CN205822751U - A kind of job platform of novel solid construction - Google Patents

A kind of job platform of novel solid construction Download PDF

Info

Publication number
CN205822751U
CN205822751U CN201620753879.1U CN201620753879U CN205822751U CN 205822751 U CN205822751 U CN 205822751U CN 201620753879 U CN201620753879 U CN 201620753879U CN 205822751 U CN205822751 U CN 205822751U
Authority
CN
China
Prior art keywords
main frame
platform
frame body
subframe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620753879.1U
Other languages
Chinese (zh)
Inventor
魏义兵
王建利
贾栋林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201620753879.1U priority Critical patent/CN205822751U/en
Application granted granted Critical
Publication of CN205822751U publication Critical patent/CN205822751U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses the job platform of a kind of novel solid construction, it is desirable to provide the job platform of a kind of novel solid construction being effectively improved construction speed.It includes the main frame body in inverted trapezoidal, two upper braces being symmetrically arranged on both sides, main frame body upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than the subframe body of main frame body, it is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described main frame body and subframe body connect and compose misconstruction side by side along cell body length direction, are provided with cat ladder between described upper brace and lower platform;Arranging the road wheel with cell body contact of incline plane on the hypotenuse of described main frame body and subframe body, the bottom of described main frame body and subframe body downwardly extends composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.This utility model can realize stereoscopic and omnibearing operation, accelerating construction progress, improves construction safety.

Description

A kind of job platform of novel solid construction
Technical field
This utility model relates to construction auxiliary equipment technical field, especially relates to the operation horizontal of a kind of novel solid construction Platform.
Background technology
In cell body, carry out equipment installation, pacify including from the equipment of lower horizontal, middle part slope section and top abutment wall section Dress, traditional platform design structure is single, and recycling performance and mobility are poor.Installation can only set step by step Standby installation, and the time setting up scaffold is long, sets up often, platform mobility is poor, and workmen's operation easier is big, risk Height, construction speed is slow, needs improvement badly.
Utility model content
This utility model overcomes shortcoming of the prior art, it is provided that a kind of conveniently moving, can be effectively improved construct into Degree, reduces workmen's job safety risk, the job platform of safe and reliable novel solid construction the most easy to use.
In order to solve above-mentioned technical problem, this utility model is achieved through the following technical solutions:
The job platform of a kind of novel solid construction, including the main frame body in inverted trapezoidal, two are symmetrically arranged on main frame body The upper brace of both sides, upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than the pair of main frame body Support body, is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described main frame body and pair Support body connects and composes misconstruction side by side along cell body length direction, is provided with cat ladder between described upper brace and lower platform; Road wheel with cell body contact of incline plane, described main frame body and the bottom of subframe body are set on the hypotenuse of described main frame body and subframe body Downwardly extend composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.
Preferably, described upper brace arranging overhanging platform, the respective end of described cat ladder connects overhanging platform.
Preferably, described upper brace uses plank to make.
Preferably, described lower platform uses plank to make.
Preferably, described road wheel and location wheel use rubber wheel.
Preferably, described main frame body and subframe body use and removably connect.
Compared with prior art, this utility model has the advantage that
1. in employing this utility model carries out groove, the installation of equipment, can reduce the workload of scaffold building platform and set up Number of times, and installation while multiple equipment can be carried out simultaneously, significantly improve working performance, reduce labor intensity, reduce operation people Member's security risk.
2. this utility model mobility is good, can reduce middle adjustment time, accelerating construction progress.
3. this utility model can realize stereoscopic and omnibearing operation, accelerating construction progress, improves construction safety, drops bottom application work Cost, has reference and promotional value in the engineering construction of the industry such as building trade and water power.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only It is embodiments more of the present utility model, for those of ordinary skill in the art, before not paying creative work Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is structural representation during this utility model use.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the enlarged drawing of part A in Fig. 1.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under paying creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
The job platform of the construction of novel solid shown in Fig. 1-3, including the main frame body 1 in inverted trapezoidal, two are symmetrically arranged on The upper brace 2 of both sides, main frame body 1 upper end, the upper protective hurdle 3 being installed on upper brace 2, in inverted trapezoidal and highly it is less than The subframe body 4 of main frame body 1, is loaded on the lower platform 5 of subframe body 4 upper end, and the lower portion hurdle being installed in lower platform 5 6;Described main frame body 1 and subframe body 4 connect and compose misconstruction, described upper brace 2 and bottom side by side along cell body length direction Cat ladder 7 it is provided with between platform 5;Road wheel 8 with cell body contact of incline plane is set on the hypotenuse of described main frame body 1 and subframe body 4, The bottom of described main frame body 1 and subframe body 4 downwardly extends composition rectangular portion, and the both sides of rectangular portion are arranged and cell body sidewall contact Location wheel 9, prevent job platform from rocking and sidesway.
Wherein, described upper brace 2 arranging overhanging platform 10, the respective end of described cat ladder 7 connects overhanging platform 10.
Wherein, described upper brace 2 uses plank to make, and described lower platform 5 uses plank to make, and has lightweight, The advantage being easy to movement.
Wherein, described road wheel 8 and location wheel 9 employing rubber wheel, it is possible to decrease the noise in moving process.
Wherein, described main frame body 1 and subframe body 4 use and removably connect, as bolt connects, and pin connection etc., it is simple to realize Split uses.
Carry out the installation of equipment in groove with this utility model, the workload of scaffold building platform can be reduced and set up time Number, improves working performance, reduces labor intensity, reduces operating personnel's security risk.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model Protection domain within.

