CN205678258U - The oil pipeline support means that safety is higher - Google Patents

The oil pipeline support means that safety is higher Download PDF

Info

Publication number
CN205678258U
CN205678258U CN201620527808.XU CN201620527808U CN205678258U CN 205678258 U CN205678258 U CN 205678258U CN 201620527808 U CN201620527808 U CN 201620527808U CN 205678258 U CN205678258 U CN 205678258U
Authority
CN
China
Prior art keywords
annulus
support
oil pipeline
equal
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620527808.XU
Other languages
Chinese (zh)
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Damo Petroleum Technology Co Ltd
Original Assignee
Chengdu Damo Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Damo Petroleum Technology Co Ltd filed Critical Chengdu Damo Petroleum Technology Co Ltd
Priority to CN201620527808.XU priority Critical patent/CN205678258U/en
Application granted granted Critical
Publication of CN205678258U publication Critical patent/CN205678258U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the oil pipeline support means that safety is higher, described device includes: support column, described support column upper end is connected with 4 pre-embedded blocks, described pre-embedded block is connected with pre-buried annulus, described pre-buried ring textures is provided with drip hole, the upper surface of collecting box lower surface and the first annulus connects, the upper end of 2 baffle plates is connected with the left and right side of collecting box respectively, described collecting box upper surface connects plastic wire, water pipe one end is connected with collecting box, the water pipe other end is connected with pre-buried annulus, 3rd support one end is connected with described support column side, the described 3rd support other end is connected with alarm structure, achieve device reasonable in design, oil pipeline is arranged on the place that earth's surface is higher, save spatial surface, and safety is higher, it is easy to safeguard, oil pipeline is carried out the technique effect of good protection.

Description

The oil pipeline support means that safety is higher
Technical field
This utility model relates to field of petroleum machinery, in particular it relates to the oil pipeline support dress that a kind of safety is higher Put.
Background technology
Oil pipeline (also referred to as pipeline, pipeline) is made up of oil pipe and adnexa thereof, and according to the needs of technological process, joins Standby corresponding oil pump unit, design and installation becomes a complete tubing, unloads in order to complete oil plant and defeated turns task.
Controlling methodology of oil pipeline, i.e. for transporting the tubing of oil and oil product, mainly by petroleum pipeline, oil transportation station And other auxiliary phases close equipment composition, be one of the capital equipment of oil movement and storage industry, be also crude oil and oil product main Conveying equipment, compared with the railway belonging to land transportation mode and highway oil transportation, pipeline oil transportation has that freight volume is big, seal Well, low cost and safety coefficient high.
The tubing of oil pipeline is generally steel pipe, uses the connection equipment such as welding and flange to connect into long-distance pipe, and Using valve to carry out open and close controlling and Flow-rate adjustment, oil pipeline mainly has isothermal conveying, heated transportation and sequentially-fed etc. defeated Send technique.
In the prior art, existing oil pipeline is typically buried in underground and is transmitted or uses stone pier base to carry out Support is transmitted on earth's surface, is embedded in underground and easily makes oil pipeline get rusty, and during the fault such as oil pipeline generation leakage of oil not Easily being found, during maintenance, staff needs to excavate earth's surface and just can overhaul, it has not been convenient to, labor intensive material resources, and use Stone pier base is supported on earth's surface, and the stone pier is the most relatively low, temporary more surface area, and easily by artificial destruction, and install Oil pipeline on earth's surface is easily destroyed by dust storm, reduces the life-span.
In sum, present inventor during utility model technical scheme, sends out in realizing the embodiment of the present application At least there is following technical problem in existing above-mentioned technology:
In the prior art, it is difficult in maintenance that the existence of existing oil pipeline is arranged on underground, is arranged on earth's surface and is easily damaged Technical problem.
Utility model content
This utility model provides the oil pipeline support means that a kind of safety is higher, solves existing oil pipeline It is difficult in maintenance that existence is arranged on underground, is arranged on the technical problem that earth's surface is easily damaged, it is achieved that device is reasonable in design, by oil transportation The place that Pipe installing is higher on earth's surface, saves spatial surface, and safety is higher, it is simple to safeguards, carries out good to oil pipeline The technique effect of good protection.
For solving above-mentioned technical problem, the embodiment of the present application provides the oil pipeline support means that safety is higher, institute State device to include:
Support column, described support column upper end is connected with the lower end of the first annulus, described support column lower end and 4 the first supports One end be all connected with, the other end of described 4 the first supports is connected with 4 pre-embedded blocks respectively, described pre-embedded block surface connect have N Individual fixing nail, described N is the positive integer more than or equal to 10, and described pre-embedded block is connected with pre-buried annulus by the second support, described Pre-buried annulus is cavity structure, and described pre-buried ring textures is provided with M drip hole, and described M is the positive integer more than or equal to 20, described Support column is sequentially connected with by a P chapelet post and forms, and described P is the positive integer more than or equal to 5, described chapelet post top half For opening shape, and described chapelet post top half is hollow-core construction, and described chapelet post the latter half is solid construction, collects Case lower surface is connected with the upper surface of described first annulus, and the upper end of 2 baffle plates is connected with the left and right side of collecting box respectively, institute The lower end stating 2 baffle plates extends respectively to the left and right side of described first annulus;Described collecting box upper surface is opening shape, 2 Fixed support lower end is all connected with described collecting box, and connecting between described 2 fixed supports has plastic wire, described collecting box following table Face is provided with osculum, and water pipe one end is connected with described osculum, and the described water pipe other end extends to the cavity of described pre-buried annulus In, described first annulus side is provided with fixing threaded hole, and screw mandrel one end is connected with stator after described fixing threaded hole, described silk The other end of bar is connected with rotary handle;3rd support one end is connected with described support column side, the described 3rd support other end Being connected with alarm structure, described alarm structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, first Detection ball is embedded in described first circular groove, is provided with collection funnel, guide rail one end and described collection below described fixed plate The lower end of funnel connects, and the described guide rail other end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, First contact chip is connected with described disk side, and the second contact chip is fixed on below described first contact chip, first wire one end Being connected with described first contact chip, the described other end of the first wire is connected with the negative pole of accumulator, second wire one end and institute Stating the second contact chip to connect, the described second wire other end is connected with the positive pole of described accumulator after being connected with alarm;Wherein, Being provided with drainage screen at described osculum, described device also includes that Q cushion block, described cushion block are cylindric, and described Q is for being more than or equal to The positive integer of 10, the diameter of described cushion block mates with the top half internal diameter size of described chapelet post, the height of described cushion block More than or equal to 0.5CM less than or equal to 1CM, described support column side the most uniformly connects W pole for climbing, Described W is the positive integer more than or equal to 10.
Wherein, in the application, by oil pipeline through the first annulus, support column is then utilized to be erected at ground by oil pipeline Above table, and support column is sequentially connected with by multiple chapelet posts and forms, staff can according to actual installation earth's surface situation, Select as the quantity of chapelet post is propped up in use by hillside or lowland, it is achieved the high flexible of support column adjusts, will The upper end of a chapelet post is inserted in the lower end of chapelet post, after oil pipeline installs, staff by rotation rotary handle, Drive screw mandrel advances so that it is fixing that stator carries out extruding to oil pipeline, ensures that oil pipeline is fixing firm, and safety is relatively Good.
Further, support column lower end is connected by the first support has 4 pre-embedded blocks to connect, and utilizes pre-embedded block to be embedded in ground Under, ensureing that support column consolidates, and the connection of pre-embedded block surface has multiple fixing nail, multiple fixing nails are divergent shape so that fixed block Combine with the earth of surrounding so that fixed block is not easy to slide, and then ensure that fixed block is fixing firm.
Further, China's oil generally is acquired then utilizing oil pipeline to be transmitted in desert area, desert Area lacks seriously, and vegetation is not easy to produce, and does not has vegetation then water and soil Sand Movement very fast, then be easily caused pre-embedded block fixing not Firm, there is potential safety hazard, the first annulus in the application is fixedly arranged above collecting box, is fixed with by support above collecting box Plastic wire, although desert is the driest, but early morning and dusk have fog at night, fog aqueous vapor meeting when fastening plastic wire Absorption forms water droplet on plastic wire, and water droplet drops onto in collecting box and is collected, and is then transferred to pre-buried annulus by water pipe In, finally by drip hole, the vegetation around pre-buried annulus is carried out drip irrigation, ensure that vegetation around generates good, and then ensure water Soil not easily runs off and the shifting of sand dunes, ensures that pre-embedded block consolidates, and then the safety of ensuring equipment.
Further, oil pipeline both sides are provided with baffle plate, utilize baffle plate can stop dust storm, it is to avoid dust storm is blown and beaten Oil pipeline surface, ensures the life-span of oil pipeline.
Further, device also includes alarm structure, reports to the police when there is acutely shake or earthquake, notifies work people Member checks, described alarm structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, the first detection Ball is embedded in described first circular groove, is provided with collection funnel, guide rail one end and described collection funnel below described fixed plate Lower end connect, the described guide rail other end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, first Contact chip is connected with described disk side, and the second contact chip is fixed on below described first contact chip, first wire one end and institute Stating the first contact chip to connect, the described other end of the first wire is connected with the negative pole of accumulator, second wire one end and described the Two contact chips connect, and the described second wire other end is connected with the positive pole of described accumulator after being connected with alarm;Alarm can Thinking audible-visual annunciator of the prior art, when occurring acutely to shake, the first detection ball is owing to shake is from the first circular groove Middle shake out drops in collection funnel, then by, on guideway transit to disk, extruding spring stack so that disk Move down, and then the first contact chip is moved down contact with the second contact chip so that battery circuit turns on, and alarm is reported Alert, it is achieved that fast notification worker productivity is higher.
Further, at osculum, it is provided with drainage screen, drainage screen is set and can avoid water-pipe blockage, when actual installation, Needing in setting height(from bottom) to be controlled precision, this device also includes Q cushion block, and cushion block is cylindric, the diameter of cushion block and institute Stating the top half internal diameter size coupling of a chapelet post, being put into by cushion block can be to the height of support column entirety inside a chapelet post Being finely adjusted, it is simple to accurately adjust support column whole height, the height of described cushion block is less than or equal to more than or equal to 0.5CM 1CM, described support column side the most uniformly connects W pole for climbing, arranges pole for climbing and is easy to work people Member's climbing support column, safeguards oil pipeline.
Wherein, described N number of fixing nail is evenly distributed on described pre-embedded block surface, and described M drip hole is evenly distributed on described Pre-buried ring textures, described 4 pre-embedded blocks are evenly distributed on described support column surrounding, and described 4 pre-embedded blocks are positioned at described pre-buried In the circumference range of annulus.
Wherein, the top half of a P-1 chapelet post, described chapelet are inserted in the latter half of a P chapelet post The top half internal diameter of post mates with the latter half outside dimension of a chapelet post.
Wherein, the described first a diameter of D1 of circular groove upper end open, described first detection bulb diameter is D2, wherein, D1 More than or equal to 1/3rd D2, and D1 is less than D2, wherein, is to avoid relatively when being designed as by D1 more than or equal to 1/3rd D2 purposes Little regular dither causes false alarm, and when depth of groove is less, detection ball, easily because slight shake skids off, causes mistake False alarm and frequently warning.
Wherein, described first contact chip and described second contact chip are all made of copper.
Wherein, described first annulus and described chapelet post all use bearing steel to make, described first annulus and described Chapelet post surface all scribbles antirust paint.Employing bearing steel can be with the intensity of ensuring equipment, and antirust paint is possible to prevent to get rusty.
The one or more technical schemes provided in the embodiment of the present application, at least have the following technical effect that or advantage:
It is designed as including by oil pipeline support means higher for safety owing to have employed: support column, described support column Upper end is connected with the lower end of the first annulus, and described support column lower end is all connected with one end of 4 the first supports, described 4 first The other end of support is connected with 4 pre-embedded blocks respectively, and described pre-embedded block surface connects N number of fixing nail, and described N is for being more than or equal to The positive integer of 10, described pre-embedded block is connected with pre-buried annulus by the second support, and described pre-buried annulus is cavity structure, described pre- Burying ring textures and be provided with M drip hole, described M is the positive integer more than or equal to 20, and described support column is connected successively by a P chapelet post Connecing composition, described P is the positive integer more than or equal to 5, and described chapelet post top half is opening shape, and on described chapelet post Half part is hollow-core construction, and described chapelet post the latter half is solid construction, collecting box lower surface and described first annulus Upper surface connects, and the upper end of 2 baffle plates is connected with the left and right side of collecting box respectively, and the lower end of described 2 baffle plates each extends over Left and right side to described first annulus;Described collecting box upper surface is opening shape, 2 fixed support lower ends all with described collection Case connects, and connecting between described 2 fixed supports has plastic wire, described collecting box lower surface to be provided with osculum, water pipe one end with Described osculum connects, and the described water pipe other end extends in the cavity of described pre-buried annulus, and described first annulus side is provided with Fixing threaded hole, screw mandrel one end is connected with stator after described fixing threaded hole, and the other end of described screw mandrel is with rotary handle even Connect;3rd support one end is connected with described support column side, and the described 3rd support other end is connected with alarm structure, described warning Structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, and it is circular that the first detection ball is embedded in described first In groove, being provided with collection funnel below described fixed plate, guide rail one end is connected with the lower end of described collection funnel, and described guide rail is another One end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, the first contact chip and described disk side Connecting, the second contact chip is fixed on below described first contact chip, and first wire one end is connected with described first contact chip, described The other end of the first wire is connected with the negative pole of accumulator, and second wire one end is connected with described second contact chip, and described second The wire other end is connected with the positive pole of described accumulator after being connected with alarm;Wherein, drainage screen, institute it are provided with at described osculum Stating device and also include that Q cushion block, described cushion block are cylindric, described Q is the positive integer more than or equal to 10, the diameter of described cushion block Mating with the top half internal diameter size of described chapelet post, the height of described cushion block is less than or equal to 1CM more than or equal to 0.5CM, Described support column side the most uniformly connects that to have W pole for climbing, described W be the positive integer more than or equal to 10 Technical scheme, so, efficiently solve existing oil pipeline and have that to be arranged on underground difficult in maintenance, be arranged on earth's surface easy The technical problem damaged, and then it is reasonable in design to achieve device, and oil pipeline is arranged on the place that earth's surface is higher, saves earth's surface Space, and safety is higher, it is simple to safeguard, oil pipeline is carried out the technique effect of good protection.
Accompanying drawing explanation
Fig. 1 is the structural representation of the oil pipeline support means that safety is higher in the embodiment of the present application one;
Fig. 2 is the structural representation of pre-embedded block in the embodiment of the present application one;
Fig. 3 is the structural representation of pre-buried annulus in the embodiment of the present application one;
Fig. 4 is the structural representation of a chapelet post in the embodiment of the present application one;
Fig. 5 is the structural representation of alarm structure in the embodiment of the present application one;
Fig. 6 is cushion block and the connection diagram of pole for climbing in the embodiment of the present application one;
Wherein, 1-support column, 2-the first annulus, 3-the first support, 4-pre-embedded block, 5-the second support, the pre-buried annulus of 6-, 7- Collecting box, 8-baffle plate, 9-fixed support, 10-plastic wire, 11-water pipe, 12-screw mandrel, 13-stator, 14-rotary handle, 15- Fixing nail, 16-drip hole, 17-props up chapelet post, 18-the 3rd support, 19-fixed plate, and 20-first detects ball, 21-collection funnel, 22-guide rail, 23-disk, 24-spring stack, 25-the first contact chip, 26-the second contact chip, 27-the first wire, 28-accumulator, 29-the second wire, 30-alarm, 31-cushion block, 32-pole for climbing.
Detailed description of the invention
This utility model provides the oil pipeline support means that a kind of safety is higher, solves existing oil pipeline It is difficult in maintenance that existence is arranged on underground, is arranged on the technical problem that earth's surface is easily damaged, it is achieved that device is reasonable in design, by oil transportation The place that Pipe installing is higher on earth's surface, saves spatial surface, and safety is higher, it is simple to safeguards, carries out good to oil pipeline The technique effect of good protection.
Technical scheme during the application implements is the above-mentioned technical problem of solution.General thought is as follows:
Have employed and be designed as including by oil pipeline support means: support column, described support column upper end and the first annulus Lower end connects, and described support column lower end is all connected with one end of 4 the first supports, and the other end of described 4 the first supports is respectively Being connected with 4 pre-embedded blocks, described pre-embedded block surface connects N number of fixing nail, and described N is the positive integer more than or equal to 10, described Pre-embedded block is connected with pre-buried annulus by the second support, and described pre-buried annulus is cavity structure, and described pre-buried ring textures is provided with M Individual drip hole, described M is the positive integer more than or equal to 20, and described support column is sequentially connected with by a P chapelet post and forms, and described P is Positive integer more than or equal to 5, described chapelet post top half is opening shape, and described chapelet post top half is hollow knot Structure, described chapelet post the latter half is solid construction, and collecting box lower surface is connected with the upper surface of described first annulus, 2 The upper end of baffle plate is connected with the left and right side of collecting box respectively, and the lower end of described 2 baffle plates extends respectively to described first annulus Left and right side;Described collecting box upper surface is opening shape, and 2 fixed support lower ends are all connected with described collecting box, described 2 Connecting between fixed support has plastic wire, described collecting box lower surface to be provided with osculum, and water pipe one end is connected with described osculum, The described water pipe other end extends in the cavity of described pre-buried annulus, and described first annulus side is provided with fixing threaded hole, screw mandrel one End is connected with stator after described fixing threaded hole, and the other end of described screw mandrel is connected with rotary handle;3rd support one end Being connected with described support column side, the described 3rd support other end is connected with alarm structure, and described alarm structure includes: fixing Plate, described fixed plate upper surface is provided with the first circular groove, and the first detection ball is embedded in described first circular groove, described solid Determining to be provided with below plate collection funnel, guide rail one end is connected with the lower end of described collection funnel, and the described guide rail other end extends to circle Dish upper surface, spring stack upper end is connected with described lower disk surface, and the first contact chip is connected with described disk side, the second contact Sheet is fixed on below described first contact chip, and first wire one end is connected with described first contact chip, described first wire another One end is connected with the negative pole of accumulator, and second wire one end is connected with described second contact chip, the described second wire other end with Alarm is connected with the positive pole of described accumulator after connecting;Wherein, being provided with drainage screen at described osculum, described device also includes Q cushion block, described cushion block is cylindric, and described Q is the positive integer more than or equal to 10, the diameter of described cushion block and described chapelet The top half internal diameter size coupling of post, the height of described cushion block is less than or equal to 1CM, described support column side more than or equal to 0.5CM Face the most uniformly connects that to have W pole for climbing, described W be the technical scheme of the positive integer more than or equal to 10, So, efficiently solve existing oil pipeline and have that to be arranged on underground difficult in maintenance, be arranged on the technology that earth's surface is easily damaged Problem, and then it is reasonable in design to achieve device, and oil pipeline is arranged on the place that earth's surface is higher, saves spatial surface, and peace Full property is higher, it is simple to safeguard, oil pipeline carries out the technique effect of good protection.
In order to be better understood from technique scheme, below in conjunction with Figure of description and specific embodiment to upper State technical scheme to be described in detail.
Embodiment one:
In embodiment one, it is provided that the oil pipeline support means that safety is higher, refer to Fig. 1-Fig. 6, described dress Put and include:
Support column 1, described support column upper end is connected with the lower end of the first annulus 2, described support column lower end and 4 first One end of frame 3 is all connected with, and the other end of described 4 the first supports is connected with 4 pre-embedded blocks 4 respectively, and described pre-embedded block surface is even Being connected to N number of fixing nail 15, described N is the positive integer more than or equal to 10, and described pre-embedded block is by the second support 5 and pre-buried annulus 6 Connecting, described pre-buried annulus is cavity structure, and described pre-buried ring textures is provided with M drip hole 16, and described M is more than or equal to 20 Positive integer, described support column is sequentially connected with by a P chapelet post 17 and forms, and described P is the positive integer more than or equal to 5, described Chapelet post top half is opening shape, and described chapelet post top half is hollow-core construction, described chapelet post the latter half For solid construction, collecting box 7 lower surface is connected with the upper surface of described first annulus, the upper end of 2 baffle plates 8 respectively with collecting box Left and right side connect, the lower end of described 2 baffle plates extends respectively to the left and right side of described first annulus;On described collecting box Surface is opening shape, and 2 fixed support 9 lower ends are all connected with described collecting box, and connecting between described 2 fixed supports has plastics Net 10, described collecting box lower surface is provided with osculum, and water pipe 11 one end is connected with described osculum, and the described water pipe other end extends To the cavity of described pre-buried annulus, described first annulus side is provided with fixing threaded hole, and screw mandrel 12 one end passes described fixing spiral shell Kong Houyu stator 13 connects, and the other end of described screw mandrel is connected with rotary handle 14;3rd support 18 one end and described support Post side connects, and the described 3rd support other end is connected with alarm structure, and described alarm structure includes: fixed plate 19, described solid Determining plate upper surface and be provided with the first circular groove, the first detection ball 20 is embedded in described first circular groove, under described fixed plate Side is provided with collection funnel 21, and guide rail 22 one end is connected with the lower end of described collection funnel, and the described guide rail other end extends to disk 23 upper surfaces, spring stack 24 upper end is connected with described lower disk surface, and the first contact chip 25 is connected with described disk side, and second Contact chip 26 is fixed on below described first contact chip, and first wire 27 one end is connected with described first contact chip, and described first The other end of wire is connected with the negative pole of accumulator 28, and second wire 29 one end is connected with described second contact chip, and described second The wire other end is connected with the positive pole of described accumulator after being connected with alarm 30;Wherein, at described osculum, it is provided with drainage screen, Described device also includes that Q cushion block 31, described cushion block are cylindric, and described Q is the positive integer more than or equal to 10, described cushion block Diameter mates with the top half internal diameter size of described chapelet post, and the height of described cushion block is less than or equal to more than or equal to 0.5CM 1CM, described support column side the most uniformly connects that to have W pole for climbing 32, described W be more than or equal to 10 Positive integer.
Wherein, in the application, by oil pipeline through the first annulus, support column is then utilized to be erected at ground by oil pipeline Above table, and support column is sequentially connected with by multiple chapelet posts and forms, staff can according to actual installation earth's surface situation, Select as the quantity of chapelet post is propped up in use by hillside or lowland, it is achieved the high flexible of support column adjusts, will The upper end of a chapelet post is inserted in the lower end of chapelet post, after oil pipeline installs, staff by rotation rotary handle, Drive screw mandrel advances so that it is fixing that stator carries out extruding to oil pipeline, ensures that oil pipeline is fixing firm, and safety is relatively Good.
Further, support column lower end is connected by the first support has 4 pre-embedded blocks to connect, and utilizes pre-embedded block to be embedded in ground Under, ensureing that support column consolidates, and the connection of pre-embedded block surface has multiple fixing nail, multiple fixing nails are divergent shape so that fixed block Combine with the earth of surrounding so that fixed block is not easy to slide, and then ensure that fixed block is fixing firm.
Further, China's oil generally is acquired then utilizing oil pipeline to be transmitted in desert area, desert Area lacks seriously, and vegetation is not easy to produce, and does not has vegetation then water and soil Sand Movement very fast, then be easily caused pre-embedded block fixing not Firm, there is potential safety hazard, the first annulus in the application is fixedly arranged above collecting box, is fixed with by support above collecting box Plastic wire, although desert is the driest, but early morning and dusk have fog at night, fog aqueous vapor meeting when fastening plastic wire Absorption forms water droplet on plastic wire, and water droplet drops onto in collecting box and is collected, and is then transferred to pre-buried annulus by water pipe In, finally by drip hole, the vegetation around pre-buried annulus is carried out drip irrigation, ensure that vegetation around generates good, and then ensure water Soil not easily runs off and the shifting of sand dunes, ensures that pre-embedded block consolidates, and then the safety of ensuring equipment.
Further, oil pipeline both sides are provided with baffle plate, utilize baffle plate can stop dust storm, it is to avoid dust storm is blown and beaten Oil pipeline surface, ensures the life-span of oil pipeline.
Further, device also includes alarm structure, reports to the police when there is acutely shake or earthquake, notifies work people Member checks, described alarm structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, the first detection Ball is embedded in described first circular groove, is provided with collection funnel, guide rail one end and described collection funnel below described fixed plate Lower end connect, the described guide rail other end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, first Contact chip is connected with described disk side, and the second contact chip is fixed on below described first contact chip, first wire one end and institute Stating the first contact chip to connect, the described other end of the first wire is connected with the negative pole of accumulator, second wire one end and described the Two contact chips connect, and the described second wire other end is connected with the positive pole of described accumulator after being connected with alarm;Alarm can Thinking audible-visual annunciator of the prior art, when occurring acutely to shake, the first detection ball is owing to shake is from the first circular groove Middle shake out drops in collection funnel, then by, on guideway transit to disk, extruding spring stack so that disk Move down, and then the first contact chip is moved down contact with the second contact chip so that battery circuit turns on, and alarm is reported Warn, it is achieved that fast notification worker productivity is higher, and addition locating module and communication module can be pin-pointed to specifically The oil pipeline section of appearance accident.
Further, at osculum, it is provided with drainage screen, drainage screen is set and can avoid water-pipe blockage, when actual installation, Needing in setting height(from bottom) to be controlled precision, this device also includes Q cushion block, and cushion block is cylindric, the diameter of cushion block and institute Stating the top half internal diameter size coupling of a chapelet post, being put into by cushion block can be to the height of support column entirety inside a chapelet post Being finely adjusted, it is simple to accurately adjust support column whole height, the height of described cushion block is less than or equal to more than or equal to 0.5CM 1CM, described support column side the most uniformly connects W pole for climbing, arranges pole for climbing and is easy to work people Member's climbing support column, safeguards oil pipeline.
Wherein, described N number of fixing nail is evenly distributed on described pre-embedded block surface, and described M drip hole is evenly distributed on described Pre-buried ring textures, described 4 pre-embedded blocks are evenly distributed on described support column surrounding, and described 4 pre-embedded blocks are positioned at described pre-buried In the circumference range of annulus.
Wherein, the top half of a P-1 chapelet post, described chapelet are inserted in the latter half of a P chapelet post The top half internal diameter of post mates with the latter half outside dimension of a chapelet post.
Wherein, the described first a diameter of D1 of circular groove upper end open, described first detection bulb diameter is D2, wherein, D1 More than or equal to 1/3rd D2, and D1 is less than D2, wherein, is to avoid relatively when being designed as by D1 more than or equal to 1/3rd D2 purposes Little regular dither causes false alarm, and when depth of groove is less, detection ball, easily because slight shake skids off, causes mistake False alarm and frequently warning.
Wherein, described first contact chip and described second contact chip are all made of copper.
Wherein, described first annulus and described chapelet post all use bearing steel to make, described first annulus and described Chapelet post surface all scribbles antirust paint.Employing bearing steel can be with the intensity of ensuring equipment, and antirust paint is possible to prevent to get rusty.
Technical scheme in above-mentioned the embodiment of the present application, at least has the following technical effect that or advantage:
It is designed as including by oil pipeline support means higher for safety owing to have employed: support column, described support column Upper end is connected with the lower end of the first annulus, and described support column lower end is all connected with one end of 4 the first supports, described 4 first The other end of support is connected with 4 pre-embedded blocks respectively, and described pre-embedded block surface connects N number of fixing nail, and described N is for being more than or equal to The positive integer of 10, described pre-embedded block is connected with pre-buried annulus by the second support, and described pre-buried annulus is cavity structure, described pre- Burying ring textures and be provided with M drip hole, described M is the positive integer more than or equal to 20, and described support column is connected successively by a P chapelet post Connecing composition, described P is the positive integer more than or equal to 5, and described chapelet post top half is opening shape, and on described chapelet post Half part is hollow-core construction, and described chapelet post the latter half is solid construction, collecting box lower surface and described first annulus Upper surface connects, and the upper end of 2 baffle plates is connected with the left and right side of collecting box respectively, and the lower end of described 2 baffle plates each extends over Left and right side to described first annulus;Described collecting box upper surface is opening shape, 2 the second pedestal lower end all with described collection Case connects, and connecting between described 2 the second supports has plastic wire, described collecting box lower surface to be provided with osculum, water pipe one end with Described osculum connects, and the described water pipe other end extends in the cavity of described pre-buried annulus, and described first annulus side is provided with Fixing threaded hole, screw mandrel one end is connected with stator after described fixing threaded hole, and the other end of described screw mandrel is with rotary handle even Connect;3rd support one end is connected with described support column side, and the described 3rd support other end is connected with alarm structure, described warning Structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, and it is circular that the first detection ball is embedded in described first In groove, being provided with collection funnel below described fixed plate, guide rail one end is connected with the lower end of described collection funnel, and described guide rail is another One end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, the first contact chip and described disk side Connecting, the second contact chip is fixed on below described first contact chip, and first wire one end is connected with described first contact chip, described The other end of the first wire is connected with the negative pole of accumulator, and second wire one end is connected with described second contact chip, and described second The wire other end is connected with the positive pole of described accumulator after being connected with alarm;Wherein, drainage screen, institute it are provided with at described osculum Stating device and also include that Q cushion block, described cushion block are cylindric, described Q is the positive integer more than or equal to 10, the diameter of described cushion block Mating with the top half internal diameter size of described chapelet post, the height of described cushion block is less than or equal to 1CM more than or equal to 0.5CM, Described support column side the most uniformly connects that to have W pole for climbing, described W be the positive integer more than or equal to 10 Technical scheme, so, efficiently solve existing oil pipeline and have that to be arranged on underground difficult in maintenance, be arranged on earth's surface easy The technical problem damaged, and then it is reasonable in design to achieve device, and oil pipeline is arranged on the place that earth's surface is higher, saves earth's surface Space, and safety is higher, it is simple to safeguard, oil pipeline is carried out the technique effect of good protection.
Although having been described for preferred embodiment of the present utility model, but those skilled in the art once knowing substantially Creative concept, then can make other change and amendment to these embodiments.So, claims are intended to be construed to bag Include preferred embodiment and fall into all changes and the amendment of this utility model scope.
Obviously, those skilled in the art can carry out various change and modification without deviating from this practicality to this utility model Novel spirit and scope.So, if of the present utility model these amendment and modification belong to this utility model claim and Within the scope of its equivalent technologies, then this utility model is also intended to comprise these change and modification.

Claims (6)

1. the oil pipeline support means that safety is higher, it is characterised in that described device includes:
Support column, described support column upper end is connected with the lower end of the first annulus, described support column lower end and the one of 4 the first supports End is all connected with, and the other end of described 4 the first supports is connected with 4 pre-embedded blocks respectively, and the connection of described pre-embedded block surface has N number of solid Fixed nail, described N is the positive integer more than or equal to 10, and described pre-embedded block is connected with pre-buried annulus by the second support, described pre-buried Annulus is cavity structure, and described pre-buried ring textures is provided with M drip hole, and described M is the positive integer more than or equal to 20, described support Post is sequentially connected with by a P chapelet post and forms, and described P is the positive integer more than or equal to 5, and described chapelet post top half is for opening Mouthful shape, and described chapelet post top half be hollow-core construction, described chapelet post the latter half is solid construction, under collecting box Surface is connected with the upper surface of described first annulus, and the upper end of 2 baffle plates is connected with the left and right side of collecting box respectively, and described 2 The lower end of individual baffle plate extends respectively to the left and right side of described first annulus;Described collecting box upper surface is opening shape, fixes for 2 Pedestal lower end is all connected with described collecting box, and connecting between described 2 fixed supports has plastic wire, described collecting box lower surface to set Having osculum, water pipe one end to be connected with described osculum, the described water pipe other end extends in the cavity of described pre-buried annulus, institute Stating the first annulus side and be provided with fixing threaded hole, screw mandrel one end is connected with stator after described fixing threaded hole, described screw mandrel The other end is connected with rotary handle;3rd support one end is connected with described support column side, the described 3rd support other end and report Alert structure connects, and described alarm structure includes: fixed plate, and described fixed plate upper surface is provided with the first circular groove, the first detection Ball is embedded in described first circular groove, is provided with collection funnel, guide rail one end and described collection funnel below described fixed plate Lower end connect, the described guide rail other end extends to disk upper surface, and spring stack upper end is connected with described lower disk surface, first Contact chip is connected with described disk side, and the second contact chip is fixed on below described first contact chip, first wire one end and institute Stating the first contact chip to connect, the described other end of the first wire is connected with the negative pole of accumulator, second wire one end and described the Two contact chips connect, and the described second wire other end is connected with the positive pole of described accumulator after being connected with alarm;Wherein, described Being provided with drainage screen at osculum, described device also includes that Q cushion block, described cushion block are cylindric, and described Q is more than or equal to 10 Positive integer, the diameter of described cushion block mates with the top half internal diameter size of described chapelet post, and the height of described cushion block is more than Equal to 0.5CM less than or equal to 1CM, described support column side the most uniformly connects W pole for climbing, described W is the positive integer more than or equal to 10.
The oil pipeline support means that safety the most according to claim 1 is higher, it is characterised in that described N number of fixing Nail is evenly distributed on described pre-embedded block surface, and described M drip hole is evenly distributed on described pre-buried ring textures, described 4 pre-buried Block is evenly distributed on described support column surrounding, and described 4 pre-embedded blocks are positioned at the circumference range of described pre-buried annulus.
The oil pipeline support means that safety the most according to claim 1 is higher, it is characterised in that a P chapelet The top half of a P-1 chapelet post, the top half internal diameter of described chapelet post and a chapelet are inserted in the latter half of post The latter half outside dimension coupling of post.
The oil pipeline support means that safety the most according to claim 1 is higher, it is characterised in that described first is circular The a diameter of D1 of groove upper end open, described first detection bulb diameter is D2, and wherein, D1 is more than or equal to 1/3rd D2, and D1 is little In D2.
The oil pipeline support means that safety the most according to claim 1 is higher, it is characterised in that described first contact Sheet and described second contact chip are all made of copper.
The oil pipeline support means that safety the most according to claim 1 is higher, it is characterised in that described first annulus All using bearing steel to make with described chapelet post, described first annulus and described chapelet post surface all scribble antirust paint.
CN201620527808.XU 2016-06-02 2016-06-02 The oil pipeline support means that safety is higher Expired - Fee Related CN205678258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620527808.XU CN205678258U (en) 2016-06-02 2016-06-02 The oil pipeline support means that safety is higher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620527808.XU CN205678258U (en) 2016-06-02 2016-06-02 The oil pipeline support means that safety is higher

Publications (1)

Publication Number Publication Date
CN205678258U true CN205678258U (en) 2016-11-09

Family

ID=57436443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620527808.XU Expired - Fee Related CN205678258U (en) 2016-06-02 2016-06-02 The oil pipeline support means that safety is higher

Country Status (1)

Country Link
CN (1) CN205678258U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822832A (en) * 2016-06-02 2016-08-03 成都大漠石油技术有限公司 Oil conveying pipeline supporting device high in safety
CN107187712A (en) * 2017-06-15 2017-09-22 成都大漠石油技术有限公司 Suitable for the tipping arrangement of petroleum storage bucket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822832A (en) * 2016-06-02 2016-08-03 成都大漠石油技术有限公司 Oil conveying pipeline supporting device high in safety
CN105822832B (en) * 2016-06-02 2018-01-30 成都大漠石油技术有限公司 The higher oil pipeline support equipment of security
CN107187712A (en) * 2017-06-15 2017-09-22 成都大漠石油技术有限公司 Suitable for the tipping arrangement of petroleum storage bucket

Similar Documents

Publication Publication Date Title
CN205678258U (en) The oil pipeline support means that safety is higher
CN203939047U (en) A kind of buoy warning thing
CN104737849A (en) Combined type movable climbing plant viaduct column greening device and method
CN202469227U (en) Prefabricated reinforced concrete fabricated pipe gallery
CN205678261U (en) Oil pipeline supports auxiliary device
CN205678259U (en) It is easy to the oil pipeline support means safeguarded
CN205678260U (en) Joint space-efficient oil pipeline support means
CN205678262U (en) Oil pipeline support means
CN103306359B (en) Rainwater regulation and drainage and storage and utilization multifunctional integrated system and construction method thereof
CN105822832B (en) The higher oil pipeline support equipment of security
CN202509608U (en) Multifunctional rainwater regulating drainage and storing utilization integrated system
CN105864510B (en) Oil pipeline supports auxiliary equipment
CN105805417B (en) It is easy to the oil pipeline support equipment safeguarded
CN205400735U (en) Shield tunnel utility tunnel
CN205636483U (en) Seamless telescoping device of foot bridge in pyrocondensation cold expanding
CN203822272U (en) Expandable filling sieve tube suitable for geothermal well
CN204343378U (en) A kind ofly utilize domatic flowing water as the tunnel fire protection system at water source
CN210421171U (en) A inspection shaft for municipal administration sewage collection pipe network
CN105972318A (en) Supporting equipment for oil conveying pipeline
CN106595802A (en) Method of monitoring of underground water outside deep foundation pit, warning and automatic recharge construction
CN105840912B (en) Save space-efficient oil pipeline support equipment
US20150337987A1 (en) Method and Structure for in situ Field Repair of Severed Drain Tile
CN206956789U (en) A kind of self-powered water flow monitor for inspection shaft
CN206942197U (en) House hydraulic pressure entirety lifting apparatus
CN205917767U (en) Urban viaduct rainwater comprehensive recovery utilization system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20170602