CN205895125U - Manual hole digging pile operation device - Google Patents

Manual hole digging pile operation device Download PDF

Info

Publication number
CN205895125U
CN205895125U CN201620726666.XU CN201620726666U CN205895125U CN 205895125 U CN205895125 U CN 205895125U CN 201620726666 U CN201620726666 U CN 201620726666U CN 205895125 U CN205895125 U CN 205895125U
Authority
CN
China
Prior art keywords
steel plate
operating platform
plate
central operating
central
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620726666.XU
Other languages
Chinese (zh)
Inventor
车连志
魏剑
周如成
牛子龙
焦仙桃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Environmental Construction Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201620726666.XU priority Critical patent/CN205895125U/en
Application granted granted Critical
Publication of CN205895125U publication Critical patent/CN205895125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型涉及工程施工技术领域,具体来说是一种人工挖孔桩作业装置,包括中心作业平台及护板,所述的中心作业平台由上钢板、下钢板、护板及槽形钢组成,在相互平行的上钢板与下钢板之间夹有槽形钢,螺杆贯穿上钢板、下钢板及槽型钢并进行固定,从而构成中心作业平台,所述的中心作业平台呈方形,中心作业平台的四边分别接有绕边轴向旋转的护板。本装置由中心作业平台及护板组成,护板可绕中心作业平台的边进行轴向旋转进行折叠,形成能保护操作人员的护筒,保证人员的健康以及人身安全;通过旋挖钻机成孔,提高作业效率的同时降低施工成本,在不增加费用的前提下降低人员劳动力强度,从而达到一定的经济效益。

The utility model relates to the technical field of engineering construction, in particular to a manual hole-digging pile operating device, which includes a central operating platform and a protective plate, and the central operating platform is composed of an upper steel plate, a lower steel plate, a protective plate and a channel steel , between the parallel upper steel plate and the lower steel plate, there is a channel steel, and the screw rod runs through the upper steel plate, the lower steel plate and the channel steel and fixes it, thereby forming a central operating platform. The central operating platform is square, and the central operating platform The four sides are respectively connected with guard plates that rotate axially around the sides. The device is composed of a central operating platform and a guard plate. The guard plate can be folded axially around the side of the central operating platform to form a casing that can protect the operator and ensure the health and personal safety of the operator; the hole is formed by a rotary drilling rig , improve operating efficiency while reducing construction costs, and reduce labor intensity without increasing costs, so as to achieve certain economic benefits.

Description

一种人工挖孔桩作业装置A device for manually digging piles

[技术领域][technical field]

本实用新型涉及工程施工技术领域,具体来说是一种人工挖孔桩作业装置。The utility model relates to the technical field of engineering construction, in particular to a manual hole-digging pile operating device.

[背景技术][Background technique]

随着国家大力发展铁路与公路,人工挖孔桩因其施工方便、速度较快、不需要大型机械设备、挖孔桩要比木桩、混凝土打入桩抗震能力强,造价比冲锥冲孔、冲击锥冲孔、冲击钻机冲孔、回旋钻机钻孔、沉井基础均较低,从而得到广泛的应用。但由于挖孔桩井下作业条件差、环境恶劣、劳动强度大,安全和质量显得尤为重要。人工挖孔桩是指桩孔采用人工挖掘方法进行成孔,然后安放钢筋笼,浇注混凝土而成的桩。现有的人工挖孔桩施工费用较大,普遍应用于各种复杂地质情况,但由于施工人员为完成工程量,往往忽视了护壁质量,从而带来很大的安全风险;另外挖孔桩井下作业条件差、环境恶劣,施工人员长期在灰尘浓度很大的有限空间内严重威胁人员健康,甚至带来严重的职业病。人工挖孔桩基本采用小型卷扬机垂直运输,上下空间较小,孔口附近作业多,危及井下作业人员的生命安全。因此,随着机械化程度的不断提升和人工施工成本进一步加大,寻找一种更加便捷,更加安全的施工方法显得尤为重要。With the vigorous development of railways and highways in the country, manual hole-digging piles are more convenient in construction, faster in speed, and do not require large-scale machinery and equipment. , Impact cone punching, percussion drilling rig punching, rotary drilling rig drilling, and caisson foundations are all low, so they are widely used. However, due to the poor working conditions, harsh environment and high labor intensity of borehole piles, safety and quality are particularly important. Manual digging pile refers to the pile that is made by manual excavation, and then the steel cage is placed, and the concrete is poured. Existing artificial excavation piles have relatively high construction costs and are generally used in various complex geological conditions. However, due to the completion of the project, the construction personnel often ignore the quality of the retaining wall, which brings great safety risks; in addition, the excavation piles are underground The working conditions are poor and the environment is harsh. Construction workers have been in a limited space with a high dust concentration for a long time, which seriously threatens the health of personnel and even brings serious occupational diseases. Manual hole-digging piles are basically transported vertically by small winches, the upper and lower spaces are small, and there are many operations near the hole, which endangers the lives of underground workers. Therefore, with the continuous improvement of the degree of mechanization and the further increase of labor construction costs, it is particularly important to find a more convenient and safer construction method.

