CN205822751U - A kind of job platform of novel solid construction - Google Patents
A kind of job platform of novel solid construction Download PDFInfo
- Publication number
- CN205822751U CN205822751U CN201620753879.1U CN201620753879U CN205822751U CN 205822751 U CN205822751 U CN 205822751U CN 201620753879 U CN201620753879 U CN 201620753879U CN 205822751 U CN205822751 U CN 205822751U
- Authority
- CN
- China
- Prior art keywords
- main frame
- platform
- frame body
- subframe
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 239000007787 solid Substances 0.000 title claims abstract description 14
- 210000005056 cell body Anatomy 0.000 claims abstract description 13
- 241000282326 Felis catus Species 0.000 claims abstract description 6
- 230000001681 protective effect Effects 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses the job platform of a kind of novel solid construction, it is desirable to provide the job platform of a kind of novel solid construction being effectively improved construction speed.It includes the main frame body in inverted trapezoidal, two upper braces being symmetrically arranged on both sides, main frame body upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than the subframe body of main frame body, it is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described main frame body and subframe body connect and compose misconstruction side by side along cell body length direction, are provided with cat ladder between described upper brace and lower platform;Arranging the road wheel with cell body contact of incline plane on the hypotenuse of described main frame body and subframe body, the bottom of described main frame body and subframe body downwardly extends composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.This utility model can realize stereoscopic and omnibearing operation, accelerating construction progress, improves construction safety.
Description
Technical field
This utility model relates to construction auxiliary equipment technical field, especially relates to the operation horizontal of a kind of novel solid construction
Platform.
Background technology
In cell body, carry out equipment installation, pacify including from the equipment of lower horizontal, middle part slope section and top abutment wall section
Dress, traditional platform design structure is single, and recycling performance and mobility are poor.Installation can only set step by step
Standby installation, and the time setting up scaffold is long, sets up often, platform mobility is poor, and workmen's operation easier is big, risk
Height, construction speed is slow, needs improvement badly.
Utility model content
This utility model overcomes shortcoming of the prior art, it is provided that a kind of conveniently moving, can be effectively improved construct into
Degree, reduces workmen's job safety risk, the job platform of safe and reliable novel solid construction the most easy to use.
In order to solve above-mentioned technical problem, this utility model is achieved through the following technical solutions:
The job platform of a kind of novel solid construction, including the main frame body in inverted trapezoidal, two are symmetrically arranged on main frame body
The upper brace of both sides, upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than the pair of main frame body
Support body, is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described main frame body and pair
Support body connects and composes misconstruction side by side along cell body length direction, is provided with cat ladder between described upper brace and lower platform;
Road wheel with cell body contact of incline plane, described main frame body and the bottom of subframe body are set on the hypotenuse of described main frame body and subframe body
Downwardly extend composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.
Preferably, described upper brace arranging overhanging platform, the respective end of described cat ladder connects overhanging platform.
Preferably, described upper brace uses plank to make.
Preferably, described lower platform uses plank to make.
Preferably, described road wheel and location wheel use rubber wheel.
Preferably, described main frame body and subframe body use and removably connect.
Compared with prior art, this utility model has the advantage that
1. in employing this utility model carries out groove, the installation of equipment, can reduce the workload of scaffold building platform and set up
Number of times, and installation while multiple equipment can be carried out simultaneously, significantly improve working performance, reduce labor intensity, reduce operation people
Member's security risk.
2. this utility model mobility is good, can reduce middle adjustment time, accelerating construction progress.
3. this utility model can realize stereoscopic and omnibearing operation, accelerating construction progress, improves construction safety, drops bottom application work
Cost, has reference and promotional value in the engineering construction of the industry such as building trade and water power.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only
It is embodiments more of the present utility model, for those of ordinary skill in the art, before not paying creative work
Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is structural representation during this utility model use.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the enlarged drawing of part A in Fig. 1.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under paying creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
The job platform of the construction of novel solid shown in Fig. 1-3, including the main frame body 1 in inverted trapezoidal, two are symmetrically arranged on
The upper brace 2 of both sides, main frame body 1 upper end, the upper protective hurdle 3 being installed on upper brace 2, in inverted trapezoidal and highly it is less than
The subframe body 4 of main frame body 1, is loaded on the lower platform 5 of subframe body 4 upper end, and the lower portion hurdle being installed in lower platform 5
6;Described main frame body 1 and subframe body 4 connect and compose misconstruction, described upper brace 2 and bottom side by side along cell body length direction
Cat ladder 7 it is provided with between platform 5;Road wheel 8 with cell body contact of incline plane is set on the hypotenuse of described main frame body 1 and subframe body 4,
The bottom of described main frame body 1 and subframe body 4 downwardly extends composition rectangular portion, and the both sides of rectangular portion are arranged and cell body sidewall contact
Location wheel 9, prevent job platform from rocking and sidesway.
Wherein, described upper brace 2 arranging overhanging platform 10, the respective end of described cat ladder 7 connects overhanging platform 10.
Wherein, described upper brace 2 uses plank to make, and described lower platform 5 uses plank to make, and has lightweight,
The advantage being easy to movement.
Wherein, described road wheel 8 and location wheel 9 employing rubber wheel, it is possible to decrease the noise in moving process.
Wherein, described main frame body 1 and subframe body 4 use and removably connect, as bolt connects, and pin connection etc., it is simple to realize
Split uses.
Carry out the installation of equipment in groove with this utility model, the workload of scaffold building platform can be reduced and set up time
Number, improves working performance, reduces labor intensity, reduces operating personnel's security risk.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this
Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model
Protection domain within.
Claims (6)
1. the job platform of a novel solid construction, it is characterised in that: including the main frame body in inverted trapezoidal, two are symmetrically installed
In the upper brace of both sides, main frame body upper end, the upper protective hurdle being installed on upper brace, in inverted trapezoidal and highly less than main
The subframe body of support body, is loaded on the lower platform of subframe body upper end, and the lower portion hurdle being installed in lower platform;Described master
Support body and subframe body connect and compose misconstruction side by side along cell body length direction, arrange between described upper brace and lower platform
There is cat ladder;Road wheel with cell body contact of incline plane, described main frame body and subframe are set on the hypotenuse of described main frame body and subframe body
The bottom of body downwardly extends composition rectangular portion, and the both sides of rectangular portion arrange the location wheel with cell body sidewall contact.
The job platform of novel solid construction the most according to claim 1, it is characterised in that: outside arranging on described upper brace
Being stretched flat platform, the respective end of described cat ladder connects overhanging platform.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described upper brace uses
Plank is made.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described lower platform uses
Plank is made.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described road wheel and location
Wheel uses rubber wheel.
The job platform of novel solid the most according to claim 1 or claim 2 construction, it is characterised in that: described main frame body and subframe
Body uses and removably connects.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620753879.1U CN205822751U (en) | 2016-07-18 | 2016-07-18 | A kind of job platform of novel solid construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620753879.1U CN205822751U (en) | 2016-07-18 | 2016-07-18 | A kind of job platform of novel solid construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205822751U true CN205822751U (en) | 2016-12-21 |
Family
ID=57562768
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620753879.1U Expired - Fee Related CN205822751U (en) | 2016-07-18 | 2016-07-18 | A kind of job platform of novel solid construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205822751U (en) |
-
2016
- 2016-07-18 CN CN201620753879.1U patent/CN205822751U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204775324U (en) | Building materials transportation engineering car | |
| CN204112696U (en) | For the electric hoist elevator shaft platform of main building construction | |
| CN205529883U (en) | Guardrail fitment platform | |
| CN203978449U (en) | A kind of lifting body of tunnel lining trolley | |
| CN204532049U (en) | Novel iron tower cat ladder structure | |
| CN204418013U (en) | Bridge flange plate is constructed self-propelled cantilever hanging basket | |
| CN205822751U (en) | A kind of job platform of novel solid construction | |
| CN203654705U (en) | Slideable hanging basket apparatus for steel skeleton assembling | |
| CN204938802U (en) | For the rail supported system of tower crane | |
| CN205348720U (en) | Take hoisting device's removal scaffold | |
| CN104499418B (en) | A kind of vehicle-mounted bridge of foldable assembled | |
| CN203639825U (en) | Reserved concrete platform operating frame capable of pushing auxiliary-arm type SS stage guardrail | |
| CN202783733U (en) | Horizontal inclined shipway structure with uniformly distributed traveling wheel pressure | |
| CN202359509U (en) | Bridge wet joint operation vehicle | |
| CN204847843U (en) | Hoist traveling carriage bearing structure | |
| CN207686319U (en) | A kind of trackless synovial membrane | |
| CN205688357U (en) | Overhead pulley rail Whole PC plate mounting platform | |
| CN208280636U (en) | A kind of elevator well safety device | |
| CN211172770U (en) | Cast-in-place oblique roofing operation platform of heavy grade | |
| CN206487128U (en) | A kind of Guiding Support Elevating Scaffold | |
| CN204691205U (en) | Elevator shaft mouth sizing steel plate operating platform | |
| CN205604072U (en) | Bridge floor pavement construction trolley car | |
| CN206308627U (en) | A kind of portable beam body side operation frame | |
| CN107190926B (en) | A kind of turnable railing of house balcony | |
| CN205955205U (en) | Formwork supporting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |