CN205663658U - But combination's hydraulic jet pump - Google Patents
But combination's hydraulic jet pump Download PDFInfo
- Publication number
- CN205663658U CN205663658U CN201620543571.4U CN201620543571U CN205663658U CN 205663658 U CN205663658 U CN 205663658U CN 201620543571 U CN201620543571 U CN 201620543571U CN 205663658 U CN205663658 U CN 205663658U
- Authority
- CN
- China
- Prior art keywords
- valve
- pump
- mixed liquid
- check valve
- discharge hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Details Of Reciprocating Pumps (AREA)
Abstract
一种可联作的水力喷射泵,泵体随油管下入井内固定不动,泵芯从泵体之上的油管内投入到泵体内,在泵体的下部安装可控式单流阀,单流阀的阀球投入前流体可以从上向下流动,不能从单流阀的混合液排出孔流出,单流阀的阀球投入后再打压,单流阀的混合液排出孔被打开,泵体下部的混合液可以从所述的混合液排出孔排出,单流阀的阀球投入后阀球可以阻止流体从上向下流动,可以通过来自下部的流体,阀球投入到滑套内,阀球的直径大于滑套下部的内径,可以进行酸化、压裂施工联作施工,对于需要酸化、压裂等施工的油井可以减少施工工序,缩短作业时间,能及时排液,避免地层受到伤害,保证酸化、压裂效果,可以减少作业费用,具有显著的经济效益。
A hydraulic jet pump that can be combined. The pump body is fixed in the well with the oil pipe. The pump core is put into the pump body from the oil pipe above the pump body. A controllable check valve is installed at the bottom of the pump body. Before the valve ball of the flow valve is put in, the fluid can flow from top to bottom, but cannot flow out from the mixed liquid discharge hole of the check valve. After the valve ball of the check valve is put in and then pressurized, the mixed liquid discharge hole of the check valve is opened, and the pump The mixed liquid in the lower part of the body can be discharged from the mixed liquid discharge hole. After the valve ball of the check valve is put in, the valve ball can prevent the fluid from flowing from top to bottom. The diameter of the valve ball is larger than the inner diameter of the lower part of the sliding sleeve, which can be combined with acidizing and fracturing construction. For oil wells that require acidizing, fracturing, etc., the construction process can be reduced, the operation time can be shortened, and the liquid can be drained in time to avoid damage to the formation. , to ensure acidizing and fracturing effects, can reduce operating costs, and have significant economic benefits.
Description
技术领域technical field
本实用新型属于油田采油用的设备,是安装在井下抽吸流体的水力喷射泵,具体是一种可联作的水力喷射泵。The utility model belongs to equipment for oil recovery in oil fields, which is a hydraulic jet pump installed in the well to suck fluid, in particular a hydraulic jet pump that can be combined.
背景技术Background technique
水力喷射泵的泵体随油管下入井内固定不动,泵芯从泵体之上的油管内投入到泵体内,泵芯在泵体内形成动力液通道、井液通道、混合液通道,使动力液的能量传递给井液,从而将井液举升到地面。为了保证下入水力喷射泵的管柱密闭和泵芯与泵体之间的密封,要在下入水力喷射泵的管柱的底部下入单流阀,使其可以阻止流体从上向下流动,不影响井液经单流阀进入泵体内。但水力喷射泵管柱下了单流阀后就不能进行酸化、压裂等联作施工,因为单流阀阻止向地层注入流体。如果油井要进行酸化、压裂等施工作业,只有单独下一躺酸化、压裂等施工管柱对地层进行酸化、压裂等施工作业,再提出这躺管柱,然后再下入水力喷射泵管柱。由上述可知,目前的喷射泵管柱不能进行联作施工,如果需要在酸化、压裂等施工作业的井上下水力喷射泵,其施工程序多,工作量大,油井作业时间长,作业费用高。由于要在酸化、压裂等施工作业的井上下水力喷射泵施工程序多、时间长,不能及时排出酸化、压裂的废液,造成废液堵塞地层,使地层受到伤害,出油量大大减少,造成重大经济损失。The pump body of the hydraulic jet pump is lowered into the well with the oil pipe and fixed, and the pump core is put into the pump body from the oil pipe above the pump body. The energy of the well fluid is transferred to the well fluid, thereby lifting the well fluid to the surface. In order to ensure the airtightness of the pipe string of the hydraulic jet pump and the seal between the pump core and the pump body, a check valve should be installed at the bottom of the pipe string of the hydraulic jet pump to prevent the fluid from flowing from top to bottom. It does not affect the well fluid entering the pump body through the check valve. However, after the hydraulic jet pump string is lowered with the check valve, acidizing, fracturing and other joint operations cannot be carried out, because the check valve prevents fluid injection into the formation. If the oil well needs to carry out acidizing, fracturing and other construction operations, only the next laying acidizing, fracturing and other construction strings are used to acidify the formation, fracturing and other construction operations, and then the laying string is raised, and then the hydraulic jet pump is lowered. pipe string. From the above, it can be seen that the current jet pump string cannot be used in joint construction. If it is necessary to install a hydraulic jet pump in a well for acidification, fracturing, etc., the construction procedures are many, the workload is heavy, the oil well operation time is long, and the operation cost is high. . Since there are many construction procedures and long time for hydraulic jet pumps to be used in the wells of acidification and fracturing operations, the acidification and fracturing waste liquid cannot be discharged in time, causing the waste liquid to block the formation, damage the formation, and greatly reduce the oil output. , resulting in significant economic losses.
