CN205688633U - A kind of installation node - Google Patents

A kind of installation node Download PDF

Info

Publication number
CN205688633U
CN205688633U CN201620640435.7U CN201620640435U CN205688633U CN 205688633 U CN205688633 U CN 205688633U CN 201620640435 U CN201620640435 U CN 201620640435U CN 205688633 U CN205688633 U CN 205688633U
Authority
CN
China
Prior art keywords
steel pipe
false keel
installation node
installation
corner brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620640435.7U
Other languages
Chinese (zh)
Inventor
甄科信
张卫增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Original Assignee
GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd filed Critical GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Priority to CN201620640435.7U priority Critical patent/CN205688633U/en
Application granted granted Critical
Publication of CN205688633U publication Critical patent/CN205688633U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of installation node, install for wallboard.This installation node includes main joist steel pipe and false keel steel pipe, and false keel steel pipe is arranged with the lower aluminum anchor ear of secondary dragon, and the end that connects of the lower aluminum anchor ear of pair dragon is connected with the corner brace being used for installing wallboard by connector.The installation node provided by this utility model, the regulation to in-site installation steelframe cornice sheathing installation site can be realized conveniently and efficiently, without in-site installation steelframe being carried out sealing-off and again welding, advantageously account for constructing when there is position deviation when between Side fascia and on-the-spot steelframe in prior art loaded down with trivial details technical problem, advantageously ensures that integral construction progress and the construction quality of Side fascia installing engineering.

