CN205679638U - Eminence apparatus insulated resistance test auxiliary device - Google Patents
Eminence apparatus insulated resistance test auxiliary device Download PDFInfo
- Publication number
- CN205679638U CN205679638U CN201620477274.4U CN201620477274U CN205679638U CN 205679638 U CN205679638 U CN 205679638U CN 201620477274 U CN201620477274 U CN 201620477274U CN 205679638 U CN205679638 U CN 205679638U
- Authority
- CN
- China
- Prior art keywords
- support base
- auxiliary device
- insulation resistance
- fixed support
- insulating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Relating To Insulation (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
Description
技术领域:Technical field:
本实用新型涉及电气试验装置技术领域,具体涉及一种高处设备绝缘电阻测试辅助装置。The utility model relates to the technical field of electrical testing devices, in particular to an auxiliary device for testing insulation resistance of high-altitude equipment.
背景技术:Background technique:
目前,对于高处设备绝缘电阻测试的方法主要有以下两种:(1)登高法,即工作人员利用绝缘梯、高凳等爬高工具攀爬到被试设备构架上进行测试。登高法完成测试后,需要用专用放电棒进行放电,不仅操作耗时长,而且存在高空坠物危险。部分110kV及以上电压等级设备由于高度过高,即使登上构架也难以完成测试。此方法不仅存在高空坠落危险而且工作效率低下。(2)绝缘杆挑线法,即工作人员将测试线端头固定在绝缘杆顶部,将测试线挑起接触被试部位以完成测试。操作过程中高压测试线存在脱落危险,会造成人员被砸伤或电击,且长时间操作会因人员疲累而导致接触不良或误碰其他带电设备。采用绝缘杆挑线法完成测试后由于测试线比较柔软,放电棒与测试线难以接触良好,会导致放电不完全或误碰操作人员等危险,此方法操作过程耗时较长,工作效率低下。为此,针对以上关键因素进行改进,设计出一种高处设备绝缘电阻测试辅助装置,可以有效提高绝缘电阻测试工作的安全系数和工作效率。At present, there are two main methods for testing the insulation resistance of high-altitude equipment: (1) The climbing method, that is, the staff use insulation ladders, high stools and other climbing tools to climb onto the frame of the equipment under test for testing. After the test of the climbing method is completed, a special discharge rod is required to discharge, which not only takes a long time to operate, but also poses the risk of falling objects from high altitude. Due to the high height of some equipment with voltage level of 110kV and above, it is difficult to complete the test even if it is mounted on the frame. This method not only has the danger of falling from a high altitude but also has low work efficiency. (2) Insulation pole pick-up method, that is, the staff fixes the end of the test line on the top of the insulation pole, and lifts the test line to touch the part to be tested to complete the test. During the operation, the high-voltage test line is in danger of falling off, which will cause people to be injured or electric shock, and long-term operation may cause poor contact or accidental contact with other live equipment due to fatigue. After the test is completed by using the insulating rod pick-up method, because the test line is relatively soft, it is difficult for the discharge rod to make good contact with the test line, which will cause dangers such as incomplete discharge or accidental contact with the operator. This method takes a long time in the operation process and low work efficiency. Therefore, in view of the above key factors, an auxiliary device for insulation resistance testing of high-altitude equipment is designed, which can effectively improve the safety factor and work efficiency of insulation resistance testing.
发明内容:Invention content:
为了克服现有技术存在的问题,本实用新型提供一种高处设备绝缘电阻测试辅助装置,可减少工作人员的工作量,消除登高作业的危险因素,有效提高绝缘电阻测试工作的安全系数和工作效率。In order to overcome the problems existing in the prior art, the utility model provides an auxiliary device for testing insulation resistance of high-altitude equipment, which can reduce the workload of staff, eliminate the risk factors of high-climbing operations, and effectively improve the safety factor and work efficiency of insulation resistance testing. efficiency.
为解决上述技术问题,本实用新型采取以下技术方案:In order to solve the above technical problems, the utility model adopts the following technical solutions:
一种高处设备绝缘电阻测试辅助装置,包括绝缘杆、固定支撑底座和连接导线,所述绝缘杆的顶部设有杆顶挂钩,所述杆顶挂钩用于使所述连接导线与设备可靠连接;所述绝缘杆的底部安装有固定支撑底座;所述固定支撑底座上设有接地接线柱、绝缘电阻测试孔和空气开关;所述连接导线设置于绝缘杆的内部,其一端连接于所述杆顶挂钩上,另一端固定连接于所述固定支撑底座上。An auxiliary device for testing insulation resistance of high-altitude equipment, including an insulating rod, a fixed support base and connecting wires. The top of the insulating rod is provided with a hook on the top of the rod, and the hook on the top of the rod is used to reliably connect the connecting wire to the equipment. ; The bottom of the insulating rod is equipped with a fixed support base; the fixed support base is provided with a grounding terminal, an insulation resistance test hole and an air switch; the connecting wire is arranged inside the insulating rod, and one end thereof is connected to the The other end is fixedly connected to the fixed support base.
上述绝缘杆为可伸缩式的中空管,可以伸长到任意需要的高度,将高压测试线升高到测试高度,适应性广。The above-mentioned insulating rod is a telescopic hollow tube, which can be extended to any required height, and can raise the high-voltage test line to the test height, and has wide adaptability.
上述杆顶挂钩用于使连接导线与设备可靠连接,消除手持绝缘杆造成的接触不良缺陷。The above pole top hook is used to reliably connect the connecting wire with the equipment, and eliminate the defect of poor contact caused by holding the insulating pole.
上述连接导线为螺旋可伸缩形,其置于伸缩式绝缘杆的内部,可避免连接导线脱落的危险。The above-mentioned connecting wires are helical and telescopic, and they are placed inside the telescopic insulating rod, which can avoid the danger of the connecting wires falling off.
上述固定支撑底座内部设有放电装置,放电装置通过空气开关将地电位与连接导线的尾端连接。测试时,空气开关断开,可以完成绝缘电阻测试;测试完毕后,只需要按下空气开关即可安全快速的进行测试后放电工作,缩短了放电工作的用时,提高了工作效率。A discharge device is provided inside the fixed support base, and the discharge device connects the ground potential to the tail end of the connecting wire through an air switch. During the test, the air switch is disconnected, and the insulation resistance test can be completed; after the test, you only need to press the air switch to perform the discharge work safely and quickly after the test, which shortens the time for discharge work and improves work efficiency.
上述绝缘杆的底部还设有一高强磁铁。A high-strength magnet is also provided at the bottom of the insulating rod.
上述固定支撑底座上设有一磁吸合,固定支撑底座与绝缘杆通过磁吸合和高强磁铁之间的吸引力进行固定,可提高绝缘杆稳定性,将连接导线引至地面,巧妙的避免登高作业,提高工作的安全性和效率。The above-mentioned fixed support base is provided with a magnetic attraction, and the fixed support base and the insulating rod are fixed through the magnetic attraction and the attractive force between the high-strength magnets, which can improve the stability of the insulating rod, lead the connecting wire to the ground, and cleverly avoid climbing operations, improving work safety and efficiency.
本实用新型的有益效果在于:The beneficial effects of the utility model are:
(1)该高处设备绝缘电阻测试辅助装置采用可拆卸结构,分为伸缩式绝缘 杆、固定支撑底座、连接导线三部分,具有结构紧凑、快速拆装、体积小巧、便于携带等优点。(1) The auxiliary device for testing insulation resistance of high-altitude equipment adopts a detachable structure, which is divided into three parts: a telescopic insulating rod, a fixed support base, and a connecting wire. It has the advantages of compact structure, quick disassembly and assembly, small size, and easy portability.
(2)本实用新型利用绝缘杆支架将高压连接导线支撑固定,减少了工作人员的工作量,并且消除了登高作业的危险因素,固定支撑底座内部加装了快捷放电装置,可以有效提高绝缘电阻测试工作的安全系数和工作效率。(2) The utility model uses insulating rod brackets to support and fix the high-voltage connecting wires, which reduces the workload of the staff and eliminates the risk factors of climbing operations. A quick discharge device is installed inside the fixed support base, which can effectively improve the insulation resistance. Test the safety factor and work efficiency of the work.
附图说明:Description of drawings:
图1是本实用新型高处设备绝缘电阻测试辅助装置的结构示意图;Fig. 1 is the structural representation of the auxiliary device for testing the insulation resistance of the utility model high equipment;
图2是本实用新型高处设备绝缘电阻测试辅助装置的电路原理示意图;Fig. 2 is a schematic diagram of the circuit principle of the utility model high equipment insulation resistance test auxiliary device;
图中:1-绝缘杆,2-固定支撑底座,3-连接导线,4-杆顶挂钩,5-接地接线柱,6-绝缘电阻测试孔,7-空气开关,8-高强磁铁,9-磁吸合。In the figure: 1-insulation rod, 2-fixed support base, 3-connecting wire, 4-rod top hook, 5-grounding terminal, 6-insulation resistance test hole, 7-air switch, 8-high-strength magnet, 9- Magnetic closure.
具体实施方式:detailed description:
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail.
如图1、图2所示,一种高处设备绝缘电阻测试辅助装置,包括绝缘杆1、固定支撑底座2和连接导线3,所述绝缘杆1的顶部设有杆顶挂钩4,所述杆顶挂钩4用于使所述连接导线3与设备可靠连接;所述绝缘杆1的底部安装有固定支撑底座2;所述固定支撑底座2上设有接地接线柱5、绝缘电阻测试孔6和空气开关7;所述连接导线3设置于绝缘杆1的内部,其一端连接于所述杆顶挂钩4上,另一端固定连接于所述固定支撑底座2上;所述绝缘杆1为可伸缩式的中空管,可以伸长到任意需要的高度,将高压连接导线3升高到测试高度;所述杆顶挂钩4用于使连接导线3与设备可靠连接;所述连接导线3为螺旋可伸缩形,其置于伸缩式绝缘杆1的内部。As shown in Figures 1 and 2, an auxiliary device for testing insulation resistance of high-altitude equipment includes an insulating rod 1, a fixed support base 2 and a connecting wire 3, and the top of the insulating rod 1 is provided with a pole-top hook 4. The pole top hook 4 is used to reliably connect the connecting wire 3 with the equipment; the bottom of the insulating pole 1 is equipped with a fixed support base 2; the fixed support base 2 is provided with a grounding terminal 5 and an insulation resistance test hole 6 and air switch 7; the connecting wire 3 is arranged inside the insulating rod 1, one end of which is connected to the hook 4 on the top of the rod, and the other end is fixedly connected to the fixed support base 2; the insulating rod 1 can be The telescopic hollow tube can be extended to any required height, and the high-voltage connecting wire 3 is raised to the test height; the hook 4 on the top of the pole is used to reliably connect the connecting wire 3 to the equipment; the connecting wire 3 is The spiral is telescopic, and it is placed inside the telescopic insulating rod 1 .
所述绝缘杆1的底部还设有一高强磁铁8;所述固定支撑底座2上设有一磁 吸合9,固定支撑底座2与绝缘杆1通过磁吸合9和高强磁铁8之间的吸引力进行固定。The bottom of the insulating rod 1 is also provided with a high-strength magnet 8; the fixed support base 2 is provided with a magnetic attraction 9, and the fixed support base 2 and the insulating rod 1 pass through the attraction force between the magnetic attraction 9 and the high-strength magnet 8. to fix.
所述固定支撑底座2内部设有放电装置,放电装置通过空气开关7将地电位与连接导线3的尾端连接。测试时,空气开关7断开,可以完成绝缘电阻测试;测试完毕后,只需要按下空气开关7即可安全快速的进行测试后放电工作,缩短了放电工作的用时,提高了工作效率。The fixed support base 2 is provided with a discharge device inside, and the discharge device connects the ground potential with the tail end of the connecting wire 3 through the air switch 7 . During the test, the air switch 7 is disconnected, and the insulation resistance test can be completed; after the test is completed, only need to press the air switch 7 to perform the post-test discharge safely and quickly, shortening the discharge time and improving work efficiency.
现场进行高处设备绝缘电阻的测试:On-site testing of insulation resistance of high-altitude equipment:
(1)准备阶段:将伸缩式绝缘杆1、固定支撑底座2、连接导线3三部分进行组装,即为该高处设备绝缘电阻测试的辅助装置;(1) Preparation stage: Assemble the telescopic insulating rod 1, the fixed support base 2, and the connecting wire 3, which are the auxiliary devices for the insulation resistance test of the high-altitude equipment;
(2)接线阶段:使用该高处设备绝缘电阻测试的辅助装置,通过杆顶挂钩4将连接导线3与待测高处设备可靠连接,并通过接地接线柱5将固定支撑底座2内部的放电装置5进行接地连接,完成接线;(2) Wiring stage: Use the auxiliary device for testing the insulation resistance of the high-altitude equipment, reliably connect the connecting wire 3 to the high-altitude equipment to be tested through the hook 4 on the top of the pole, and connect the discharge inside the fixed support base 2 through the grounding terminal 5 The device 5 is grounded and connected to complete the wiring;
(3)测试阶段:将绝缘电阻测试设备连接于绝缘电阻测试孔6上,断开空气开关7,开启绝缘电阻测试设备进行该高处设备绝缘电阻的测试,记录数据,测试完毕;(3) Test stage: connect the insulation resistance testing equipment to the insulation resistance testing hole 6, disconnect the air switch 7, turn on the insulation resistance testing equipment to test the insulation resistance of the high-altitude equipment, record the data, and the test is completed;
(4)放电阶段:按下空气开关6,即可安全快速的进行测试后放电工作。(4) Discharging stage: Press the air switch 6 to safely and quickly discharge after the test.
现场进行高处设备绝缘电阻测试时,未使用本装置前,此项工作平均用时为23.85min,使用本装置后,工作用时缩短为9.81min,因此工作时间节省了58.57%,极大的提高了工作效率。When testing the insulation resistance of high-altitude equipment on site, before using this device, the average time for this work is 23.85 minutes. After using this device, the working time is shortened to 9.81 minutes, so the working time is saved by 58.57%, which greatly improves work efficiency.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620477274.4U CN205679638U (en) | 2016-05-24 | 2016-05-24 | Eminence apparatus insulated resistance test auxiliary device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620477274.4U CN205679638U (en) | 2016-05-24 | 2016-05-24 | Eminence apparatus insulated resistance test auxiliary device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205679638U true CN205679638U (en) | 2016-11-09 |
Family
ID=57436151
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620477274.4U Expired - Fee Related CN205679638U (en) | 2016-05-24 | 2016-05-24 | Eminence apparatus insulated resistance test auxiliary device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205679638U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105929205A (en) * | 2016-05-24 | 2016-09-07 | 国网宁夏电力公司中卫供电公司 | Insulation resistance test auxiliary device for high-altitude equipment |
-
2016
- 2016-05-24 CN CN201620477274.4U patent/CN205679638U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105929205A (en) * | 2016-05-24 | 2016-09-07 | 国网宁夏电力公司中卫供电公司 | Insulation resistance test auxiliary device for high-altitude equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104035014B (en) | Method for alternating-current voltage withstand testing of 220 kV and 330 kV insulated tools and instruments | |
| CN103336153B (en) | High-voltage test junction pole | |
| CN103176000A (en) | Telescopic high altitude test wire connector | |
| CN203690524U (en) | Test operating lever for outdoor high-voltage class transformer | |
| CN203148982U (en) | Test fixture for loop resistance of circuit breaker | |
| CN104007375A (en) | Facility for alternating current voltage withstand tests for 200kV and 330kV insulation tools and instruments | |
| CN201449397U (en) | Multi-purpose wiring operating lever based on field high voltage test | |
| CN109254243A (en) | A kind of high-voltage circuitbreaker test short jumper device | |
| CN203224580U (en) | An apparatus for zinc oxide lightning arrester energized testing | |
| CN105929205A (en) | Insulation resistance test auxiliary device for high-altitude equipment | |
| CN205246780U (en) | Condenser is discharge device for experiment | |
| CN110726954A (en) | 500kV zinc oxide arrester leakage current exempts from to ascend a height testing arrangement | |
| CN202221437U (en) | Special tool for lightning arrester live test | |
| CN203572842U (en) | Lightning arrester experiment rack for transformer substation | |
| CN210690637U (en) | A special short-circuit device for electrical testing of high-voltage transformers | |
| CN205657371U (en) | Multi -functional grounding handcart | |
| CN205231447U (en) | High -tension apparatus overhauls supplementary termination | |
| CN202583245U (en) | High-order wiring device used for high-voltage electrical device | |
| CN203909080U (en) | Telescopic wiring post used for transformation ratio tests of current transformer in transformer station | |
| CN205749582U (en) | Transformer testing clamps | |
| CN206057297U (en) | A kind of scene shows the pillar porcelain insulator live detection diagnostic device of failure | |
| CN210982698U (en) | A 500kV Zinc Oxide Surge Arrester Leakage Current No Ascent Test Device | |
| CN204613251U (en) | For the anti induction voltage connection box of line parameter circuit value test | |
| CN203981710U (en) | A kind of Assisted Combinatorial device that is applicable to megger method test power distribution network stake resistance | |
| CN209148844U (en) | A kind of high-voltage circuitbreaker test short jumper device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20190524 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |