CN205713061U - Steel pipe type all steel frame bridging - Google Patents
Steel pipe type all steel frame bridging Download PDFInfo
- Publication number
- CN205713061U CN205713061U CN201620323248.6U CN201620323248U CN205713061U CN 205713061 U CN205713061 U CN 205713061U CN 201620323248 U CN201620323248 U CN 201620323248U CN 205713061 U CN205713061 U CN 205713061U
- Authority
- CN
- China
- Prior art keywords
- pipe type
- oblique fulcrum
- steel pipe
- oblique
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种脚手架剪刀撑,具体为一种钢管型全钢架剪刀撑。 The utility model relates to a scaffold scissors brace, in particular to a steel pipe type all-steel frame scissors brace.
背景技术 Background technique
剪刀撑:脚手架竖向或水平向成对设置的交叉斜杆,斜杆采用旋转扣件相互固定。剪刀撑用旋转扣件固定在与之相交的水平杆或立杆上。 Scissors support: The scaffolding is vertically or horizontally arranged in pairs with crossed diagonal bars, and the diagonal bars are fixed to each other by rotating fasteners. The scissor support is fixed on the horizontal bar or vertical bar that intersects it with a rotating fastener.
现有技术的问题是:由于斜杆为中空杆杆状具有一定的直径,交叉以后两斜杆位于不同平面上,其中一根斜杆要固定在脚手架的立杆上,另外一根要固定在脚手架的横杆上,安装起来非常不方便。加之先我公司设计了一种采用钢板网片式的防护网,这种钢护网可代替现有柔性的防护网,钢板网片式的防护网使用寿命更长,现在要将钢板网固定在脚手架的外表面,由于脚手架与钢板网间又固定有前述的剪刀撑,剪刀撑较厚使得防护网距离脚手架的距离较长,一方面增大了安装钢板网的难度,另一方面由于钢板网的连接件的质量要求就增加了很多,提高了人力和生产资料的成本。 The problem of the prior art is: since the oblique rods are hollow and have a certain diameter, the two oblique rods are located on different planes after crossing. It is very inconvenient to install on the crossbar of the scaffold. In addition, our company first designed a protective net using expanded metal mesh, which can replace the existing flexible protective net. The expanded mesh protective net has a longer service life. Now it is necessary to fix the expanded metal on the On the outer surface of the scaffold, because the aforementioned scissor brace is fixed between the scaffold and the steel mesh, the thicker the scissor brace makes the distance between the protective net and the scaffold longer, on the one hand it increases the difficulty of installing the steel mesh, on the other hand because the steel mesh The quality requirements of the connecting parts have increased a lot, which has increased the cost of manpower and production materials.
实用新型内容 Utility model content
本实用新型为了解决现有剪刀撑由于斜杆位于不同平面而带来的各种问题,意在提供一种较薄的剪刀撑。 The utility model aims to provide a thinner scissors stay in order to solve various problems of the existing scissors stay because the inclined bars are located on different planes.
本实用新型提供基础方案是:钢管型全钢架剪刀撑,包括两块固定板以及四根斜支杆,两块固定板中部铰接,固定板两端各固定有一根斜支杆,四根斜支杆位于同一平面。 The basic scheme provided by the utility model is: a steel pipe-type all-steel frame scissors support, including two fixed plates and four oblique struts, the middle parts of the two fixed plates are hinged, one oblique strut is fixed at each end of the fixed plate, and four oblique struts are fixed. The struts are on the same plane.
与现有技术相比,本方案的优点在于:1.本方案由两块固定板铰接在一起,在符合设计强度要求的前提下,固定板堆叠在一起的厚度要小于两钢管的厚度。同时在本方案中斜支杆位于同一平面内。因此本方案的厚度要小于现有技术中剪刀撑的厚度。 Compared with the prior art, the advantages of this solution are: 1. This solution consists of two fixed plates hinged together. Under the premise of meeting the design strength requirements, the thickness of the fixed plates stacked together is smaller than the thickness of the two steel pipes. At the same time, in this scheme, the oblique struts are located in the same plane. Therefore the thickness of this scheme will be less than the thickness of scissors stay in the prior art.
