CN205730714U - Boiler waste gas purification device - Google Patents

Boiler waste gas purification device Download PDF

Info

Publication number
CN205730714U
CN205730714U CN201620579545.7U CN201620579545U CN205730714U CN 205730714 U CN205730714 U CN 205730714U CN 201620579545 U CN201620579545 U CN 201620579545U CN 205730714 U CN205730714 U CN 205730714U
Authority
CN
China
Prior art keywords
framework
purification
waste gas
boiler waste
purification device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620579545.7U
Other languages
Chinese (zh)
Inventor
陈旋胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Zhilan Environment Protection Technology Co Ltd
Original Assignee
Jiangmen Zhilan Environment Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Zhilan Environment Protection Technology Co Ltd filed Critical Jiangmen Zhilan Environment Protection Technology Co Ltd
Priority to CN201620579545.7U priority Critical patent/CN205730714U/en
Application granted granted Critical
Publication of CN205730714U publication Critical patent/CN205730714U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Treating Waste Gases (AREA)
  • Gas Separation By Absorption (AREA)

Abstract

The utility model discloses boiler waste gas purification device, including first class purification portion, secondary purification portion, three grades of purification portions and level Four purification portion;Described first class purification portion and secondary purification portion are by the first pipeline communication, and described secondary purification portion is connected by second pipe with three grades of purification portions, and described three grades of purification portions and level Four purification portion are by the 3rd pipeline communication;Described first class purification portion includes the first framework and the water wheels being arranged in the first framework, is loaded with absorbing liquid in described first framework, and the bottom of described water wheels contacts with absorbing liquid, and water wheels rotate generation spray and purify waste gas.Relative to prior art, boiler waste gas purification device simple in construction of the present utility model, make discharge gas up to standard by multistage purification, and described boiler waste gas purification device Non-energy-consumption, the positive overbottom pressure power utilizing the equipment exhaustings such as boiler is the energy, carry out the conversion of energy, it is achieved that low-carbon (LC), energy-conservation and high-efficiency environment friendly.

Description

Boiler waste gas purification device
Technical field
This utility model relates to waste gas purification apparatus, particularly relates to a kind of boiler waste gas purification device.
Background technology
The pollution of China in recent years is day by day serious, and haze weather threatens human lives.And the equipment such as boiler are in the process of use The discharge of middle waste gas is the main cause causing this kind of phenomenon.During boiler work, scavenged by chimney, wherein contain a large amount of Dust and other harmful gas, particularly burning insufficient when, discharge mostly be coke solids granule.These contain If a large amount of dust, the gas of granule are directly discharged in environment, environment can be caused harm greatly, the mankind more can be caused each Plant respiratory disorder.
It is directed to this kind of problem, prior art develops many boiler waste gas purification devices, but existing purifier Being essentially all the wet pouring injecting type of employing to purify, structure is complicated, cost intensive, and clean-up effect is the best, it is impossible to reach state The requirement of family's environmental protection.And in use need to consume other energy, further resulted in the waste of the energy.
Utility model content
The purpose of this utility model is to overcome shortcoming and defect of the prior art, it is provided that a kind of boiler waste gas purification dress Put, simple in construction, Non-energy-consumption and three-waste free discharge.
The present invention is achieved by the following technical solutions: boiler waste gas purification device, including first class purification portion and two grades Purification portion, described first class purification portion and secondary purification portion are by the first pipeline communication;Described first class purification portion includes the first framework With the water wheels being arranged in the first framework, in described first framework, it is loaded with absorbing liquid, the bottom of described water wheels and absorption liquid level Contacting, described first framework top is provided with exhaust gas entrance and the first outlet, and described exhaust gas entrance extends in the first framework And be arranged at above water wheels side;Described secondary purification portion includes that a gas-fog separator, one end of described first pipeline are connected to One outlet, the other end accesses gas-fog separator.
Relative to prior art, boiler waste gas purification device simple in construction of the present utility model, make row by multistage purification Venting body is up to standard, and described boiler waste gas purification device Non-energy-consumption, and the positive overbottom pressure power utilizing the equipment exhaustings such as boiler is the energy, Carry out the conversion of energy, it is achieved that low-carbon (LC), energy-conservation and high-efficiency environment friendly.
Further, described water wheels include rotating shaft and multiple blade, in the sheathed rotating shaft of the plurality of blade, and revolve around rotating shaft Turn;Described rotating shaft level is fixedly installed in the first framework.
Further, described secondary purification portion also includes that the second framework, described gas-fog separator are arranged at the second framework top, Described gas-fog separator and the connection of the second framework;Described second framework top is provided with the second outlet, inside described second framework It is loaded with absorbing liquid.
Further, described boiler waste gas purification device also includes three grades of purification portions, described three grades of purification portions and secondary purification Portion is connected by second pipe;Described three grades of purification portions include the 3rd framework, are loaded with absorbing liquid in described 3rd framework;Described 3rd framework top is provided with the 3rd entrance and the 3rd outlet;One end of described second pipe is connected to the of the second framework top Two outlets, the other end is connected to the 3rd entrance of the 3rd framework.
Further, described second pipe is connected to the 3rd entrance, and extends to the 3rd framework absorbed inside ullage.From And make gas be fully contacted with absorbing liquid.
Further, described boiler waste gas purification device also includes level Four purification portion, described level Four purification portion and three grades of purifications Portion passes through the 3rd pipeline communication;Described level Four purification portion includes a clarifier-tank, is loaded with absorbing liquid in described clarifier-tank, described Three pipeline one end are connected to the 3rd outlet of the 3rd framework, and the other end accesses in clarifier-tank, and immerse absorption liquid level in clarifier-tank Under.
Further, described 3rd pipeline enters the end cross-sectional area of clarifier-tank more than or equal to the 3rd other positions of pipeline Cross-sectional area.Increase the contact area of gas and absorbing liquid, increase the absorbing liquid purification separation degree to gas.
Further, absorbing liquid outlet it is provided with bottom described first framework.
Further, described absorbing liquid is water.
In order to be more fully understood that and implement, describe this utility model below in conjunction with the accompanying drawings in detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of boiler waste gas purification device of the present utility model.
Fig. 2 is the plan structure schematic diagram of boiler waste gas purification device of the present utility model.
Detailed description of the invention
Please refer to Fig. 1 and Fig. 2, described boiler waste gas purification device include first class purification portion 10, secondary purification portion 20, Three grades of purification portions 30 and level Four purification portion 40.Described first class purification portion 10 is connected by the first pipeline 11 with secondary purification portion 20, Described secondary purification portion 20 is connected by second pipe 21 with three grades of purification portions 30, described three grades of purification portions 30 and level Four purification portion 40 are connected by the 3rd pipeline 31.
Described first class purification portion 10 includes the first framework 12 and the water wheels 13 being arranged in the first framework 12.Described first frame Body 12 is internal is loaded with water 50, and the bottom of described water wheels 13 contacts with water 50.Described first framework 12 top is provided with waste gas and enters Mouthfuls 121 and first outlet 122, in described exhaust gas entrance 121 extends to the first framework 12 and be arranged at above water wheels 13 side, when useless Gas enters in first class purification portion 10 by exhaust gas entrance 121, and gas pressure drives water wheels 13 to rotate, and produces spray, enters waste gas Row cooling decompression and purification.In the present embodiment, bottom described first framework 12, it is provided with absorbing liquid outlet 123, can be the most right Water is replaced.Described water wheels 13 include rotating shaft and multiple blade, in the sheathed rotating shaft of the plurality of blade, and revolve around rotating shaft Turn;Described rotating shaft level is fixedly installed in the first framework.
Described secondary purification portion 20 includes the second framework 22 and is arranged at the gas-fog separator 23 at the second framework 22 top, institute State gas-fog separator 23 to connect with the second framework 22.One end of described first pipeline 11 is connected to the first outlet 122, another termination Enter gas-fog separator 23, so that described first class purification portion 10 connects with secondary purification portion 20.Described second framework 22 top sets Being equipped with the second outlet 221, described second framework 22 is internal is loaded with water 50, and the outlet of described gas-fog separator 23 is arranged at second On framework 22 water surface.The aerosol that waste gas through first class purification portion 10 enters secondary purification portion 20 by the first pipeline 11 separates Device 23, after isolation of purified, arrives the second framework 22 internal.
Described three grades of purification portions 30 include the 3rd framework 32.Described 3rd framework 32 top is provided with the 3rd entrance 321 He 3rd outlet 322.One end of described second pipe 21 is connected to second outlet 221 at the second framework 22 top, and the other end connects In the 3rd entrance 321 of the 3rd framework 32, so that described secondary purification portion 20 connects with three grades of purification portions 30.At the present embodiment In, described second pipe 21 is connected to the 3rd entrance 321, and extends to above the internal water surface of the 3rd framework 32.Described 3rd frame Water 50 it is loaded with in body 32.Through secondary purification portion 20 purified gas inside the second framework 22, by second pipe 21 Enter in the 3rd framework 32 of three grades of purification portions 30, gas is further purified.
Described level Four purification portion 40 includes a clarifier-tank 41.It is loaded with water 50 in described clarifier-tank 41.Described 3rd pipeline One end of 31 is connected to the 3rd outlet 322 of the 3rd framework 32, and the other end accesses in clarifier-tank 41, and immerses water in clarifier-tank 41 Under face.Described 3rd pipeline 31 immerses the end cross-sectional area horizontal stroke more than or equal to the 3rd other positions of pipeline 31 of clarifier-tank 41 Sectional area.The gas purified through three grades of purification portions 30 enters the underwater of clarifier-tank 41, entering through water by the 3rd pipeline 31 One step absorb, filter and purify after, escape the water surface, now expellant gas meets discharge standard of air pollutants.
In the present embodiment, it is not limited in described first framework the 12, second framework the 22, the 3rd framework 32 and water purifying tank 41 Contain water, also can contain other and can absorb and purify the absorbing liquid of harmful substance in waste gas.Described boiler waste gas purification device Can arrange at least one first pipeline 11, second pipe 21 and the 3rd pipeline 31, arranging pipeline can increase purification effect further Rate.
Work process of the present utility model described further below and principle:
The exhaust gas entrance 121 in the first class purification portion 10 of boiler waste gas purification device described in the utility model and boiler or its He produces needs the plant waste gases outlet of the waste gas purified to be connected.Waste gas enters in first class purification portion 10 by exhaust gas entrance 121, Utilizing the positive overbottom pressure power during equipment exhausting waste gas such as boiler, waste gas drives water wheels 13 to rotate and produces spray, is lowered the temperature by waste gas Decompression and purification.Through the first outlet 122 entrance first by the first framework 12 top of first class purification portion 10 purified gas Pipeline 11, subsequently into the gas-fog separator 23 in secondary purification portion 20, gas enters the second frame after gas-fog separator 23 purifies Body 22, separates again by water purification.Subsequently by the second outlet 221 entrance second pipe at the second framework 22 top 21, subsequently into three grades of purification portions 30, continue gas is purified, by the 3rd outlet at the 3rd framework 32 top after purification 322 enter the 3rd pipeline 31, subsequently into level Four purification portion 40.Gas initially enters clarifier-tank 41 water surface by the 3rd pipeline 31 Under, gas closely acts on water, gas carries out high-efficient purification further, is then escaped by clarifier-tank 41 water surface, discharge symbol Close the gas of atmosphere pollutants emission standards.And during whole, the moieties in waste gas can be only absorbed by the water, can conduct High-quality potash fertilizer reclaims, and refuse reclamation can be further saved the energy.
Relative to prior art, boiler waste gas purification device simple in construction of the present utility model, make row by multistage purification Venting body is up to standard, and described boiler waste gas purification device Non-energy-consumption, and the positive overbottom pressure power utilizing the equipment exhaustings such as boiler is the energy, Carry out the conversion of energy, it is achieved that low-carbon (LC), energy-conservation and high-efficiency environment friendly.
This utility model is not limited to above-mentioned embodiment, if do not taken off various changes of the present utility model or deformation From spirit and scope of the present utility model, if these are changed and deformation belongs to claim of the present utility model and equivalent technologies Within the scope of, then this utility model is also intended to comprise these changes and deformation.

Claims (9)

1. boiler waste gas purification device, it is characterised in that: include first class purification portion and secondary purification portion, described first class purification portion with Secondary purification portion passes through the first pipeline communication;Described first class purification portion includes the first framework and the water being arranged in the first framework Wheel, is loaded with absorbing liquid in described first framework, the bottom of described water wheels contacts with absorbing liquid level, described first framework top Being provided with exhaust gas entrance and the first outlet, described exhaust gas entrance extends in the first framework and is arranged at above water wheels side;Described Secondary purification portion includes that a gas-fog separator, one end of described first pipeline are connected to the first outlet, and the other end accesses aerosol and divides From device.
Boiler waste gas purification device the most according to claim 1, it is characterised in that: further, described water wheels include rotating shaft With multiple blades, in the sheathed rotating shaft of the plurality of blade, and rotate around rotating shaft;Described rotating shaft level is fixedly installed on the first frame Internal.
Boiler waste gas purification device the most according to claim 1 and 2, it is characterised in that: described secondary purification portion also includes Second framework, described gas-fog separator is arranged at the second framework top, described gas-fog separator and the connection of the second framework;Described Two framework tops are provided with the second outlet, are loaded with absorbing liquid inside described second framework.
Boiler waste gas purification device the most according to claim 3, it is characterised in that: described boiler waste gas purification device also wraps Including three grades of purification portions, described three grades of purification portions are connected by second pipe with secondary purification portion;Described three grades of purification portions include Three frameworks, are loaded with absorbing liquid in described 3rd framework;Described 3rd framework top is provided with the 3rd entrance and the 3rd outlet;Institute The one end stating second pipe is connected to second outlet at the second framework top, and the other end is connected to the 3rd entrance of the 3rd framework.
Boiler waste gas purification device the most according to claim 4, it is characterised in that: described second pipe is connected to the 3rd and enters Mouthful, and extend to the 3rd framework absorbed inside ullage.
Boiler waste gas purification device the most according to claim 4, it is characterised in that: described boiler waste gas purification device also wraps Including level Four purification portion, described level Four purification portion and three grades of purification portions are by the 3rd pipeline communication;Described level Four purification portion includes one Clarifier-tank, is loaded with absorbing liquid in described clarifier-tank, described 3rd pipeline one end is connected to the 3rd outlet of the 3rd framework, another Terminate in clarifier-tank, and immerse under clarifier-tank interior absorption liquid level.
Boiler waste gas purification device the most according to claim 6, it is characterised in that: described 3rd pipeline enters clarifier-tank End cross-sectional area is more than or equal to the cross-sectional area of the 3rd other positions of pipeline.
Boiler waste gas purification device the most according to claim 1, it is characterised in that: it is provided with suction bottom described first framework Receipts liquid exports.
9. according to the boiler waste gas purification device described in any claim in claim 1,2 or 4-8, it is characterised in that: institute Stating absorbing liquid is water.
CN201620579545.7U 2016-06-15 2016-06-15 Boiler waste gas purification device Expired - Fee Related CN205730714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620579545.7U CN205730714U (en) 2016-06-15 2016-06-15 Boiler waste gas purification device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620579545.7U CN205730714U (en) 2016-06-15 2016-06-15 Boiler waste gas purification device

Publications (1)

Publication Number Publication Date
CN205730714U true CN205730714U (en) 2016-11-30

Family

ID=57386664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620579545.7U Expired - Fee Related CN205730714U (en) 2016-06-15 2016-06-15 Boiler waste gas purification device

Country Status (1)

Country Link
CN (1) CN205730714U (en)

Similar Documents

Publication Publication Date Title
CN201988299U (en) Waste gas purifying device
CN205412644U (en) Painting workshop waste gas treatment system
CN208032267U (en) A kind of safe and efficient desulfurizing tower
CN202224049U (en) Acid and hydrocarbon mixed waste gas treatment equipment
CN201223759Y (en) Equipment for processing production exhaust-gas of reclaimed rubber
CN204582910U (en) A kind of waste gas treatment equipment
CN217092879U (en) Special hydrochloric acid tail gas absorption device for production of phenoxyacetic acid derivatives
CN205287989U (en) Environmental protection absorption tower for chemical production
CN204627711U (en) A kind of automobile exhaust gas processing apparatus
CN203043804U (en) Organic waste gas recycling and purifying device
CN203829867U (en) Collecting and purifying device for tail gas in loading of crude benzene
CN205216581U (en) Can realize device of flue gas desulfurization denitration simultaneously
CN205517040U (en) Boiler desulfurization dust collector
CN205977326U (en) Automobile exhaust gas processing device
CN207307499U (en) A kind of flue gas cools down scrubbing tower
CN204704824U (en) A kind of chemical production equipment vent gas incinerator
CN203899438U (en) High-efficiency durable neutralizing tower
CN209348414U (en) Exhaust-gas treatment catalysis oxidizing tower
CN211025791U (en) Energy-concerving and environment-protective mill exhaust treatment device
CN207254037U (en) A kind of organic waste gas treatment system
CN204511588U (en) Exhaust gas processing device
CN205640942U (en) Dedicated energy -saving tail gas processing apparatus of thermal power machine
CN222709326U (en) Tail gas absorbing device in chemical reaction process
CN105251340A (en) Efficient automatic waste gas removing device for oil paint production
CN205269358U (en) Sulphur acid mist purification device of high performance battery

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20170615

CF01 Termination of patent right due to non-payment of annual fee