[实用新型内容][utility model content]

本实用新型主要解决人工挖孔桩人员劳动强度大,作业危险性高的问题,在不增加费用的前提下,提供一种安全方便的人工挖孔桩作业装置。The utility model mainly solves the problems of high labor intensity and high operation risk of manual hole-digging pile personnel, and provides a safe and convenient manual hole-digging pile operation device without increasing the cost.

为了实现上述目的,设计一种人工挖孔桩作业装置,包括中心作业平台及护板,所述的中心作业平台由上钢板、下钢板、护板及槽形钢组成,在相互平行的上钢板与下钢板之间夹有槽形钢,螺杆贯穿上钢板、下钢板及槽型钢并进行固定,从而构成中心作业平台,所述的中心作业平台呈方形,中心作业平台的四边分别接有绕边轴向旋转的护板。In order to achieve the above-mentioned purpose, a kind of manual hole-digging pile operation device is designed, which includes a central operating platform and a guard plate. The central operating platform is composed of an upper steel plate, a lower steel plate, a guard plate and a channel steel. There is a channel-shaped steel between the lower steel plate, and the screw rod runs through the upper steel plate, the lower steel plate and the channel-shaped steel and is fixed to form a central operating platform. The central operating platform is square, and the four sides of the central operating platform are respectively connected with wrapping Axial swivel guard.

所述的作业装置上设有旋挖钻机,旋挖钻机采用不同直径的圆钻头,圆钻头中心与桩位中心重合。The operating device is provided with a rotary drilling rig, and the rotary drilling rig adopts round drills with different diameters, and the center of the round drill coincides with the center of the pile position.

所述的中心作业平台四角分别设有吊环,钢丝绳穿过吊环将中心作业平台固定于卷扬机下方。The four corners of the central operation platform are respectively provided with suspension rings, and the steel wire rope passes through the suspension rings to fix the central operation platform under the hoist.

本实用新型同现有技术相比,其优点在于:本装置由中心作业平台及护板组成,护板可绕中心作业平台的边进行轴向旋转进行折叠,形成能保护操作人员的护筒,保证人员的健康以及人身安全;通过旋挖钻机成孔,提高作业效率的同时降低施工成本,在不增加费用的前提下降低人员劳动力强度,从而达到一定的经济效益。Compared with the prior art, the utility model has the advantages that the device is composed of a central operating platform and a guard plate, and the guard plate can be folded axially around the side of the central operating platform to form a protective tube that can protect the operator. To ensure the health and personal safety of personnel; to form holes through rotary drilling rigs, improve operating efficiency while reducing construction costs, and reduce labor intensity without increasing costs, thereby achieving certain economic benefits.

[附图说明][Description of drawings]

图1是本实用新型的作业示意图;Fig. 1 is the operation schematic diagram of the present utility model;

图2是本实用新型的中作业平台的俯视图;Fig. 2 is a top view of the middle work platform of the present utility model;

图中:1.上钢板 2.下钢板 3.护板 4.槽形钢 5.螺杆 6.卷扬机 7.钢丝绳 8.吊环。In the figure: 1. Upper steel plate 2. Lower steel plate 3. Guard plate 4. Channel steel 5. Screw rod 6. Hoist 7. Steel wire rope 8. Lifting ring.