发明内容Contents of the invention
本实用新型的目的是设计一种可联作的水力喷射泵,使其下水力喷射泵的管柱可以进行酸化、压裂等联作施工,克服上述存在的问题,减少施工工序,缩短作业时间,避免地层受到伤害,减少作业费用。The purpose of this utility model is to design a hydraulic jet pump that can be combined, so that the pipe column of the hydraulic jet pump can be used for joint construction such as acidification and fracturing, so as to overcome the above-mentioned problems, reduce the construction process, and shorten the working time , to avoid formation damage and reduce operating costs.
本实用新型的目的是这样实现的:包括泵芯、泵体,泵体随油管下入井内固定不动,泵芯从泵体之上的油管内投入到泵体内,泵芯在泵体内形成动力液通道、井液通道、混合液通道,在泵体的下部安装可控式单流阀,单流阀的阀球投入前流体可以从上向下流动,不能从单流阀的混合液排出孔流出,单流阀的阀球投入后再打压,单流阀的混合液排出孔被打开,泵体下部的混合液可以从所述的混合液排出孔排出,单流阀的阀球投入后阀球可以阻止流体从上向下流动,可以通过来自下部的流体。The purpose of this utility model is achieved in the following way: including the pump core and the pump body, the pump body is fixed in the well along with the oil pipe, the pump core is put into the pump body from the oil pipe above the pump body, and the pump core forms a dynamic force in the pump body Fluid channel, well fluid channel, and mixed liquid channel. A controllable check valve is installed at the lower part of the pump body. outflow, the valve ball of the check valve is put in and then pressurized, the mixed liquid discharge hole of the check valve is opened, the mixed liquid in the lower part of the pump body can be discharged from the mixed liquid discharge hole, the valve ball of the check valve is put into the valve The ball can prevent the fluid from flowing from top to bottom, and can pass the fluid from the bottom.
所述的可控式单流阀包括上密封圈、剪断销钉、下密封圈、滑套、阀球、阀体,阀体上有混合液排出孔,滑套上套装上密封圈、下密封圈,滑套安装在阀体内,滑套覆盖所述的混合液排出孔,上密封圈处于所述的混合液排出孔之上,下密封圈处于所述的混合液排出孔之下,滑套由剪断销钉固定在阀体上,阀球投入到滑套内,阀球的直径大于滑套下部的内径。The controllable check valve includes an upper sealing ring, a shear pin, a lower sealing ring, a sliding sleeve, a valve ball, and a valve body. , the sliding sleeve is installed in the valve body, the sliding sleeve covers the mixed liquid discharge hole, the upper seal ring is above the mixed liquid discharge hole, the lower sealing ring is below the mixed liquid discharge hole, the sliding sleeve is formed by The shear pin is fixed on the valve body, the valve ball is put into the sliding sleeve, and the diameter of the valve ball is greater than the inner diameter of the lower part of the sliding sleeve.
本实用新型的有益效果是:阀球投入前混合液排出孔被堵塞,管柱与地层相通,可以进行酸化、压裂施工,酸化、压裂施工结束后投入阀球打压,剪断销钉被打断,滑套下行,混合液排出孔使泵体内外联通,再投入泵芯到泵体内,水力喷射泵就可工作抽油了,因此,本实用新型可以进行联作施工,克服了现有水力喷射泵存在的不足,对于需要酸化、压裂等施工的油井可以减少施工工序,缩短作业时间,能及时排液,避免地层受到伤害,保证酸化、压裂效果,可以减少作业费用,具有显著的经济效益。The beneficial effects of the utility model are: before the valve ball is put into the mixed fluid discharge hole is blocked, the pipe string is connected with the formation, acidification and fracturing construction can be carried out, after the acidification and fracturing construction is completed, the valve ball is put into pressure, and the shearing pin is interrupted , the sliding sleeve goes down, the mixed liquid discharge hole connects the inside and outside of the pump body, and then puts the pump core into the pump body, and the hydraulic jet pump can work to pump oil. Therefore, the utility model can carry out joint construction, which overcomes the existing hydraulic jet Insufficient pumps, for oil wells that need acidizing, fracturing, etc., construction procedures can be reduced, operation time can be shortened, liquid can be drained in time, formation damage can be avoided, acidizing and fracturing effects can be guaranteed, and operating costs can be reduced. benefit.
附图说明Description of drawings
图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
具体实施方式detailed description
下面结合附图1对本实用新型的实施例进行说明。Below in conjunction with accompanying drawing 1 embodiment of the present utility model is described.
如图1所示,本实用新型的实施例包括泵芯1、泵体2,泵体2随油管下入井内固定不动,泵芯1从泵体2之上的油管内投入到泵体2内,泵芯1在泵体2内形成动力液通道、井液通道、混合液通道,在泵体2的下部安装可控式单流阀,单流阀的阀球投入前流体可以从上向下流动,不能从单流阀的混合液排出孔流出,单流阀的阀球投入后再打压,单流阀的混合液排出孔被打开,泵体2下部的混合液可以从所述的混合液排出孔排出,单流阀的阀球投入后阀球可以阻止流体从上向下流动,可以通过来自下部的流体。As shown in Figure 1, the embodiment of the utility model includes a pump core 1 and a pump body 2. The pump body 2 is fixed in the well with the oil pipe, and the pump core 1 is dropped into the pump body 2 from the oil pipe above the pump body 2. Inside, the pump core 1 forms a power fluid channel, a well fluid channel, and a mixed fluid channel in the pump body 2, and a controllable check valve is installed at the lower part of the pump body 2. Before the valve ball of the check valve is put into Down flow, can not flow out from the mixed liquid discharge hole of the check valve, the valve ball of the check valve is put in and then pressurized, the mixed liquid discharge hole of the check valve is opened, and the mixed liquid in the lower part of the pump body 2 can flow from the mixed liquid After the valve ball of the check valve is put in, the valve ball can prevent the fluid from flowing from top to bottom, and can pass the fluid from the bottom.
所述的可控式单流阀包括上密封圈3、剪断销钉5、下密封圈6、滑套7、阀球8、阀体9,阀体9上有混合液排出孔4,滑套7上套装上密封圈3、下密封圈6,滑套7安装在阀体9内,滑套7覆盖所述的混合液排出孔4,上密封圈3处于所述的混合液排出孔4之上,下密封圈6处于所述的混合液排出孔4之下,上密封圈3、下密封圈6密封滑套7与阀体9之间的间隙,滑套7由剪断销钉5固定在阀体9上,阀球8投入到滑套7内,阀球8的直径大于滑套7下部的内径,阀球8可以堵塞滑套7下部的内孔。剪断销钉5处于上密封圈3、下密封圈6之间,使安装剪断销钉5的螺纹间隙不漏失。The controllable check valve includes an upper sealing ring 3, a shear pin 5, a lower sealing ring 6, a sliding sleeve 7, a valve ball 8, and a valve body 9, and the valve body 9 has a mixed liquid discharge hole 4, and the sliding sleeve 7 Upper sleeve upper sealing ring 3, lower sealing ring 6, sliding sleeve 7 is installed in the valve body 9, sliding sleeve 7 covers the mixed liquid discharge hole 4, and the upper sealing ring 3 is above the mixed liquid discharge hole 4 , the lower sealing ring 6 is under the mixed liquid discharge hole 4, the upper sealing ring 3 and the lower sealing ring 6 seal the gap between the sliding sleeve 7 and the valve body 9, and the sliding sleeve 7 is fixed on the valve body by the shear pin 5 9, the valve ball 8 is dropped into the sliding sleeve 7, the diameter of the valve ball 8 is greater than the inner diameter of the sliding sleeve 7 bottom, and the valve ball 8 can block the inner hole of the sliding sleeve 7 bottom. The shearing pin 5 is between the upper sealing ring 3 and the lower sealing ring 6, so that the thread gap for installing the shearing pin 5 does not leak.
可控式单流阀安装在泵体2的下部时阀球8不放入,泵体2、可控式单流阀随油管下入井内,使可控式单流阀之下的封隔器座封密封套管,地面至地层处于畅通状态,能将入井介质打入地层,可以进行如酸化、压裂等施工。施工结束后投入阀球8、泵芯1打压(也可以先投阀球8打压后,再投入泵芯1),滑套7被堵塞,压力使剪断销钉5被剪断,滑套7下行,混合液排出孔4被打开,泵芯1的下部插入滑套7内配合密封,混合液排出孔4与井液进入通道被隔开,水力喷射泵可以工作采油,从而实现酸化、压裂等施工与采油联作。When the controllable check valve is installed in the lower part of the pump body 2, the valve ball 8 is not put in, the pump body 2 and the controllable check valve are lowered into the well along with the tubing, so that the packer under the controllable check valve The sealing casing is sealed, and the ground to the formation is in a smooth state, which can drive the well medium into the formation, and can be used for acidizing, fracturing and other constructions. After the construction is completed, the valve ball 8 and the pump core 1 are put into pressure (the valve ball 8 can also be put into the pump core 1 for pressure first), the sliding sleeve 7 is blocked, the pressure causes the shear pin 5 to be cut, the sliding sleeve 7 goes down, and the mixing The liquid discharge hole 4 is opened, the lower part of the pump core 1 is inserted into the sliding sleeve 7 to cooperate with sealing, the mixed liquid discharge hole 4 is separated from the well fluid inlet channel, and the hydraulic jet pump can work to produce oil, so as to realize acidification, fracturing and other constructions and operations. Joint oil production.
泵芯1的底部有筛孔,井液可以通过此筛孔从下向上流到泵芯1里,筛孔的尺寸小于阀球8的尺寸,可以挡住阀球8,使阀球8不会向上窜动,限制阀球8的活动范围。There is a sieve hole at the bottom of the pump core 1 through which the well fluid can flow from bottom to top into the pump core 1. The size of the sieve hole is smaller than the size of the valve ball 8, which can block the valve ball 8 and prevent the valve ball 8 from going upward. The movement limits the range of motion of the valve ball 8.
由泵芯1、泵体2组成的水力喷射泵的工作原理与普通水力喷射泵相同。The working principle of the hydraulic jet pump composed of the pump core 1 and the pump body 2 is the same as that of the common hydraulic jet pump.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620543571.4U CN205663658U (en) | 2016-06-07 | 2016-06-07 | But combination's hydraulic jet pump |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620543571.4U CN205663658U (en) | 2016-06-07 | 2016-06-07 | But combination's hydraulic jet pump |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205663658U true CN205663658U (en) | 2016-10-26 |
Family
ID=57156477
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620543571.4U Expired - Fee Related CN205663658U (en) | 2016-06-07 | 2016-06-07 | But combination's hydraulic jet pump |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205663658U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117248876A (en) * | 2022-06-10 | 2023-12-19 | 中国石油天然气股份有限公司 | A double sliding sleeve type anti-backflow steam huff and puff steam injection pipe string |
-
2016
- 2016-06-07 CN CN201620543571.4U patent/CN205663658U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117248876A (en) * | 2022-06-10 | 2023-12-19 | 中国石油天然气股份有限公司 | A double sliding sleeve type anti-backflow steam huff and puff steam injection pipe string |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103133340B (en) | Gas well automatic drain plunger | |
| CN107366510A (en) | A kind of down-hole plugging device and actuating oil-pumping unit with pressure, the workover treatment technology of oil pipe | |
| CN210033376U (en) | Negative pressure unblocking tool | |
| CN203420679U (en) | A large-displacement composite lifting system for deep wells and ultra-deep wells | |
| CN104948147B (en) | Flow splitting device, heavy oil viscosity reduction production system and production method thereof | |
| CN204532255U (en) | Ground hydraulic open-type down-hole drainage device | |
| CN205100952U (en) | Device of self -sealing oil stream is overhauld in not kill -job oil pumping operation | |
| CN111878042B (en) | Shale gas horizontal well full life cycle drainage and gas production integrated pipe column and construction method | |
| CN103807222B (en) | Two-tube hydraulic jet pump | |
| CN106321030B (en) | Make device for perforation and the connection of sand fracturing | |
| CN202338481U (en) | Gas well automatic drain plunger | |
| CN203403868U (en) | Heavy oil well double-jet-pump lifting pipe string | |
| CN107939351A (en) | A coalbed methane drainage gas recovery device and its use method | |
| CN206554888U (en) | Pump assembly extracting device of oil is sprayed in the direct circulation of single tube post in oil pipe | |
| CN204002746U (en) | Coiled tubing infinite stages fracturing sliding bush | |
| CN205297515U (en) | A hydraulic jet fracturing device driven by coiled tubing | |
| CN107795297A (en) | Multistage a chain of Cut Block blocking | |
| CN204041041U (en) | Oil Well Stimulation Device | |
| CN104453772A (en) | Self-sealed compression type packer | |
| CN204591206U (en) | A kind of underground supercharged annular blowout preventer | |
| CN110318712B (en) | A special downhole hydraulic motor for oil production | |
| CN104019030A (en) | Discharging device of reverse-circulating liquid-driving oil extraction screw pump | |
| CN209724295U (en) | One-way downhole shut-off valve | |
| CN221120200U (en) | Variable displacement rod type oil pump | |
| CN220118289U (en) | Variable displacement oil pump |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161026 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |