CN205875426U - Novel basement antiseep connection structure - Google Patents

Novel basement antiseep connection structure Download PDF

Info

Publication number
CN205875426U
CN205875426U CN201620785061.8U CN201620785061U CN205875426U CN 205875426 U CN205875426 U CN 205875426U CN 201620785061 U CN201620785061 U CN 201620785061U CN 205875426 U CN205875426 U CN 205875426U
Authority
CN
China
Prior art keywords
slip casting
shaped plate
antiseep
reinforced concrete
steel sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620785061.8U
Other languages
Chinese (zh)
Inventor
杨烨辉
严君萍
郦丹华
陶高富
胡文飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Wanda's Construction Group Co Ltd
Original Assignee
Zhejiang Wanda's Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Wanda's Construction Group Co Ltd filed Critical Zhejiang Wanda's Construction Group Co Ltd
Priority to CN201620785061.8U priority Critical patent/CN205875426U/en
Application granted granted Critical
Publication of CN205875426U publication Critical patent/CN205875426U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a novel basement antiseep connection structure, it includes reinforced concrete structure, the gap lower part is equipped with the polyurethane foam filling layer, upper portion is equipped with waterproof cement mortar and repairs the top layer, gap department top is equipped with the V -arrangement steel sheet, V -arrangement steel sheet both sides all are equipped with horizontal edge fit, expansion bolts fixes the both sides of V -arrangement steel sheet on adjacent two reinforced concrete structure through horizontal edge fit, V -arrangement steel sheet top is equipped with slip casting steel mouth, creep slip casting liquid pours into into in the leaking stoppage space. The utility model discloses a polyurethane paste carries out interim stagnant water and forms certain controllable space the seepage body, then withholds a shape steel sheet on the structure surface, injects creep slip casting into and glue in the controllable space that steel sheet and above -mentioned polyurethane formed, and this kind of slip casting is glued and is never solidified, though through its fine extensibility can and other materials also can powerful bonding under the circumstances of humidity and the performance of creep reach the purpose of stagnant water, its construction work is simple, is suitable for popularization and application.

Description

A kind of Novel underground room antiseep attachment structure
Technical field
This utility model belongs to technical field of building construction, is specifically related to a kind of Novel underground room antiseep attachment structure.
Background technology
, easily there is seepage in expansion joint between body of wall or other gaps, affects its quality.
The leak stopping used at present directly uses cement mortar etc., but of long duration, new crack easily occurs.
Utility model content
For the above-mentioned problems in the prior art, the purpose of this utility model is to provide a kind of Novel underground room to prevent Seepage attachment structure.
Described a kind of Novel underground room antiseep attachment structure, including reinforced concrete structure, it is characterised in that adjacent Being divided into upper and lower two parts at gap between two reinforced concrete structures, bottom is provided with polyurethane foam packed layer, and top sets Being provided with waterproof cement mortar and repair top layer, polyurethane foam packed layer is repaired top layer with waterproof cement mortar and is connected, at gap Top is provided with v-shaped plate, and v-shaped plate both sides are equipped with horizontal edge fit, and expansion bolt passes through horizontal edge fit by the both sides of v-shaped plate Being fixed on adjacent two reinforced concrete structures, v-shaped plate top is provided with one group of slip casting steel mouth arranged side by side, and creep injection slurry leads to Cross slip casting steel mouth to inject in the leak stopping space formed between v-shaped plate and waterproof cement mortar repairing top layer.
Described a kind of Novel underground room antiseep attachment structure, it is characterised in that the horizontal edge fit of described v-shaped plate with Rubber strip it is provided with between reinforced concrete structure.
Described a kind of Novel underground room antiseep attachment structure, it is characterised in that the width of rubber strip is 100mm.
Described a kind of Novel underground room antiseep attachment structure, it is characterised in that waterproof cement mortar repairs top layer by being coated with The brush waterproof cement mortar on two limits, reinforced concrete structure gap and polyurethane foam packed layer obtains the knot of falling isosceles trapezoid Structure, its thickness is 50-100mm.
Described a kind of Novel underground room antiseep attachment structure, it is characterised in that the opening of v-shaped plate is more than slit aperture Width.
The construction method of described a kind of Novel underground room antiseep attachment structure, it is characterised in that include preparation of construction, Interim precipitation or sealing, repair cleaning basic unit, crimping steel formability, patch water stop rubber pad, and concrete structure is punched, and withholds steel plate, close Envelope processes, and fills sealing slip casting steel mouth, slip casting, checks seepage, secondary grouting;Inspect for acceptance and incrustation.
The construction method of described a kind of Novel underground room antiseep attachment structure, it is characterised in that specifically include following step Rapid:
1) preparation of construction
Be familiar with construction drawing, survey job site, work out construction plan, work out construction technical schemes, prepare construction material, Facility etc..
2) interim precipitation or sealing
By drain by the open fire carrying-off at gap, inject E-107 type polyurethane grout material and carry out interim sealing or fall Water;
3) cleaning basic unit is repaired
Repairing the concrete in the 300mm of both sides, gap, it is ensured that flat smooth, steel plate is withheld rear without microgroove, nothing in gap Foreign material, inject polyurethane grout material and form polyurethane foam packed layer outside the concrete wall of both sides, gap, top, gap in bottom, gap Surface surpasses rheological characteristic Thief zone epoxy resin by injection S601 type and strengthens, and forms waterproof cement mortar and repairs top layer;
4) crimping steel formability, patch water stop rubber pad
Galvanized steel plain sheet or corrosion resistant plate crimping being become band v-shaped structure, obtains v-shaped plate, the level surveyed at v-shaped plate two connects Punching on limit, the one side withheld at v-shaped plate and rubber strip connect all-purpose adhesive on one side brush the most simultaneously, will when all-purpose adhesive is tack-free Rubber strip is pasted onto on the v-shaped plate brushing all-purpose adhesive, and firmly densification is real, standby;
5) punch in the concrete structure of reinforced concrete structure
Measure the accurate location in hole on the horizontal edge fit of step 4), equidistant to both sides centered by concrete stretches gap put Line, carries out labelling, and the concrete structure correspondence position at reinforced concrete structure punches, it is ensured that hole is the most accurate
6) steel plate, encapsulation process are withheld
The v-shaped plate of step 4) is withheld on the flexible sealing having openning hole, the V-arrangement of rubber strip will be posted with expansion bolt Interal fixation is on reinforced concrete structure, and v-shaped plate and waterproof cement mortar are repaired and formed leak stopping space between top layer;
7) dress sealing slip casting steel mouth, slip casting
Being welded at the V-shaped groove of v-shaped plate by slip casting steel mouth, slip casting steel mouth upper end connects slip casting machine steel mouth, and first pressure testing is led to Gas, after leak stopping space that step 6) is obtained carry out slip casting, inject creep slip casting glue, keep constant voltage slip casting, to second steel mouth Constant voltage one minute again during pulp, Grouting Pipe of backing off, with flax silk and plug by stifled for grouting nozzle tight, the most in order at each slip casting steel Slip casting on mouth, thus arrives last slip casting steel mouth, constant voltage three minutes;
8) seepage, secondary grouting are checked
Owing to air may be had not empty in local during slip casting, the creep of serosity and trickling can produce breakthrough, Secondary grouting on the slip casting steel mouth that the seepage point away from gap is nearest;
9) inspect for acceptance and incrustation
Observe 8-15 days ne-leakage posteriority and harvest work, and with PVC or aluminum-pinch, flexible gap is carried out decoration process.
The construction method of described a kind of Novel underground room antiseep attachment structure, it is characterised in that the bolt in step 6) When in hole, injecting structure glue prevents from pressurizeing, slurry flows out in hole, and v-shaped plate limit mouth fluid sealant is obturaged, it is ensured that during grouting under pressure Do not reveal slurry.
The construction method of described a kind of Novel underground room antiseep attachment structure, it is characterised in that gap width be 30~ 40mm, the minimum 150mm of distance of polyurethane foam packed layer distance slit aperture.
The construction method of described a kind of Novel underground room antiseep attachment structure, it is characterised in that the concrete knot in step 5) The degree of depth of punching on structure is 120-150mm.
By using above-mentioned technology, compared with prior art, the beneficial effects of the utility model are as follows:
This utility model carries out temporary leaking water by polyurethane slurry and forms certain inspectable space, then seepage body Withhold folding shape steel plate at body structure surface, in the inspectable space that steel plate and above-mentioned polyurethane are formed, inject creep slip casting glue, this kind Slip casting glue never solidifies, even if by its good extension property and also can strong bond in the case of humidity with other material With the purpose that the performance of creep reaches sealing, its construction work is simple, is suitable to popularization and application.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-waterproof cement mortar repairs top layer, 2-reinforced concrete structure, 3-rubber strip, 4-expansion bolt, and 5-blocks up Blank, 6-V shape steel plate, 7-slip casting steel mouth, 8-polyurethane foam packed layer.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model will be further described, but protection domain of the present utility model is also It is not limited only to this:
As it is shown in figure 1, a kind of Novel underground room of the present utility model antiseep attachment structure, including reinforced concrete structure 2, it is divided into upper and lower two parts at the gap between adjacent two reinforced concrete structures 2, bottom is provided with polyurethane foam packed layer 8, top is provided with waterproof cement mortar and repairs top layer 1, and waterproof cement mortar repairs top layer 1 by brushing at two reinforced concretes The waterproof cement mortar of limit, soil structure 2 gap and polyurethane foam packed layer 8 obtains down isosceles trapezoidal structure, and its thickness is 50- 100mm, at gap, top is provided with v-shaped plate 6, and v-shaped plate 6 both sides are equipped with horizontal edge fit, and expansion bolt 4 is by horizontal edge fit Being fixed on the both sides of v-shaped plate 6 on adjacent two reinforced concrete structures 2, v-shaped plate 6 top is provided with one group of note arranged side by side Slurry steel mouth 7, creep injection slurry injects v-shaped plate 6 by slip casting steel mouth 7 and formation between top layer 1 repaired by waterproof cement mortar In leak stopping space 5.
In order to improve antiseep effect, this utility model is by the horizontal edge fit of described v-shaped plate 6 and reinforced concrete structure Being provided with rubber strip 3 between 2, the width of rubber strip 3 is 100mm, and the opening of v-shaped plate 6 is more than the width of slit aperture, by slit aperture Stifled jail, prevents water from penetrating into from gap.
The construction method of Novel underground room of the present utility model antiseep attachment structure, including preparation of construction → interim precipitation Or sealing → repairing cleaning basic unit → crimping steel formability, patch water stop rubber pad → perforating → withhold steel plate, encapsulation process → dress Sealing slip casting steel mouth → pressure testing ventilation → constant voltage slip casting → inspection seepage → secondary grouting → → incrustation of inspecting for acceptance;Specifically Step is as follows:
1) preparation of construction
It is familiar with construction drawing, surveys job site, work out construction plan, work out construction technical schemes;Preparation construction material, Facility, labour force etc.;
2) interim precipitation or sealing
In the case of general water slop failure, water percolating capacity is bigger, and after basement periphery backfills, level of ground water rises, for just Typically interim sealing or precipitation is carried out by injection E-107 type polyurethane grout material, it is also possible to interim by drain in construction By open fire carrying-off, repair cleaning basic unit for next step and lay a solid foundation;
3) cleaning basic unit is repaired
Concrete in the 300mm of both sides, gap is repaired by a, it is ensured that flat smooth, and steel plate is withheld rear without microgroove, arrives in gap In bury no-sundries;
B as in buried deeply or damaged completely, the cleaning degree of depth is 150mm, it is ensured that stitches wide 30~40mm, exceedes width High grade mortar to be used is repaired to reduce expense, and electric pick too small to width is opened and induced body of wall;
C crosses in gap depths (more than 150mm) and injects E-107 type polyurethane grout material, forms sealing and shape by its foaming Become certain inspectable space;
Both sides, d gap concrete wall outer surface surpasses rheological characteristic Thief zone epoxy resin by injection S601 type and strengthens, and one On the other hand concrete is strengthened by aspect, guarantees impervious to reach design standard.
4) crimping steel formability, patch water stop rubber pad
(condition license is available stainless by 400mm width (can be adjusted according to engineering practice) 3mm thickness galvanized steel plain sheet for a Steel plate is more preferable) crimping becomes the stand-by plate of band V-arrangement, and find range at steel plate two outside steel plate, away from 50mm, beat the Ф 20 of spacing 180mm Hole;
5mm thickness rubber slab is cut into the wide rubber strip of 100mm by b;
One side and the one side of rubber strip that c withholds at steel plate brush all-purpose adhesive simultaneously, are glued by rubber strip when glue is tack-free It is attached to brush on the steel plate of all-purpose adhesive, and firmly densification is real;
5) punch in concrete structure
Measured the accurate location of steel plate hole, centered by concrete expansion joint to both sides equidistant unwrapping wire, carry out labelling, punching is deep Degree is about 130mm, it is ensured that hole is the most accurate;
6) steel plate, encapsulation process are withheld
The steel plate fastener of band V-shaped groove is pressed onto on the expansion joint having openning hole, lengthens expansion bolt with No. 14 and will post rubber blanket Steel plate fastener fasten solid, when in bolt hole, injecting structure glue prevents pressurization, slurry flows out in hole.Steel plate limit mouth sealant sealing Sternly, it is ensured that during grouting under pressure, do not reveal slurry;
7) dress sealing slip casting steel mouth, slip casting
By the steel mouth of 40mm length with being welded at the V-shaped groove of galvanized steel plain sheet, connecting slip casting machine steel mouth, first pressure testing is ventilated, after Carry out slip casting, inject Z102 type movement joint special creep slip casting glue, keep constant voltage slip casting, to constant voltage again during second steel mouth pulp One minute, Grouting Pipe of backing off, grouting nozzle is blocked up tight with flax silk and plug.Slip casting on each grouting nozzle the most in order, thus To last steel mouth, constant voltage three minutes;
8) seepage, secondary grouting are checked
Owing to slip casting is to be injected in the cavity between steel plate and concrete wall by Z102 type movement joint special creep slip casting glue, Pressure is not required to too big, air may be had not empty in local during slip casting, and the creep of serosity and trickling may also be oozed Leak source, after upon examination it is found that on the steel plate steel mouth nearest away from seepage point secondary grouting.It is full of creep glue in finally guaranteeing cavity, By the leak stopping at the strong bond of all sites of creep glue and the material such as concrete, steel plate, never solidified the property with creep by it The purpose of permanent leak stopping can be reached;
9) inspect for acceptance, incrustation
By i.e. checking and accepting completion after the observation ne-leakage of a period of time.With other decoration material such as PVC or aluminum-pinch after completing Material carries out decoration process to flexible gap.

Claims (5)

1. a Novel underground room antiseep attachment structure, including reinforced concrete structure (2), it is characterised in that adjacent two steel Being divided into upper and lower two parts at gap between tendon concrete structure (2), bottom is provided with polyurethane foam packed layer (8), and top sets Being provided with waterproof cement mortar and repair top layer (1), polyurethane foam packed layer (8) and waterproof cement mortar repair top layer (1) even Connecing, at gap, top is provided with v-shaped plate (6), and v-shaped plate (6) both sides are equipped with horizontal edge fit, and expansion bolt (4) passes through level The both sides of v-shaped plate (6) are fixed on adjacent two reinforced concrete structures (2) by edge fit, and v-shaped plate (6) top is provided with one Organizing slip casting steel mouth (7) arranged side by side, creep injection slurry injects v-shaped plate (6) by slip casting steel mouth (7) and repairs with waterproof cement mortar In the leak stopping space (5) formed between top layer (1).
A kind of Novel underground room the most according to claim 1 antiseep attachment structure, it is characterised in that described v-shaped plate (6) it is provided with rubber strip (3) between horizontal edge fit and reinforced concrete structure (2).
A kind of Novel underground room the most according to claim 2 antiseep attachment structure, it is characterised in that the width of rubber strip (3) Degree is 100mm.
A kind of Novel underground room the most according to claim 1 antiseep attachment structure, it is characterised in that waterproof cement mortar Repair top layer (1) by brushing at two reinforced concrete structure (2) limits, gap and the waterproof cement of polyurethane foam packed layer (8) Mortar obtains down isosceles trapezoidal structure, and its thickness is 50-100mm.
A kind of Novel underground room the most according to claim 4 antiseep attachment structure, it is characterised in that v-shaped plate (6) Opening is more than the width of slit aperture.
CN201620785061.8U 2016-07-25 2016-07-25 Novel basement antiseep connection structure Active CN205875426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620785061.8U CN205875426U (en) 2016-07-25 2016-07-25 Novel basement antiseep connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620785061.8U CN205875426U (en) 2016-07-25 2016-07-25 Novel basement antiseep connection structure

Publications (1)

Publication Number Publication Date
CN205875426U true CN205875426U (en) 2017-01-11

Family

ID=57697603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620785061.8U Active CN205875426U (en) 2016-07-25 2016-07-25 Novel basement antiseep connection structure

Country Status (1)

Country Link
CN (1) CN205875426U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN108560592A (en) * 2018-06-25 2018-09-21 中冶武汉冶金建筑研究院有限公司 Prosthetic device and its method for the fracture of underground pipe gallery waterproof structure for deformation seams

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN106088364B (en) * 2016-07-25 2019-01-25 浙江万达建设集团有限公司 A kind of basement antiseep connection structure and its construction method
CN108560592A (en) * 2018-06-25 2018-09-21 中冶武汉冶金建筑研究院有限公司 Prosthetic device and its method for the fracture of underground pipe gallery waterproof structure for deformation seams

Similar Documents

Publication Publication Date Title
CN106088364B (en) A kind of basement antiseep connection structure and its construction method
CN104594387B (en) Improved post-cast strip advance water stop construction method
CN105019480B (en) Construction treatment method for building cracks
CN202788022U (en) Wall crack combined type repair structure
CN102817382B (en) The repairerment construction method of basement deformation joint seepage
CN206545228U (en) A kind of piping lane with waterproof construction
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN211037072U (en) Piping lane bottom plate waterproof construction
CN109208651B (en) Construction method and structure of deformation joint water-drainage-preventing structure of underground engineering super-long structure body
CN110629800A (en) Deformation joint treatment method and deformation joint waterproof structure
CN110206074A (en) A kind of underground waterproof engineering construction technology
CN205875426U (en) Novel basement antiseep connection structure
CN107165290A (en) Basement bottom board prespreading Macromolecular self-adhesive membrane waterproof roll non-bituminous base construction
CN107524174A (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN105780940B (en) building expansion joint anti-leakage structure
CN106567554A (en) Reinforcing construction method of masonry structural building
CN207846696U (en) A kind of compound leak stopping system
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN210975898U (en) Prefabricated template system of basement outer wall post-cast strip
CN111733894A (en) Anti-floating system of deep foundation pit underground structure and construction process
CN208072433U (en) A kind of interim precipitation steel sleeve being used for basic posthole and catch pit
CN207498991U (en) A kind of exhaust valve pit