[具体实施方式][detailed description]

下面结合附图对本实用新型作进一步说明,这种装置的结构和原理对本专业的人来说是非常清楚的。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。Below in conjunction with accompanying drawing, the utility model is further described, and the structure and principle of this device are very clear to those skilled in the art. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

参见图1及图2,人工挖孔桩作业装置包括中心作业平台及护板,中心作业平台由上钢板、下钢板、护板及槽形钢组成,在相互平行的上钢板与下钢板之间夹有槽形钢,螺杆贯穿上钢板、下钢板及槽型钢并进行固定,从而构成中心作业平台,中心作业平台呈方形,中心作业平台的四边分别接有绕边轴向旋转的护板。作业装置上设有旋挖钻机,旋挖钻机采用不同直径的圆钻头,圆钻头中心与桩位中心重合。中心作业平台四角分别设有吊环,钢丝绳穿过吊环将中心作业平台固定于卷扬机下方。Referring to Figure 1 and Figure 2, the manual excavation pile operation device includes a central operating platform and a guard plate. The central operating platform is composed of an upper steel plate, a lower steel plate, a guard plate and a channel steel. The channel steel is clamped, and the screw runs through the upper steel plate, the lower steel plate and the channel steel and is fixed to form a central operating platform. The central operating platform is square, and the four sides of the central operating platform are respectively connected with protective plates that rotate around the sides in an axial direction. The operating device is provided with a rotary drilling rig, and the rotary drilling rig adopts round drill bits of different diameters, and the center of the round drill bit coincides with the center of the pile position. The four corners of the central operation platform are respectively provided with suspension rings, and the steel wire rope passes through the suspension rings to fix the central operation platform under the hoist.

本装置使用流程如下:The use process of this device is as follows:

1.点位放样:利用全站仪精确确定挖孔桩四角以及不同圆对应的圆心,并做好护桩,确保能够恢复桩位。1. Point setting out: Use the total station to accurately determine the four corners of the excavated pile and the centers corresponding to different circles, and do a good job of protecting the piles to ensure that the piles can be restored.

2.卷扬机吊下人工挖孔桩作业装置,利用旋挖钻机钻进成孔,旋挖钻机一般采用圆形钻头,通过采用不同直径的圆钻头组合代替矩形,从而代替人工成孔,适用于石质地段,利用护桩恢复桩位中心,钻机就位好,由专人负责指挥旋挖钻机,确保钻头中心对准桩位中心进行钻孔,钻孔过程中,操作人员随时观察钻杆是否垂直,开始钻进时采用低速钻进,主卷扬机钢丝绳承担不低于钻杆、钻具重量之和的20%,以保证孔位不产生偏差,应根据不同的岩体选择不同的钻头。宜先施工小直径钻头,再施工大直径钻头。2. The hoist lifts the manual hole-digging pile operation device, and uses the rotary drilling rig to drill into the hole. The rotary drilling rig generally uses a round drill bit, and a combination of round drill bits with different diameters is used to replace the rectangle, thereby replacing the artificial hole. It is suitable for stone In the ground section, use the guard pile to restore the center of the pile position, and the drilling rig is in place. A special person is in charge of directing the rotary drilling rig to ensure that the center of the drill bit is aligned with the center of the pile position for drilling. During the drilling process, the operator observes whether the drill pipe is vertical at any time. At the beginning of drilling, low-speed drilling is adopted, and the wire rope of the main winch bears no less than 20% of the total weight of the drill pipe and drilling tools to ensure that the hole position does not deviate. Different drill bits should be selected according to different rock masses. It is advisable to construct the small-diameter drill bit first, and then construct the large-diameter drill bit.

3.将中心作业平台四边的护板折起,折叠作业平台,保证护壁施工时作业人员的安全。3. Fold up the guard plates on the four sides of the central operating platform and fold the operating platform to ensure the safety of the workers during the construction of the retaining wall.

4.桩芯混凝土灌注:混凝土采用串筒灌注,串筒直径为30cm,每节长度在1.5m以内,上下节采用吊耳挂接,且串筒底部与孔内底部或混凝土高度不大于2m。随着混凝土浇筑,逐段取下串筒,每层混凝土灌注高度不超过50cm,分层捣实直至桩顶。4. Pile core concrete pouring: Concrete is poured with string tubes. The diameter of the string tubes is 30cm, and the length of each section is within 1.5m. As the concrete is poured, the string tubes are removed section by section, and the concrete pouring height of each layer does not exceed 50cm, and is compacted layer by layer until the top of the pile.

