CN205863784U - Wedge shape shunt line earth potential live installs tool kit - Google Patents
Wedge shape shunt line earth potential live installs tool kit Download PDFInfo
- Publication number
- CN205863784U CN205863784U CN201620550038.0U CN201620550038U CN205863784U CN 205863784 U CN205863784 U CN 205863784U CN 201620550038 U CN201620550038 U CN 201620550038U CN 205863784 U CN205863784 U CN 205863784U
- Authority
- CN
- China
- Prior art keywords
- wedge
- installation
- stainless steel
- shunt
- ground potential
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型涉及一种电力检修作业的技术领域,尤其涉及一种楔形分流线地电位带电安装组合工具,具体是安装楔形分流线的组合工具,适用于地电位带电安装节点分流线,可提高导线的导流能力和输电可靠性,降低节点因负荷引起的温度,避免事故的发生。本实用新型包括挑杆和安装锤组合而成,所述挑杆是由弹性楔头与不锈钢管A相连接,不锈钢管A与挑杆绝缘操作杆相连接构成;所述安装锤与不锈钢管B相连接,不锈钢管B与安装锤绝缘操作杆相连接。本实用新型能安全可靠地开展地电位安装楔形分流线夹作业;还可以用于停电检修作业。本实用新型还具有小巧美观便于携带,操作简捷方便,实用性较强的优点。与现有技术相比,显著提高了带电安装分流线夹的实用性和操作性。
The utility model relates to the technical field of electric power maintenance work, in particular to a combination tool for installing a wedge-shaped shunt line with live potential, in particular to a combined tool for installing a wedge-shaped shunt line, which is suitable for a shunt line with a ground potential live installation node, It can improve the conduction capacity of the conductor and the reliability of power transmission, reduce the temperature of the node caused by the load, and avoid the occurrence of accidents. The utility model comprises a pick rod and a mounting hammer. The pick rod is composed of an elastic wedge head connected with a stainless steel pipe A, and the stainless steel pipe A is connected with a pick rod insulating operating rod; the installation hammer is connected with a stainless steel pipe B. Connected, the stainless steel tube B is connected with the insulating operating rod of the installation hammer. The utility model can safely and reliably carry out the operation of installing wedge-shaped shunt clamps on the ground potential; it can also be used for maintenance operations in power failures. The utility model also has the advantages of small size, beautiful appearance, easy to carry, simple and convenient operation, and strong practicability. Compared with the prior art, the practicability and operability of the live installation shunt clamp are significantly improved.
Description
技术领域technical field
本实用新型涉及一种电力检修作业的技术领域,尤其涉及一种楔形分流线地电位带电安装组合工具,具体是安装楔形分流线的组合工具,适用于地电位带电安装节点分流线,可提高导线的导流能力和输电可靠性,降低节点因负荷引起的温度,避免事故的发生。The utility model relates to the technical field of electric power maintenance operations, in particular to a wedge-shaped shunt line ground potential live installation combination tool, in particular a combination tool for installing wedge-shaped shunt lines, which is suitable for ground potential live installation node shunt lines, It can improve the conduction capacity of the conductor and the reliability of power transmission, reduce the temperature of the node caused by the load, and avoid the occurrence of accidents.
背景技术Background technique
由于产品质量、施工质量、运维质量及恶劣气候等因素的影响,电力线路节点有时会发生节点过热现象。节点过热若不能得到及时消除,可能引发节点熔断,发生断线事故。Due to the influence of factors such as product quality, construction quality, operation and maintenance quality, and harsh weather, power line nodes sometimes experience node overheating. If the overheating of nodes cannot be eliminated in time, it may cause node fusing and disconnection accidents.
为避免该类事故的发生,截止目前,电力线路运检单位主要须开展以下方面的工作。一是按设备状态评价及线路负荷情况及时开展导线节点测温工作。二是对发生过热的节点进行停电检修或进行带电检修。In order to avoid such accidents, up to now, power line inspection units mainly need to carry out the following work. The first is to carry out temperature measurement of conductor nodes in a timely manner according to equipment status evaluation and line load conditions. The second is to carry out power-off maintenance or live maintenance for overheated nodes.
最常采用的检修方式是停电检修,检修人员可以直接接触导线作业,作业方式相对简单。但是,停电将影响供电可靠性,甚至影响供电负荷,减少供电电量。因此,常常也采用带电作业的方式安装节点分流线。由于节点过热时作业已经处于危险状态,为降低作业风险,通常采用地电位的作业方式安装螺栓式分流线。这种螺栓式分流线的安装方式是用专用绝缘操作杆将线夹安放于导线上,并用操作钩拧紧线夹螺栓,使线夹与导线充分接触,起到分流作用。其不足之处是接触面积不够,分流效果有限,不能长期运行。The most commonly used maintenance method is power outage maintenance. The maintenance personnel can directly contact the wires for operation, and the operation method is relatively simple. However, a power outage will affect the reliability of power supply, and even affect the power supply load, reducing the power supply. Therefore, live work is often used to install node shunt lines. Since the operation is already in a dangerous state when the node is overheated, in order to reduce the operation risk, the ground potential operation method is usually used to install the bolt type shunt line. The installation method of this bolt-type shunt line is to place the clamp on the wire with a special insulating operating rod, and tighten the clamp bolt with the operating hook to make the clamp fully contact with the wire and play a shunting role. The disadvantage is that the contact area is not enough, the shunting effect is limited, and it cannot be operated for a long time.
楔形分流线与导线接触面积充分,楔紧效果良好,可以长期运行。如可以进行地电位安装,将会极大地改善分流线的分流效果,弥补现有螺栓式分流线的不足。发明内容The contact area between the wedge-shaped shunt line and the conductor is sufficient, the wedge tight effect is good, and it can run for a long time. If the ground potential installation can be carried out, the shunting effect of the shunt line will be greatly improved, and the deficiency of the existing bolt type shunt line will be made up for. Contents of the invention
针对上述现有技术中存在的地电位带电安装楔形分流线的问题,本实用新型提供一种楔形分流线地电位带电安装组合工具。目的是提供一种可以安全可靠地开展地电位安装楔形分流线夹作业,还可以用于停电检修作业,外型小巧便于携带,操作简捷方便,实用性较强的一种组合工具。Aiming at the problem of installing wedge-shaped shunt wires with ground potential live in the above-mentioned prior art, the utility model provides a combination tool for ground potential live installation of wedge-shaped shunt wires. The purpose is to provide a combination tool that can safely and reliably install wedge-shaped shunt clamps on ground potential, and can also be used for power failure maintenance operations. It is small and portable, simple and convenient to operate, and has strong practicability.
实用新型内容Utility model content
为达到上述实用新型目的,本实用新型所采用的技术方案是:In order to achieve the above-mentioned utility model purpose, the technical solution adopted in the utility model is:
楔形分流线地电位带电安装组合工具,包括挑杆和安装锤组合而成,所述挑杆是由弹性楔头与不锈钢管A相连接,不锈钢管A与挑杆绝缘操作杆相连接构成;所述安装锤与不锈钢管B相连接,不锈钢管B与安装锤绝缘操作杆相连接。The wedge-shaped shunt line ground potential live installation combination tool is composed of a pick rod and a mounting hammer. The pick rod is composed of an elastic wedge head connected with a stainless steel pipe A, and the stainless steel pipe A is connected with the pick rod insulation operating rod; The installation hammer is connected with the stainless steel pipe B, and the stainless steel pipe B is connected with the insulating operating rod of the installation hammer.
所述弹性楔头为O形结构。The elastic wedge is an O-shaped structure.
所述弹性楔头与分流线夹相配合,当弹性楔头插入至分流线夹方形操作孔时,在弹力作用下向内收缩与分流线夹的方形操作孔充分配合。The elastic wedge is matched with the shunt clip, and when the elastic wedge is inserted into the square operation hole of the shunt clip, it shrinks inward under the action of elastic force to fully cooperate with the square operation hole of the shunt clip.
所述挑杆与分流线夹的连接方式为弹性连接。The connection mode between the pick rod and the shunt clamp is elastic connection.
所述安装锤为与分流线夹相匹配的月牙形。The installation hammer is in the shape of a crescent that matches the shunt clip.
所述弹性楔头为不锈钢弹性钢片。The elastic wedge head is a stainless steel elastic steel sheet.
本实用新型的优点及效果是:Advantage and effect of the present utility model are:
本实用新型能安全可靠地开展地电位安装楔形分流线夹作业;还可以用于停电检修作业。本实用新型还具有小巧美观便于携带,操作简捷方便,实用性较强的优点。与现有技术相比,显著提高了带电安装分流线夹的实用性和操作性。The utility model can safely and reliably carry out the operation of installing wedge-shaped shunt clamps on the ground potential; it can also be used for maintenance operations in power failures. The utility model also has the advantages of small size, beautiful appearance, easy to carry, simple and convenient operation, and strong practicability. Compared with the prior art, the practicability and operability of the live installation shunt clamp are significantly improved.
下面结合附图和具体实施方式,对本实用新型做进一步详细的说明。Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail.
附图说明Description of drawings
图1 是本实用新型中挑杆的结构示意图; Fig. 1 is a schematic structural view of the pick rod in the utility model;
图2 是本实用新型中安装锤的结构示意图;Fig. 2 is a schematic structural view of the installation hammer in the utility model;
图3是图2中安装锤的A-A向剖视图。Fig. 3 is an A-A sectional view of the installation hammer in Fig. 2 .
图中:挑杆绝缘操作杆1,弹性楔头2,安装锤绝缘操作杆3,安装锤4。Among the figure: pick rod insulating operating rod 1, elastic wedge head 2, installing hammer insulating operating rod 3, installing hammer 4.
具体实施方式detailed description
本实用新型为一种楔形分流线地电位带电安装组合工具,本组合工具是由挑杆和月牙形安装锤4两套工具组成,如图1和图2所示。The utility model is a wedge-shaped shunt line ground potential charged installation combination tool, which is composed of two sets of tools, a pick rod and a crescent-shaped installation hammer 4, as shown in Figures 1 and 2.
如图1所示,图1是本实用新型中挑杆的结构示意图,是由挑杆绝缘操作杆1和弹性楔头2组成,其中弹性楔头2与不锈钢管A相连接,不锈钢管A与挑杆绝缘操作杆1相连接。所述的弹性楔头2为O形结构,所述的弹性楔头2能够与分流线夹相配合。当弹性楔头2插入至分流线夹方形操作孔时,在弹力作用下向内收缩与分流线夹的方形操作孔产生充分配合,安装完成后,可以退出。所述的挑杆与分流线夹的连接方式为弹性连接,这样在满足强度要求的前提下便于分离。As shown in Figure 1, Figure 1 is a structural schematic diagram of the pick rod in the present utility model, which is composed of a pick rod insulating operating rod 1 and an elastic wedge head 2, wherein the elastic wedge head 2 is connected with the stainless steel pipe A, and the stainless steel pipe A is connected with the stainless steel pipe A The pick rod insulation operating rod 1 is connected. The elastic wedge head 2 is an O-shaped structure, and the elastic wedge head 2 can cooperate with the shunt wire clamp. When the elastic wedge 2 is inserted into the square operation hole of the shunt clip, it will shrink inward under the action of the elastic force to fully cooperate with the square operation hole of the shunt clip. After the installation is completed, it can be withdrawn. The connection mode of the pick rod and the shunt clamp is elastic connection, which is easy to separate under the premise of meeting the strength requirement.
如图2和图3所示,图2 是本实用新型中安装锤的结构示意图,图3是图2中安装锤的A-A向剖视图。本实用新型与挑杆相配合的工具是能够与分流线夹配合的安装锤4,安装锤4采用与分流线夹相匹配的月牙形,充分保证与楔体的接触面积和打击冲击力。其中安装锤4固定连接在不锈钢管B上,不锈钢管B与安装锤绝缘操作杆3相连接。当握住安装锤绝缘操作杆3时,用月牙形安装锤4敲击分流线夹方形操作孔,即可以使楔体充分受力,保证握力要求。As shown in Fig. 2 and Fig. 3, Fig. 2 is a structural schematic diagram of the installation hammer in the present invention, and Fig. 3 is an A-A sectional view of the installation hammer in Fig. 2 . The utility model is matched with the tool for the pick rod is the installation hammer 4 that can cooperate with the shunt wire clamp. The installation hammer 4 adopts a crescent shape that matches the shunt wire clip, which fully ensures the contact area with the wedge and the impact force . Wherein the installation hammer 4 is fixedly connected on the stainless steel pipe B, and the stainless steel pipe B is connected with the insulating operating rod 3 of the installation hammer. When holding the insulating operating rod 3 of the installation hammer, knock the square operating hole of the shunt wire clamp with the crescent-shaped installation hammer 4, so that the wedge can be fully stressed to ensure the grip force requirement.
具体实施时,可以由三名地电位电力工人相互配合下,共同完成该项作业。其中两名地电位电力工人分别用挑杆绝缘操作杆1挑起分流线夹管体使其接触导线;另一名地电位电力工人用挑杆绝缘操作杆1挑起分流线夹楔体,与管体安装;然后用配有安装锤的安装锤绝缘操作杆3敲击楔体,使其充分就位。During specific implementation, the operation can be completed jointly by three ground potential electric workers in cooperation with each other. Among them, two electric workers with ground potential use the insulated operating rod 1 to stir up the clamping body of the shunt line to make it contact the wire; , and installed with the pipe body; then tap the wedge body with the installation hammer insulation operating rod 3 equipped with the installation hammer to make it fully seated.
本实用新型所述挑杆的主要实施方式如下:The main embodiment of the pick bar described in the utility model is as follows:
1、挑杆绝缘操作杆的电气强度和机械强度应满足相关行业标准要求。1. The electrical strength and mechanical strength of the pole insulation operating rod should meet the requirements of relevant industry standards.
2、用不锈钢弹性钢片制作O形弹性楔头,其自身强度及与分流线夹操作方孔间的连接强度必须满足承载分流线重量的2.5倍。2. The O-shaped elastic wedge head is made of stainless steel elastic steel sheet. Its own strength and the connection strength with the operating square hole of the shunt wire clip must meet 2.5 times the weight of the shunt wire.
3、将O形弹性楔头焊接于不锈钢管A上。3. Weld the O-shaped elastic wedge to the stainless steel pipe A.
4、将焊有O形弹性楔头的不锈钢管A通过丝扣的方式与挑杆绝缘操作杆连接紧固。4. Connect and fasten the stainless steel pipe A welded with the O-shaped elastic wedge head with the insulated operating rod of the lifting rod by means of threaded buckles.
安装锤的主要实施方式如下:The main implementation of the installation hammer is as follows:
1、安装锤绝缘操作杆的电气强度和机械强度应满足相关行业标准要求。1. The electrical strength and mechanical strength of the insulating operating rod of the installed hammer should meet the requirements of relevant industry standards.
2、用铸铁制作月牙形安装锤,通过实验选取与分流线夹楔体相符合的重量及其尺寸。2. Use cast iron to make a crescent-shaped installation hammer, and select the weight and size consistent with the shunt clip wedge through experiments.
3、将月牙形安装锤焊接于不锈钢管B上。3. Weld the crescent-shaped installation hammer to the stainless steel pipe B.
4、将焊有月牙形安装锤的不锈钢管B通过丝扣的方式与安装锤绝缘操作杆紧固连接。4. Tightly connect the stainless steel pipe B welded with the crescent-shaped installation hammer with the insulating operating rod of the installation hammer by means of threaded buckles.
由上述挑杆和安装锤共同构成了楔形分流线夹地电位安装组合工具。The combination tool for installing the wedge-shaped shunt line clip and the ground potential is jointly formed by the above-mentioned pick rod and the installation hammer.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620550038.0U CN205863784U (en) | 2016-06-08 | 2016-06-08 | Wedge shape shunt line earth potential live installs tool kit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620550038.0U CN205863784U (en) | 2016-06-08 | 2016-06-08 | Wedge shape shunt line earth potential live installs tool kit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205863784U true CN205863784U (en) | 2017-01-04 |
Family
ID=57638397
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620550038.0U Expired - Fee Related CN205863784U (en) | 2016-06-08 | 2016-06-08 | Wedge shape shunt line earth potential live installs tool kit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205863784U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105826870A (en) * | 2016-06-08 | 2016-08-03 | 国网辽宁省电力有限公司电力科学研究院 | Wedge-shaped diversion line ground potential live installation combination tool |
-
2016
- 2016-06-08 CN CN201620550038.0U patent/CN205863784U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105826870A (en) * | 2016-06-08 | 2016-08-03 | 国网辽宁省电力有限公司电力科学研究院 | Wedge-shaped diversion line ground potential live installation combination tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201975536U (en) | Crimping quick-coupling jointing clamp | |
| CN203674624U (en) | A sleeve-type combination tool for fastening and draining wire clips | |
| CN103683104A (en) | A ratchet combination tool for live fastening and draining clip | |
| CN103368110B (en) | The charged installation and removal construction method of non-bearing connecting clip | |
| CN205583183U (en) | Take binding post's improvement type parallel groove clamp | |
| CN204516914U (en) | Earthing device when distribution line and equipment interruption maintenance | |
| CN205863784U (en) | Wedge shape shunt line earth potential live installs tool kit | |
| CN202564558U (en) | Copper row shunt clamp | |
| CN210201444U (en) | Circuit breaking structure | |
| CN201584701U (en) | Tool for replacing 'V' string insulator of 220kV line in live state | |
| CN201629516U (en) | Three-connected extension-resisting clamp for extra HVDC transmission line | |
| CN105826870A (en) | Wedge-shaped diversion line ground potential live installation combination tool | |
| CN206774995U (en) | Special purpose tools for electric fastening bolt | |
| CN201562769U (en) | UHV grounding wire device | |
| CN103762517B (en) | High-voltage ground wire installation method | |
| CN210704540U (en) | A tool for high-altitude live remote control electric tightening of wire clamp bolts for transmission lines | |
| CN202868079U (en) | Current transformer pole clip for high-voltage transmission line | |
| CN206004211U (en) | Replacement of 35‑110kV compression type line clamp tension single string insulator clamp | |
| CN202259718U (en) | Movable-type grounding pile | |
| CN209434754U (en) | Replace the combination tool of direct current grounding pole route suspension string | |
| CN207884196U (en) | One kind ± 800kV extra high voltage line double-linkage double-hanging-point pendulous string isolators more changing device | |
| CN201927726U (en) | Sequentially-mounted ground wire | |
| CN204243233U (en) | Fastening-type wire connection device | |
| CN204760902U (en) | Wire anchor installation specialized tool | |
| CN203733958U (en) | Wire clamp for power transformation equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 |