CN205559182U - Plunger pump with high pressure drainage hole - Google Patents

Plunger pump with high pressure drainage hole Download PDF

Info

Publication number
CN205559182U
CN205559182U CN201620271528.7U CN201620271528U CN205559182U CN 205559182 U CN205559182 U CN 205559182U CN 201620271528 U CN201620271528 U CN 201620271528U CN 205559182 U CN205559182 U CN 205559182U
Authority
CN
China
Prior art keywords
plunger
pump
high pressure
hole
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620271528.7U
Other languages
Chinese (zh)
Inventor
冯浩杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Ming Yin Electronic Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620271528.7U priority Critical patent/CN205559182U/en
Application granted granted Critical
Publication of CN205559182U publication Critical patent/CN205559182U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fuel-Injection Apparatus (AREA)

Abstract

The utility model relates to a plunger pump with high pressure drainage hole, including the pump body, pump cover, the pump cover is installed first plunger passageway and second plunger passageway have been offered to one side of the pump body in the pump body, offered prism of first order consent and prism of second order consent in the pump cover, install first plunger in first plunger passageway, install the second plunger in second plunger passageway, and diversion channels A has been offered to the preceding terminal surface intermediate position of first plunger, have offered two obliquely high pressure drainage hole A on diversion channels A's inside wall, diversion channels B has been offered to the preceding terminal surface intermediate position of second plunger, has offered two obliquely high pressure drainage hole B on diversion channels B's inside wall. Through seted up diversion channels A and high -pressure drainage hole A beyond the great wall at the prism of first order, seted up diversion channels B and high -pressure drainage hole B beyond the great wall at the prism of second order, can reduce the cavitation erosion, prevent to produce on the plunger dimple, reduce cavitation wear, improve the life of plunger.

Description

A kind of plunger displacement pump with high pressure conduction hole
Technical field
This utility model relates to pump class technical field, particularly relates to a kind of have high pressure conduction hole Plunger displacement pump.
Background technology
Plunger displacement pump is an important device of hydraulic system.It relies on plunger reciprocal in the pump housing Motion, makes the volume of seal operation cavity volume change and realizes oil suction, force feed.Plunger displacement pump There is the advantages such as rated pressure height, compact conformation, efficiency height and Flow-rate adjustment convenience, by extensively General high pressure, big flow and the flow of being applied to needs the occasion of regulation, such as hydraulic press, engineering In machinery and boats and ships.
Plunger displacement pump is generally divided into single plunger pump, horizontal plunger pump, axial plunger pump and radial column Plug pump.
1, single plunger pump: single plunger pump structure composition mainly have eccentric, plunger, spring, The pump housing, two check valves.Sealed volume is formed between plunger and pump housing hole.Eccentric rotates One turn, plunger pumps once, moves downward oil suction, and move upward oil extraction.Pump The fluid volume that every revolution is discharged is referred to as discharge capacity, discharge capacity and pump structure relating to parameters.
2, horizontal plunger pump: horizontal plunger pump is to be installed side by side by several plungers, with 1 song Axle is by connecting rod slider or is pushed directly on plunger by eccentric shaft and moves reciprocatingly, it is achieved inhales, arrange The hydraulic pump of liquid.They the most all use valve type flow distribution apparatus, and are mostly dosing pump. Emulsion pump in coal mine hydraulic supporting system is typically all horizontal plunger pump.
3, axial plunger pump: axial plunger pump is piston or the vibration-direction of plunger and pump The plunger displacement pump that body central shaft is parallel.Axial plunger pump utilizes the plunger parallel with power transmission shaft at post Move back and forth what produced volume change was operated in consent.Due to plunger and plunger Hole is all circular pieces, adds the class fit that can reach the highest man-hour, therefore volumetric efficiency High.
4, d-axis swash plate plunger pump: d-axis swash plate plunger pump be divided into forced feed type and from Two kinds of oil suction type.Forced feed type hydraulic pump is mostly the fuel tank using and having air pressure, by air pressure The hydraulic oil container of fuel feeding, after starting machine every time, it is necessary to waits hydraulic pressure stain case to reach to use After air pressure, machinery could be operated.Machine, meeting is just started during such as the air pressure deficiency of hydraulic oil container Causing with piston shoes in hydraulic pump is pulled phenomenon, goes out to cause backhaul plate and pressing plate in the pump housing Heel and toe wear.
5, radial plunger pump: radial plunger pump can be divided into Flat valve and the big class of axle flow two.Valve There is the shortcomings such as fault rate is high, efficiency is low in flow distribution radial plunger pump.
6, hydraulic planger pump: hydraulic planger pump, by the hydraulic oil container of gas-pressurized, is opening every time After movement machine, it is necessary to after waiting hydraulic oil container to reach to use air pressure, machinery could be operated.
Plunger in plunger displacement pump is during realizing oil suction oil extraction at present, due to Oil shocking On the front end face of plunger, cavitation can be produced, reduce the service life of plunger.
Utility model content
This utility model is in order to overcome deficiency of the prior art, it is provided that one has high pressure The plunger displacement pump of conduction hole.
This utility model is to be achieved through the following technical solutions:
A kind of plunger displacement pump with high pressure conduction hole, including the pump housing, pump cover, described pump cover is pacified It is contained in the side of the described pump housing, in the described pump housing, offers the first plunger channel and the second plunger Passage, offers the first plunger hole and the second plunger hole in described pump cover, at described first post In plug passage, the first plunger is installed, in described second plunger channel, the second post is installed Plug, the front end face centre position of described first plunger offers drainage channel A, draws described Two oblique high pressure conduction hole A are offered on the medial wall of circulation road A;Described second post The front end face centre position of plug offers drainage channel B, in the inner side of described drainage channel B Two oblique high pressure conduction hole B are offered on wall.
As optimal technical scheme of the present utility model, described drainage channel A and drainage channel The size of B is identical.
As optimal technical scheme of the present utility model, described high pressure conduction hole A and high pressure draw The size of discharge orifice B is identical.
As optimal technical scheme of the present utility model, described first plunger hole and the first plunger Passage communicates, and described second plunger hole and the second plunger channel communicate, and described first plunger leads to The size of road and the second plunger channel is identical, described first plunger hole and the second plunger hole big Little identical.
Compared with prior art, the beneficial effects of the utility model are: this utility model leads to Cross on the first plunger, offer drainage channel A and high pressure conduction hole A, on the second plunger Offer drainage channel B and high pressure conduction hole B, it is possible to reduce cavitation erosion, prevent from producing on plunger Raw micro-hole, reduces cavitation wear, improves the service life of plunger.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, with Lower combination drawings and Examples, are further elaborated to this utility model.Should manage Solving, specific embodiment described herein only in order to explain this utility model, is not used to Limit this utility model.
Referring to Fig. 1, Fig. 1 is structural representation of the present utility model.
Described a kind of plunger displacement pump with high pressure conduction hole, including the pump housing 1, pump cover 2, described Pump cover 2 is arranged on the side of the described pump housing 1, offers the first plunger and lead in the described pump housing 1 Road 11 and the second plunger channel 12, offer the first plunger hole 21 and in described pump cover 2 Two plunger holes 22, are provided with the first plunger 111 in described first plunger channel 11, Second plunger 112, described first plunger hole 21 are installed in described second plunger channel 12 Communicate with the first plunger channel 11, described second plunger hole 22 and the second plunger channel 12 Communicating, described first plunger channel 11 is identical with the size of the second plunger channel 12, described First plunger hole 21 is identical with the size of the second plunger hole 22.
The front end face centre position of described first plunger 111 offers drainage channel A3, in institute State and on the medial wall of drainage channel A3, offer two oblique high pressure conduction hole A4;Described The front end face centre position of the second plunger 112 offers drainage channel B5, leads in described drain Two oblique high pressure conduction hole B6 are offered on the medial wall of road B5;Described drainage channel A3 is identical with the size of drainage channel B5, described high pressure conduction hole A4 and high pressure conduction hole The size of B6 is identical.By offering drainage channel A and high pressure conduction hole on the first plunger A, offers drainage channel B and high pressure conduction hole B on the second plunger, it is possible to reduce gas Erosion, prevents from producing micro-hole on plunger, reduces cavitation wear, improves the service life of plunger.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this practicality Novel, all made within spirit of the present utility model and principle any amendment, equivalent replace Change and improvement etc., within should be included in protection domain of the present utility model.

Claims (4)

1. there is a plunger displacement pump for high pressure conduction hole, including the pump housing (1), pump cover (2), described pump Lid (2) is arranged on the side of the described pump housing (1), offers the first plunger and lead in the described pump housing (1) Road (11) and the second plunger channel (12), offer the first plunger hole (21) in described pump cover (2) With the second plunger hole (22), in described first plunger channel (11), the first plunger (111) is installed, In described second plunger channel (12), the second plunger (112) is installed, it is characterised in that: described The front end face centre position of the first plunger (111) offers drainage channel A (3), leads in described drain Two oblique high pressure conduction hole A (4) are offered on the medial wall of road A (3);Described second plunger (112) front end face centre position offers drainage channel B (5), described drainage channel B (5) Medial wall on offer two oblique high pressure conduction hole B (6).
A kind of plunger displacement pump with high pressure conduction hole the most according to claim 1, it is characterised in that: Described drainage channel A (3) is identical with the size of drainage channel B (5).
A kind of plunger displacement pump with high pressure conduction hole the most according to claim 2, it is characterised in that: Described high pressure conduction hole A (4) is identical with the size of high pressure conduction hole B (6).
A kind of plunger displacement pump with high pressure conduction hole the most according to claim 1, it is characterised in that: Described first plunger hole (21) communicates with the first plunger channel (11), described second plunger hole (22) Communicate with the second plunger channel (12), described first plunger channel (11) and the second plunger channel (12) Size identical, described first plunger hole (21) is identical with the size of the second plunger hole (22).
CN201620271528.7U 2016-04-01 2016-04-01 Plunger pump with high pressure drainage hole Expired - Fee Related CN205559182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620271528.7U CN205559182U (en) 2016-04-01 2016-04-01 Plunger pump with high pressure drainage hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620271528.7U CN205559182U (en) 2016-04-01 2016-04-01 Plunger pump with high pressure drainage hole

Publications (1)

Publication Number Publication Date
CN205559182U true CN205559182U (en) 2016-09-07

Family

ID=56813767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620271528.7U Expired - Fee Related CN205559182U (en) 2016-04-01 2016-04-01 Plunger pump with high pressure drainage hole

Country Status (1)

Country Link
CN (1) CN205559182U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640624A (en) * 2016-12-11 2017-05-10 桐城市湃腾机械设计有限公司 Pump body structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640624A (en) * 2016-12-11 2017-05-10 桐城市湃腾机械设计有限公司 Pump body structure

Similar Documents

Publication Publication Date Title
CN103696921B (en) A kind of valve flow distribution radial plunger oil hydraulic pump adopting hydraulic coupling backhaul
CN102889190B (en) A kind of can the mine-used emulsion pump of automatic preparation emulsified liquid
CN201496219U (en) Pneumatic plunger pump
CN205559182U (en) Plunger pump with high pressure drainage hole
CN205559183U (en) Plunger pump of two -sided sloping cam plate
CN201568292U (en) Novel plunger pump
CN108730148B (en) A kind of double plunger fracturing pump of hydraulic-driven
CN203214314U (en) Return oil-less axial plunger pump
CN205330951U (en) Axial plunger pump
CN205349629U (en) Novel plunger pump structure
CN205559249U (en) Improve wear resistance's plunger pump
CN205714728U (en) A kind of plunger displacement pump reducing noise
CN206694341U (en) A kind of break-in tool oil path high-pressure pressure-relief valve structure
CN108425665A (en) A kind of fracturing pump of hydraulic-driven
CN205330899U (en) Double plunger pump
CN205638902U (en) Plunger with ring channel
CN203879472U (en) Automatic dosing device of oil well
CN202152718U (en) Double-acting plunger pump with low rotational speed and large discharge capacity
CN205172912U (en) Axial plunger pump with spring mounting seat
CN206206298U (en) A kind of air pressure feed flow fuel tank of auxiliary hydraulic pump self-priming
CN203175582U (en) Hydraulic control annular cavity liquid-return low-resistance integrated valve set system
CN105673375A (en) Numerical-control water hydraulic variable piston pump
CN205503431U (en) Store up bits type pump body
CN205117710U (en) Novel plunger
CN201212493Y (en) Bidirectional hydraulic supercharging mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fan Hongwei

Inventor after: Jin Minghe

Inventor before: Feng Haojie

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170602

Address after: 510663 Guangdong city of Guangzhou province Tianhe District Zhuji Road No. 61, room B201

Patentee after: Guangzhou Ming Yin Electronic Technology Co., Ltd.

Address before: 311800 Zhejiang city in Shaoxing Province town of Zhuji city shop house

Patentee before: Feng Haojie

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20200401

CF01 Termination of patent right due to non-payment of annual fee