Claims (3)

1.一种人工挖孔桩作业装置,包括中心作业平台及护板,其特征在于所述的中心作业平台由上钢板、下钢板、护板及槽形钢组成,在相互平行的上钢板与下钢板之间夹有槽形钢,螺杆贯穿上钢板、下钢板及槽型钢并进行固定,从而构成中心作业平台,所述的中心作业平台呈方形,中心作业平台的四边分别接有绕边轴向旋转的护板。1. A manual hole-digging pile operating device, comprising a central operating platform and a guard plate, characterized in that the central operating platform is made up of an upper steel plate, a lower steel plate, a guard plate and a channel steel, and the upper steel plate and the guard plate parallel to each other A channel steel is sandwiched between the lower steel plates, and the screw goes through the upper steel plate, the lower steel plate and the channel steel and is fixed to form a central working platform. The central working platform is square, and the four sides of the central working platform are respectively connected with side shafts to the swivel guard. 2.如权利要求1所述的一种人工挖孔桩作业装置,其特征在于所述的作业装置上设有旋挖钻机,旋挖钻机采用不同直径的圆钻头,圆钻头中心与桩位中心重合。2. A kind of manual hole-digging pile operating device as claimed in claim 1, characterized in that said operating device is provided with a rotary drilling rig, and the rotary drilling rig adopts round drill bits of different diameters, and the center of the round drill bit and the center of the pile position coincide. 3.如权利要求1所述的一种人工挖孔桩作业装置,其特征在于所述的中心作业平台四角分别设有吊环,钢丝绳穿过吊环将中心作业平台固定于卷扬机下方。3. A manual hole-digging pile operation device as claimed in claim 1, characterized in that the four corners of the central working platform are respectively provided with lifting rings, and the steel wire rope passes through the lifting rings to fix the central working platform under the hoist.
CN201620726666.XU 2016-07-11 2016-07-11 Manual hole digging pile operation device Expired - Fee Related CN205895125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620726666.XU CN205895125U (en) 2016-07-11 2016-07-11 Manual hole digging pile operation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620726666.XU CN205895125U (en) 2016-07-11 2016-07-11 Manual hole digging pile operation device

Publications (1)

Publication Number Publication Date
CN205895125U true CN205895125U (en) 2017-01-18

Family

ID=57771393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620726666.XU Expired - Fee Related CN205895125U (en) 2016-07-11 2016-07-11 Manual hole digging pile operation device

Country Status (1)

Country Link
CN (1) CN205895125U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761144A (en) * 2021-01-18 2021-05-07 四川沿江攀宁高速公路有限公司 Formwork device for pile foundation construction and construction system using same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761144A (en) * 2021-01-18 2021-05-07 四川沿江攀宁高速公路有限公司 Formwork device for pile foundation construction and construction system using same

Similar Documents

Publication Publication Date Title
CN102392650B (en) Non-explosive tunnel excavation construction method
CN204113111U (en) Double hydraulic pressure percussion-rotary drilling enters, churning unit head
CN106192995A (en) A kind of apparatus for work about caisson mechanical hole building and construction method thereof
CN110952986B (en) Shaft secondary expanding excavation method based on steel platform
CN106089027B (en) A kind of construction method using anti-well rig maintenance drop shaft
CN111608587B (en) Construction system and method of hard rock drilling for interlocking piles in foundation pits in height-restricted areas
CN111663892A (en) Rock-socketed inclined pile impact drilling pile-forming construction process
CN101851922A (en) Method for eliminating underground anchor rope/rod by using all casing drill
CN110593255B (en) A construction method of full casing occlusal pile suitable for sand and pebble soil layer
WO2024088229A1 (en) Non-rotating down-the-hole hammer drilling machine and use method thereof
CN104278676A (en) Real-time treatment method and equipment of bored pile head
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN207609374U (en) Lifting self-propelled full casing full rotary drilling rig
CN211623325U (en) High efficiency drilling equipment
WO2017128572A1 (en) Use of prestressed steel strand in multi-angle drilling and coring process
CN205895125U (en) Manual hole digging pile operation device
CN107401388B (en) Device and method for treating stuck drill of a drilling rig
CN202946012U (en) Sleeving spiral drilling machine for pile head processing
CN207727581U (en) A kind of full-sleeve obstacle cleaning machine
CN111042820B (en) Construction method for sand layer with oversized pilot hole by vertical shaft raise-shaft method
CN111155513B (en) Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method
CN204326963U (en) The anti-well boring device of a kind of vertical shaft
CN113585958A (en) Telescopic drill rod reverse circulation down-the-hole hammer drill and use method thereof
CN107063213A (en) A kind of earth's surface monitoring point and installation aiding device and method suitable for loess geology tunnel
CN206928296U (en) Pile pulling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200436, No. three, 278 Road, Jingan District, Shanghai

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: China Railway Municipal Environmental Construction Co.,Ltd.

Address before: 200436, No. three, 278 Road, Jingan District, Shanghai

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

CF01 Termination of patent right due to non-payment of annual fee