2.采用本方案结构时,四斜支杆错开的距离较小,斜支杆位于同一水平面内,因此四斜支杆受力结构更为稳定。 2. When the structure of this scheme is adopted, the staggered distance of the four oblique struts is small, and the oblique struts are located in the same horizontal plane, so the stressed structure of the four oblique struts is more stable.
3.采用本方案时,安装更为简单,现有技术中,由于形成剪刀撑的两斜杆间错开位于不同平面上,因此在其中一根斜杆固定在脚手架的立杆后,另一斜杆则需要固定在脚手架的横向水平杆的伸出端上。这导致安装现有的剪刀撑的过程较为复杂。而采用本方案结构时,由于四根斜支杆几乎位于同一平面上,所以可以将所有斜支杆固定脚手架的横杆或者脚手架的立杆上,较之背景中的安装方案简单得多。 3. When this solution is adopted, the installation is simpler. In the prior art, since the two inclined bars forming the scissor brace are staggered and located on different planes, after one of the inclined bars is fixed on the vertical pole of the scaffold, the other inclined The pole then needs to be fixed on the protruding end of the transverse horizontal pole of the scaffold. This complicates the process of installing existing scissor stays. When adopting the structure of this scheme, since the four oblique struts are almost on the same plane, all the oblique struts can be fixed on the horizontal bar of the scaffold or the vertical pole of the scaffold, which is much simpler than the installation scheme in the background.
4.采用本方案减小了剪刀撑与脚手架的距离,针对脚手架外采用了钢板网的结构时,钢板网需要采用特制的连接件固定在脚手架上,由于钢板网位于剪刀撑之外,剪刀撑增大了钢板网与脚手架间的距离,所以当剪刀撑的厚度较大时,连接件所需的长度就较长,越长的连接件对其设计强度要求就越高,减小剪刀撑与脚手架间的距离,可使钢板网与剪刀撑相对于脚手架的距离缩短,进而缩短连接件的长度,可降低对连接件的设计要求,在满足安全需求的同时降低了生产成本,同时钢板网与脚手架的距离较短安装也更为简单。 4. Adopting this scheme reduces the distance between the scissors brace and the scaffold. When the steel mesh structure is used outside the scaffold, the steel mesh needs to be fixed on the scaffold with special connectors. Since the steel mesh is located outside the scissors brace, the scissors brace The distance between the expanded metal mesh and the scaffold is increased, so when the thickness of the scissors brace is larger, the required length of the connector is longer, and the longer the connector, the higher the design strength requirements, and the reduction of the scissors brace and The distance between the scaffolds can shorten the distance between the expanded metal mesh and the scissor brace relative to the scaffold, thereby shortening the length of the connectors, reducing the design requirements for the connectors, and reducing production costs while meeting safety requirements. The scaffolding distance is shorter and the installation is easier.
方案二:为基础方案的优选,斜支杆的自由端固定在脚手架的立杆上。有益效果:本方案中的自由端是指斜支杆远离固定板的一端,斜支杆固定于立杆上的稳定性优于固定在横杆上的稳定性,这里所称的立杆与横杆是指的脚手架的立杆横杆。 Scheme 2: For the optimization of the basic scheme, the free end of the oblique strut is fixed on the vertical pole of the scaffold. Beneficial effects: the free end in this scheme refers to the end of the oblique strut away from the fixed plate. The stability of the oblique strut fixed on the vertical rod is better than that fixed on the horizontal rod. The vertical rod and the horizontal rod are called here. The pole refers to the vertical bar of the scaffold.
方案三:为方案二的优选,还包括接长杆与活动扣件,接长杆通过活动扣件固定连接于斜支杆自由端上,接长杆通过活动扣件固定连接于立杆上。有益效果:采用活动扣件固定是稳定、成本较低的连接方式,为了制作方便斜支杆长度不会太长,正常使用时通常要接上接长管延剪刀撑的长度。 Scheme 3: The optimization of Scheme 2 also includes extension rods and movable fasteners. The extension rods are fixedly connected to the free ends of the oblique poles through movable fasteners, and the extension rods are fixedly connected to the vertical rods through movable fasteners. Beneficial effects: Fixing with movable fasteners is a stable and low-cost connection method. In order to facilitate the production, the length of the oblique pole will not be too long. In normal use, it is usually necessary to connect an extension pipe to extend the length of the scissors.
方案四:为基础方案至方案三任意一项方案的优选,固定板开有与斜支杆外壁相适应的凹槽,斜支杆位于凹槽中。有益效果:固定板与斜支杆连接结构的一种选择,斜支杆的管状结构较为完整,斜支杆的结构较为稳定。 Scheme 4: For the optimization of any one of schemes from basic scheme to scheme 3, the fixing plate is provided with a groove compatible with the outer wall of the oblique strut, and the oblique strut is located in the groove. Beneficial effect: a choice of the connection structure between the fixed plate and the oblique strut, the tubular structure of the oblique strut is relatively complete, and the structure of the oblique strut is relatively stable.
方案五:为基础方案至方案三任意一项方案的优选,斜支杆开设有供固定板插入的固定槽,固定板位于固定槽中。有益效果:固定板与斜支杆连接结构的另一种选择,该连接结构接触面积大,固定槽对斜支杆具有一定的限制作用,无论采用什么样的固定方式都能使连接更为稳定。 Scheme 5: For the optimization of any one of schemes from basic scheme to scheme 3, the oblique strut is provided with a fixing groove for the insertion of the fixing plate, and the fixing plate is located in the fixing groove. Beneficial effects: Another choice for the connection structure between the fixed plate and the oblique strut. This connection structure has a large contact area, and the fixing groove has a certain restrictive effect on the oblique strut. No matter what kind of fixing method is used, the connection can be made more stable .
方案六:为方案五的优选,斜支杆与固定板均开有通孔,固定板与斜支杆间采用螺栓连接或者销轴连接。有益效果:螺栓和销轴连接成本低,安装快,同时便于拆卸。 Scheme 6: For the optimization of Scheme 5, both the oblique strut and the fixed plate have through holes, and the fixed plate and the oblique strut are connected by bolts or pins. Beneficial effect: the cost of bolt and pin shaft connection is low, the installation is fast, and at the same time, it is easy to disassemble.
方案七:为方案四的优选,两块固定板间采用螺栓或者销轴固定连接。有益效果:螺栓和销轴连接成本低,安装块,同时可拆卸,便于调节固定板间的角度。 Scheme 7: For the optimization of Scheme 4, bolts or pins are used to fix the connection between the two fixed plates. Beneficial effect: the bolt and the pin shaft are connected at low cost, and the mounting block is detachable, so that the angle between the fixing plates can be adjusted conveniently.
方案八:为方案六的优选,两块固定板间采用螺栓或者销轴固定连接。有益效果:固定板与斜支杆之间均采用螺栓以及销轴连接便于现场装配。 Scheme 8: For the optimization of Scheme 6, bolts or pins are used to fix the connection between the two fixed plates. Beneficial effects: bolts and pin shafts are used to connect the fixed plate and the oblique support rods to facilitate on-site assembly.
方案九:为方案四的优选,固定板焊接斜支杆。有益效果:此方案没有破坏斜支杆结构,焊接后斜支杆的结构强度高。 Scheme 9: For the optimization of scheme 4, the fixed plate is welded with oblique struts. Beneficial effect: the scheme does not destroy the structure of the oblique strut, and the structural strength of the oblique strut after welding is high.
方案十:为方案五的优选,固定板焊接斜支杆。有益效果:此方案连接位置可焊接面积增大,焊接效果较好。 Scheme 10: For the optimization of Scheme 5, the fixed plate is welded with oblique struts. Beneficial effect: the weldable area of the connection position of this scheme increases, and the welding effect is better.
附图说明 Description of drawings
图1为本实用新型钢管型全钢架剪刀撑实施例的结构示意图。 Fig. 1 is a schematic structural view of an embodiment of a steel pipe-type all-steel frame scissors brace of the present invention.
图2为图1立体结构示意图。 FIG. 2 is a schematic diagram of the three-dimensional structure of FIG. 1 .
图3为图2中的固定板与斜支杆连接图。 Fig. 3 is a connection diagram of the fixed plate and the inclined strut in Fig. 2 .
具体实施方式 detailed description
下面通过具体实施方式对本实用新型作进一步详细的说明: The utility model is described in further detail below by means of specific embodiments:
说明书附图中的附图标记包括:固定板1、斜支杆2、螺栓3、钢管。 The reference signs in the drawings of the description include: fixed plate 1, inclined strut 2, bolt 3, steel pipe.
如图1、图2以及图3所示的实施例1,包括两块固定板1以及四根斜支杆2,两块固定板1中部铰接,固定板1两端各固定有一根斜支杆2,四根斜支杆2位于同一平面。还包括接长杆与活动扣件,接长杆通过活动扣件固定连接于斜支杆2自由端上,接长杆通过活动扣件固定连接于立杆上。固定板1开有与斜支杆2外壁相适应的凹槽,斜支杆2位于凹槽中。 两块固定板1间采用螺栓3或者销轴固定连接。固定板1焊接斜支杆2。 Embodiment 1 shown in Figure 1, Figure 2 and Figure 3 includes two fixed plates 1 and four oblique struts 2, the middle parts of the two fixed plates 1 are hinged, and one oblique strut is fixed at both ends of the fixed plate 1 2. The four oblique struts 2 are located on the same plane. It also includes an extension rod and a movable fastener, the extension rod is fixedly connected to the free ends of the oblique poles 2 through the movable fastener, and the extension rod is fixedly connected to the vertical rod through the movable fastener. The fixing plate 1 is provided with a groove adapted to the outer wall of the oblique strut 2, and the oblique strut 2 is located in the groove. The two fixed plates are fixedly connected by bolts 3 or pin shafts. The fixed plate 1 is welded with an oblique strut 2 .
本实施例由两块固定板1铰接在一起,在符合设计强度要求的前提下,固定板1堆叠在一起的厚度要小于两钢管的厚度。同时在本实施例中斜支杆2位于同一平面内。因此本实施例的厚度要小于现有技术中剪刀撑的厚度。四斜支杆2错开的距离较小,斜支杆2位于同一水平面内,因此四斜支杆2受力结构更为稳定。采用本实施例时,安装更为简单,现有技术中,由于形成剪刀撑的两斜杆间错开位于不同平面上,因此在其中一根斜杆固定在脚手架的立杆后,另一斜杆则需要固定在脚手架的横向水平杆的伸出端上。这导致安装现有的剪刀撑的过程较为复杂。而采用本实施例结构时,由于四根斜支杆2几乎位于同一平面上,所以均可以固定在同一平面的脚手架上,安装方便。采用本实施例减小了剪刀撑与脚手架的距离,针对脚手架外采用了钢板网的结构时,钢板网需要采用特制的连接件固定在脚手架上,由于钢板网位于剪刀撑之外,所以当剪刀撑的厚度较大时,连接件所需的长度就较长,越长的连接件对其设计强度要求就越高,减小剪刀撑与脚手架间的距离,可使钢板网与剪刀撑相对于脚手架的距离缩短,进而缩短连接件的长度,可降低对连接件的设计要求,在满足安全需求的同时降低了生产成本。 In this embodiment, two fixing plates 1 are hinged together. Under the premise of meeting the design strength requirements, the thickness of the fixing plates 1 stacked together is smaller than the thickness of the two steel pipes. At the same time, in this embodiment, the oblique struts 2 are located in the same plane. Therefore, the thickness of this embodiment is smaller than that of the scissor stay in the prior art. The staggered distance of the four oblique struts 2 is small, and the oblique struts 2 are located in the same horizontal plane, so the stressed structure of the four oblique struts 2 is more stable. When this embodiment is adopted, the installation is simpler. In the prior art, since the two oblique rods forming the scissor brace are staggered and located on different planes, after one of the oblique rods is fixed on the vertical rod of the scaffold, the other oblique rod Then it needs to be fixed on the protruding end of the horizontal horizontal bar of the scaffold. This complicates the process of installing existing scissor stays. And when adopting the structure of this embodiment, since the four oblique struts 2 are almost located on the same plane, they can all be fixed on the scaffold on the same plane, which is convenient for installation. Adopting this embodiment reduces the distance between the scissors brace and the scaffold. When the steel mesh structure is adopted outside the scaffold, the steel mesh needs to be fixed on the scaffold with special connectors. Since the steel mesh is located outside the scissors brace, it is When the thickness of the brace is large, the required length of the connector is longer, and the longer the connector, the higher the design strength requirements. Reducing the distance between the scissors brace and the scaffold can make the steel mesh and the scissors brace relatively The distance of the scaffolding is shortened, thereby shortening the length of the connecting parts, which can reduce the design requirements for the connecting parts, and reduce the production cost while meeting the safety requirements.
实施例2包括两块固定板1以及四根斜支杆2,两块固定板1中部铰接,固定板1两端各固定有一根斜支杆2,四根斜支杆2位于同一平面。还包括接长杆与活动扣件,接长杆通过活动扣件固定连接于斜支杆2自由端上,接长杆通过活动扣件固定连接于立杆上。述斜支杆2开设有供固定板1插入的固定槽,固定板1位于固定槽中。斜支杆2与固定板1均开有通孔,固定板1与斜支杆2间采用螺栓3连接或者销轴连接。两块固定板1间采用螺栓3或者销轴固定连接。 Embodiment 2 includes two fixed plates 1 and four slanted struts 2 , the middle parts of the two fixed plates 1 are hinged, and one slanted strut 2 is fixed to each end of the fixed plate 1 , and the four slanted struts 2 are located on the same plane. It also includes an extension rod and a movable fastener, the extension rod is fixedly connected to the free ends of the oblique poles 2 through the movable fastener, and the extension rod is fixedly connected to the vertical rod through the movable fastener. The inclined strut 2 is provided with a fixing groove for inserting the fixing plate 1, and the fixing plate 1 is located in the fixing groove. Both the oblique struts 2 and the fixed plate 1 have through holes, and the fixed plate 1 and the oblique struts 2 are connected by bolts 3 or pin shafts. The two fixed plates are fixedly connected by bolts 3 or pin shafts.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620323248.6U CN205713061U (en) | 2016-04-18 | 2016-04-18 | Steel pipe type all steel frame bridging |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620323248.6U CN205713061U (en) | 2016-04-18 | 2016-04-18 | Steel pipe type all steel frame bridging |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205713061U true CN205713061U (en) | 2016-11-23 |
Family
ID=57296839
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620323248.6U Expired - Lifetime CN205713061U (en) | 2016-04-18 | 2016-04-18 | Steel pipe type all steel frame bridging |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205713061U (en) |
-
2016
- 2016-04-18 CN CN201620323248.6U patent/CN205713061U/en not_active Expired - Lifetime
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204850389U (en) | Wedge-shaped clamping groove type steel pipe scaffold | |
| WO2015024464A1 (en) | Quickly assembled truss for hanging baskets | |
| CN204402015U (en) | A kind of aluminum alloy mould plate system pulling-on piece formula diagonal brace | |
| CN204060148U (en) | A kind of fence that can improve application life | |
| CN110468960B (en) | Supporting structure capable of adjusting node displacement of net rack and construction method | |
| CN204608825U (en) | A kind of three-chip type stone bolt locating rack | |
| CN106884505A (en) | A kind of adjustable frame post reinforcing bar spacer ferrule and its installation and method for dismounting | |
| CN206376507U (en) | Prefabrication outrigger | |
| CN112031390A (en) | A horizontal rod for socket-type steel pipe support | |
| CN209443835U (en) | A kind of architectural engineering temporary distribution box folding protective device | |
| CN209538041U (en) | Support system and steel corbel assembly thereof | |
| CN203891545U (en) | Reinforcing device for main material of 7727 power transmission tower | |
| CN102127962A (en) | Improved bidirectionally stressed foundation knot attached to lifting scaffold | |
| CN206942650U (en) | A kind of detachable cat ladder | |
| CN201924532U (en) | Standard stair guard rail capable of being repeatedly used | |
| CN205875657U (en) | Plug -in type steel pipe scaffold frame | |
| CN204590563U (en) | A kind of Novel dismountable scaffold | |
| CN210659177U (en) | Connecting node of assembly type operation platform | |
| CN203669345U (en) | External protection device of bailey truss platform | |
| CN207348447U (en) | A kind of scaffold lifting is early to tear system open | |
| CN212897607U (en) | Tower type supporting truss | |
| CN205677354U (en) | A municipal engineering safety fence | |
| CN207526085U (en) | A kind of attachment type raise scaffold structure | |
| CN216566652U (en) | A kind of support structure for construction engineering | |
| CN222332951U (en) | Easy-to-disassemble and assemble steel structure for building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20161123 |