CN205583533U - Right insulator specialized tool with electricity - Google Patents
Right insulator specialized tool with electricity Download PDFInfo
- Publication number
- CN205583533U CN205583533U CN201620415108.1U CN201620415108U CN205583533U CN 205583533 U CN205583533 U CN 205583533U CN 201620415108 U CN201620415108 U CN 201620415108U CN 205583533 U CN205583533 U CN 205583533U
- Authority
- CN
- China
- Prior art keywords
- insulator
- bar
- insulating
- pole
- righting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Insulators (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种专用工具,具体涉及一种带电扶正绝缘子专用工具。 The utility model relates to a special tool, in particular to a special tool for live righting insulators.
背景技术 Background technique
目前输配电架空线路上时线路与杆塔横担之间的绝缘物体是绝缘子,因为大风的缘故,绝缘子底部螺丝松动,经常会出现歪倒的现象,这给输配电架空线路的正常运行带来了很大的安全隐患,为了扶正歪倒的绝缘子,供电部门需停电才能登杆进行,这样不但降低了供电可靠性,同时耗费时间。 At present, insulators are the insulating objects between the line and the cross-arm of the tower on the overhead lines of power transmission and distribution. There is a great potential safety hazard. In order to straighten the crooked insulator, the power supply department needs to cut off the power to climb the pole. This not only reduces the reliability of power supply, but also takes time.
发明内容 Contents of the invention
本实用新型的目的就是针对现有技术存在的缺陷,提供一种带电扶正绝缘子专用工具。 The purpose of the utility model is to provide a special tool for live righting insulators aiming at the defects in the prior art.
其技术方案是:带电扶正绝缘子专用工具,包括支撑杆和旋紧杆,所述支撑杆为在第一绝缘杆的一端部设有夹线钩头组成;所述旋紧杆为在第二绝缘杆的一端部设有能拆装的套筒扳手组成。 Its technical solution is: a special tool for live righting insulators, including a support rod and a tightening rod, the support rod is composed of a clamping hook at one end of the first insulating rod; One end of the rod is provided with a removable socket wrench.
其中,所述夹线钩头由两个安装方向相反的金属钩子组成。所述第一绝缘杆及第二绝缘杆均为环氧树脂材料制作成1.5—2.5米长的绝缘杆。 Wherein, the clamping hook head is composed of two metal hooks with opposite installation directions. Both the first insulating rod and the second insulating rod are made of epoxy resin material and are 1.5-2.5 meters long.
本实用新型与现有技术相比较,具有以下优点:设计合理、结构简单、强度大,便捷高效,无需停电便可进行绝缘子的扶正和紧固,安全实用,不仅提高了工作效率,同时保证了供电可靠性。 Compared with the prior art, the utility model has the following advantages: reasonable design, simple structure, high strength, convenience and high efficiency, the straightening and fastening of insulators can be carried out without power failure, safe and practical, not only improving work efficiency, but also ensuring power supply reliability.
附图说明 Description of drawings
图1是本实用新型中支撑杆的结构示意图; Fig. 1 is the structural representation of support bar in the utility model;
图2是本实用新型中旋紧杆的结构示意图。 Fig. 2 is a structural schematic diagram of the tightening rod in the utility model.
具体实施方式 detailed description
参照图1—图2,一种带电扶正绝缘子专用工具,包括支撑杆和旋紧杆,支撑杆和旋紧杆配合使用,所述支撑杆为在第一绝缘杆1的一端部设有夹线钩头2组成,所述夹线钩头2由两个安装方向相反的金属钩子组成。所述旋紧杆为在第二绝缘杆3的一端部设有能拆装的套筒扳手4组成,套筒扳手4的规格可根据螺丝的型号随时更换。所述第一绝缘杆1及第二绝缘杆3均为环氧树脂材料制作成1.5—2.5米长的绝缘杆。 Referring to Figure 1-Figure 2, a special tool for live righting insulators, including a support rod and a tightening rod, the support rod and the tightening rod are used in conjunction, and the support rod is provided with a clamping wire at one end of the first insulating rod 1 The hook head 2 is composed of two metal hooks with opposite mounting directions. Said tightening rod is formed by being provided with a dismountable socket wrench 4 at one end of the second insulating rod 3, and the specifications of the socket wrench 4 can be replaced at any time according to the type of the screw. Both the first insulating rod 1 and the second insulating rod 3 are insulating rods made of epoxy resin material with a length of 1.5-2.5 meters.
使用时,一人手握支撑杆的第一绝缘杆1,将支撑杆的夹线钩头2向上,将夹线钩头2的两个钩子将导线支撑并锁紧,这时导线作用于绝缘子上的力暂由夹线钩头2承受,通过夹线钩头2可将绝缘子扶正到正确的位置;此时另一人手握旋紧杆的第二绝缘杆3,其套筒扳手4端向上,将套筒扳手对准绝缘子底部的螺丝,转动第二绝缘杆3即可拧紧绝缘子底部的螺丝,套筒扳手的规格可根据绝缘子底部螺丝的型号随时更换,以适应不同规格的绝缘子。 When in use, one person holds the first insulating rod 1 of the support rod, raises the clamping hook 2 of the support rod upward, supports and locks the two hooks of the clamping hook 2 on the wire, and at this time the wire acts on the insulator The force of the clamping hook 2 is temporarily borne by the clamping hook 2, and the insulator can be straightened to the correct position through the clamping hook 2; at this time, another person holds the second insulating rod 3 of the tightening rod, and the 4 ends of the socket wrench are upward. Align the socket wrench with the screw at the bottom of the insulator, and turn the second insulating rod 3 to tighten the screw at the bottom of the insulator. The specifications of the socket wrench can be changed at any time according to the type of the screw at the bottom of the insulator, so as to adapt to insulators of different specifications.
