CN205669461U - A kind of blower fan tower barrel attachment structure - Google Patents
A kind of blower fan tower barrel attachment structure Download PDFInfo
- Publication number
- CN205669461U CN205669461U CN201620444070.0U CN201620444070U CN205669461U CN 205669461 U CN205669461 U CN 205669461U CN 201620444070 U CN201620444070 U CN 201620444070U CN 205669461 U CN205669461 U CN 205669461U
- Authority
- CN
- China
- Prior art keywords
- tower
- flange
- flange circle
- bolt
- holder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 21
- 230000001105 regulatory effect Effects 0.000 claims description 12
- 230000000694 effects Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003749 cleanliness Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
This utility model relates to a kind of blower fan tower barrel attachment structure, including, upper tower and lower tower, it is provided with flange arrangement in the junction of two tower, flange arrangement includes, flange circle, is positioned at tower end, fixes with the inwall of tower and is connected, and is provided with multiple bolt hole;Reinforcement, is fixedly connected between two bolts hole of flange circle, and axially extends to away from side, tower end along tower, and fixing with tower inwall is connected;Described flange circle is a pair, is separately mounted in upper and lower tower, and is formed a fixed connection by bolt;The inner circumferential side of described flange circle is additionally provided with holder, and described holder is arranged on the surface of two flange circles, and is fixed to clamp by two flange circles.This utility model increases reinforcement in the junction of tower, enhances the bond strength of flange circle and tower, and holder has shared the pulling force that bolt bears, and effectively reduces the load of bolt so that bolt is difficult to loosen, and extends the service life of bolt.
Description
Technical field
This utility model relates to wind power plant, especially a kind of blower fan tower barrel attachment structure.
Background technology
Wind energy, as a kind of regenerative resource, has inexhaustible, the advantage of cleanliness without any pollution.In order to efficiently
The seizure wind energy of rate, the blower fan of Large-scale Wind Turbines is generally placed at the high-altitude of six or seven ten meters, it is therefore desirable to have high intensity
Tower be supported, blower fan tower barrel, as the major bearing structures of blower fan, is typically made up of more piece, when mounted, by rise
More piece tower is fitted together by the equipment that hangs, to reach the setting height(from bottom) of blower fan.Existing tower is bolted more, two towers
Stress between Tong is mainly born by connecting bolt and flange arrangement, due to long-time wind-engaging power effect, and tower junction strong
Degree can be gradually reduced, and the bolt of tower junction easily loosens, the easy stress destruction of flange arrangement, therefore there is bigger installation
Hidden danger.
Given this this utility model is proposed.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of blower fan tower barrel attachment structure, has
The advantage that bonding strength is high.
In order to realize this purpose, this utility model adopts the following technical scheme that
A kind of blower fan tower barrel attachment structure, including, upper tower and lower tower, described upper tower is fixing with lower tower to be connected,
Be provided with flange arrangement in the junction of two tower, described flange arrangement includes,
Flange circle, is positioned at tower end, fixes with the inwall of tower and is connected, and is provided with multiple bolt hole;
Reinforcement, is fixedly connected between two bolts hole of flange circle, and along tower axially to the internal extension of tower, and
Fix with tower inwall and be connected;
Described flange circle is a pair, is separately mounted in upper and lower tower, is provided with bolt in the bolt hole of flange circle, upper,
Lower tower is formed a fixed connection by bolt;
The inner circumferential side of described flange circle is additionally provided with holder, and described holder is arranged on the surface of two flange circles, and by two
Flange circle fixes to clamp.
Further, the centre position of described holder is provided with the groove dodging reinforcement, and the reinforcement of upper and lower tower is respectively
It is stuck in groove.
Further, described holder has two clamping end and connects the middle interconnecting piece of two clamping end, described two folders
Hold end and be positioned at the upper and lower sides of two flange circles, and contact.
Further, described groove is arranged on the centre position of two clamping end, and by the end face side of clamping end in
Between connecting portion direction extend.