Claims (6)

1. the job platform of a novel solid construction, it is characterised in that: including the main frame body in inverted trapezoidal, two are symmetrically installed In the upper brace of both sides, main frame body upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than main The subframe body of support body, is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described master Support body and subframe body connect and compose misconstruction side by side along cell body length direction, arrange between described upper brace and lower platform There is cat ladder;Road wheel with cell body contact of incline plane, described main frame body and subframe are set on the hypotenuse of described main frame body and subframe body The bottom of body downwardly extends composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.
The job platform of novel solid construction the most according to claim 1, it is characterised in that: outside arranging on described upper brace Being stretched flat platform, the respective end of described cat ladder connects overhanging platform.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described upper brace uses Plank is made.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described lower platform uses Plank is made.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described road wheel and location Wheel uses rubber wheel.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described main frame body and subframe Body uses and removably connects.
CN201620753879.1U 2016-07-18 2016-07-18 A kind of job platform of novel solid construction Expired - Fee Related CN205822751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620753879.1U CN205822751U (en) 2016-07-18 2016-07-18 A kind of job platform of novel solid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620753879.1U CN205822751U (en) 2016-07-18 2016-07-18 A kind of job platform of novel solid construction

Publications (1)

Publication Number Publication Date
CN205822751U true CN205822751U (en) 2016-12-21

Family

ID=57562768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620753879.1U Expired - Fee Related CN205822751U (en) 2016-07-18 2016-07-18 A kind of job platform of novel solid construction

Country Status (1)

Country Link
CN (1) CN205822751U (en)

Similar Documents

Publication Publication Date Title
CN204775324U (en) Building materials transportation engineering car
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN205529883U (en) Guardrail fitment platform
CN203978449U (en) A kind of lifting body of tunnel lining trolley
CN204532049U (en) Novel iron tower cat ladder structure
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN205822751U (en) A kind of job platform of novel solid construction
CN203654705U (en) Slideable hanging basket apparatus for steel skeleton assembling
CN204938802U (en) For the rail supported system of tower crane
CN205348720U (en) Take hoisting device's removal scaffold
CN104499418B (en) A kind of vehicle-mounted bridge of foldable assembled
CN203639825U (en) Reserved concrete platform operating frame capable of pushing auxiliary-arm type SS stage guardrail
CN202783733U (en) Horizontal inclined shipway structure with uniformly distributed traveling wheel pressure
CN202359509U (en) Bridge wet joint operation vehicle
CN204847843U (en) Hoist traveling carriage bearing structure
CN207686319U (en) A kind of trackless synovial membrane
CN205688357U (en) Overhead pulley rail Whole PC plate mounting platform
CN208280636U (en) A kind of elevator well safety device
CN211172770U (en) Cast-in-place oblique roofing operation platform of heavy grade
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN204691205U (en) Elevator shaft mouth sizing steel plate operating platform
CN205604072U (en) Bridge floor pavement construction trolley car
CN206308627U (en) A kind of portable beam body side operation frame
CN107190926B (en) A kind of turnable railing of house balcony
CN205955205U (en) Formwork supporting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161221

CF01 Termination of patent right due to non-payment of annual fee