CN205742944U - A kind of construction operation scaffold - Google Patents

A kind of construction operation scaffold Download PDF

Info

Publication number
CN205742944U
CN205742944U CN201521012295.0U CN201521012295U CN205742944U CN 205742944 U CN205742944 U CN 205742944U CN 201521012295 U CN201521012295 U CN 201521012295U CN 205742944 U CN205742944 U CN 205742944U
Authority
CN
China
Prior art keywords
lifting frame
locking device
base frame
pedestal
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521012295.0U
Other languages
Chinese (zh)
Inventor
宿敏
张冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Industry Polytechnic College
Original Assignee
Zhejiang Industry Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Industry Polytechnic College filed Critical Zhejiang Industry Polytechnic College
Priority to CN201521012295.0U priority Critical patent/CN205742944U/en
Application granted granted Critical
Publication of CN205742944U publication Critical patent/CN205742944U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本实用新型公开了一种施工作业脚手架,包括一体制造而成的基架,所述基架的四脚底安装有移动轮、锁死件;所述基架的左、右侧分别安装有第一三角撑;所述基架的竖直撑杆的外延部上都安装有第一套管,每个所述套管上都安装有第一卡锁装置;所述升降架的前侧安装有对称的两防护栏,所述升降架的后侧通过撑杆安装有收泥板,所述升降架的竖直撑杆的外延部上都安装有带第二卡锁装置的第二套管。本实用新型所述的一种施工作业脚手架,所述安装有移动轮以及锁死件的基架通过第一套管和第一卡锁装置可网上安装升降架,升降架上安装第二套管、第二卡锁装置,不断加升降架,三角撑防护栏的安装保证作业的安全,收泥板的安装避免作业过程中泥料等的浪费。

The utility model discloses a construction work scaffold, which comprises a base frame manufactured integrally, moving wheels and locking parts are installed on the four feet of the base frame; the left and right sides of the base frame are respectively equipped with first Triangular brace; the extension of the vertical strut of the base frame is equipped with a first sleeve, and each of the sleeves is equipped with a first locking device; the front side of the lifting frame is installed with a symmetrical The two guardrails, the rear side of the lifting frame is equipped with a mud receiving plate through the strut, and the extension of the vertical strut of the lifting frame is equipped with a second sleeve with a second locking device. In the scaffolding for construction work described in the utility model, the base frame equipped with moving wheels and locking parts can be installed with a lifting frame on the Internet through the first casing and the first locking device, and the second casing is installed on the lifting frame , The second locking device, the lifting frame is added continuously, the installation of the triangular support fence ensures the safety of the operation, and the installation of the mud collection board avoids the waste of mud and other materials during the operation.

Description

一种施工作业脚手架scaffolding for construction work

技术领域technical field

本实用新型涉及建筑施工领域,尤其是一种施工作业脚手架。The utility model relates to the field of building construction, in particular to a scaffold for construction work.

背景技术Background technique

目前脚手架使用非常广泛,但是仍然存在问题:At present, scaffolding is widely used, but there are still problems:

1、随着高度升高,安全系数仍然不高;1. As the height increases, the safety factor is still not high;

2、基架往上加升降架十分非常不方便,需要繁琐的拧螺丝;2. It is very inconvenient to add the lifting frame to the base frame, and it needs cumbersome screwing;

3、在作业过程中泥料往往掉落一地,非常容易浪费。3. During the operation, the mud often falls to the ground, which is very easy to waste.

实用新型内容Utility model content

本实用新型的目的在于提供一种施工作业脚手架,所述安装有移动轮以及锁死件的基架通过第一套管和第一卡锁装置可网上安装升降架,升降架上安装第二套管、第二卡锁装置,随着作业高度的升高可不断加升降架,三角撑防护栏的安装保证作业的安全,收泥板的安装避免作业过程中泥料等的浪费,本实用新型结构简单,实用方便,节约成本,且更加安全。The purpose of this utility model is to provide a scaffolding for construction work. The base frame equipped with moving wheels and locking parts can be equipped with a lifting frame on the Internet through the first sleeve and the first locking device, and the second set of lifting frame is installed on the lifting frame. The pipe and the second locking device can continuously add the lifting frame with the increase of the working height, the installation of the triangular brace guardrail ensures the safety of the operation, and the installation of the mud collection board avoids the waste of mud and other materials during the operation process. The utility model The utility model has the advantages of simple structure, practicality and convenience, cost saving and safety.

为了达到上述目的,本实用新型的技术方案是:In order to achieve the above object, the technical scheme of the utility model is:

一种施工作业脚手架,包括一体制造而成的基架,所述基架的四脚底安装有移动轮,每个所述移动轮上都安装有锁死件;所述基架的左、右侧分别安装有第一三角撑;所述基架的竖直撑杆的外延部上都安装有第一套管,每个所述套管上都安装有第一卡锁装置;所述基架通过套管安装有升降架,所述升降架的左、右侧分别安装有第二三角撑,所述升降架的前侧安装有对称的两防护栏,所述升降架的后侧通过撑杆安装有收泥板,所述升降架的竖直撑杆的外延部上都安装有带第二卡锁装置的第二套管。A kind of scaffolding for construction work, comprising an integrally manufactured base frame, moving wheels are installed on the four feet of the base frame, each of the moving wheels is equipped with a locking piece; the left and right sides of the base frame First triangular braces are respectively installed; first bushings are installed on the extensions of the vertical braces of the pedestal, and first locking devices are installed on each of the pedestals; the pedestal passes through The casing is equipped with a lifting frame, and the left and right sides of the lifting frame are respectively equipped with second triangular supports. There is a mud receiving plate, and the extensions of the vertical struts of the lifting frame are all equipped with second bushings with second locking devices.

所述防护栏包括可左右拉动的护栏拉杆,所述护栏拉杆上安装有护网,所述升降架前侧的两横杆之间安装有可对护栏拉杆限位的卡位块。The guardrail includes a guardrail pull rod that can be pulled left and right, a protective net is installed on the guardrail pull rod, and a locking block that can limit the guardrail pull rod is installed between the two cross bars on the front side of the lifting frame.

本实用新型的有益效果是:本实用新型的一种施工作业脚手架,所述安装有移动轮以及锁死件的基架通过第一套管和第一卡锁装置可网上安装升降架,升降架上安装第二套管、第二卡锁装置,随着作业高度的升高可不断加升降架,三角撑防护栏的安装保证作业的安全,收泥板的安装避免作业过程中泥料等的浪费,本实用新型结构简单,实用方便,节约成本,且更加安全。The beneficial effects of the utility model are: a construction work scaffold of the utility model, the pedestal installed with the moving wheels and the locking parts can be equipped with a lifting frame and a lifting frame online through the first sleeve and the first locking device. The second casing and the second locking device are installed on the top, and the lifting frame can be continuously added with the increase of the working height. The installation of the triangular support fence ensures the safety of the operation. waste, the utility model is simple in structure, practical and convenient, saves cost, and is safer.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

具体实施方式detailed description

实施例1Example 1

如图1一种施工作业脚手架,包括一体制造而成的基架1,所述基架1的四脚底安装有移动轮2,每个所述移动轮2上都安装有锁死件3;所述基架1的左、右侧分别安装有第一三角撑4;所述基架1的竖直撑杆的外延部上都安装有第一套管5,每个所述套管5上都安装有第一卡锁装置6;所述基架1通过套管5安装有升降架7,所述升降架7的左、右侧分别安装有第二三角撑8,所述升降架7的前侧安装有对称的两防护栏9,所述升降架7的后侧通过撑杆10安装有收泥板11,所述升降架7的竖直撑杆的外延部上都安装有带第二卡锁装置12的第二套管13。A kind of scaffolding for construction work as shown in Fig. 1, comprises the pedestal 1 that is made integrally, and the four foot bottoms of described pedestal 1 are equipped with moving wheel 2, and all are equipped with locking member 3 on each described moving wheel 2; The left and right sides of the pedestal 1 are respectively equipped with first triangular braces 4; the extensions of the vertical struts of the pedestal 1 are equipped with first sleeves 5, and each of the sleeves 5 has a The first locking device 6 is installed; the base frame 1 is equipped with a lifting frame 7 through the sleeve 5, and the left and right sides of the lifting frame 7 are respectively equipped with a second triangular brace 8, and the front of the lifting frame 7 Two symmetrical guardrails 9 are installed on the side, and the rear side of the lifting frame 7 is equipped with a mud receiving plate 11 through a strut 10, and the extension of the vertical strut of the lifting frame 7 is equipped with a second card. The second sleeve 13 of the lock device 12 .

所述防护栏9包括可左右拉动的护栏拉杆14,所述护栏拉杆14上安装有护网15,所述升降架7前侧的两横杆之间安装有可对护栏拉杆14限位的卡位块16。The guardrail 9 includes a guardrail pull bar 14 that can be pulled left and right, a protective net 15 is installed on the guardrail pull bar 14, and a card that can limit the guardrail pull bar 14 is installed between the two cross bars on the front side of the lifting frame 7. Bit block 16.

本实施例的一种施工作业脚手架,所述安装有移动轮以及锁死件的基架通过第一套管和第一卡锁装置可网上安装升降架,升降架上安装第二套管、第二卡锁装置,随着作业高度的升高可不断加升降架,三角撑防护栏的安装保证作业的安全,收泥板的安装避免作业过程中泥料等的浪费,本实用新型结构简单,实用方便,节约成本,且更加安全。In the scaffolding for construction work in this embodiment, the base frame equipped with moving wheels and locking parts can be equipped with a lifting frame online through the first sleeve and the first locking device, and the second sleeve, the second locking device, and the second sleeve are installed on the lifting frame. Two locking devices, the lifting frame can be continuously added with the increase of the working height, the installation of the triangular support fence ensures the safety of the operation, and the installation of the mud receiving plate avoids waste of mud materials during the operation process. The utility model has a simple structure. It is practical and convenient, saves cost and is safer.

Claims (2)

1. a construction operation scaffold, it is characterised in that: include integrally manufactured pedestal (1), the four of described pedestal (1) Sole is provided with movable pulley (2), and each described movable pulley (2) is fitted with deadlocking member (3);The left and right side of described pedestal (1) It is separately installed with the first trivet (4);First sleeve (5) it is fitted with, often on the epitaxy part of the vertical strut of described pedestal (1) It is fitted with the first buckling and locking device (6) on individual described sleeve pipe (5);Described pedestal (1) is provided with crane (7) by sleeve pipe (5), The left and right side of described crane (7) is separately installed with the second trivet (8), and the installed in front of described crane (7) has symmetry Two guard rails (9), the rear side of described crane (7) is provided with receipts mud plate (11) by strut (10), erecting of described crane (7) It is fitted with the second sleeve pipe (13) with the second buckling and locking device (12) on the epitaxy part of straight strut.
A kind of construction operation scaffold the most according to claim 1, it is characterised in that: described guard rail (9) includes can be left The guardrail pull bar (14) that the right side pulls, described guardrail pull bar (14) is provided with protecting wire net (15), and the two of described crane (7) front side are horizontal Be provided with between bar can be spacing to guardrail pull bar (14) screens block (16).
CN201521012295.0U 2015-12-09 2015-12-09 A kind of construction operation scaffold Expired - Fee Related CN205742944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521012295.0U CN205742944U (en) 2015-12-09 2015-12-09 A kind of construction operation scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521012295.0U CN205742944U (en) 2015-12-09 2015-12-09 A kind of construction operation scaffold

Publications (1)

Publication Number Publication Date
CN205742944U true CN205742944U (en) 2016-11-30

Family

ID=57387609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521012295.0U Expired - Fee Related CN205742944U (en) 2015-12-09 2015-12-09 A kind of construction operation scaffold

Country Status (1)

Country Link
CN (1) CN205742944U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826315A (en) * 2019-02-19 2019-05-31 河南农业大学 A spliced-connected composite frame and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826315A (en) * 2019-02-19 2019-05-31 河南农业大学 A spliced-connected composite frame and its construction method

Similar Documents

Publication Publication Date Title
CN103206074A (en) Elevator shaft template construction method, platform and support
CN203008398U (en) Telescopic protection handrail for temporary use
CN205742944U (en) A kind of construction operation scaffold
CN202866311U (en) Construction stair protective barrier and veering connecting device
CN202577960U (en) A Suspended Outer Bearing Composite Steel Formwork Applied in Roller Compacted Concrete Construction
CN212078601U (en) A scaffold with safety guards
CN204370827U (en) Face frontier defense guard fence
CN201546433U (en) An adjustable mobile platform
CN205000618U (en) Novel scaffold
CN105464353A (en) High-safety scaffold for building
CN105781090A (en) Tool-type elevator shaft operating platform with adjustable size and height
CN205330126U (en) High scaffold of security for building
CN214615326U (en) Scaffolding for building construction
CN205742953U (en) A kind of movable Scaffold on band Quick Release Double-protection hurdle
CN204850515U (en) Steel construction faces limit protector
CN204174915U (en) Scaffold
CN211596310U (en) Temporary construction platform for surface finishing in garden road construction process
CN209179451U (en) A building safety construction platform
CN209397897U (en) A kind of Multi-functional indoor scaffold
CN205296795U (en) Take scaffold of warning effect
CN205934748U (en) Support arrangement for be used for prestressing force stretch -draw of bent cap bottom surface
CN203755627U (en) Movable type scaffold
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN204357085U (en) Pin-connected panel operating platform
CN207530406U (en) A kind of assembling distribution box climbing frame with side stay

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20161209

CF01 Termination of patent right due to non-payment of annual fee