案中,通过旋转长度定位调节套即可对套取段套入固定接驳头主体的长度进行调整,其使用方便快捷。In the above solution, by rotating the length positioning adjustment sleeve, the length of the sleeve taking section inserted into the main body of the fixed connection head can be adjusted, which is convenient and quick to use.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
本发明提供的快速接驳头采用直套调距式结构,无需进行截流即可进行安装抢修,即套即用即调,安装方便快捷。The quick connecting head provided by the present invention adopts a straight-set distance-adjustable structure, which can be installed and repaired without interception, and can be adjusted immediately after being set, and the installation is convenient and quick.
附图说明Description of drawings
图1为抢修快速接驳头的结构示意图。Figure 1 is a structural schematic diagram of the emergency repair quick connector.
图2为抢修快速接驳头的分解示意图。Figure 2 is an exploded schematic view of the emergency repair quick connector.
图3为抢修快速接驳头的爆炸图。Figure 3 is an exploded view of the emergency repair quick connector.
具体实施方式detailed description
附图仅用于示例性说明,不能理解为对本专利的限制;The accompanying drawings are for illustrative purposes only and cannot be construed as limiting the patent;
以下结合附图和实施例对本实用新型做进一步的阐述。Below in conjunction with accompanying drawing and embodiment the utility model is described further.
实施例1Example 1
如图1~3所示,一种抢修快速接驳头,包括固定接驳头主体1、滑动接驳头主体2、第一防漏密封圈3、第二防漏密封圈4、第三防漏密封圈5,其中第一防漏密封圈3、第二防漏密封圈4分别安装在固定接驳头主体1第一端、第二端的端口内壁上;所述滑动接驳头主体2包括套取段21和接驳段22,套取段21与接驳段22连接及连通;套取段21的外周直径小于固定接驳头主体1的内周直径,部分套取段21通过固定接驳头1主体的第一端或第二端套入固定接驳头主体1内,第一防漏密封圈3或第二防漏密封圈4与套取段21的外周表面紧密接触;接驳段22的外周直径、内周直径与固定接驳头主体1的外周直径、内周直径相等;第三防漏密封圈5安装在接驳段22的端口内壁上。As shown in Figures 1 to 3, a quick repair connector includes a fixed connector body 1, a sliding connector body 2, a first leak-proof seal ring 3, a second leak-proof seal ring 4, a third leak-proof seal ring Leakage seal ring 5, wherein the first leak-proof seal ring 3 and the second leak-proof seal ring 4 are respectively installed on the inner wall of the port of the first end and the second end of the fixed joint body 1; the sliding joint body 2 includes The sleeve section 21 and the connection section 22 are connected and communicated with the connection section 22; the outer diameter of the sleeve section 21 is smaller than the inner diameter of the fixed joint body 1, and part of the sleeve section 21 passes through the fixed joint. The first end or the second end of the main body of the wharf 1 is inserted into the main body 1 of the fixed wharf, and the first leak-proof sealing ring 3 or the second leak-proof sealing ring 4 is in close contact with the outer peripheral surface of the sleeve section 21; The outer and inner diameters of the section 22 are equal to the outer and inner diameters of the fixed joint body 1 ; the third leak-proof sealing ring 5 is installed on the inner wall of the port of the connecting section 22 .
用户在使用抢修快速接驳头对管道进行抢修时,只需要将固定接驳头主体1的第一端或第二端与截断的管道的一端连接起来,然后通过拉伸移动套取段21来对套取段21套入固定接驳头主体1的深度进行调整,然后将滑动接驳头主体2的接驳段22与截断的管道的另一端连接起来,即可完成整个抢修的过程。When the user uses the quick repair joint to repair the pipeline, he only needs to connect the first end or the second end of the main body 1 of the fixed joint with one end of the cut pipe, and then move the sleeve section 21 by stretching. Adjust the depth of the sleeve section 21 inserted into the fixed joint main body 1, and then connect the joint section 22 of the sliding joint main body 2 with the other end of the truncated pipeline to complete the entire emergency repair process.
上述方案中,固定接驳头主体1的第一端、第二端内设置有防漏密封圈,滑动接驳头主体2的接驳段22的端口内设置有防漏密封圈,所以固定接驳头主体1的第一端或第二端与截断的管道的一端的连接为软性连接,固定接驳头主体1的第一端或第二端与套取段21的连接为软性连接,接驳段22与截断的管道的另一端的连接为软性连接,防漏密封圈对以上三处的连接进行密封,避免接驳后出现漏水的情况。In the above scheme, the first end and the second end of the fixed joint main body 1 are provided with leak-proof sealing rings, and the ports of the connecting section 22 of the sliding joint main body 2 are provided with leak-proof sealing rings, so the fixed joint The connection between the first or second end of the wharf main body 1 and one end of the truncated pipeline is a flexible connection, and the connection between the first or second end of the fixed wharf main body 1 and the sleeve section 21 is a flexible connection , the connection between the connection section 22 and the other end of the cut-off pipeline is a flexible connection, and the leak-proof sealing ring seals the connections at the above three places, so as to avoid water leakage after connection.
本发明提供的抢修快速接驳头的安装使用方便快捷,能够对管道进行快速抢修,甚至在抢修的过程中无需进行截流,从而减少不必要的工序。The rapid repair joint head provided by the present invention is convenient and quick to install and use, and can quickly repair the pipeline, and even does not need to cut off the flow during the repair process, thereby reducing unnecessary procedures.
本实施例中,固定接驳头主体1第一端、第二端的端口内壁上沿其径向方向分别开设有一环状的凹槽11,凹槽11的直径大于固定接驳头主体1的内周直径,第一防漏密封圈3、第二防漏密封圈4分别安装在固定接驳头主体1第一端、第二端端口的凹槽11内。In this embodiment, an annular groove 11 is formed on the inner wall of the port of the first end and the second end of the fixed joint body 1 along its radial direction, and the diameter of the groove 11 is larger than the inner wall of the fixed joint body 1. Circumferential diameter, the first anti-leakage sealing ring 3 and the second anti-leakage sealing ring 4 are respectively installed in the grooves 11 of the ports at the first end and the second end of the main body 1 of the fixed joint.
本实施例中,所述接驳段22的端口内壁上沿其径向方向开设有一环状的凹槽11,凹槽11的直径大于接驳段22的内周直径,第三防漏密封圈5安装在接驳段22端口的凹槽11内。In this embodiment, an annular groove 11 is formed on the inner wall of the port of the connection section 22 along its radial direction, the diameter of the groove 11 is larger than the inner diameter of the connection section 22, and the third leak-proof sealing ring 5 is installed in the groove 11 of the connection section 22 ports.
本实施例中,在将套取段21套入固定接驳头主体1时,需要根据被截断的管道两端的距离对套取段21套入固定接驳头主体1的长度进行调整,为了方便这一调整过程,本发明提供的抢修快速接驳头还包括有长度定位调节套6,所述长度定位调节套6的内壁面上开设有内螺纹61;所述套取段21中部的外表面上开设有外螺纹211;长度定位调节套6套取在套取段21中部的外表面上,长度定位调节套6通过其内壁面上的内螺纹61与套取段21外表面上的外螺纹211与套取段21连接。In this embodiment, when inserting the sleeve section 21 into the main body 1 of the fixed joint, it is necessary to adjust the length of the sleeve section 21 inserted into the main body 1 of the fixed joint according to the distance between the two ends of the cut-off pipe. In this adjustment process, the emergency repair quick connector provided by the present invention also includes a length positioning adjustment sleeve 6, and an internal thread 61 is provided on the inner wall surface of the length positioning adjustment sleeve 6; There is an external thread 211 on the top; the length positioning adjustment sleeve 6 is set on the outer surface of the middle part of the sleeve section 21, and the length positioning adjustment sleeve 6 passes through the internal thread 61 on the inner wall surface and the external thread on the outer surface of the sleeve section 21. 211 is connected with the snare section 21.
上述方案中,通过旋转长度定位调节套6即可对套取段21套入固定接驳头主体1的长度进行调整,其使用方便快捷。In the above solution, by rotating the length positioning adjustment sleeve 6, the length of the sleeve section 21 inserted into the fixed connection head main body 1 can be adjusted, which is convenient and quick to use.
显然,本实用新型的上述实施例仅仅是为清楚地说明本实用新型所作的举例,而并非是对本实用新型的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型权利要求的保护范围之内。Apparently, the above-mentioned embodiments of the present utility model are only examples for clearly illustrating the present utility model, rather than limiting the implementation manner of the present utility model. For those of ordinary skill in the art, other changes or changes in different forms can be made on the basis of the above description. It is not necessary and impossible to exhaustively list all the implementation manners here. All modifications, equivalent replacements and improvements made within the spirit and principles of the utility model shall be included in the protection scope of the claims of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620805425.4U CN205908907U (en) | 2016-07-27 | 2016-07-27 | Salvage head of plugging into fast |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620805425.4U CN205908907U (en) | 2016-07-27 | 2016-07-27 | Salvage head of plugging into fast |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205908907U true CN205908907U (en) | 2017-01-25 |
Family
ID=57803240
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620805425.4U Active CN205908907U (en) | 2016-07-27 | 2016-07-27 | Salvage head of plugging into fast |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205908907U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109869552A (en) * | 2019-04-19 | 2019-06-11 | 中国航发湖南动力机械研究所 | A kind of air pipe line attachment device |
-
2016
- 2016-07-27 CN CN201620805425.4U patent/CN205908907U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109869552A (en) * | 2019-04-19 | 2019-06-11 | 中国航发湖南动力机械研究所 | A kind of air pipe line attachment device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MY167445A (en) | Tube joint | |
| CN201152423Y (en) | pipe connector | |
| CN209164851U (en) | a quick connector | |
| CN204254106U (en) | Gas appliance connects uses stainless steel corrugated flexible hose | |
| CN108180328A (en) | For connecting the watertight connector of reduced pipe | |
| CN104901258A (en) | Hole plugging device for cable conduit | |
| CN204403638U (en) | Pipe valve quick-acting joint | |
| CN205745850U (en) | A kind of pipe fitting plug part | |
| CN204628850U (en) | A kind of oil filter pipe coupling | |
| CN210066902U (en) | An outer pipe joint capable of quickly centering and clamping the faucet | |
| CN212537066U (en) | Hose coupling for hydraulic system | |
| CN205402078U (en) | Emergency plugging valve of oil pipeline | |
| CN104399177A (en) | Medical device quick connection mechanism | |
| CN204401040U (en) | A kind of blocking dregs of converter furnace sliding plate gudgeon medium channel device | |
| CN205173793U (en) | Rotating joint | |
| CN104847990A (en) | Rapid connector | |
| CN115306964A (en) | Water-saving irrigation's conduit coupling mechanism | |
| CN206504045U (en) | Secondary sealed PE mine pipe | |
| CN205388199U (en) | Conversion assembly is accepted to pipeline | |
| CN219530085U (en) | Hydraulic movable joint | |
| CN205639935U (en) | Pipeline threaded connection connects | |
| CN205938250U (en) | Diesel engine oil way pipeline connecting device | |
| CN205639699U (en) | Universal tee bend subassembly of tap | |
| CN205592457U (en) | Break valve gear | |
| CN224174702U (en) | Pipe fitting connecting piece and pipe fitting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |