CN205716004U - A kind of high pressure vertical shaft penstock erecting device - Google Patents
A kind of high pressure vertical shaft penstock erecting device Download PDFInfo
- Publication number
- CN205716004U CN205716004U CN201620382777.3U CN201620382777U CN205716004U CN 205716004 U CN205716004 U CN 205716004U CN 201620382777 U CN201620382777 U CN 201620382777U CN 205716004 U CN205716004 U CN 205716004U
- Authority
- CN
- China
- Prior art keywords
- rope
- elevator
- work platform
- construction work
- installation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种压力钢管安装装置,具体涉及一种高压竖井压力钢管安装装置。 The utility model relates to a pressure steel pipe installation device, in particular to a pressure steel pipe installation device for a high-pressure shaft.
背景技术 Background technique
水电站超深高压竖井压力钢管安装,属于典型的高危作业,由于受吊装条件及地理环境的限制,存在极大安全隐患及风险,同时也给压力钢管安装也带来极大挑战,同时在安装过程中施工人员存在安全隐患。 The installation of penstocks in ultra-deep and high-pressure shafts of hydropower stations is a typical high-risk operation. Due to the limitations of hoisting conditions and geographical environment, there are great potential safety hazards and risks. At the same time, it also brings great challenges to the installation of penstocks. At the same time, during the installation process There are potential safety hazards for construction workers.
实用新型内容 Utility model content
本实用新型提供一种使用方便、安全可靠的适用于超深高压竖井压力钢管安装装置。 The utility model provides a convenient, safe and reliable installation device for pressure steel pipes in ultra-deep high-pressure shafts.
本实用新型采用的技术方案是:一种高压竖井压力钢管安装装置,包括施工作业平台和升降电梯;施工作业平台为三层结构,分别为底层、通过支撑柱与底层连接的中间层和通过支撑柱与中间层连接的顶层;升降电梯设置在施工平台内部;升降电梯包括吊笼、设置在吊笼上部的平衡梁和连接到平衡梁的绳卡;还设置有第二卷扬机,第二卷扬机连接升降绳的一端;升降绳依次连接绳卡和设置在施工作业平台顶层的定滑轮,另一端与地锚固定连接。 The technical solution adopted by the utility model is: a high-pressure shaft pressure steel pipe installation device, including a construction work platform and an elevator; The top floor where the column is connected to the middle layer; the elevator is set inside the construction platform; the elevator includes a cage, a balance beam arranged on the upper part of the cage and a rope clamp connected to the balance beam; a second hoist is also provided, and the second hoist connects One end of the hoisting rope; the hoisting rope is sequentially connected to the rope clamp and the fixed pulley arranged on the top floor of the construction work platform, and the other end is fixedly connected to the ground anchor.
进一步的,所述平衡梁内部还设置有防坠器;第一卷扬机连接防坠绳的一端,防坠绳依次连接防坠器和设置在施工作业平台顶层的定滑轮,另一端与地锚固定连接。 Further, the inside of the balance beam is also provided with an anti-fall device; the first hoist is connected to one end of the anti-fall rope, and the anti-fall rope is sequentially connected to the anti-fall device and the fixed pulley arranged on the top floor of the construction work platform, and the other end is fixed to the ground anchor connect.
进一步的,还包括有导向轮,导向轮设置在升降绳和防坠绳通过的路径上,并分别与升降绳和防坠绳连接。 Further, guide wheels are also included, and the guide wheels are arranged on the paths through which the lifting rope and the anti-falling rope pass, and are respectively connected with the lifting rope and the anti-falling rope.
进一步的,所述升降电梯下方设置有临时作业平台。 Further, a temporary working platform is set under the elevator.
进一步的,所述临时作业平台下方设置有爬梯。 Further, a ladder is provided under the temporary working platform.
进一步的,所述施工作业平台的底层、中间层和顶层的周边均设置有围栏。 Further, fences are provided around the bottom, middle and top floors of the construction work platform.