Description

A kind of installation node
Technical field
This utility model relates to technical field of building construction, particularly to a kind of installation node for installing wallboard.
Background technology
Prior art uses the installation of Side fascia corner brace mounting means more.Wherein, corner brace refers to connect 90 degree of right angles Intersect the handware of component, determine the model of corner brace, form and material category, corner brace according to connected member stress size It is frequently utilized in decorative engineering and furniture assembling;Wallboard refers to a kind of building materials, including Side fascia and lining, such as, Side fascia It is primarily referred to as external decoration curtain wall wall board (aluminium sheet, aluminium-plastic panel etc.), is again exterior wall cladding.
In prior art, mainly, use in-site installation steelframe is as mounting seat, according to setting for the mounting means of Side fascia The theoretical size of meter is welded on the steel pipe that building structure is reserved, is then used in combination installing rack on installation steelframe and corner brace is real The installation of existing Side fascia.Wherein, in-site installation steelframe there will be dimensional discrepancy, position deviation in welding process unavoidably, now Generally require the metallic plate that pad is little between corner brace and in-site installation frame.When deviation is excessive, then must be by in-site installation steel Frame is dismantled, and again welds, and the especially dismounting of the false keel steel pipe in in-site installation steelframe construction is more.Steelframe weldering is installed at the scene After having connect, need to remeasure its shape and position dimension, when dimensional discrepancy and the position deviation of in-site installation steelframe all exist In zone of reasonableness, producer places an order production Side fascia further according to this size.
As fully visible, in prior art, when dimensional discrepancy, position occurs in the in-site installation steelframe relative theory size welded When putting deviation, the integral construction progress of wallboard installing engineering and construction quality will be severely impacted, especially for moulding Complicated Side fascia installing engineering.
Therefore, when dimensional discrepancy, position deviation occurs in in-site installation steelframe relative theory size, how to ensure that wallboard is pacified The dress integral construction progress of engineering and construction quality, be current those skilled in the art technical problems urgently to be resolved hurrily.
Utility model content
In view of this, this utility model provides a kind of installation node for wallboard installing engineering, can be conveniently and efficiently Realize the regulation of corner brace installation site on in-site installation steelframe, it is not necessary to in-site installation steelframe is carried out sealing-off and again welds, Advantageously account in prior art owing to the loaded down with trivial details technology of constructing that dimensional discrepancy, position deviation cause occurs in in-site installation steelframe Problem, advantageously ensures that integral construction progress and the construction quality of Side fascia installing engineering.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of installation node, installs for wallboard, and described installation node includes main joist steel pipe and false keel steel pipe, described Being arranged with secondary imperial lower aluminum anchor ear on false keel steel pipe, the connection end of the described lower aluminum anchor ear of secondary dragon passes through connector and is used for installing institute The corner brace stating wallboard connects.
Preferably, in above-mentioned installation node, connection code that described connector includes being sequentially connected with, tip adjusting bracket, corner brace Mounting seat, wherein, described tip adjusting bracket is provided with the first bar hole, and:
The connection end of one end of described connection code aluminum anchor ear lower with described secondary dragon removably connects, and connecting bolt is through described Described connection code is removably connected by the installing hole on the first bar hole and described connection code with described tip adjusting bracket;
One end of described corner brace mounting seat is connected with described tip adjusting bracket, and the other end is connected with described corner brace.
Preferably, in above-mentioned installation node, the contact surface between described tip adjusting bracket and described corner brace mounting seat is arc Shape structure.
Preferably, in above-mentioned installation node, described tip adjusting bracket with on the described contact surface being connected between code and/or institute State on the contact surface between tip adjusting bracket and described corner brace mounting seat, be respectively arranged with the teeth structure being engaged with each other.
Preferably, in above-mentioned installation node, also include false keel link and be set on described false keel steel pipe The upper aluminum anchor ear of secondary dragon, one end of described false keel link is connected with the described upper aluminum anchor ear of secondary dragon, the other end and described main joist Fastener for connection.
Preferably, in above-mentioned installation node, including false keel link with under being set on described main joist steel pipe Steel hoop, one end of described false keel link and described lower steel anchor ear connection, the other end and described false keel fastener for connection.
Preferably, in above-mentioned installation node, embraced by lower steel between described false keel link and described lower steel hoop Hoop fixed plate is attached, and the connection end of described lower steel hoop is connected with described lower steel hoop fixed plate, and described false keel connects Being provided with the second bar hole on frame, connecting bolt is through the installing hole on described second bar hole and described lower steel hoop fixed plate Described false keel link is removably connected with described lower steel hoop fixed plate.
Preferably, in above-mentioned installation node, also include that mounting disc, described mounting disc include:
For the mounting disc main body connecting end connection of the pipe reserved with structure, described mounting disc main body is provided with many Individual arc waist-shaped hole, multiple described arc waist-shaped holes are sequentially distributed along the circumference presetting round wire;
For the connecting plate with described main joist fastener for connection, described connecting plate is vertical with the center of described mounting disc main body It is connected.
Preferably, in above-mentioned installation node, also include that steel hoop, described upper steel hoop are set in described main joist steel Guan Shang, and be connected with described connecting plate.
Preferably, in above-mentioned installation node, described connecting plate is by installing rack and described upper steel anchor ear connection, described peace Shelve and/or be provided with on described connecting plate the Article 3 for regulating described installing rack and the spacing of described mounting disc main body Shape hole.
When dimensional discrepancy, position deviation occurs in in-site installation steelframe relative theory size, cause the wallboard installed not Time in the wallboard mounting plane that designed in advance is good, take apart and aluminum anchor ear under revolute dragon, by the regulation lower aluminum anchor ear of secondary dragon with The installation site of the relative position adjustments corner brace between false keel steel pipe, thus have adjusted the installation site of wallboard, make wallboard accurate Really it is arranged in the wallboard mounting plane that designed in advance is good, when wallboard is adjusted to correct position, the lower aluminum anchor ear of the secondary dragon of locking.
Visible by technique scheme, that this utility model provides installation node, by being set on false keel steel pipe The lower aluminum anchor ear of secondary dragon so that the in-site installation steelframe being made up of main joist steel pipe and false keel steel pipe with on in-site installation steelframe Corner brace between be provided with rotary freedom, reduce and even stop dimensional discrepancy when wallboard is installed and position deviation.
Thus visible, the installation node that provided by this utility model, can realize conveniently and efficiently in-site installation steelframe On the position adjustments of corner brace, it is not necessary to in-site installation steelframe carried out sealing-off and again weld, advantageously accounting in prior art Owing to the loaded down with trivial details technical problem of constructing that dimensional discrepancy, position deviation are brought occurs in in-site installation steelframe, advantageously ensure that wallboard The integral construction progress of installing engineering and construction quality.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only It is embodiments more of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work Under, it is also possible to other accompanying drawing is obtained according to these accompanying drawings.
The front view installing node that Fig. 1 provides for this utility model embodiment;
The left view installing node that Fig. 2 provides for this utility model embodiment;
The front view of the mounting disc that Fig. 3 provides for this utility model embodiment;
The left view of the mounting disc that Fig. 4 provides for this utility model embodiment;
The upward view of the mounting disc that Fig. 5 provides for this utility model embodiment;
The front view of the installing rack that Fig. 6 provides for this utility model embodiment;
The left view of the installing rack that Fig. 7 provides for this utility model embodiment;
The attachment structure schematic diagram of the upper steel hoop that Fig. 8 provides for this utility model embodiment;
The attachment structure schematic diagram of the lower steel hoop that Fig. 9 provides for this utility model embodiment;
The structural representation of the upper aluminum anchor ear of secondary dragon that Figure 10 provides for this utility model embodiment;
The structural representation of the lower aluminum anchor ear of secondary dragon that Figure 11 provides for this utility model embodiment;
The structural representation connecting code that Figure 12 provides for this utility model embodiment;
The structural representation of the corner brace mounting seat that Figure 13 provides for this utility model embodiment;
The front view of the tip adjusting bracket that Figure 14 provides for this utility model embodiment;
The left view of the tip adjusting bracket that Figure 15 provides for this utility model embodiment.
Wherein: the pipe that 1-mono-structure is reserved, the installing plate that 2-structure is reserved, 3-installs bolt, 4-mounting disc, and 41-pacifies Sabot main body, 42-connecting plate, 5-installing rack, 51-Article 3 shape hole, 6-pair dragon adjusting bracket, the upper steel hoop of 7-, steel hoop under 8-, Steel hoop fixed plate under 81-, 9-tip adjusting bracket, 91-the first bar hole, the upper aluminum anchor ear of 10-pair dragon, 11-false keel steel pipe,
12-false keel link, 13-main joist steel pipe, aluminum anchor ear under 14-pair dragon, 15-connects code, 16-rustless steel self tapping Screw, 17-corner brace mounting seat, 18-Side fascia decorative cover, 19-corner brace.
Detailed description of the invention
This utility model embodiment provides a kind of installation node for wallboard installing engineering, can realize conveniently and efficiently To the regulation of corner brace installation site on in-site installation steelframe, it is not necessary to in-site installation steelframe is carried out sealing-off and again welds, favorably In solving in prior art owing to in-site installation steelframe occurs that the loaded down with trivial details technology of constructing that dimensional discrepancy, position deviation cause is asked Topic, advantageously ensures that integral construction progress and the construction quality of wallboard installing engineering.
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to the front view installing node that Fig. 1 to Figure 15, Fig. 1 provide for this utility model embodiment, Fig. 2 is this reality The left view installing node provided by new embodiment, the front view of the mounting disc that Fig. 3 provides for this utility model embodiment, The left view of the mounting disc that Fig. 4 provides for this utility model embodiment, the mounting disc that Fig. 5 provides for this utility model embodiment Upward view, the front view of the installing rack that Fig. 6 provides for this utility model embodiment, Fig. 7 provides for this utility model embodiment The left view of installing rack, the attachment structure schematic diagram of the upper steel hoop that Fig. 8 provides for this utility model embodiment, Fig. 9 is this reality The attachment structure schematic diagram of lower steel hoop provided by new embodiment, on the secondary dragon that Figure 10 provides for this utility model embodiment The structural representation of aluminum anchor ear, the structural representation of the lower aluminum anchor ear of secondary dragon that Figure 11 provides for this utility model embodiment, Figure 12 The structural representation connecting code provided for this utility model embodiment, the corner brace peace that Figure 13 provides for this utility model embodiment The structural representation of dress seat, the front view of the tip adjusting bracket that Figure 14 provides for this utility model embodiment, Figure 15 is that this practicality is new The left view of the tip adjusting bracket that type embodiment provides.
The installation node that this utility model embodiment provides, for wallboard installing engineering, installs and uses with Side fascia below Installation node as a example by be specifically described.(at this it should be noted that the installation node that this utility model provides not only is suitable for Installing and using in Side fascia, applies also for installing and using of other wallboards such as the close lining of construction requirement, and this practicality is new Type is to this and is not specifically limited.)
The installation node that this utility model embodiment provides, installs for wallboard.This installation node includes main joist steel pipe 13 and false keel steel pipe 11, false keel steel pipe 11 is arranged with the lower aluminum anchor ear 14 of secondary dragon, the connection end of the lower aluminum anchor ear 14 of secondary dragon leads to The corner brace 19 crossing connector and be used for installing wallboard is connected.
When dimensional discrepancy, position deviation occurs in in-site installation steelframe relative theory size, cause the wallboard installed not Time in the wallboard mounting plane that designed in advance is good, take aluminum under the lower aluminum anchor ear 14 of secondary dragon and connecting bolt, and revolute dragon apart Anchor ear 14, by the installation position of the lower relative position adjustments corner brace 19 between aluminum anchor ear 14 with false keel steel pipe 11 of the secondary dragon of regulation Put, thus have adjusted the installation site of Side fascia, make Side fascia be accurately fitted within the wallboard mounting plane that designed in advance is good, When Side fascia is adjusted to correct position, the lower aluminum anchor ear 14 of the secondary dragon of locking and connecting bolt thereof.
Visible by technique scheme, that this utility model provides installation node, by being set in false keel steel pipe 11 On the lower aluminum anchor ear 14 of secondary dragon so that the in-site installation steelframe being made up of main joist steel pipe 13 and false keel steel pipe 11 and on-the-spot peace It is provided with rotary freedom between corner brace 19 on steel loading frame, reduces dimensional discrepancy when even stopping wallboard installation and position is inclined Difference.
Thus visible, the installation node that provided by this utility model, can realize conveniently and efficiently in-site installation steelframe On the position adjustments of corner brace 19, it is not necessary to in-site installation steelframe carried out sealing-off and again weld, advantageously accounting for prior art In the technical problem loaded down with trivial details owing to construction that dimensional discrepancy, position deviation bring occurring between in-site installation steelframe, advantageously ensure that The integral construction progress of wallboard installing engineering and construction quality.
In a particular embodiment, as in figure 2 it is shown, in above-mentioned installation node, secondary dragon is lower between aluminum anchor ear 14 and corner brace 19 Connection code 15 that connector includes being sequentially connected with, tip adjusting bracket 9, corner brace mounting seat 17.Wherein, tip adjusting bracket 9 is provided with One bar hole 91, the adjustable length direction of the first bar hole 91 is vertical with the decorative cover of Side fascia to be mounted, thus can pass through The distance between the first bar hole 91 and connecting bolt regulation corner brace 19 and Side fascia mounting plane on tip adjusting bracket 9.
Specifically, the one end connecting code 15 removably connects with the connection end of aluminum anchor ear 14 under pair dragon, and the other end is by even Connecting bolt removably connects with tip adjusting bracket 9, and this connecting bolt is positioned at the first bar hole 91 and the installing hole connected on code 15; One end of corner brace mounting seat 17 is connected with tip adjusting bracket 9, and the other end is connected with corner brace 19.By the Article 1 on tip adjusting bracket 9 Shape hole 91, can make and have translation freedoms between tip adjusting bracket 9 and connection code 15.During construction, can be by this first bar shaped Hole 91 adjusts the distance (i.e. distance between corner brace 19 and Side fascia mounting plane) between Side fascia and in-site installation steelframe, from And have adjusted the actual installation position of Side fascia, when being adjusted to correct position, lock tip adjusting bracket 9 and be connected between code 15 Connecting bolt.
In order to optimize technique scheme further, above-mentioned tip adjusting bracket 9 is set to the contact surface of corner brace mounting seat 17 Fit each other for arcuate structure (preferably this arcuate structure is the half cylindrical structure as shown in Figure 13 to Figure 15), to make the tip There is between adjusting bracket 9 and corner brace mounting seat 17 rotary freedom, thus by this arcuate structure scalable corner brace 19 and exterior wall Can do not agree with each other between plate mounting plane.Specifically, tip adjusting bracket 9 has the stretched head of arcuate structure by rustless steel certainly Attack screw 16 to be connected with corner brace mounting seat 17.During construction, by adjusting the phase para-position between tip adjusting bracket 9 and corner brace mounting seat 17 Put, adjust the actual installation position of Side fascia, when being adjusted to correct position, by tapping screw 16 by tip adjusting bracket 9 and angle Code mounting seat 17 is connected.
Additionally, in order to that strengthens between tip adjusting bracket 9 with corner brace mounting seat 17 fixing is connected, tip adjusting bracket 9 and corner brace peace On contact surface between dress seat 17, it is respectively arranged with the teeth structure being engaged with each other.Additionally, in like manner, tip adjusting bracket 9 and connection Also it is respectively arranged with, on contact surface between code 15, the teeth structure being engaged with each other.
In a particular embodiment, as shown in Figure 2, in-site installation steelframe includes main joist steel pipe 13 and false keel steel pipe 11, main joist steel pipe 13 and false keel steel pipe 11 are connected by false keel link 12.
In above-mentioned installation node, one end of false keel link 12 is by the upper aluminum of secondary dragon being set on false keel steel pipe 11 Anchor ear 10 is connected with false keel steel pipe 11, and the i.e. secondary upper aluminum anchor ear 10 of dragon is set on false keel steel pipe 11, false keel link 12 The upper aluminum anchor ear 10 of one end and pair dragon be connected, the other end is connected with main joist steel pipe 13.By the upper aluminum anchor ear 10 of secondary dragon, pair can be made Keel steel tube 11 has rotary freedom, the physical location of scalable whole false keel steel pipe 11 simultaneously regulation false keel steel pipe The physical location of all installed parts on 11.The concrete structure of this upper aluminum anchor ear 10 of pair dragon refers to Figure 10.When in-site installation steel When dimensional discrepancy, position deviation occurs in frame, take the upper aluminum anchor ear 10 of secondary dragon and connecting bolt thereof, and revolute keel steel tube 11 apart, Thus have adjusted the physical location of corner brace 19, and have adjusted the actual installation position of Side fascia, when being adjusted to correct position, locking The upper aluminum anchor ear 10 of secondary dragon and attachment structure thereof.
Thus visible, the installation node of this utility model embodiment offer, by aluminum under the upper aluminum anchor ear 10 of secondary dragon and pair dragon Anchor ear 14, makes the false keel steel pipe 11 in in-site installation steelframe have rotary freedom and translation freedoms.When in-site installation steel When frame dimensional discrepancy, position deviation occurs relative to the theoretical size needed for Side fascia mounting plane, it is right to realize conveniently and efficiently The regulation of false keel steel pipe 11 in in-site installation steelframe, it is not necessary to in-site installation steelframe carries out sealing-off and again welds, is conducive to Solve to construct when position deviation, dimensional discrepancy occurs in in-site installation steelframe in prior art loaded down with trivial details technical problem, is conducive to Ensure integral construction progress and the construction quality of Side fascia installing engineering.
Further, in above-mentioned installation node, main joist steel pipe 13 is arranged with lower steel hoop 8, false keel link One end of 12 is connected with false keel steel pipe 11 by the upper aluminum anchor ear 10 of secondary dragon being set on false keel steel pipe 11, and the other end passes through Lower steel hoop 8 is connected with main joist steel pipe 13.The concrete attachment structure of this lower steel hoop 8 refers to Fig. 9.When in-site installation steelframe When dimensional discrepancy, position deviation occur, take the bolt in lower steel hoop 8 and attachment structure thereof apart, and rotate lower steel hoop 8, from And have adjusted the relative position between lower steel hoop 8 and main joist steel pipe 13, thus have adjusted the corner brace on false keel steel pipe 11 The actual installation position of 19, i.e. have adjusted the actual installation position of Side fascia, when being adjusted to correct position, and the lower steel hoop of locking 8 and attachment structure.
Specifically, it is attached by lower steel hoop fixed plate 81 between false keel link 12 and lower steel hoop 8, lower steel The connection end of anchor ear 8 is connected with lower steel hoop fixed plate 81, and false keel link 12 is provided with the second bar hole, connecting bolt Through the installing hole on the second bar hole and lower steel hoop fixed plate 81 by false keel link 12 and lower steel hoop fixed plate 81 Removably connect, thus make, between main joist steel pipe 13 and false keel steel pipe 11, there is translation freedoms.
Further, in above-mentioned installation node, mounting disc 4 is also included.As shown in Figures 1 to 5, mounting disc 4 includes installing Disc main body 41 and connecting plate 42, wherein, mounting disc main body 41 connects for the connection end of the pipe 1 reserved with structure, connecting plate 42 for being connected with main joist steel pipe 13, and, connecting plate 42 is vertical with the center of mounting disc main body 41 to be connected, mounting disc main body Being provided with multiple arc waist-shaped hole (i.e. the centrage of waist-shaped hole is arc) on 41, multiple arc waist-shaped holes are along presetting round wire M Circumference be sequentially distributed.
In a particular embodiment, as it is shown in figure 5, the arc center curvature of a curve of arc waist-shaped hole in mounting disc 4 is with pre- If the curvature of round wire M is identical, and the radian of preferred arc waist-shaped hole is 30 °, so that in-site installation steelframe is provided with The rotary freedom of 30 °.But be not limited to that this, those skilled in the art can also arrange this curved waist according to actual needs The radian in type hole is 18 °, 20 °, 40 ° or any radian more than zero, and this utility model is to this and is not specifically limited.
During construction, the connection end of the pipe 1 that bolt is reserved through the arc waist-shaped hole in mounting disc main body 41 and structure On installing hole, mounting disc 4 is connected with pipe 1.During construction, if in-site installation steelframe (is primarily referred to as in Fig. 1 and Fig. 2 institute The false keel steel pipe 11 shown and main joist steel pipe 13) there is dimensional discrepancy, position deviation in relative theory size, releasable connection is pacified Sabot 4 and the bolt of pipe 1, rotate mounting disc 4 and tight a bolt after correct position again, mounting disc 4 again connected with pipe 1 Connect.
Visible, by above-mentioned arc mounting hole, make the corner brace mounting seat on in-site installation steelframe and in-site installation steelframe 17 and corner brace 19 be provided with rotary freedom, when there is dimensional discrepancy, position deviation in in-site installation steelframe, can be conveniently and efficiently Realize the regulation to in-site installation steelframe, it is not necessary to in-site installation steelframe carried out sealing-off and again welds, advantageously accounting for existing Occur in technology constructing when dimensional discrepancy, position deviation when between Side fascia and in-site installation steelframe loaded down with trivial details technical problem, favorably In the integral construction progress and the construction quality that ensure Side fascia installing engineering.
Further, (on this, the concrete attachment structure of steel hoop 7 please be joined also to include steel hoop 7 in above-mentioned installation node Read Fig. 8), during construction, the connecting plate 42 in mounting disc 4 is connected with main joist steel pipe 13 by installing rack 5, upper steel hoop 7, i.e. goes up Steel hoop 7 is set on main joist steel pipe 13, and one end of installing rack 5 is connected with connecting plate 42, and the other end is with upper steel hoop 7 even Connect.
Thus visible, installation node that this utility model embodiment provides, by upper steel hoop 7 and attachment structure thereof, with And lower steel hoop 8 and attachment structure thereof, make the main joist steel pipe 13 of in-site installation steelframe and false keel steel pipe 11 and preset structure Between there is rotary freedom and translation freedoms.When in-site installation steelframe relative to Side fascia mounting plane occur dimensional discrepancy, During position deviation, the regulation to in-site installation steelframe can be realized conveniently and efficiently, it is not necessary to in-site installation steelframe is carried out sealing-off and Again weld, advantageously account for prior art is constructed when dimensional discrepancy, position deviation occurs in in-site installation steelframe loaded down with trivial details Technical problem, advantageously ensures that integral construction progress and the construction quality of Side fascia installing engineering.
Further, installing rack 5 is provided with the Article 3 for regulating installing rack 5 and the spacing of mounting disc main body 41 Shape hole (as shown in Figure 7), the connecting plate 42 of mounting disc 4 is provided with bolt hole (as shown in Figure 4), and during construction, bolt is worn Cross the Article 3 shape hole on installing rack 5 and the bolt hole on connecting plate 43 installing rack 5 and connecting plate 42 to be connected.Specifically, The length direction of three bar holes as illustrated in figs. 2 and 7, after i.e. connecting plate 42 is installed with installing rack 5, the length in Article 3 shape hole Direction is vertical with mounting disc main body 41, for when dimensional discrepancy, position deviation occurs in in-site installation steelframe, passes through demounting bolt And adjust the relative position between connecting plate 42 with installing rack 5, to regulate the distance between installing rack 5 and mounting disc main body 41.
But being not limited thereto, connected mode between installing rack 5 and connecting plate 42 is it may also is that the connection of mounting disc 4 Being provided with Article 3 shape hole on plate 42, installing rack 5 is provided with bolt hole, during construction, bolt is through the Article 3 shape of installing rack 5 Installing rack 5 and connecting plate 42 are connected by the bolt hole on hole and connecting plate 42.Equally reach to regulate installing rack 5 and mounting disc The purpose of the spacing of main body 41.
Visible, what this utility model embodiment provided installs the node setting by above-mentioned Article 3 shape hole, order scene peace Corner brace mounting seat 17 and corner brace 19 on steel loading frame and in-site installation steelframe are provided with translation freedoms, when in-site installation steelframe When dimensional discrepancy, position deviation occur, the regulation to in-site installation steelframe can be realized conveniently and efficiently, it is not necessary to in-site installation steel Frame carries out sealing-off and again welds, and advantageously accounts for occurring when between in-site installation steelframe in prior art that dimensional discrepancy, position are inclined Construct loaded down with trivial details technical problem during difference, advantageously ensure that integral construction progress and the construction quality of Side fascia installing engineering.
As fully visible, this utility model by the in-site installation steelframe between corner brace mounting seat 17 and the reserved structure of building and The attachment structure that can adjust it is provided with multiple degrees of freedom, if the fixing of in-site installation steelframe is pointed out between multiple attachment structures Existing dimensional discrepancy or position deviation, the installation node that can provide by adjusting this utility model embodiment eliminates deviation.
The installation node provided due to this utility model embodiment allows in-site installation steelframe to have relatively large deviation, thus, outward Wallboard producer can be directly produced Side fascia according to the theoretical size of design, without waiting that the welding of in-site installation steelframe is complete After measure actual size reproduction again, so will be greatly improved integral construction progress and the construction quality of Side fascia engineering, especially Being the Side fascia engineering complicated for moulding, advantage of the present utility model is especially prominent.
At this it should be noted that the node of installing that this utility model provides is applicable not only to installing and using of Side fascia, Applying also for installing and using of other wallboards such as the close lining of construction requirement, this is not done concrete limit by this utility model Fixed.
Finally, in addition it is also necessary to explanation, in this article, the relational terms of such as first and second or the like be used merely to by One entity or operation separate with another entity or operating space, and not necessarily require or imply these entities or operation Between exist any this reality relation or order.And, term " includes ", " comprising " or its any other variant meaning Containing comprising of nonexcludability, so that include that the process of a series of key element, method, article or equipment not only include that A little key elements, but also include other key elements being not expressly set out, or also include for this process, method, article or The key element that equipment is intrinsic.In the case of there is no more restriction, statement " including ... " key element limited, do not arrange Except there is also other identical element in including the process of described key element, method, article or equipment.
In this specification, each embodiment uses the mode gone forward one by one to describe, and what each embodiment stressed is and other The difference of embodiment, between each embodiment, identical similar portion sees mutually.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses this practicality new Type.Multiple amendment to these embodiments will be apparent from for those skilled in the art, is determined herein The General Principle of justice can realize in the case of without departing from spirit or scope of the present utility model in other embodiments.Cause This, this utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (10)

1. a node is installed, installs for wallboard, it is characterised in that described installation node includes main joist steel pipe (13) and pair Keel steel tube (11), described false keel steel pipe (11) is arranged with the lower aluminum anchor ear (14) of secondary dragon, the lower aluminum anchor ear (14) of described secondary dragon The end that connects be connected with being used for installing the corner brace (19) of described wallboard by connector.
Installation node the most according to claim 1, it is characterised in that described connector includes the connection code being sequentially connected with (15), tip adjusting bracket (9), corner brace mounting seat (17), wherein, described tip adjusting bracket (9) is provided with the first bar hole (91), and And:
The connection end of one end of described connection code (15) aluminum anchor ear (14) lower with described secondary dragon removably connects, and connecting bolt passes Installing hole on described first bar hole (91) and described connection code (15) is by described connection code (15) and described tip adjusting bracket (9) Removably connect;
One end of described corner brace mounting seat (17) is connected with described tip adjusting bracket (9), and the other end is connected with described corner brace (19).
Installation node the most according to claim 2, it is characterised in that described tip adjusting bracket (9) and described corner brace mounting seat (17) contact surface between is arcuate structure.
Installation node the most according to claim 3, it is characterised in that described tip adjusting bracket (9) is connected code (15) with described Between contact surface on and/or described tip adjusting bracket (9) and described corner brace mounting seat (17) between contact surface on, be respectively provided with There is the teeth structure being engaged with each other.
Installation node the most according to claim 1, it is characterised in that also include false keel link (12) and be set in institute State the upper aluminum anchor ear (10) of secondary dragon on false keel steel pipe (11), one end of described false keel link (12) and the described upper aluminum of secondary dragon Anchor ear (10) connects, and the other end is connected with described main joist steel pipe (13).
Installation node the most according to claim 1, it is characterised in that also include false keel link (12) and be set in institute Stating the lower steel hoop (8) on main joist steel pipe (13), one end of described false keel link (12) is with described lower steel hoop (8) even Connecing, the other end is connected with described false keel steel pipe (11).
Installation node the most according to claim 6, it is characterised in that described false keel link (12) is embraced with described lower steel It is attached by lower steel hoop fixed plate (81) between hoop (8), the connection end of described lower steel hoop (8) and described lower steel hoop Fixed plate (81) connects, and described false keel link (12) is provided with the second bar hole, and connecting bolt passes described Article 2 Installing hole on shape hole and described lower steel hoop fixed plate (81) is solid with described lower steel hoop by described false keel link (12) Determine plate (81) to removably connect.
Installation node the most according to claim 1, it is characterised in that described installation node also includes mounting disc (4), described Mounting disc (4) including:
For the mounting disc main body (41) connecting end connection of the pipe (1) reserved with structure, on described mounting disc main body (41) Being provided with multiple arc waist-shaped hole, multiple described arc waist-shaped holes are sequentially distributed along the circumference presetting round wire;
For the connecting plate (42) being connected with described main joist steel pipe (13), described connecting plate (42) and described mounting disc main body (41) center is vertically connected.
Installation node the most according to claim 8, it is characterised in that described installation node also includes steel hoop (7), institute State steel hoop (7) to be set on described main joist steel pipe (13), and be connected with described connecting plate (42).
Installation node the most according to claim 9, it is characterised in that described connecting plate (42) passes through installing rack (5) and institute State steel hoop (7) to connect, described installing rack (5) and/or described connecting plate (42) are provided with for regulating described installing rack (5) with the Article 3 shape hole (51) of the spacing of described mounting disc main body (41).
CN201620640435.7U 2016-06-22 2016-06-22 A kind of installation node Expired - Fee Related CN205688633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620640435.7U CN205688633U (en) 2016-06-22 2016-06-22 A kind of installation node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620640435.7U CN205688633U (en) 2016-06-22 2016-06-22 A kind of installation node

Publications (1)

Publication Number Publication Date
CN205688633U true CN205688633U (en) 2016-11-16

Family

ID=57425821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620640435.7U Expired - Fee Related CN205688633U (en) 2016-06-22 2016-06-22 A kind of installation node

Country Status (1)

Country Link
CN (1) CN205688633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461656A (en) * 2017-07-13 2017-12-12 安徽金烁科技有限公司 A kind of greenhouse gardening illumination lamp
CN108457407A (en) * 2018-05-14 2018-08-28 中建八局装饰工程有限公司 A kind of adjustable curtain wall connecting system of three-dimensional

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461656A (en) * 2017-07-13 2017-12-12 安徽金烁科技有限公司 A kind of greenhouse gardening illumination lamp
CN108457407A (en) * 2018-05-14 2018-08-28 中建八局装饰工程有限公司 A kind of adjustable curtain wall connecting system of three-dimensional
CN108457407B (en) * 2018-05-14 2024-05-14 中建八局装饰工程有限公司 Curtain connecting system with adjustable three-dimensional

Similar Documents

Publication Publication Date Title
CN103758265B (en) A kind of irregular facade rack type GRC curtain wall and installation method thereof
JP2018017049A (en) Support device for curtain wall
CN108678241B (en) Back bolt type plate curtain wall
CN205688633U (en) A kind of installation node
JP2015523479A (en) Structural members in the framework structure
CN207905358U (en) A kind of beam building template
CN103306453B (en) Structure for mounting stone and method for mounting stone
CN103774851A (en) Assembling method of spatial curve-surface metal curtain wall
CN206090954U (en) Fire compartment wall structure
JP2019116823A (en) Construction method of exterior wall
CN210857628U (en) Aluminum plate curtain wall connecting structure
CN109577530A (en) The adjustable connecting node construction of curtain wall and construction method based on conversion angle steel
CN215106478U (en) Three-dimensional adjusting system for installing keel in high and large space
CN104563349B (en) The attached steelframe of curtain wall back is installed on the connecting assembly in agent structure and installation method
CN113585559A (en) Curtain wall unit and curtain wall with same
CN208503173U (en) A kind of fastener of screen carrier round tube and round tube interconnection
CN208899699U (en) A kind of adjustable outer eaves grating connection system
CN105800466A (en) Electric conducting frame
CN208533805U (en) The connector of curtain wall round bar and main structure
CN214364623U (en) Metal dry hanging piece
CN112324020A (en) Multi-curved-surface metal plate curtain wall installation system and method
CN216476264U (en) Fixing assembly for side-mounted electric hanging basket front support on flower stand beam
CN208650447U (en) A kind of curved decorative plate mounting structure
CN104763124B (en) A kind of lattice metal supporting frame
CN209723679U (en) A kind of attached wall tension member for extending old building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

CF01 Termination of patent right due to non-payment of annual fee