本实用新型设计合理、结构简单、强度大,便捷高效,无需停电便可进行绝缘子的扶正和紧固,安全实用,不仅提高了工作效率,同时保证了供电可靠性。 The utility model is reasonable in design, simple in structure, high in strength, convenient and efficient, and can carry out straightening and fastening of insulators without power failure, is safe and practical, not only improves work efficiency, but also ensures power supply reliability.
Claims (3)
- The most charged righting insulator specific purpose tool, including support bar and screw bar, it is characterised in that: described support bar is to be provided with clamp gib head composition at the one end of the first insulating bar;The described bar that screws is to be provided with, at the one end of the second insulating bar, the box spanner composition that can be removably mounted.
- Charged righting insulator specific purpose tool the most according to claim 1, it is characterised in that: described clamp gib head is made up of the metal hook that two installation directions are contrary.
- Charged righting insulator specific purpose tool the most according to claim 1, it is characterised in that: described first insulating bar and the second insulating bar are epoxide resin material and are fabricated to 1.5 2.5 meters of long insulating bars.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620415108.1U CN205583533U (en) | 2016-05-10 | 2016-05-10 | Right insulator specialized tool with electricity |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620415108.1U CN205583533U (en) | 2016-05-10 | 2016-05-10 | Right insulator specialized tool with electricity |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205583533U true CN205583533U (en) | 2016-09-14 |
Family
ID=56856449
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620415108.1U Expired - Fee Related CN205583533U (en) | 2016-05-10 | 2016-05-10 | Right insulator specialized tool with electricity |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205583533U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106654988A (en) * | 2016-11-18 | 2017-05-10 | 国网山东省电力公司新泰市供电公司 | Fastening tool used for insulator and method thereof |
| CN110265237A (en) * | 2019-07-19 | 2019-09-20 | 广东电网有限责任公司 | A kind of not straight correcting device of disconnecting link conjunction |
| CN116316258A (en) * | 2023-02-16 | 2023-06-23 | 国网新疆电力有限公司昌吉供电公司 | A device for fastening and straightening insulators with live lines |
-
2016
- 2016-05-10 CN CN201620415108.1U patent/CN205583533U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106654988A (en) * | 2016-11-18 | 2017-05-10 | 国网山东省电力公司新泰市供电公司 | Fastening tool used for insulator and method thereof |
| CN106654988B (en) * | 2016-11-18 | 2017-11-10 | 国网山东省电力公司新泰市供电公司 | A kind of method for carrying out tightening operation to insulator based on fastening tool |
| CN110265237A (en) * | 2019-07-19 | 2019-09-20 | 广东电网有限责任公司 | A kind of not straight correcting device of disconnecting link conjunction |
| CN116316258A (en) * | 2023-02-16 | 2023-06-23 | 国网新疆电力有限公司昌吉供电公司 | A device for fastening and straightening insulators with live lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203456796U (en) | Broadsword fixture for replacing single insulator of duplex insulator string during power failure | |
| CN101820144B (en) | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire | |
| CN205583533U (en) | Right insulator specialized tool with electricity | |
| CN108847612A (en) | The specific purpose tool of charged for replacement 35kV strain insulator string | |
| CN207459562U (en) | The auxiliary stand of cross-arm in a kind of replacement line bar | |
| CN201315354Y (en) | Grounding wire clamp at gap bridge bus conducting wire end | |
| CN203300937U (en) | High-hitching ground wire operating lever | |
| CN103594964A (en) | Pole tower lead supporting frame | |
| CN203352104U (en) | Multifunctional insulating cross arm | |
| CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
| CN104466459B (en) | Multifunctional grounding wire | |
| CN204053905U (en) | Electrified fastening device clamp erecting tools | |
| CN105186402A (en) | Multifunctional cable head preparation device | |
| CN205104855U (en) | Multi -functional cable head production device | |
| CN205189743U (en) | Insulating hard terraced afterbody mounting fixture | |
| CN105239918B (en) | Tail fixing clamp for insulating hard ladder | |
| CN202210666U (en) | A tool for fastening U-shaped bolts of line suspension clamps with electricity | |
| CN205692990U (en) | One is charged takes fire tool kit | |
| CN204793832U (en) | Join in marriage electrified maintenance in many loop lines of net way and carry lineman's utensil | |
| CN204651789U (en) | The special hanger of hot-line insulator string replacement | |
| CN203456795U (en) | Conductor-side link plate clamping tool for replacing four-split conductor duplex strain insulator string | |
| CN203871749U (en) | Hot-line work feeler lever laborsaving wrench | |
| CN203850720U (en) | Live working probe rod wrench | |
| CN102420402A (en) | New Technology of Live Fastening Drainage Wire Clamp | |
| CN105790158A (en) | Special tools for live replacement of 35kV tension insulator strings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20170510 |