进一步的,所述施工作业平台的顶层和底层外侧均设置有导向滑轮。 Further, the outer sides of the top layer and the bottom layer of the construction work platform are provided with guide pulleys.
本实用新型的有益效果是: The beneficial effects of the utility model are:
(1)本实用新型施工作业平台能够随着高压竖井压力钢管安装高度同步上升,升降电梯可以满足施工人员上下,还可以作为安装耗材补给的通道; (1) The construction work platform of the utility model can rise synchronously with the installation height of the pressure steel pipe of the high-pressure shaft, and the elevator can meet the needs of the construction personnel up and down, and can also be used as a channel for the supply of installation consumables;
(2)本实用新型设置有防坠器,可以保障升降电梯的安全; (2) The utility model is equipped with a fall arrester, which can ensure the safety of the elevator;
(3)本实用新型结构简单、操作方便,实用性强。 (3) The utility model has the advantages of simple structure, convenient operation and strong practicability.
附图说明 Description of drawings
图1为本实用新型结构示意图。 Fig. 1 is the structural representation of the utility model.
图2为本实用新型升降电梯结构示意图。 Fig. 2 is a structural schematic diagram of the lift elevator of the present invention.
图3为本实用新型升降电梯连接关系示意图。 Fig. 3 is a schematic diagram of the connection relationship of the elevator of the present invention.
图中:1-待装钢管管节,2-施工作业平台,3-升降电梯,4-升降系统,5-临时作业平台,6-爬梯,7-地锚,8-导向轮,9-绳卡,10-防坠器,11-平衡梁,12-吊笼,13-定滑轮,14-防坠绳,15-升降绳,16-第一卷扬机,17-第二卷扬机。 In the figure: 1-steel pipe joint to be installed, 2-construction work platform, 3-lift elevator, 4-lift system, 5-temporary work platform, 6-climbing ladder, 7-ground anchor, 8-guide wheel, 9-rope Card, 10-fall arrester, 11-balance beam, 12-hanging cage, 13-fixed pulley, 14-anti-falling rope, 15-hoisting rope, 16-the first winch, 17-the second winch.
具体实施方式 detailed description
下面结合附图和具体实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described further.
如图1-3所示,一种高压竖井压力钢管安装装置,包括施工作业平台2和升降电梯3;施工作业平台2为三层结构,分别为底层、通过支撑柱与底层连接的中间层和通过支撑柱与中间层连接的顶层;升降电梯3设置在施工平台内部;升降电梯3包括吊笼12、设置在吊笼12上部的平衡梁11和连接到平衡梁11的绳卡9;还设置有第二卷扬机17,第二卷扬机17连接钢丝绳15的一端;钢丝绳15依次连接绳卡9和设置在施工作业平台2顶层的定滑轮13,另一端与地锚7固定连接。 As shown in Figure 1-3, a high-pressure shaft penstock installation device includes a construction work platform 2 and an elevator elevator 3; the construction work platform 2 is a three-layer structure, which is the bottom layer, the middle layer connected to the bottom layer through support columns, and the bottom layer. The top floor that is connected with the middle layer by the support column; Elevator 3 is arranged on the inside of construction platform; Elevator 3 includes cage 12, the balance beam 11 that is arranged on the top of suspension cage 12 and the rope clamp 9 that is connected to balance beam 11; Also set The second hoist 17 is arranged, and the second hoist 17 connects an end of the wire rope 15;
进一步的,所述平衡梁11内部还设置有防坠器10;第一卷扬机16连接防坠绳14的一端,防坠绳14依次连接防坠器10和设置在施工作业平台2顶层的定滑轮13,另一端与地锚7固定连接。 Further, the inside of the balance beam 11 is also provided with a fall arrester 10; the first hoist 16 is connected to one end of the fall prevention rope 14, and the fall arrester 14 is connected in turn to the fall arrester 10 and the fixed pulley arranged on the top floor of the construction work platform 2 13, the other end is fixedly connected with ground anchor 7.
进一步的,还包括有导向轮8,导向轮8设置在升降绳15和防坠绳14通过的路径上,并分别与升降绳15和防坠绳14连接。 Further, a guide wheel 8 is also included, and the guide wheel 8 is arranged on the path where the lifting rope 15 and the anti-falling rope 14 pass, and is connected with the lifting rope 15 and the anti-falling rope 14 respectively.
进一步的,所述升降电梯3下方设置有临时作业平台5。 Further, a temporary working platform 5 is arranged below the elevator 3 .
进一步的,所述临时作业平台5下方设置有爬梯6。 Further, a ladder 6 is provided under the temporary working platform 5 .
进一步的,所述施工作业平台2的底层、中间层和顶层的周边均设置有围栏。 Further, fences are provided around the bottom, middle and top floors of the construction work platform 2 .
进一步的,所述施工作业平台2的顶层和底层外侧均设置有导向滑轮。 Further, guide pulleys are provided on the outer sides of the top layer and the bottom layer of the construction work platform 2 .
使用时,采用钢丝绳通过施工作业平台2顶层的吊耳和挂钩悬挂于已装钢管管壁上口,通常设置8个吊耳,其中4个通过钢丝绳悬挂在已装钢管管壁上口;另外4个连接钢丝绳作为施工作业平台2的备用钢丝绳;施工作业平台2的顶层和底层外侧对称设置4个导向滑轮,在施工作业平台2的吊装过程中起到导向和稳定的作用;施工作业平台2的升降可使用竖井洞顶桥机进行起吊,也可以采用均布的4台手拉葫芦进行人工升降;将施工作业平台2吊到已装钢管部位固定好后,垂直起吊设备将待装钢管管节1吊至接近最上节已装钢管上端口;然后将施工作业平台2上的4根备用钢丝绳挂到垂直起吊设备上,使作业平台随待装钢管稳定固定后摘除挂在起吊设备上的起吊钢丝绳;待施工作业平台2上升至待装钢管内适当位置,将施工作业平台2上的4根常用钢丝绳挂钩悬挂于待装钢管管口,取下4根备用钢丝绳,施工人员即可在施工作业平台2上继续进行钢管安装作业,以此类推,直至高压竖井直管管节安装全部完成;施工平台2的顶层主要是供安装人员用于管节调整、对接、组拼、压缝工作平台使用;施工作业平台2的中间层主要是用于放置焊接设备和材料使用;施工作业平台2的底层主要是用于管节对接环缝的焊接、打磨、探伤、检查和防腐使用。 When in use, steel wire ropes are used to hang on the upper opening of the installed steel pipe wall through the lifting lugs and hooks on the top layer of the construction work platform 2. Usually, 8 lifting lugs are set, 4 of which are hung on the upper opening of the installed steel pipe wall through steel wire ropes; the other 4 4 connecting wire ropes are used as spare wire ropes of the construction work platform 2; four guide pulleys are arranged symmetrically on the top and bottom sides of the construction work platform 2, which play a guiding and stable role in the hoisting process of the construction work platform 2; the construction work platform 2 Lifting can be carried out by using the vertical shaft crane, or manually by 4 evenly distributed chain hoists; after the construction work platform 2 is hoisted to the place where the steel pipe has been installed and fixed, the vertical lifting equipment will move the steel pipe section to be installed 1. Hoist until it is close to the upper port of the installed steel pipe in the uppermost section; then hang the 4 spare steel wire ropes on the construction work platform 2 to the vertical lifting equipment, so that the work platform is stable and fixed with the steel pipe to be installed, and then remove the hoisting steel wire ropes hanging on the lifting equipment ; Waiting for the construction work platform 2 to rise to the appropriate position in the steel pipe to be installed, hang 4 commonly used steel wire rope hooks on the construction work platform 2 on the pipe mouth of the steel pipe to be installed, take off the 4 spare steel wire ropes, and the construction personnel can be on the construction work platform Continue to install the steel pipes on 2, and so on, until the installation of the straight pipe joints of the high-pressure shaft is completed; the top floor of the construction platform 2 is mainly used by the installers for the adjustment, docking, assembly, and seam work platforms of the pipe joints; The middle layer of the construction work platform 2 is mainly used for placing welding equipment and materials; the bottom layer of the construction work platform 2 is mainly used for welding, grinding, flaw detection, inspection and anti-corrosion of the butt ring joints of pipe joints.
升降电梯3用于运送和搭载安装施工人员、设备和材料上下之用;升降电梯3采用型材和钢板焊接而成;使用时,升降电梯3安全连接后,操作第二卷扬机17即可实现升降电梯3的升降;升降电梯3设置平衡梁11和防坠器10,使得升降电梯3在整个升降过程中,有效预防人员高空坠落事故的发生,而且可以防止升降电梯3发生旋转,确保了施工人员的生命安全;如果升降电梯3遇到事故时,防坠器10可以迅速抱死阻止升降电梯3的进一步掉落;升降绳15和防坠绳14应随施工作业平台2同步升降,待施工作业平台2悬挂到位后,重新调整升降绳15和防坠绳14的张紧度至安全使用范围;通常第一卷扬机16采用5t卷扬机,第二卷扬机17采用10t卷扬机;升降电梯3下方设置有临时作业平台5,可以方便施工人员的上下,其下方还设置有爬梯6进一步方便施工人员的作业施工;升降绳15通过导向轮8连接第二卷扬机17;防坠绳14通过导向轮8连接第一卷扬机16;通过导向轮8改变升降绳15和防坠绳14的方向。 Elevator 3 is used to transport and carry installation and construction personnel, equipment and materials up and down; elevator 3 is welded by profiles and steel plates; when in use, after elevator 3 is safely connected, the second winch 17 can be operated to realize the elevator 3's lifting; the elevator 3 is provided with a balance beam 11 and a fall arrester 10, so that the elevator 3 can effectively prevent people from falling from high altitudes during the entire lifting process, and can prevent the elevator 3 from rotating, ensuring the safety of construction personnel. Safety of life; if elevator 3 runs into an accident, anti-falling device 10 can be locked up quickly to stop further falling of elevator 3; Elevating rope 15 and anti-falling rope 14 should be lifted synchronously with construction work platform 2, waiting for construction work platform 2 After the suspension is in place, re-adjust the tension of the lifting rope 15 and the anti-falling rope 14 to the safe use range; usually the first hoist 16 adopts a 5t hoist, and the second hoist 17 adopts a 10t hoist; a temporary work platform is provided under the elevator 3 5. It is convenient for construction workers to go up and down, and there is also a ladder 6 below it to further facilitate the construction of construction workers; the lifting rope 15 is connected to the second hoist 17 through the guide wheel 8; the anti-falling rope 14 is connected to the first hoist 16 through the guide wheel 8 ; Change the direction of the lifting rope 15 and the anti-falling rope 14 through the guide wheel 8.
本实用新型能够经济、安全、高效的完成超深高压竖井压力钢管安装任务;并且结构简单、操作方便,实用性强。 The utility model can economically, safely and efficiently complete the task of installing pressure steel pipes in ultra-deep high-pressure shafts; and the utility model has simple structure, convenient operation and strong practicability.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。 The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620382777.3U CN205716004U (en) | 2016-04-29 | 2016-04-29 | A kind of high pressure vertical shaft penstock erecting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620382777.3U CN205716004U (en) | 2016-04-29 | 2016-04-29 | A kind of high pressure vertical shaft penstock erecting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205716004U true CN205716004U (en) | 2016-11-23 |
Family
ID=57331493
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620382777.3U Expired - Fee Related CN205716004U (en) | 2016-04-29 | 2016-04-29 | A kind of high pressure vertical shaft penstock erecting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205716004U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113602959A (en) * | 2021-07-21 | 2021-11-05 | 华电云南发电有限公司以礼河发电厂 | Device and method for installing pressure steel pipe joints in vertical shaft |
| CN114634130A (en) * | 2022-02-25 | 2022-06-17 | 三峡大学 | Device and method for transporting, adjusting and installing flexible plastic pipelines in circular-section tunnel |
| CN118373313A (en) * | 2024-06-25 | 2024-07-23 | 中国水利水电第十二工程局有限公司 | Underground automatic mounting lifting appliance for large-diameter high-strength steel pipe of deep vertical shaft and use method |
| CN119244826A (en) * | 2024-12-09 | 2025-01-03 | 中国水利水电第五工程局有限公司 | A transportation device and a transportation method for a pipe-jacking water delivery pipe section |
-
2016
- 2016-04-29 CN CN201620382777.3U patent/CN205716004U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113602959A (en) * | 2021-07-21 | 2021-11-05 | 华电云南发电有限公司以礼河发电厂 | Device and method for installing pressure steel pipe joints in vertical shaft |
| CN113602959B (en) * | 2021-07-21 | 2023-10-27 | 华电云南发电有限公司以礼河发电厂 | Device and method for installing steel pipe joint in vertical shaft internal pressure |
| CN114634130A (en) * | 2022-02-25 | 2022-06-17 | 三峡大学 | Device and method for transporting, adjusting and installing flexible plastic pipelines in circular-section tunnel |
| CN114634130B (en) * | 2022-02-25 | 2023-10-27 | 三峡大学 | Device and method for transportation, adjustment and installation of flexible plastic pipes in circular cross-section tunnels |
| CN118373313A (en) * | 2024-06-25 | 2024-07-23 | 中国水利水电第十二工程局有限公司 | Underground automatic mounting lifting appliance for large-diameter high-strength steel pipe of deep vertical shaft and use method |
| CN119244826A (en) * | 2024-12-09 | 2025-01-03 | 中国水利水电第五工程局有限公司 | A transportation device and a transportation method for a pipe-jacking water delivery pipe section |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204782031U (en) | Interior climbing tower hangs entrance to a cave from promoting safety protection platform | |
| CN103352559A (en) | Hanging type movable working platform for storage tank maintenance | |
| CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
| CN112012103A (en) | Suspension bridge main push-towing rope overhauls device | |
| CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
| CN103274315A (en) | Installing and hoisting device for side plate and upright of gas chamber | |
| CN204702437U (en) | A kind of build-up type power pontoon combination mast crane device | |
| CN203128099U (en) | Slipping type pipeline lifting device | |
| CN103879860A (en) | Device special for elevator installation | |
| CN203531352U (en) | Hanging type movable working platform for storage tank maintenance | |
| CN207175168U (en) | Maintenance cage for vertical shaft | |
| CN106144929A (en) | Group hoist device and construction method | |
| CN101649684A (en) | Installing method of roof mast | |
| CN106639287A (en) | Vertical transporting method for stone in outer wall scaffold | |
| CN203959697U (en) | The equalizing bar of hoisting platform truss | |
| CN215803106U (en) | Safe construction platform system for mounting steel inner barrel of multi-pipe chimney | |
| CN205590182U (en) | Tower crane dismantles part and puts from hoist and mount | |
| CN205932883U (en) | Shaft construction cage | |
| CN213196240U (en) | Support device for vehicle welding repair | |
| CN204643664U (en) | A kind of building tower crane | |
| CN204490247U (en) | A kind of skip bucket tail rope hanger of fall arrest | |
| CN206309001U (en) | Stone Vertical transportation system in exterior wall scaffold | |
| CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
| CN106586907A (en) | Installation and use method of stone vertical-conveyance lifting basket inside external wall scaffold | |
| CN113957805A (en) | Installation device and method for hanging water supply and drainage pipeline under bridge |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 |