Further, at least one clamping end of described holder being provided with a jackscrew structure, described jackscrew structure includes,
Run through this clamping end the threaded rod of threaded engagement and regulating block between this clamping end and flange circle, described threaded rod
Be arrangeding in parallel with the bolt on flange circle, described regulating block is connected with threaded rod, and can be moved up and down by the rotation of threaded rod,
The side of regulating block contacts with flange circle surface.
Further, the width of described holder is more than the distance of adjacent two bolts hole, and described clamping end is along tower radially
Extend to the region between the bolt hole of flange circle and tower inwall, clamping end be provided with the through hole coordinated with bolt hole,
Described bolt passes through hole and the bolt hole of flange circle of clamping end, and is formed a fixed connection with flange circle by holder.
Further, described two clamping end are vertically arranged with middle interconnecting piece, and described middle interconnecting piece is interior with flange circle
All sides fit.
After using technical scheme described in the utility model, bring following beneficial effect:
This utility model, by increasing reinforcement on the flange circle of tower, enhances flange circle strong with the combination of tower
Degree, after upper and lower tower is bolted, by installing holder, utilizes the clamping action of holder so that upper and lower tower
Connect the most firm, and holder has shared the pulling force that bolt bears, and effectively reduces the load of bolt so that bolt is difficult to
Loosen, extend the service life of bolt.
Accompanying drawing explanation
The structure sectional view of Fig. 1: this utility model embodiment one;
Fig. 2: the top view of this utility model embodiment one;
Fig. 3: for the Y close-up schematic view of Fig. 1;
The structure sectional view of Fig. 4: this utility model embodiment two;
Fig. 5: the top view of this utility model embodiment two;
Wherein: 1, upper tower 2, lower tower 3, flange circle 4, holder 5, bolt 6, clamping end 7, middle connection
Portion 8, jackscrew structure 9, through hole 10, reinforcement 11, threaded rod 12, regulating block.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
Embodiment one
As it is shown in figure 1, a kind of blower fan tower barrel attachment structure, including cylindrical upper tower 1 and lower tower 2, general, on
Tower 1 and lower tower 2 have certain tapering, to increase its stability.Described upper tower 1 is fixing with lower tower 2 to be connected, two
The junction of tower is provided with flange arrangement, and described flange arrangement includes, flange circle 3 reinforcement that be connected fixing with flange circle 3
10.Described flange circle 3 is fixing with the inwall of tower to be connected, and is provided with multiple bolt hole, can make upper tower 1 by flange circle 3
It is mutually butted with lower tower 2.Described flange circle 3 is a pair, is separately mounted in upper and lower tower 1,2, the end face of flange circle 3
With tower end flush, after upper and lower tower 1,2 connects, the end face of two flange circles 3 fits.General, single flange circle 3
Often it is segmented into multi-section circular arc blanking, and is spliced.Flange circle 3 is fixing with tower by the way of welding to be connected.
Described reinforcement 10 is fixedly connected between two bolts hole of flange circle 3, and along tower axially inside tower
Extend, and fixing with tower inwall be connected.Reinforcement 10 is fixing with flange circle 3 and tower inwall by the way of welding to be connected.
Bolt 5 is installed in the bolt hole of flange circle 3,5 makes upper and lower tower 1,2 form a fixed connection by tighting a bolt.
For strengthening the intensity of tower junction, the inner circumferential side of described flange circle 3 is additionally provided with holder 4, and described holder 4 is pacified
It is contained in the surface of two flange circles 3, and two flange circles 3 are fixed to clamp.Two flange circles 3 not only by the fastening force of bolt 5,
But also by by the thrust from holder 4.Holder 4 typically uses the metalwork of high intensity, is unlikely to deform, upper and lower
Tower 1,2, by the common effect of bolt 5 with holder 4, connects relatively reliable, effectively prevent bolt 5 and occurs to loosen.
As in figure 2 it is shown, specifically, it is provided with the groove dodging reinforcement 10 in the centre position of holder 4, described groove
Width is close with the thickness of reinforcement 10, and when holder 4 is arranged on flange circle 3, accordingly, the groove of holder 4 is stuck in
On reinforcement 10, make the reinforcement 10 of upper and lower tower 1,2 be stuck in groove, serve the effect of location reinforcement 10,
Under the positioning action of groove, upper and lower tower 1,2 cannot relatively rotate, and therefore, holder 4 serves to have shared and cuts suffered by bolt 5
The effect of shear force.
As it is shown on figure 3, described holder 4 has two clamping end 6 and connects the middle interconnecting piece 7 of two clamping end 6, institute
State clamping end 6 and be stuck in the upper and lower sides of flange circle 3, and contact with each other, to provide certain thrust.Preferably, described two folders
Hold end 6 to be vertically arranged with middle interconnecting piece 7, form straight turning, described middle interconnecting piece 7 and flange circle 3 in both junctions
Inner circumferential side fit, clamping end 6 and middle interconnecting piece 7 are vertically arranged and can preferably outline with flange circle 3 be affixed
Close, to increase contact area.
Being provided with a jackscrew structure 8 at least one clamping end 6 of described holder 4, this jackscrew structure 8 is used for adjusting folder
The pressure that two flange circles 3 are applied by gripping member 4.Described jackscrew structure 8 includes, runs through this clamping end 6 screw thread of threaded engagement
Bar 11 and between this clamping end 6 and flange circle 3 regulating block 12, described threaded rod 11 is parallel with the bolt 5 on flange circle 3
Arranging, described regulating block 12 is connected with threaded rod 11, and regulating block 12 can be made to move up and down by rotating threaded rod 11, regulating block
The side of 12 contacts with flange circle 3 surface, is used for applying pressure.
Owing to threaded rod 11 and holder 4 are threaded engagement, therefore, when rotating threaded rod 11, regulating block 12 will occur
Moving up and down, when regulating block 12 moves to flange circle 3 direction, holder 4 is applied to the pressure on flange circle 3 and will constantly increase
Greatly, and being compressed by two flange circles 3, when opposite direction rotates threaded rod 11, the pressure that holder 4 is applied on flange circle 3 will not
Disconnected reduction, can conveniently dismantle.
Embodiment two
As shown in Figure 4, Figure 5, from the difference of embodiment one, the present embodiment is that the structure of holder 4 is different, the present embodiment
In the width of described holder 4 more than the distance of adjacent two bolts hole, described clamping end 6 extends radially to flange along tower
Region between bolt hole and the tower inwall of circle 3, is provided with the through hole 9 coordinated with bolt hole on clamping end 6, through hole 9
Diameter is slightly larger than bolt hole.Described bolt 5 through the through hole of clamping end 6 and the bolt hole of flange circle 3, and by holder 4 with
Flange circle 3 forms a fixed connection.When mounted, first upper and lower tower 1,2 is docked, then holder 4 is installed, makes holder 4
The bolt hole of through hole alignment flange circle 3, then installs bolt 5, makes holder 4 form a fixed connection with flange circle 3.
Principle of the present utility model is: described holder 4 is rigid member, when it is stuck on flange circle 3, it will thus provide certain
Thrust, make two flange circles 3 fit together closely, and the groove on holder 4 coordinate with reinforcement 10, serves
The effect of location reinforcement 10, therefore, holding frame 4 has been shared the tension suffered by bolt 5 of the upper and lower tower of connection simultaneously and has cut
Shearing stress so that tower connects more firm.Flange circle 3, by the structure-reinforced connection with tower of reinforcement 10, improves
Tower, in the intensity of junction, effectively reduces the cost of overhaul.
The above is embodiment of the present utility model, it is noted that for the ordinary skill in the art,
Without departing under this utility model principle premise, it is also possible to making various deformation and improvement, this also should be considered as this utility model
Protection domain.
Claims (7)
1. a blower fan tower barrel attachment structure, including, upper tower and lower tower, described upper tower is fixing with lower tower to be connected,
The junction of two tower is provided with flange arrangement, it is characterised in that: described flange arrangement includes,
Flange circle, is positioned at tower end, fixes with the inwall of tower and is connected, and is provided with multiple bolt hole;
Reinforcement, is fixedly connected between two bolts hole of flange circle, and along tower axially to the internal extension of tower, and and tower
Cylinder inwall is fixing to be connected;
Described flange circle is a pair, is separately mounted in upper and lower tower, is provided with bolt, upper and lower tower in the bolt hole of flange circle
Cylinder is formed a fixed connection by bolt;
The inner circumferential side of described flange circle is additionally provided with holder, and described holder is arranged on the surface of two flange circles, and by two flanges
Circle fixes to clamp.
A kind of blower fan tower barrel attachment structure the most according to claim 1, it is characterised in that: the centre position of described holder
Being provided with the groove dodging reinforcement, the reinforcement of upper and lower tower is stuck in groove.
A kind of blower fan tower barrel attachment structure the most according to claim 2, it is characterised in that: described holder has two clampings
End and the middle interconnecting piece of connection two clamping end, described two clamping end are positioned at the upper and lower sides of two flange circles, and contact.
A kind of blower fan tower barrel attachment structure the most according to claim 3, it is characterised in that: described groove is arranged on two clampings
The centre position of end, and extended to middle interconnecting piece direction by the end face side of clamping end.
A kind of blower fan tower barrel attachment structure the most according to claim 3, it is characterised in that: at least one folder of described holder
Holding and be provided with a jackscrew structure on end, described jackscrew structure includes, run through this clamping end threaded engagement threaded rod and
Regulating block between this clamping end and flange circle, described threaded rod be arranged in parallel with the bolt on flange circle, described regulation
Block is connected with threaded rod, and can be moved up and down by the rotation of threaded rod, and the side of regulating block contacts with flange circle surface.
A kind of blower fan tower barrel attachment structure the most according to claim 3, it is characterised in that: the width of described holder is more than
The distance of adjacent two bolts hole, described clamping end extends radially between the bolt hole of flange circle and tower inwall along tower
Region, is provided with the through hole coordinated with bolt hole on clamping end, and described bolt is through the through hole of clamping end and flange circle
Bolt hole, and holder is formed a fixed connection with flange circle.
A kind of blower fan tower barrel attachment structure the most according to claim 3, it is characterised in that: described two clamping end with in
Between connecting portion be vertically arranged, described middle interconnecting piece fits with the inner circumferential side of flange circle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620444070.0U CN205669461U (en) | 2016-05-16 | 2016-05-16 | A kind of blower fan tower barrel attachment structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620444070.0U CN205669461U (en) | 2016-05-16 | 2016-05-16 | A kind of blower fan tower barrel attachment structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205669461U true CN205669461U (en) | 2016-11-02 |
Family
ID=57193187
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620444070.0U Expired - Fee Related CN205669461U (en) | 2016-05-16 | 2016-05-16 | A kind of blower fan tower barrel attachment structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205669461U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106640545A (en) * | 2016-12-13 | 2017-05-10 | 北京金风科创风电设备有限公司 | Transition connecting piece, concrete tower and concrete tower construction method |
| CN111306007A (en) * | 2020-04-09 | 2020-06-19 | 颜志成 | Fan tower drum connecting structure and construction method |
| CN111997844A (en) * | 2020-09-09 | 2020-11-27 | 上海电气风电集团股份有限公司 | Monitoring system for tower clearance of wind generating set |
| CN112739908A (en) * | 2018-08-13 | 2021-04-30 | 西门子歌美飒可再生能源私人有限责任公司 | Assembly comprising a first and a second component and a connecting element and method for assembling such an assembly |
| CN114017262A (en) * | 2021-11-30 | 2022-02-08 | 中国华能集团清洁能源技术研究院有限公司 | A connection structure and method for a spliced wind power support column |
| CN116221029A (en) * | 2023-03-30 | 2023-06-06 | 长沙鼎盛重工科技有限公司 | Prefabricated tower shell ring connection structure of wind-powered electricity generation mixed tower |
| CN117167377A (en) * | 2023-01-14 | 2023-12-05 | 国电联合动力技术有限公司 | Locking flange |
| WO2024132071A1 (en) * | 2022-12-23 | 2024-06-27 | Vestas Wind Systems A/S | Wind turbine tower section and connection arrangement therefor |
-
2016
- 2016-05-16 CN CN201620444070.0U patent/CN205669461U/en not_active Expired - Fee Related
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106640545A (en) * | 2016-12-13 | 2017-05-10 | 北京金风科创风电设备有限公司 | Transition connecting piece, concrete tower and concrete tower construction method |
| CN112739908A (en) * | 2018-08-13 | 2021-04-30 | 西门子歌美飒可再生能源私人有限责任公司 | Assembly comprising a first and a second component and a connecting element and method for assembling such an assembly |
| US11236726B2 (en) | 2018-08-13 | 2022-02-01 | C1 Connections Holding B.V. | Assembly comprising a first and a second member and a connector, and a method of assembling such an assembly |
| CN112739908B (en) * | 2018-08-13 | 2022-03-11 | C1连接控股私人有限责任公司 | Assembly comprising a first and a second component and a connecting element and method for assembling such an assembly |
| CN111306007A (en) * | 2020-04-09 | 2020-06-19 | 颜志成 | Fan tower drum connecting structure and construction method |
| CN111997844A (en) * | 2020-09-09 | 2020-11-27 | 上海电气风电集团股份有限公司 | Monitoring system for tower clearance of wind generating set |
| CN114017262A (en) * | 2021-11-30 | 2022-02-08 | 中国华能集团清洁能源技术研究院有限公司 | A connection structure and method for a spliced wind power support column |
| WO2024132071A1 (en) * | 2022-12-23 | 2024-06-27 | Vestas Wind Systems A/S | Wind turbine tower section and connection arrangement therefor |
| CN117167377A (en) * | 2023-01-14 | 2023-12-05 | 国电联合动力技术有限公司 | Locking flange |
| CN117167377B (en) * | 2023-01-14 | 2026-02-03 | 国电联合动力技术有限公司 | Locking flange |
| CN116221029A (en) * | 2023-03-30 | 2023-06-06 | 长沙鼎盛重工科技有限公司 | Prefabricated tower shell ring connection structure of wind-powered electricity generation mixed tower |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205669461U (en) | A kind of blower fan tower barrel attachment structure | |
| CN205592592U (en) | Lift support piece | |
| CN105083467B (en) | A kind of shipbuilding axle rudder system bracing wire frock | |
| CN102328196B (en) | Vibration type pin pulling device | |
| CN101299520B (en) | High voltage transmission line ground wire riser | |
| CN201428238Y (en) | Expansion sleeve type scaffold connecting part | |
| CN209488498U (en) | A adjustable photovoltaic support for mountain region | |
| CN202689665U (en) | Three-column type repair tower | |
| CN205577583U (en) | Salvage tower system and dismantle light -duty armful of pole immediately | |
| CN212673848U (en) | Supporting device for material blocking arm of heating furnace feeding rack | |
| CN210457369U (en) | Simple continuous casting fan-shaped section frame connecting pipe extraction device | |
| CN222301672U (en) | Photovoltaic module mounting bracket | |
| CN202192405U (en) | Hydraulic automatic pin pulling device | |
| CN202910794U (en) | Novel generator thrust tile dismantling tool | |
| CN220870245U (en) | Pipeline installation regulator | |
| CN208132861U (en) | Horizontal hydrogenerator disassembling device for main shaft | |
| CN201250066Y (en) | Correlative structure of adjustable wall laying stay bars | |
| CN222066783U (en) | Quick disassembly and assembly of tunnel support frame | |
| CN103273325B (en) | A kind of steel plate shearing machine load bearing holder mounting structure | |
| CN218814409U (en) | Steel construction installation connection structure | |
| CN221030981U (en) | Steel construction building beam template | |
| CN215859158U (en) | Prestress tensioning suspension tool for wind power tower | |
| CN203282182U (en) | Installation structure for bearing pedestal of steel plate shearing equipment | |
| CN219569169U (en) | Green light steel building frame | |
| CN202556038U (en) | Shield constructs quick-witted jack and props boots installation and dismounting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161102 Termination date: 20180516 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |